4 resultados para Introductory accounting

em Universidad Politécnica de Madrid


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this document is to serve as the printed material for the seminar "An Introductory Course on Constraint Logic Programming". The intended audience of this seminar are industrial programmers with a degree in Computer Science but little previous experience with constraint programming. The seminar itself has been field tested, prior to the writing of this document, with a group of the application programmers of Esprit project P23182, "VOCAL", aimed at developing an application in scheduling of field maintenance tasks in the context of an electric utility company. The contents of this paper follow essentially the flow of the seminar slides. However, there are some differences. These differences stem from our perception from the experience of teaching the seminar, that the technical aspects are the ones which need more attention and clearer explanations in the written version. Thus, this document includes more examples than those in the slides, more exercises (and the solutions to them), as well as four additional programming projects, with which we hope the reader will obtain a clearer view of the process of development and tuning of programs using CLP. On the other hand, several parts of the seminar have been taken out: those related with the account of fields and applications in which C(L)P is useful, and the enumerations of C(L)P tools available. We feel that the slides are clear enough, and that for more information on available tools, the interested reader will find more up-to-date information by browsing the Web or asking the vendors directly. More details in this direction will actually boil down to summarizing a user manual, which is not the aim of this document.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Choosing an appropriate accounting system for manufacturing has always been a challenge for managers. In this article we try to compare three accounting systems designed since 1980 to address problems of traditional accounting system. In the first place we are going to present a short overview on background and definition of three accounting systems: Activity Based costing, Time-Driven Activity Based Costing and Lean Accounting. Comparisons are made based on the three basic roles of information generated by accounting systems: financial reporting, decision making, and operational control and improvement. The analysis in this paper reveals how decisions are made over the value stream in the companies using Lean Accounting while decisions under the ABC Accounting system are taken at individual product level, and finally we will show how TD-ABC covers both product and process levels for decision making. In addition, this paper shows the importance of nonfinancial measures for operational control and improvement under the Lean Accounting and TD-ABC methods whereas ABC relies mostly on financial measures in this context.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A multivariate analysis on flood variables is needed to design some hydraulic structures like dams, as the complexity of the routing process in a reservoir requires a representation of the full hydrograph. In this work, a bivariate copula model was used to obtain the bivariate joint distribution of flood peak and volume, in order to know the probability of occurrence of a given inflow hydrograph. However, the risk of dam overtopping is given by the maximum water elevation reached during the routing process, which depends on the hydrograph variables, the reservoir volume and the spillway crest length. Consequently, an additional bivariate return period, the so-called routed return period, was defined in terms of risk of dam overtopping based on this maximum water elevation obtained after routing the inflow hydrographs. The theoretical return periods, which give the probability of occurrence of a hydrograph prior to accounting for the reservoir routing, were compared with the routed return period, as in both cases hydrographs with the same probability will draw a curve in the peak-volume space. The procedure was applied to the case study of the Santillana reservoir in Spain. Different reservoir volumes and spillway lengths were considered to investigate the influence of the dam and reservoir characteristics on the results. The methodology improves the estimation of the Design Flood Hydrograph and can be applied to assess the risk of dam overtopping

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Electricity price forecasting is an interesting problem for all the agents involved in electricity market operation. For instance, every profit maximisation strategy is based on the computation of accurate one-day-ahead forecasts, which is why electricity price forecasting has been a growing field of research in recent years. In addition, the increasing concern about environmental issues has led to a high penetration of renewable energies, particularly wind. In some European countries such as Spain, Germany and Denmark, renewable energy is having a deep impact on the local power markets. In this paper, we propose an optimal model from the perspective of forecasting accuracy, and it consists of a combination of several univariate and multivariate time series methods that account for the amount of energy produced with clean energies, particularly wind and hydro, which are the most relevant renewable energy sources in the Iberian Market. This market is used to illustrate the proposed methodology, as it is one of those markets in which wind power production is more relevant in terms of its percentage of the total demand, but of course our method can be applied to any other liberalised power market. As far as our contribution is concerned, first, the methodology proposed by García-Martos et al(2007 and 2012) is generalised twofold: we allow the incorporation of wind power production and hydro reservoirs, and we do not impose the restriction of using the same model for 24h. A computational experiment and a Design of Experiments (DOE) are performed for this purpose. Then, for those hours in which there are two or more models without statistically significant differences in terms of their forecasting accuracy, a combination of forecasts is proposed by weighting the best models(according to the DOE) and minimising the Mean Absolute Percentage Error (MAPE). The MAPE is the most popular accuracy metric for comparing electricity price forecasting models. We construct the combi nation of forecasts by solving several nonlinear optimisation problems that allow computation of the optimal weights for building the combination of forecasts. The results are obtained by a large computational experiment that entails calculating out-of-sample forecasts for every hour in every day in the period from January 2007 to Decem ber 2009. In addition, to reinforce the value of our methodology, we compare our results with those that appear in recent published works in the field. This comparison shows the superiority of our methodology in terms of forecasting accuracy.