7 resultados para Practice construction

em Universidad Politécnica de Madrid


Relevância:

40.00% 40.00%

Publicador:

Resumo:

The construction industry, one of the most important ones in the development of a country, generates unavoidable impacts on the environment. The social demand towards greater respect for the environment is a high and general outcry. Therefore, the construction industry needs to reduce the impact it produces. Proper waste management is not enough; we must take a further step in environmental management, where new measures need to be introduced for the prevention at source, such as good practices to promote recycling. Following the amendment of the legal frame applicable to Construction and Demolition Waste (C&D waste), important developments have been incorporated in European and International laws, aiming to promote the culture of reusing and recycling. This change of mindset, that is progressively taking place in society, is allowing for the consideration of C&D waste no longer as an unusable waste, but as a reusable material. The main objective of the work presented in this paper is to enhance C&D waste management systems through the development of preventive measures during the construction process. These measures concern all the agents intervening in the construction process as only the personal implication of all of them can ensure an efficient management of the C&D waste generated. Finally, a model based on preventive measures achieves organizational cohesion between the different stages of the construction process, as well as promoting the conservation of raw materials through the use and waste minimization. All of these in order to achieve a C&D waste management system, whose primary goal is zero waste generation

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Inside COBRA 2011 RICS International Research Conference, the present paper is linked to analyze the liability of the construction professional in his practice as a expert witness in the Spanish legal framework. In a large number of legal procedures related to the building it is necessary the intervention of the expert witness to report on the subject of litigation, and to give an opinion about possible causes and solutions. This field is increasingly importantly for the practice of construction professional that requires an important specialization. The expert provides his knowledge to the judge in the matter he is dealing with (construction, planning, assessment, legal, ...), providing arguments or reasons as the base for his case and acting as part of the evidence. Although the importance of expert intervention in the judicial process, the responsibilities arising from their activity is a slightly studied field. Therefore, the study has as purpose to think about the regulation of professional activities raising different aims. The first is to define the action of the construction professional-expert witness and the need for expert evidence, establishing the legal implications of this professional activity. The different types of responsibilities (the civil, criminal and administrative) have been established as well as the economic, penal or disciplinary damages that can be derived from the expert report

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The traditional teaching methods used for training civil engineers are currently being called into question as a result of the new knowledge and skills now required by the labor market. In addition, the European Higher Education Area is requesting that students be given a greater say in their learning. In the subject called Construction and Building Materials at the Civil Engineering School of the Universidad Politécnica de Madrid, a path was set three academic years ago to lead to an improvement in traditional teaching by introducing active methodologies. The innovations are based on cooperative learning, new technologies, and continuous assessment. The writers’ proposal is to offer their experience as a contribution to the debate on how students can be encouraged to acquire the skills currently demanded from a civil engineer, though not overlooking solid, top-quality training. From the outcomes obtained, it can be concluded that using new teaching techniques to supplement a traditional approach provides more opportunities for students to learn while boosting their motivation. In our case, the introduction of these changes has resulted in an increased pass rate of 29% on average, when such a figure is considered in the light of the mean value of passes during the last decade.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The authors are from UPM and are relatively grouped, and all have intervened in different academic or real cases on the subject, at different times as being of different age. With precedent from E. Torroja and A. Páez in Madrid Spain Safety Probabilistic models for concrete about 1957, now in ICOSSAR conferences, author J.M. Antón involved since autumn 1967 for euro-steel construction in CECM produced a math model for independent load superposition reductions, and using it a load coefficient pattern for codes in Rome Feb. 1969, practically adopted for European constructions, giving in JCSS Lisbon Feb. 1974 suggestion of union for concrete-steel-al.. That model uses model for loads like Gumbel type I, for 50 years for one type of load, reduced to 1 year to be added to other independent loads, the sum set in Gumbel theories to 50 years return period, there are parallel models. A complete reliability system was produced, including non linear effects as from buckling, phenomena considered somehow in actual Construction Eurocodes produced from Model Codes. The system was considered by author in CEB in presence of Hydraulic effects from rivers, floods, sea, in reference with actual practice. When redacting a Road Drainage Norm in MOPU Spain an optimization model was realized by authors giving a way to determine the figure of Return Period, 10 to 50 years, for the cases of hydraulic flows to be considered in road drainage. Satisfactory examples were a stream in SE of Spain with Gumbel Type I model and a paper of Ven Te Chow with Mississippi in Keokuk using Gumbel type II, and the model can be modernized with more varied extreme laws. In fact in the MOPU drainage norm the redacting commission acted also as expert to set a table of return periods for elements of road drainage, in fact as a multi-criteria complex decision system. These precedent ideas were used e.g. in wide Codes, indicated in symposia or meetings, but not published in journals in English, and a condensate of contributions of authors is presented. The authors are somehow involved in optimization for hydraulic and agro planning, and give modest hints of intended applications in presence of agro and environment planning as a selection of the criteria and utility functions involved in bayesian, multi-criteria or mixed decision systems. Modest consideration is made of changing in climate, and on the production and commercial systems, and on others as social and financial.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Software Product Line Engineering (SPLE) has proved to have significant advantages in family-based software development, but also implies the up¬front design of a product-line architecture (PLA) from which individual product applications can be engineered. The big upfront design associated with PLAs is in conflict with the current need of "being open to change". However, the turbulence of the current business climate makes change inevitable in order to stay competitive, and requires PLAs to be open to change even late in the development. The trend of "being open to change" is manifested in the Agile Software Development (ASD) paradigm, but it is spreading to the domain of SPLE. To reduce the big upfront design of PLAs as currently practiced in SPLE, new paradigms are being created, one being Agile Product Line Engineering (APLE). APLE aims to make the development of product-lines more flexible and adaptable to changes as promoted in ASD. To put APLE into practice it is necessary to make mechanisms available to assist and guide the agile construction and evolution of PLAs while complying with the "be open to change" agile principle. This thesis defines a process for "the agile construction and evolution of product-line architectures", which we refer to as Agile Product-Line Archi-tecting (APLA). The APLA process provides agile architects with a set of models for describing, documenting and tracing PLAs, as well as an algorithm to analyze change impact. Both the models and the change impact analysis offer the following capabilities: Flexibility & adaptability at the time of defining software architectures, enabling change during the incremental and iterative design of PLAs (anticipated or planned changes) and their evolution (unanticipated or unforeseen changes). Assistance in checking architectural integrity through change impact analysis in terms of architectural concerns, such as dependencies on earlier design decisions, rationale, constraints, and risks, etc.Guidance in the change decision-making process through change im¬pact analysis in terms of architectural components and connections. Therefore, APLA provides the mechanisms required to construct and evolve PLAs that can easily be refined iteration after iteration during the APLE development process. These mechanisms are provided in a modeling frame¬work called FPLA. The contributions of this thesis have been validated through the conduction of a project regarding a metering management system in electrical power networks. This case study took place in an i-smart software factory and was in collaboration with the Technical University of Madrid and Indra Software Labs. La Ingeniería de Líneas de Producto Software (Software Product Line Engi¬neering, SPLE) ha demostrado tener ventajas significativas en el desarrollo de software basado en familias de productos. SPLE es un paradigma que se basa en la reutilización sistemática de un conjunto de características comunes que comparten los productos de un mismo dominio o familia, y la personalización masiva a través de una variabilidad bien definida que diferencia unos productos de otros. Este tipo de desarrollo requiere el diseño inicial de una arquitectura de línea de productos (Product-Line Architecture, PLA) a partir de la cual los productos individuales de la familia son diseñados e implementados. La inversión inicial que hay que realizar en el diseño de PLAs entra en conflicto con la necesidad actual de estar continuamente "abierto al cam¬bio", siendo este cambio cada vez más frecuente y radical en la industria software. Para ser competitivos es inevitable adaptarse al cambio, incluso en las últimas etapas del desarrollo de productos software. Esta tendencia se manifiesta de forma especial en el paradigma de Desarrollo Ágil de Software (Agile Software Development, ASD) y se está extendiendo también al ámbito de SPLE. Con el objetivo de reducir la inversión inicial en el diseño de PLAs en la manera en que se plantea en SPLE, en los último años han surgido nuevos enfoques como la Ingeniera de Líneas de Producto Software Ágiles (Agile Product Line Engineering, APLE). APLE propone el desarrollo de líneas de producto de forma más flexible y adaptable a los cambios, iterativa e incremental. Para ello, es necesario disponer de mecanismos que ayuden y guíen a los arquitectos de líneas de producto en el diseño y evolución ágil de PLAs, mientras se cumple con el principio ágil de estar abierto al cambio. Esta tesis define un proceso para la "construcción y evolución ágil de las arquitecturas de lineas de producto software". A este proceso se le ha denominado Agile Product-Line Architecting (APLA). El proceso APLA proporciona a los arquitectos software un conjunto de modelos para de¬scribir, documentar y trazar PLAs, así como un algoritmo para analizar vel impacto del cambio. Los modelos y el análisis del impacto del cambio ofrecen: Flexibilidad y adaptabilidad a la hora de definir las arquitecturas software, facilitando el cambio durante el diseño incremental e iterativo de PLAs (cambios esperados o previstos) y su evolución (cambios no previstos). Asistencia en la verificación de la integridad arquitectónica mediante el análisis de impacto de los cambios en términos de dependencias entre decisiones de diseño, justificación de las decisiones de diseño, limitaciones, riesgos, etc. Orientación en la toma de decisiones derivadas del cambio mediante el análisis de impacto de los cambios en términos de componentes y conexiones. De esta manera, APLA se presenta como una solución para la construcción y evolución de PLAs de forma que puedan ser fácilmente refinadas iteración tras iteración de un ciclo de vida de líneas de producto ágiles. Dicha solución se ha implementado en una herramienta llamada FPLA (Flexible Product-Line Architecture) y ha sido validada mediante su aplicación en un proyecto de desarrollo de un sistema de gestión de medición en redes de energía eléctrica. Dicho proyecto ha sido desarrollado en una fábrica de software global en colaboración con la Universidad Politécnica de Madrid e Indra Software Labs.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Within the last century the interest in wind-induced loads over civil engineering structures has become more and more important, the reason being that the development of new construction techniques and materials has allowed engineers and architects to design new structures far from the traditional concepts, and in many cases wind actions over these singular structures are not included in the existing codes of practice. In this paper the windinduced static loads over bridges constructed by the double cantilever method during erection stages are considered. The aerodynamic load over a double cantilever bridge under a yawing-angled wind produces a yawing (torsional) moment on the bridge deck, which can lead to undesirable rotation of the deck about the supporting pier. The effects of the wind yaw angle and the length of the deck are analysed. The wind action caused by the presence of sliding concrete forms at the ends of the deck is also studied.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The difficulty of dealing with construction and demolition waste (CDW) on construction sites is not new and continues to be a significant environmental problem. Currently the CDW collection system in Spain is done in a decentralized manner by each sub-contracted company, being necessary to implement effective waste management measures ensuring a correct management and minimization. During the last years several measures have been launched in order to improve and encourage the reuse and recycling of CDW. A widespread solution for CDW recovery is using them as a landscaping aggregate or for road bases and sub-bases. However, measures encouraging onsite prevention still need to be enhanced. This paper studies the major work stage generating CDW and analyses the categories of CDW produced during its execution. For this, several real building sites have been analysed in order to quantify the estimation of CDW generated. Results of this study show that a significant contributor to the CDW generation on building construction sites in Spain are the masonry works. Finally, a Best Practices Manual (BPM) is proposed containing several strategies on masonry works aimed not only at CDW prevention, but also at improving their management and minimization. The use of this BPM together with the Study and Plan of CDW management --required by law--, promotes the environmental management of the company, favouring the cohesion of the construction process organization at all stages giving rise to establishing responsibilities in the field of waste and providing a greater control over the process. Keywords: construction and demolition waste, management, masonry works, good practice measures, prevention.