6 resultados para Public procurement code

em Universidad Politécnica de Madrid


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper discusses a model based on the agency theory to analyze the optimal transfer of construction risk in public works contracts. The base assumption is that of a contract between a principal (public authority) and an agent (firm), where the payment mechanism is linear and contains an incentive mechanism to enhance the effort of the agent to reduce construction costs. A theoretical model is proposed starting from a cost function with a random component and assuming that both the public authority and the firm are risk averse. The main outcome of the paper is that the optimal transfer of construction risk will be lower when the variance of errors in cost forecast, the risk aversion of the firm and the marginal cost of public funds are larger, while the optimal transfer of construction risk will grow when the variance of errors in cost monitoring and the risk aversion of the public authority are larger

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The new European Standard EN 301 549 “Accessibility requirements suitable for public procurement of ICT products and services in Europe” is the response by CEN, CENELEC and ETSI to the European Commission’s Mandate 376. Today, ICT products and services are converging, and the boundaries between product categories are being constantly blurred. For that reason EN 301 549 has been drafted using a feature-based approach, instead of being based on product categories. The result is a standard that can be applied to any ICT product and service, by identifying applicable requirements depending on the features of the ICT. This demonstration presents ongoing work at the research group CETTICO of the Technical University of Madrid. CETTICO is developing a workgroup-based support tool where teams of people can annotate the result of performing a conformity assessment of a given ICT product or service according to the requirements of the EN. One of the functions of the tool is creating evaluation projects. During that task the user defines the features of the corresponding ICT product or service by answering questions presented by the tool. As a result of this process, the tool will create a list of applicable requirements and recommendations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

El propósito de este proyecto de fin de Grado es el estudio y desarrollo de una aplicación basada en Android que proporcionará soporte y atención a los servicios de transporte público existentes en Cracovia, Polonia. La principal funcionalidad del sistema será consultar la posición de un determinado autobús o tranvía y mostrar su ubicación con exactitud. Para lograr esto, necesitaremos tres fases de desarrollo. En primer lugar, deberemos implementar un sistema que obtenga las coordenadas geográficas de los vehículos de transporte público en cada instante. A continuación, tendremos que registrar todos estos datos y almacenarlos en una base de datos en un servidor web. Por último, desarrollaremos un sistema cliente que realice consultas a tiempo real sobre estos datos almacenados, obteniendo la posición para una línea determinada y mostrando su ubicación con un marcador en el mapa. Para hacer el seguimiento de los vehículos, sería necesario tener acceso a una API pública que nos proporcionase la posición registrada por los GPS que integran cada uno de ellos. Como esta API no existe actualmente para los servicios de autobús, y para los tranvías es de uso meramente privado, desarrollaremos una segunda aplicación en Android que hará las funciones del lado servidor. En ella podremos elegir mediante una simple interfaz el número de línea y un código específico que identificará a cada vehículo en particular (e.g. podemos tener 6 tranvías recorriendo la red al mismo tiempo para la línea 24). Esta aplicación obtendrá las coordenadas geográficas del teléfono móvil, lo cual incluye latitud, longitud y orientación a través del proveedor GPS. De este modo, podremos realizar una simulación de como el sistema funcionará a tiempo real utilizando la aplicación servidora desde dentro de un tranvía o autobús y, al mismo tiempo, utilizando la aplicación cliente haciendo peticiones para mostrar la información de dicho tranvía. El cliente, además, podrá consultar la ruta de cualquier línea sin necesidad de tener acceso a Internet. Almacenaremos las rutas y paradas de cada línea en la memoria del teléfono móvil utilizando ficheros XML debido al poco espacio que ocupan y a lo útil que resulta poder consultar un trayecto en cualquier momento, independientemente del acceso a la red. El usuario también podrá consultar las tablas de horarios oficiales para cada línea. Aunque en este caso si será necesaria una conexión a Internet debido a que se realizará a través de la web oficial de MPK. Para almacenar todas las coordenadas de cada vehículo en cada instante necesitaremos crear una base de datos en un servidor. Esto se resolverá mediante el uso de MYSQL y PHP. Se enviarán peticiones de tipo GET y POST a los servicios PHP que se encargarán de traducir y realizar la consulta correspondiente a la base de datos MYSQL. Por último, gracias a todos los datos recogidos relativos a la posición de los vehículos de transporte público, podremos realizar algunas tareas de análisis. Comparando la hora exacta a la que los vehículos pasaron por cada parada y la hora a la que deberían haber pasado según los horarios oficiales, podremos descubrir fallos en estos. Seremos capaces de determinar si es un error puntual debido a factores externos (atascos, averías,…) o si por el contrario, es algo que ocurre muy a menudo y se debería corregir el horario oficial. ABSTRACT The aim of this final Project (for University) is to develop an Android application thatwill provide support and feedback to the public transport services in Krakow. The main functionality of the system will be to track the position of a desired bus or tram line, and display its position on the map. To achieve this, we will need 3 stages: the first one will be to implement a system that sends the geographical position of the public transport vehicles, the second one will be to collect this data in a web server, and the last one will be to get the last location registered for the desired line and display it on the map. For tracking the vehicles, we would need to have access to a public API that should be connected with each bus/tram GPS. As this doesn’t exist in Krakow or at least is not available for public use, we will develop a second android application that will do the server side job. We will be able to choose in a simple interface the line number and a code letter to identify each vehicle (e.g. we can have 6 trams that belong to the line number 24 working at the same time). It will take the current mobile geolocation; this includes getting latitude, longitude and bearing from the GPS provider. Thus, we will be able to make a simulation of how the system works in real time by using the server app inside a tram and at the same time, using the client app and making requests to display the information of that tram. The client will also be able to check the path of the desired line without internet access. We will store the path and stops for each line locally in the phone memory using xml files due to the few requirements of available space it needs and the usefulness of checking a path when needed. This app will also offer the functionality of checking the timetable for the line, but in this case, it will link to the official Mpk website, so Internet access will be required. For storing all the coordinates for each vehicle at every moment we will need to create a database on a server. We have decided that the easiest way is to use Mysql and PHP for the deployment of the service. We will send GET and POST requests to the php files and those files will make the according queries to our database. Finally, based on all the collected data, we will be able to get some information about errors in the system of public transport timetables. We will check at what time a line was in each specific stop and compare it with the official timetable to find mistakes of time. We will determine if it is something that happens occasionally and related to external factors (e.g. traffic jams, breakdowns…) or if on the other hand, it is something that happens very often and the public transport timetables should be looked over and corrected.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this paper we present a global overview of the recent study carried out in Spain for the new hazard map, which final goal is the revision of the Building Code in our country (NCSE-02). The study was carried our for a working group joining experts from The Instituto Geografico Nacional (IGN) and the Technical University of Madrid (UPM) , being the different phases of the work supervised by an expert Committee integrated by national experts from public institutions involved in subject of seismic hazard. The PSHA method (Probabilistic Seismic Hazard Assessment) has been followed, quantifying the epistemic uncertainties through a logic tree and the aleatory ones linked to variability of parameters by means of probability density functions and Monte Carlo simulations. In a first phase, the inputs have been prepared, which essentially are: 1) a project catalogue update and homogenization at Mw 2) proposal of zoning models and source characterization 3) calibration of Ground Motion Prediction Equations (GMPE’s) with actual data and development of a local model with data collected in Spain for Mw < 5.5. In a second phase, a sensitivity analysis of the different input options on hazard results has been carried out in order to have criteria for defining the branches of the logic tree and their weights. Finally, the hazard estimation was done with the logic tree shown in figure 1, including nodes for quantifying uncertainties corresponding to: 1) method for estimation of hazard (zoning and zoneless); 2) zoning models, 3) GMPE combinations used and 4) regression method for estimation of source parameters. In addition, the aleatory uncertainties corresponding to the magnitude of the events, recurrence parameters and maximum magnitude for each zone have been also considered including probability density functions and Monte Carlo simulations The main conclusions of the study are presented here, together with the obtained results in terms of PGA and other spectral accelerations SA (T) for return periods of 475, 975 and 2475 years. The map of the coefficient of variation (COV) are also represented to give an idea of the zones where the dispersion among results are the highest and the zones where the results are robust.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper describes a theoretical model based primarily on transaction costs, for comparing the various tendering mechanisms used for transportation Public-Private Partnership (PPP) projects. In particular, the model contrasts negotiated procedures with the open procedure, as defined by the current European Union legislation on public tendering. The model includes both ex ante transaction costs (borne during the tendering stage) and ex post transaction costs (such as enforcement costs, re-negotiation costs, and costs arising from litigation between partners), explaining the trade-off between them. Generally speaking, it is assumed that the open procedure implies lower transaction costs ex ante, while the negotiated procedure reduces the probability of the appearance of new contingencies not foreseen in the contract, hence diminishing the expected value of transaction costs ex post. Therefore, the balance between ex ante and ex post transaction costs is the main criterion for deciding whether the open or negotiated procedure would be optimal. Notwithstanding, empirical evidence currently exists only on ex ante transaction costs in transportation infrastructure projects. This evidence has shown a relevant difference between the two procedures as far as ex ante costs are concerned, favouring the open procedure. The model developed in this paper also demonstrates that a larger degree of complexity in a contract does not unequivocally favour the use of a negotiated procedure. Only in those cases dealing with very innovative projects, where important dimensions of the quality of the asset or service are not verifiable, may we observe an advantage in favour of the negotiated procedure. The bottom line is that we find it difficult to justify the employment of negotiated procedures in most transportation PPP contracts, especially in the field of roads. Nevertheless, the field remains open for future empirical work and research on the levels of transaction costs borne ex post in PPP contracts, as well as on the probabilities of such costs appearing under any of the procurement procedures.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Customer Satisfaction Surveys (CSS) have become an important tool for public transport planners, as improvements in the perceived quality of service lead to greater use of public transport and lower traffic pollution. Until now, Intelligent Transportation System (ITS) enhancements in public transport have traditionally included fleet management systems based on Automatic Vehicle Location (AVL) technologies, which can be used to optimize routing and scheduling, and to feed real-time information into passenger information channels. However, surveys of public transport users could also benefit from the new information technologies. As most customers carry their smartphones when traveling, Quick Response (QR) codes open up the possibility of conducting these surveys at a lower cost.This paper contributes to the limited existing literature by developing the analysis of QR codes applied to CSS in public transport and highlighting their importance in reducing the cost of data collection and processing. The added value of this research is that it provides the first assessment of a real case study in Madrid (Spain) using QR codes for this purpose. This pilot experience was part of a research project analyzing bus service quality in the same case study, so the QR code survey (155 valid questionnaires) was validated using a conventional face-to-face survey (520 valid questionnaires). The results show clearly that, after overcoming a few teething troubles, this QR code application will ultimately provide transport management with a useful tool to reduce survey costs