4 resultados para Obligations of medical researchers

em Universidad Politécnica de Madrid


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Background. Over the last years, the number of available informatics resources in medicine has grown exponentially. While specific inventories of such resources have already begun to be developed for Bioinformatics (BI), comparable inventories are as yet not available for Medical Informatics (MI) field, so that locating and accessing them currently remains a hard and time-consuming task. Description. We have created a repository of MI resources from the scientific literature, providing free access to its contents through a web-based service. Relevant information describing the resources is automatically extracted from manuscripts published in top-ranked MI journals. We used a pattern matching approach to detect the resources? names and their main features. Detected resources are classified according to three different criteria: functionality, resource type and domain. To facilitate these tasks, we have built three different taxonomies by following a novel approach based on folksonomies and social tagging. We adopted the terminology most frequently used by MI researchers in their publications to create the concepts and hierarchical relationships belonging to the taxonomies. The classification algorithm identifies the categories associated to resources and annotates them accordingly. The database is then populated with this data after manual curation and validation. Conclusions. We have created an online repository of MI resources to assist researchers in locating and accessing the most suitable resources to perform specific tasks. The database contained 282 resources at the time of writing. We are continuing to expand the number of available resources by taking into account further publications as well as suggestions from users and resource developers.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the year 1999 approves the Law of Construction Building (LOE, in Spanish) to regulate a sector such as construction, which contained some shortcomings from the legal point of view. Currently, the LOE has been in force 12 years, changing the spanish world of the construction, due to influenced by internationalization. Within the LOE, there regulating the different actors involved in the construction building, as the Projects design, the Director of Construction, the developer, The builder, Director of execution of the construction (actor only in Spain, similar as construcion engineer and abroad in), control entities and the users, but lacks figure Project manager will assume the delegation of the promoter helping and you organize, direct and management the process. This figure assumes that the market and contracts are not legally regulated in Spain, then should define and establish its regulation in the LOE. (Spain Construction Law) The translation in spanish of the words "Project Manager is owed to Professor Rafael de Heredia in his book Integrated Project Management, as agent acting on behalf of the organization and promoter assuming control of the project, ie Integraded Project Management . Already exist in Spain, AEDIP (Spanish Association Integrated of Project Construction management) which comprises the major companies in “Project Management” in Spain, and MeDIP (Master in Integrated Construction Project) the largest and most advanced studies at the Polytechnic University of Madrid, in "Construction Project Management" they teach which is also in Argentina. The Integrated Project ("Project Management") applied to the construction process is a methodological technique that helps to organize, control and manage the resources of the promoters in the building process. When resources are limited (which is usually most situations) to manage them efficiently becomes very important. Well, we find that in this situation, the resources are not only limited, but it is limited, so a comprehensive control and monitoring of them becomes not only important if not crucial. The alternative of starting from scratch with a team that specializes in developing these follow directly intervening to ensure that scarce resources are used in the best possible way requires the use of a specific methodology (Manual DIP, Matrix Foreign EDR breakdown structure EDP Project, Risk Management and Control, Design Management, et ..), that is the methodology used by "Projects managers" to ensure that the initial objectives of the promoters or investors are met and all actors in process, from design to construction company have the mind aim of the project will do, trying to get their interests do not prevail over the interests of the project. Among the agents listed in the building process, "Project Management" or DIPE (Director Comprehensive building process, a proposed name for possible incorporation into the LOE, ) currently not listed as such in the LOE (Act on Construction Planning ), one of the agents that exist within the building process is not regulated from the legal point of view, no obligations, ie, as is required by law to have a project, a builder, a construction management, etc. DIPE only one who wants to hire you as have been advanced knowledge of their services by the clients they have been hiring these agents, there being no legal obligation as mentioned above, then the market is dictating its ruling on this new figure, as if it were necessary, he was not hired and eventually disappeared from the building process. As the aim of this article is regular the process and implement the name of DIPE in the Spanish Law of buildings construction (LOE)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Institute of Tropical Medicine in Antwerp hereby presents the results of two pilot distance learning training programmes, developed under the umbrella of the AFRICA BUILD project (FP7). The two courses focused on evidence-based medicine (EBM): with the aim of enhancing research and education, via novel approaches and to identify research needs emanating from the field. These pilot experiences, which were run both in English-speaking (Ghana), and French-speaking (Mali and Cameroon) partner institutions, produced targeted courses for the strengthening of research methodology and policy. The courses and related study materials are in the public domain and available through the AFRICA BUILD Portal (http://www.africabuild.eu/taxonomy/term/37); the training modules were delivered live via Dudal webcasts. This paper assesses the success and difficulties of transferring EBM skills with these two specific training programmes, offered through three different approaches: fully online facultative courses, fully online tutor supported courses or through a blended approach with both online and face-to-face sessions. Key factors affecting the selection of participants, the accessibility of the courses, how the learning resources are offered, and how interactive online communities are formed, are evaluated and discussed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Recent commentaries have proposed the advantages of using open exchange of data and informatics resources for improving health-related policies and patient care in Africa. Yet, in many African regions, both private medical and public health information systems are still unaffordable. Open exchange over the social Web 2.0 could encourage more altruistic support of medical initiatives. We have carried out some experiments to demonstrate the feasibility of using this approach to disseminate open data and informatics resources in Africa. After the experiments we developed the AFRICA BUILD Portal, the first Social Network for African biomedical researchers. Through the AFRICA BUILD Portal users can access in a transparent way to several resources. Currently, over 600 researchers are using distributed and open resources through this platform committed to low connections.