2 resultados para Latin--Study and teaching--Early works to 1800

em Universidad Politécnica de Madrid


Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this work, a comparison between the competences codes in the CDIÓs* curriculum, the ones defined for the Tunning Project and the International Project Management Association (IPMA) is made. The goal is to define the most appropriate competences codes for the engineering education in Latin America. The CDIO code is obtained from the engineering practice, and responds to the Accreditation Board for Engineering and Technology (ABET) standards of accreditation. The Tuning competences are the ones defined for Latin America and the IPMÁs are international competences for project management. It is the first time that the competences defined in ABET accreditation standards in the engineering field are compared with the international competences according to IPMÁs model. The results give evidence that, in first place, there is a need to apply holistic models in the definition of an engineering curriculum. Second, the pertinence of these models in the definition of engineering programs in Latin America.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The difficulty of dealing with construction and demolition waste (CDW) on construction sites is not new and continues to be a significant environmental problem. Currently the CDW collection system in Spain is done in a decentralized manner by each sub-contracted company, being necessary to implement effective waste management measures ensuring a correct management and minimization. During the last years several measures have been launched in order to improve and encourage the reuse and recycling of CDW. A widespread solution for CDW recovery is using them as a landscaping aggregate or for road bases and sub-bases. However, measures encouraging onsite prevention still need to be enhanced. This paper studies the major work stage generating CDW and analyses the categories of CDW produced during its execution. For this, several real building sites have been analysed in order to quantify the estimation of CDW generated. Results of this study show that a significant contributor to the CDW generation on building construction sites in Spain are the masonry works. Finally, a Best Practices Manual (BPM) is proposed containing several strategies on masonry works aimed not only at CDW prevention, but also at improving their management and minimization. The use of this BPM together with the Study and Plan of CDW management --required by law--, promotes the environmental management of the company, favouring the cohesion of the construction process organization at all stages giving rise to establishing responsibilities in the field of waste and providing a greater control over the process. Keywords: construction and demolition waste, management, masonry works, good practice measures, prevention.