4 resultados para Market Entry Strategy
em Universidad Politécnica de Madrid
Resumo:
In this paper we present a solution for building a better strategy to take part in external electricity markets. For an optimal strategy development, both the internal system costs as well as the future values of the series of electricity prices in external markets need to be known. But in practice, the real problems that must be faced are that both future electricity prices and costs are unknown. Thus, the first ones must be modeled and forecasted and the costs must be calculated. Our methodology for building an optimal strategy consists of three steps: The first step is modeling and forecasting market prices in external systems. The second step is the cost calculation on internal system taking into account the expected prices in the first step. The third step is based on the results of the previous steps, and consists of preparing the bids for external markets. The main goal is to reduce consumers' costs unlike many others that are oriented to increase GenCo's profits.
Resumo:
A description of the first renewable forward market mechanisms in the Iberian Electricity Market is provided. A contract for difference mechanism is available in Spain since March 2011between the last resort suppliers and the special regime (renewables and cogeneration) settling the price differences between the equilibrium price of the forward regulated auctions for the last resort supply and the spot price of the corresponding delivery period. Regulated auctions of baseload futures of the Portuguese zone in which the Portuguese last resort supplier sells the special regime production exist since December 2011. The experience gained from renewables auctions in Latin America could be used in the Iberian Electricity market, complementing these first market mechanisms. Introduction of renewable auctions at least for the most mature technologies (i.e. wind) in Spain and Portugal providing a fair price for the renewable generation will be of utmost importance in the short term to diminish the tariff deficit caused by the massive deployment of the feed-in-tariff scheme. Liquidity in the forward markets will also increase as a result of the entry of renewable generation companies intending to maximize their profits due to gradual suppression of feed in tariff schemes.
Resumo:
Short-run forecasting of electricity prices has become necessary for power generation unit schedule, since it is the basis of every profit maximization strategy. In this article a new and very easy method to compute accurate forecasts for electricity prices using mixed models is proposed. The main idea is to develop an efficient tool for one-step-ahead forecasting in the future, combining several prediction methods for which forecasting performance has been checked and compared for a span of several years. Also as a novelty, the 24 hourly time series has been modelled separately, instead of the complete time series of the prices. This allows one to take advantage of the homogeneity of these 24 time series. The purpose of this paper is to select the model that leads to smaller prediction errors and to obtain the appropriate length of time to use for forecasting. These results have been obtained by means of a computational experiment. A mixed model which combines the advantages of the two new models discussed is proposed. Some numerical results for the Spanish market are shown, but this new methodology can be applied to other electricity markets as well
Resumo:
The more and more demanding conditions in the power generation sector requires to apply all the available technologies to optimize processes and reduce costs. An integrated asset management strategy, combining technical analysis and operation and maintenance management can help to improve plant performance, flexibility and reliability. In order to deploy such a model it is necessary to combine plant data and specific equipment condition information, with different systems devoted to analyze performance and equipment condition, and take advantage of the results to support operation and maintenance decisions. This model that has been dealt in certain detail for electricity transmission and distribution networks, is not yet broadly extended in the power generation sector, as proposed in this study for the case of a combined power plant. Its application would turn in direct benefit for the operation and maintenance and for the interaction to the energy market