5 resultados para Net expected return
em Universidad Politécnica de Madrid
Resumo:
Is it profitable for an investor, from a risk-return perspective, to acquire a stake in a quoted company when a capital increase is announced? This paper analyses the return obtained from the investment in equity issues with cash contribution and pre-emptive rights, aimed at funding corporate activities: acquisitions, investments in new facilities and/or strengthening the balance sheet of the companies undertaking the equity issue. During the 16 years covered by the study, the results show a negative average excess risk-adjusted return of almost 5%, from the moment that the equity offer is announced until the completion of the preferential subscription period. To obtain this excess return, the difference between the nominal Internal Rate of Return (IRR) and the expected return, using the CAPM, is computed for each equity issue. The intention behind this method is to eliminate the effects of time and any other possible effect on the stock price during the period of the analysis.The results from this article are consistent with the Pecking Order theory for the Spanish Stock Market also six months after the preferential subscription period. However, there is a positive return after three months.
Resumo:
El objetivo de esta tesis doctoral es averiguar si el anuncio por parte del accionista significativo de ejercitar su derecho de suscripción preferente elimina o reduce la asimetría de información en las ampliaciones de capital con derecho de suscripción preferente en el Mercado de Valores español. Durante los 17 años analizados, encontramos que ni el anuncio de la ampliación de capital ni el tipo de aseguramiento acordado en cada ampliación tienen un impacto estadísticamente significativo en el Exceso de Rentabilidad Ajustada por Riesgo. Principalmente, el análisis realizado utiliza la información requerida por la Comisión Nacional del Mercado de Valores (CNMV) que deben aportar los accionistas significativos en el Folleto de emisión publicado con carácter previo a la ampliación. Esta investigación desglosa las ofertas en un Grupo 1, el cual incluye aquéllas en las que los accionistas significativos anuncian su intención de ejercitar su derecho en las emisiones, y el Grupo 2, que incluye aquéllas en donde no acuden o simplemente no existía información al respecto ya que no es una información obligatoria a incluir en el Folleto. Para cada ampliación de capital y para tres periodos de tiempo distintos se obtiene el Exceso de Rentabilidad Ajustada por Riesgo (ERAR) como la diferencia entre la Tasa Interna de Retorno y el Retorno Esperado, utilizando el modelo CAPM. De este modo, se trata de aislar el efecto temporal. La principal contribución de esta tesis doctoral es el hallazgo de una rentabilidad negativa estadísticamente significativa cuando el accionista significativo anuncia su intención de no suscribir la ampliación, o no existe información suficiente sobre su intención a este respecto. Adicionalmente, el análisis que se ha llevado a cabo en este estudio muestra un refuerzo estadísticamente significativo de este efecto negativo en la rentabilidad cuando existe simultáneamente una falta de compromiso por parte del accionista significativo y la ampliación no está asegurada. ABSTRACT The aim of this doctoral dissertation is to find out whether or not consideration of significant shareholders announcement of intention to exercise subscription rights makes a difference in eliminating or reducing the effects of asymmetrical information in equity offerings with pre-emptive rights on the Spanish Stock Market. For the 17 years of equity issues covered, we find that neither equity issue announcements nor the type of underwriting arrangements has a statistically significant impact on the issues’ Excess Risk Adjusted Return. The analysis uses the information required by CNMV (Spanish equivalent to SEC) to be provided by the significant shareholders in the equity issue’s prospectus. The doctoral dissertation breaks the offerings down into Group 1, in which the significant shareholders indicated their intention to subscribe, and Group 2, for which there was not enough information provided as to their intentions. For each equity issue, Excess Risk Adjusted Return (ERAR) is obtained, for three different periods, as is the difference between nominal Internal Rate of Return and expected return, using the CAPM. By subtracting the expected return from the IRR, the effect of time or any other variable influencing the stock price during the period, aside from the equity issue, should, in principle, be removed. The main contribution of this study is the finding of a statistically significant negative impact on returns either when the significant shareholders indicate their intention not to subscribe, or when not enough information is provided about their intention. We also find a statistically significant reinforcing negative effect on returns in the case of simultaneous lack of commitment on the part of significant shareholders, and non-underwritten equity issues.
Resumo:
The Universidad Politécnica of Madrid (UPM) includes schools and faculties that were for engineering degrees, architecture and computer science, that are now in a quick EEES Bolonia Plan metamorphosis getting into degrees, masters and doctorate structures. They are focused towards action in machines, constructions, enterprises, that are subjected to machines, human and environment created risks. These are present in actions such as use loads, wind, snow, waves, flows, earthquakes, forces and effects in machines, vehicles behavior, chemical effects, and other environmental factors including effects of crops, cattle and beasts, forests, and varied essential economic and social disturbances. Emphasis is for authors in this session more about risks of natural origin, such as for hail, winds, snow or waves that are not exactly known a priori, but that are often considered with statistical expected distributions giving extreme values for convenient return periods. These distributions are known from measures in time, statistic of extremes and models about hazard scenarios and about responses of man made constructions or devices. In each engineering field theories were built about hazards scenarios and how to cover for important risks. Engineers must get that the systems they handle, such as vehicles, machines, firms or agro lands or forests, obtain production with enough safety for persons and with decent economic results in spite of risks. For that risks must be considered in planning, in realization and in operation, and safety margins must be taken but at a reasonable cost. That is a small level of risks will often remain, due to limitations in costs or because of due to strange hazards, and maybe they will be covered by insurance in cases such as in transport with cars, ships or aircrafts, in agro for hail, or for fire in houses or in forests. These and other decisions about quality, security for men or about business financial risks are sometimes considered with Decision Theories models, using often tools from Statistics or operational Research. The authors have done and are following field surveys about risk consideration in the careers in UPM, making deep analysis of curricula taking into account the new structures of degrees in the EEES Bolonia Plan, and they have considered the risk structures offered by diverse schools of Decision theories. That gives an aspect of the needs and uses, and recommendations about improving in the teaching about risk, that may include special subjects especially oriented for each career, school or faculty, so as to be recommended to be included into the curricula, including an elaboration and presentation format using a multi-criteria decision model.
Resumo:
Rising water demands are difficult to meet in many regions of the world. In consequence, under meteorological adverse conditions, big economic losses in agriculture can take place. This paper aims to analyze the variability of water shortage in an irrigation district and the effect on farmer?s income. A probabilistic analysis of water availability for agriculture in the irrigation district is performed, through a supply-system simulation approach, considering stochastically generated series of stream-flows. Net margins associated to crop production are as well estimated depending on final water allocations. Net margins are calculated considering either single-crop farming, either a polyculture system. In a polyculture system, crop distribution and water redistribution are calculated through an optimization approach using the General Algebraic Modeling System (GAMS) for several scenarios of irrigation water availability. Expected net margins are obtained by crop and for the optimal crop and water distribution. The maximum expected margins are obtained for the optimal crop combination, followed by the alfalfa monoculture, maize, rice, wheat and finally barley. Water is distributed as follows, from biggest to smallest allocation: rice, alfalfa, maize, wheat and barley.
Resumo:
A multivariate analysis on flood variables is needed to design some hydraulic structures like dams, as the complexity of the routing process in a reservoir requires a representation of the full hydrograph. In this work, a bivariate copula model was used to obtain the bivariate joint distribution of flood peak and volume, in order to know the probability of occurrence of a given inflow hydrograph. However, the risk of dam overtopping is given by the maximum water elevation reached during the routing process, which depends on the hydrograph variables, the reservoir volume and the spillway crest length. Consequently, an additional bivariate return period, the so-called routed return period, was defined in terms of risk of dam overtopping based on this maximum water elevation obtained after routing the inflow hydrographs. The theoretical return periods, which give the probability of occurrence of a hydrograph prior to accounting for the reservoir routing, were compared with the routed return period, as in both cases hydrographs with the same probability will draw a curve in the peak-volume space. The procedure was applied to the case study of the Santillana reservoir in Spain. Different reservoir volumes and spillway lengths were considered to investigate the influence of the dam and reservoir characteristics on the results. The methodology improves the estimation of the Design Flood Hydrograph and can be applied to assess the risk of dam overtopping