8 resultados para Mozambique belt
em Universidad Politécnica de Madrid
Resumo:
Mining in the Iberian Pyrite Belt (IPB), the biggest VMS metallogenetic province known in the world to date, has to face a deep crisis in spite of the huge reserves still known after ≈5 000 years of production. This is due to several factors, as the difficult processing of complex Cu-Pb-Zn-Ag- Au ores, the exhaustion of the oxidation zone orebodies (the richest for gold, in gossan), the scarce demand for sulphuric acid in the world market, and harder environmental regulations. Of these factors, only the first and the last mentioned can be addressed by local ore geologists. A reactivation of mining can therefore only be achieved by an improved and more efficient ore processing, under the constraint of strict environmental controls. Digital image analysis of the ores, coupled to reflected light microscopy, provides a quantified and reliable mineralogical and textural characterization of the ores. The automation of the procedure for the first time furnishes the process engineers with real-time information, to improve the process and to preclude or control pollution; it can be applied to metallurgical tailings as well. This is shown by some examples of the IPB.
Resumo:
El proyecto se enmarca dentro de un programa de la ONG Helvetas Swiss Intercooperation, llamado PROGOAS (Programa de Gobernancia local en Agua y Saneamiento). Este programa, busca como resultado prioritario, el fortalecimiento institucional en lo que respecta a la gestión, construcción y rehabilitación de infraestructuras AGUASAN a todos los niveles en 8 distritos dentro de las provincias de Cabo Delgado y Nampula. A la vista de los resultados del programa anterior, PROGOAS fase I, finalizada en Marzo de 2012, era obvio que existían problemas a la hora de realizar una diagnosis de los logros alcanzados en esta fase primera y de la situación actual, sobre todo en lo que concierne al seguimiento del nivel de desempeño de los Comités de Agua y Saneamiento a nivel comunitario. Esto es, tanto el sistema de partida (“Baseline”), como el sistema de seguimiento y evaluación en el que se basaba PROGOAS fase I, era muy débil e insuficiente para abarcar un buen punto de partida con el que comparar en un futuro los logros alcanzados durante la ejecución de sus actividades, y, en hacer el seguimiento y la evaluación del desempeño de los actores de interés en los 8 distritos en los que se pretende trabajar. También cabe destacar que, el sistema de monitoria de PROGOAS fase I, era especialmente débil a la hora de evaluar los logros alcanzados en su fin último, que es asegurar el acceso de agua a las comunidades rurales. A la vista de estos problemas, el proyecto se enfoca en la elaboración de un sistema englobando herramientas integradas con diferentes funciones: servir como base de datos, como sistema de seguimiento y evaluación en diferentes períodos de tiempo de los indicadores y resultados esperados del programa, capaces de evaluar automáticamente el desempeño de los actores de interés (a nivel distrital, de localidad y comunidad), y de realizar consultas automáticas con el fin de priorizar los sectores más perjudicados en lo que concierne a la gestión, rehabilitación y construcción en AGUASAN.
Resumo:
The “Basic Infrastructure for Development and Sustainability” Cooperation Group of the Universidad Polítecnica de Madrid has developed a project in the city of Beira, Mozambique, financed by the Spanish International Development Cooperation Agency, to mitigate the consequences associated with climate change, which together with the city’s location and the lack of suitable maintenance in the area, have left Beira more exposed to flooding and coastal erosion. In order to provide a solution to these problems, consideration has been given to the renovation of coastal defence infrastructure and the system of stormwater drainage channels.
Resumo:
This work implements an optimization of the phosphorus gettering effect during the contact co-firing step by means of both simulations and experiments in an industrial belt furnace. An optimized temperature profile, named ‘extended co-firing step’, is presented. Simulations show that the effect of the short annealing on the final interstitial iron concentration depends strongly on the initial contamination level of the material and that the ‘extended co-firing’ temperature profile can enhance the gettering effect within a small additional time. Experimental results using sister wafers from the same multicrystalline silicon ingot confirm these trends and show the potential of this new defect engineering tool to improve the solar cell efficiency.
Resumo:
"A corazón abierto" plantea la regeneración del centro de barrio, el gran Mercado Xipamanine, Maputo, Mozambique. Mozambique es un país localizado al sudeste de áfrica. El 78% de la población se encuentra en la pobreza y mas de la mitad de la población en pobreza absoluta. Dentro de Maputo, Xamanculo es un barrio que destaca por su actividad comercial . Ahí se localiza el Mercado sobre el que actúa el proyecto. Se trabaja en un solar que incluye un mercado informal, viviendas auto-construidas dispersas, barracas y una terminal de transporte. Se analiza la orografía del terreno, planteando un proyecto en el que se evita el riesgo por inundaciones por lo que se redistribuyen los equipamientos en el solar tratando de aglutinarlos según programa y las circulaciones que generan dejando un espacio vacío en el centro que funciona como espacio público. Se plantea un proyecto por fases llegando a una fusión entre lo formal y lo informal basándose en el planteamiento de aceptar las pre-existencias y que sean generadoras de proyecto.
Resumo:
El objetivo principal es dotar de infraestructura (agua y saneamiento), aumentar los servicios y potenciar el desarrollo económico y autónomo de las poblaciones del municipio de Mugazine.
Resumo:
El objetivo general del presente proyecto es contribuir al uso racional del suelo con fines urbanos, disminuyendo los niveles de informalidad en la vivienda y contando con el esfuerzo propio y la ayuda mutua como bases para el desarrollo del proyecto, posibilitando un plan vital integrado a través de la satisfacción de las necesidades de asentamiento, residencia y producción. El objetivo específico consiste en desarrollar un proyecto de asentamiento ex-novo para 670 familias en un área de 72 ha ubicada en el barrio de Intaca, a 23 km del centro de la ciudad de Matola. El proyecto incluye la comprensión del microterritorio, el análisis de los problemas existentes y el planteamiento de una solución integrada que los resuelva, pasando por las fases de análisis de la elección del sitio, parcelación, urbanización, y edificación. Es fundamental contar tanto con la fuerza de los pobladores (última fase principalmente), como con la colaboración de instituciones locales desde el comienzo.
Resumo:
En los años 2000 y 2001 unas devastadoras inundaciones arrasaron diversas zonas de Mozambique, en especial la zona Sur del país. Más de 700 personas murieron y varios miles de cientos perdieron su casa. A raíz de esto, en el año 2004, las Misioneras Franciscanas crearon el actual distrito de Mumemo, en el distrito de Marracuene, asentada a 30 Km. de Maputo. Con la cooperación de Cáritas y Manos Unidas levantaron todo un pueblo de la nada, gracias también a la colaboración de diferentes agencias y ONGD´s. En colaboración con la ONG África Directo surge la posibilidad de darle continuidad a este proyecto, siguiendo así con el trabajo realizado en la zona por la Hermanas Franciscanas. El proyecto inicial promovía la creación de un nuevo barrio para el asentamiento de 1.777 familias (10.000 personas) las cuales, tras perder todo bajo las aguas y el fango, tuvieron que dejar su antiguo barrio de Chamanculo en el centro de Maputo