4 resultados para Long line

em Universidad Politécnica de Madrid


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Software Product Line Engineering (SPLE) is becoming widely used due to the improvement it means when developing software products of the same family. However, SPLE demands long-term investment on a product-line platform that might not be profitable due to rapid changing business settings. Since Agile Software Development (ASD) approaches are being successfully applied in volatile markets, several companies have suggested the idea of integrating SPLE and ASD when a family product has to be developed. Agile Product Line Engineering (APLE) advocates the integration of SPLE and ASD to address their lacks when they are individually applied to software development. A previous literature re-view of experiences and practices on APLE revealed important challenges about how to fully put APLE into practice. Our contribution address several of these challenges by tailoring the agile method Scrum by means of three concepts that we have defined: plastic partial components, working PL-architectures, and reactive reuse.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The delay caused by the reflected ray in broadband communication has a great influence on the communications in subway tunnel. This paper presents measurements taken in subway tunnels at 2.4 GHz, with 5 MHz bandwidth. According to propagation characteristics of tunnel, the measurements were carried out with a frequency domain channel sounding technique, in three typical scenarios: line of sight (LOS), Non-line-of-sight (NLOS) and far line of sight (FLOS), which lead to different delay distributions. Firstly IFFT was chosen to get channel impulse response (CIR) h(t) from measured three-dimensional transfer functions. Power delay profile (PDP) was investigated to give an overview of broadband channel model. Thereafter, a long delay caused by the obturation of tunnel is observed and investigated in all the scenarios. The measurements show that the reflection can be greatly remained by the tunnel, which leads to long delay cluster where the reflection, but direct ray, makes the main contribution for radio wave propagation. Four important parameters: distribution of whole PDP power, first peak arriving time, reflection cluster duration and PDP power distribution of reflection cluster were studied to give a detailed description of long delay characteristic in tunnel. This can be used to ensure high capacity communication in tunnels

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Understanding the molecular programs of the generation of human dopaminergic neurons (DAn) from their ventral mesencephalic (VM) precursors is of key importance for basic studies, progress in cell therapy, drug screening and pharmacology in the context of Parkinson's disease. The nature of human DAn precursors in vitro is poorly understood, their properties unstable, and their availability highly limited. Here we present positive evidence that human VM precursors retaining their genuine properties and long-term capacity to generate A9 type Substantia nigra human DAn (hVM1 model cell line) can be propagated in culture. During a one month differentiation, these cells activate all key genes needed to progress from pro-neural and prodopaminergic precursors to mature and functional DAn. For the first time, we demonstrate that gene cascades are correctly activated during differentiation, resulting in the generation of mature DAn. These DAn have morphological and functional properties undistinguishable from those generated by VM primary neuronal cultures. In addition, we have found that the forced expression of Bcl-XL induces an increase in the expression of key developmental genes (MSX1, NGN2), maintenance of PITX3 expression temporal profile, and also enhances genes involved in DAn long-term function, maintenance and survival (EN1, LMX1B, NURR1 and PITX3). As a result, Bcl-XL anticipates and enhances DAn generation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The 6 cylinder servo-hydraulic loading system of CEDEX's track box (250 kN, 50 Hz) has been recently implemented with a new piezoelectric loading system (±20 kN, 300 Hz) allowing the incorporation of low amplitude high frequency dynamic load time histories to the high amplitude low frequency quasi-static load time histories used so far in the CEDEX's track box to assess the inelastic long term behavior of ballast under mixed traffic in conventional and high- speed lines. This presentation will discuss the results obtained in the first long-duration test performed at CEDEX's track box using simultaneously both loading systems, to simulate the pass-by of 6000 freight vehicles (1M of 225 kN axle loads) travelling at a speed of 120 km/h over a line with vertical irregularities corresponding to a medium quality lin3e level. The superstructure of the track tested at full scale consisted of E 60 rails, stiff rail pads (mayor que 450 kN/mm), B90.2 sleepers with USP 0.10 N/mm and a 0.35 m thick ballast layer of ADIF first class. A shear wave velocity of 250 m/s can be assumed for the different layers of the track sub-base. The ballast long-term settlements will be compared with those obtained in a previous long-duration quasi- static test performed in the same track, for the RIVAS [EU co-funded] project, in which no dynamic loads where considered. Also, the results provided by a high diameter cyclic triaxial cell with ballast tested in full size will be commented. Finally, the progress made at CEDEX's Geotechnical Laboratory to reproduce numerically the long term behavior of ballast will be discussed.