21 resultados para Private Sphere
em Universidad Politécnica de Madrid
Resumo:
Public Private Partnerships (PPPs) are mostly implemented to circumvent budgetary constraints, and to encourage efficiency and quality in the provision of public infrastructure in order to reach social welfare. One of the ways of reaching the latter objective is by the introduction of performance based standards tied to bonuses and penalties to reward or punish the performance of the contractor. This paper focuses on the implementation of safety based incentives in PPPs in such a way that the better the safety outcome the greater larger will be the economic reward to the contractor. The main aim of this paper is to identify whether the incentives to improve road safety in PPPs are ultimately effective in improving safety ratios in Spain. To that end, Poisson and negative binomial regression models have been applied using information of motorways of the Spanish network of 2006. The findings indicate that even though road safety is highly influenced by variables that are not much controllable by the contractor such as the Average Annual Daily Traffic and the percentage of heavy vehicles, the implementation of safety incentives in PPPs has a positive influence in the reduction of fatalities, injuries and accidents.
Resumo:
Neutron spectra unfolding and dose equivalent calculation are complicated tasks in radiation protection, are highly dependent of the neutron energy, and a precise knowledge on neutron spectrometry is essential for all dosimetry-related studies as well as many nuclear physics experiments. In previous works have been reported neutron spectrometry and dosimetry results, by using the ANN technology as alternative solution, starting from the count rates of a Bonner spheres system with a LiI(Eu) thermal neutrons detector, 7 polyethylene spheres and the UTA4 response matrix with 31 energy bins. In this work, an ANN was designed and optimized by using the RDANN methodology for the Bonner spheres system used at CIEMAT Spain, which is composed of a He neutron detector, 12 moderator spheres and a response matrix for 72 energy bins. For the ANN design process a neutrons spectra catalogue compiled by the IAEA was used. From this compilation, the neutrons spectra were converted from lethargy to energy spectra. Then, the resulting energy ?uence spectra were re-binned by using the MCNP code to the corresponding energy bins of the He response matrix before mentioned. With the response matrix and the re-binned spectra the counts rate of the Bonner spheres system were calculated and the resulting re-binned neutrons spectra and calculated counts rate were used as the ANN training data set.
Resumo:
This paper shows the results of a research aimed to formulate a general model for supporting the implementation and management of an urban road pricing scheme. After a preliminary work, to define the state of the art in the field of sustainable urban mobility strategies, the problem has been theoretically set up in terms of transport economy, introducing the external costs’ concept duly translated into the principle of pricing for the use of public infrastructures. The research is based on the definition of a set of direct and indirect indicators to qualify the urban areas by land use, mobility, environmental and economic conditions. These indicators have been calculated for a selected set of typical urban areas in Europe on the basis of the results of a survey carried out by means of a specific questionnaire. Once identified the most typical and interesting applications of the road pricing concept in cities such as London (Congestion Charging), Milan (Ecopass), Stockholm (Congestion Tax) and Rome (ZTL), a large benchmarking exercise and the cross analysis of direct and indirect indicators, has allowed to define a simple general model, guidelines and key requirements for the implementation of a pricing scheme based traffic restriction in a generic urban area. The model has been finally applied to the design of a road pricing scheme for a particular area in Madrid, and to the quantification of the expected results of its implementation from a land use, mobility, environmental and economic perspective.
Resumo:
Many countries around the world are implementing Public?Private?Partnership (PPP) contacts to manage road infrastructure. In some of these contracts the public sector introduces economic incentives to the private operator to foster the accomplishment of social goals. One of the incentives that have been introduced in some PPP contracts is related to safety in such a way that the better the safety outcome the greater will be the economic reward to the contractor. The aim of this paper is at identify whether the incentives to improve road safety in highway PPPs are ultimately effective in improving safety ratios. To this end Poisson and negative binomial regression models have been applied using information from highway sections in Spain. The findings indicate that even though road safety is highly influenced by variables that are not much controllable by the contractor such as the Average Annual Daily Traffic and the percentage of heavy vehicles, the implementation of safety incentives in PPPs has a positive influence in the reduction of fatalities, injuries and accidents.
Resumo:
The aim of this paper is to call into question those typologies conventionally used in developing the post-industrial urban fabric (streets, cityblocks, slabs, etc.), often catering to urban designs based on speculative interests and completely overlooking community interests. By defining the concepts of ?postpublic space? and ?reversible urban entities? and illustrating them with an exemplary case of Spanish residential architecture from the 1960s, we establish one possible way of tackling contemporary urban-residential projects. This alternative approach considers the relationship between residential systems and open space systems and promotes the continuity and/or alternation of scales between house and city in an effort to improve the urban quality of life for residents and external users.
Resumo:
This master thesis is intended to perform an exploratory approach for the potential to Public-Private Partnerships as a tool for advanced collaboration between businesses and the cooperation system in the specific context of humanitarian action. It intends to conduct a case study analysis of representative interactions between the public and private actors in the humanitarian aid, and in conjunction with a profound revision of the existing literature, creates a set of conclusions and recommendations that can serve as a prototype for possible inclusion guide the private sector in humanitarian action through new paradigms that go beyond the classical donor-recipient model.
Resumo:
Use of a spherical grid as electron collector at the anodic end of a tether, as recently proposed, is considered. The standard analysis of space-charge limited current to a solid sphere (with neither magnetic nor plasma-motion effects), which has been shown to best fit TSS1R in-orbit results at very high bias, is used to determine effects from grid transparency on current collected; the analysis is first reformulated in the formalism recently introduced in the two-dimensional analysis of bare-tethers. A discussion of the electric potential created by a spherical grid in vacuum is then carried out; it is shown that each grid-wire collects current well below its maximum OML current, the effective grid transparency being close to its optical value. Formulae for the current to a spherical grid, showing the effects of grid transparency, is determined. A fully consistent analysis of electric potential and electron density, outside and inside the grid, is completed.
Resumo:
Cloud computing and, more particularly, private IaaS, is seen as a mature technology with a myriad solutions tochoose from. However, this disparity of solutions and products has instilled in potential adopters the fear of vendor and data lock-in. Several competing and incompatible interfaces and management styles have given even more voice to these fears. On top of this, cloud users might want to work with several solutions at the same time, an integration that is difficult to achieve in practice. In this paper, we propose a management architecture that tries to tackle these problems; it offers a common way of managing several cloud solutions, and an interface that can be tailored to the needs of the user. This management architecture is designed in a modular way, and using a generic information model. We have validated our approach through the implementation of the components needed for this architecture to support a sample private IaaS solution: OpenStack
Resumo:
The size and complexity of cloud environments make them prone to failures. The traditional approach to achieve a high dependability for these systems relies on constant monitoring. However, this method is purely reactive. A more proactive approach is provided by online failure prediction (OFP) techniques. In this paper, we describe a OFP system for private IaaS platforms, currently under development, that combines di_erent types of data input, including monitoring information, event logs, and failure data. In addition, this system operates at both the physical and virtual planes of the cloud, taking into account the relationships between nodes and failure propagation mechanisms that are unique to cloud environments.
Resumo:
Since the mid 80ies the Trans ‐European Transport Network (TEN‐T) policy has been setting the framework for the development of infrastructure for the smooth functioning of the internal market within the European Union (EU). Public Private Partnerships (PPPs) have always been regarded by the EU as a key instrument to promote the TEN‐T.
Resumo:
OUTLINE: • Introduction • Experimental Setup • Experimental Procedure • Experimental Results - Surface Roughness - Residual Stresses - Friction - Wear - EDX • Conclusions
Resumo:
Cloud computing and, more particularly, private IaaS, is seen as a mature technol- ogy with a myriad solutions to choose from. However, this disparity of solutions and products has instilled in potential adopters the fear of vendor and data lock- in. Several competing and incompatible interfaces and management styles have increased even more these fears. On top of this, cloud users might want to work with several solutions at the same time, an integration that is difficult to achieve in practice. In this Master Thesis I propose a management architecture that tries to solve these problems; it provides a generalized control mechanism for several cloud infrastructures, and an interface that can meet the requirements of the users. This management architecture is designed in a modular way, and using a generic infor- mation model. I have validated the approach through the implementation of the components needed for this architecture to support a sample private IaaS solution: OpenStack.
Resumo:
This paper describes a theoretical model based primarily on transaction costs, for comparing the various tendering mechanisms used for transportation Public-Private Partnership (PPP) projects. In particular, the model contrasts negotiated procedures with the open procedure, as defined by the current European Union legislation on public tendering. The model includes both ex ante transaction costs (borne during the tendering stage) and ex post transaction costs (such as enforcement costs, re-negotiation costs, and costs arising from litigation between partners), explaining the trade-off between them. Generally speaking, it is assumed that the open procedure implies lower transaction costs ex ante, while the negotiated procedure reduces the probability of the appearance of new contingencies not foreseen in the contract, hence diminishing the expected value of transaction costs ex post. Therefore, the balance between ex ante and ex post transaction costs is the main criterion for deciding whether the open or negotiated procedure would be optimal. Notwithstanding, empirical evidence currently exists only on ex ante transaction costs in transportation infrastructure projects. This evidence has shown a relevant difference between the two procedures as far as ex ante costs are concerned, favouring the open procedure. The model developed in this paper also demonstrates that a larger degree of complexity in a contract does not unequivocally favour the use of a negotiated procedure. Only in those cases dealing with very innovative projects, where important dimensions of the quality of the asset or service are not verifiable, may we observe an advantage in favour of the negotiated procedure. The bottom line is that we find it difficult to justify the employment of negotiated procedures in most transportation PPP contracts, especially in the field of roads. Nevertheless, the field remains open for future empirical work and research on the levels of transaction costs borne ex post in PPP contracts, as well as on the probabilities of such costs appearing under any of the procurement procedures.
Resumo:
The current deficit situation of the Spanish airport system suggests the need to manage this in a more efficient and profitable way. One of the possible options is through private management and being able to do this through Public Private Partnerships (PPP). This study analyzes the situation of the sector and its economic importance and the different possibilities for introducing private management in a public company, specifying the situation in the case of airports, presenting the advantages and disadvantages of these possibilities, and aiming at results obtained in other places where it has been applied. It is proposed that the ideal model for the introduction of private management would be through PPP models tailored to each airport, but having common characteristics according to the group they belong to. Finally, we observe that not all airports are commercially attractive, so that the PPP concept does not apply to all of them. In some cases even the operability itself is not viable at all, and that should be considered separately in order to avoid creating a private monopoly while trying to enhance competition among them.