26 resultados para International construction
em Universidad Politécnica de Madrid
Resumo:
Inside COBRA 2011 RICS International Research Conference, the present paper is linked to analyze the liability of the construction professional in his practice as a expert witness in the Spanish legal framework. In a large number of legal procedures related to the building it is necessary the intervention of the expert witness to report on the subject of litigation, and to give an opinion about possible causes and solutions. This field is increasingly importantly for the practice of construction professional that requires an important specialization. The expert provides his knowledge to the judge in the matter he is dealing with (construction, planning, assessment, legal, ...), providing arguments or reasons as the base for his case and acting as part of the evidence. Although the importance of expert intervention in the judicial process, the responsibilities arising from their activity is a slightly studied field. Therefore, the study has as purpose to think about the regulation of professional activities raising different aims. The first is to define the action of the construction professional-expert witness and the need for expert evidence, establishing the legal implications of this professional activity. The different types of responsibilities (the civil, criminal and administrative) have been established as well as the economic, penal or disciplinary damages that can be derived from the expert report
Resumo:
The construction industry, one of the most important ones in the development of a country, generates unavoidable impacts on the environment. The social demand towards greater respect for the environment is a high and general outcry. Therefore, the construction industry needs to reduce the impact it produces. Proper waste management is not enough; we must take a further step in environmental management, where new measures need to be introduced for the prevention at source, such as good practices to promote recycling. Following the amendment of the legal frame applicable to Construction and Demolition Waste (C&D waste), important developments have been incorporated in European and International laws, aiming to promote the culture of reusing and recycling. This change of mindset, that is progressively taking place in society, is allowing for the consideration of C&D waste no longer as an unusable waste, but as a reusable material. The main objective of the work presented in this paper is to enhance C&D waste management systems through the development of preventive measures during the construction process. These measures concern all the agents intervening in the construction process as only the personal implication of all of them can ensure an efficient management of the C&D waste generated. Finally, a model based on preventive measures achieves organizational cohesion between the different stages of the construction process, as well as promoting the conservation of raw materials through the use and waste minimization. All of these in order to achieve a C&D waste management system, whose primary goal is zero waste generation
Resumo:
This paper proposes the EvoBANE system. EvoBANE automatically generates Bayesian networks for solving special-purpose problems. EvoBANE evolves a population of individuals that codify Bayesian networks until it finds near optimal individual that solves a given classification problem. EvoBANE has the flexibility to modify the constraints that condition the solution search space, self-adapting to the specifications of the problem to be solved. The system extends the GGEAS architecture. GGEAS is a general-purpose grammar-guided evolutionary automatic system, whose modular structure favors its application to the automatic construction of intelligent systems. EvoBANE has been applied to two classification benchmark datasets belonging to different application domains, and statistically compared with a genetic algorithm performing the same tasks. Results show that the proposed system performed better, as it manages different complexity constraints in order to find the simplest solution that best solves every problem.
Resumo:
The need of the Bourbon monarchy to build a Naval Base in the Bay of Cartagena (Spain) during the eighteenth century, implied performing various actions on the environment which allowed the construction of the new dock. One of the priority actions was the transformation of the watershed of the streams that flowed into Mandaraches´s sea. For this reason, a dike was designed and constructed in the northern part of the city. The design of this great work, which was designed as a fortification of the city, was subject to considerable uncertainties. Its proximity to the city involved the demolition of several buildings in the San Roque´s neighborhood. The greater or lesser number of affected buildings and the value of the just indemnification for the expropriation of them, become decisive factors to determine if the work was viable for the Royal Estate or not.
Resumo:
El presente trabajo de Tesis Doctoral surge de la Figura de la Dirección Integrada de Proyecto en Edificación (“Project & Construction Management”) y su analisis de la situación regulatoria en la legislación española. El primer planteamiento fue pensar en la situación actual de esta figura en el contexto internacional, para analizar su repercusión en el sector de la edificación, lo cual me llevo a cabo las siguientes preguntas que he reuelto en esta investigación. ¿ Como surge el ¨Project & Construction Management”? ¿ Cuales son sus actividades, funciones y cometidos? ¿ Existe el ¨Project & Construction Management” en otros países? ¿Hay regulación del ¨Project & Construction Management” en esos paises? ¿Cómo es la regulación del ¨Project & Construction Management”? ¿Existe demanda del ¨Project & Construction Management” en España? ¿Cómo es esa demanda en España, y como se puede cuantificar? ¿Existe regulación del ¨Project & Construction Management” en España? ¿ Como debería ser la regulación del ¨Project & Construction Management” en España? Todas las preguntas anteriores las he ido respondiendo con el presente trabajo, llegando a una serie de respuestas, que están reflejadas en el desarrollo del presente trabajo y que resumo: - EL ¨Project & Construction Management” surge a principios del siglo XX en USA, desarrollándose como una disciplina con metodología propia y extendiéndose por otros países. - EL ¨Project & Construction Management” es una disciplina, basada en una metodología propia con herramientas y técnicas para organizar cualquier 14 proyecto de cualquier tipo, pero en este caso un proyecto de edificación, para lo cual he definido con todo detalle esta figura. - El origen del ¨Project & Construction Management” es anglosajón, concretamente en USA, extendiendose luego al Reino Unido, a Europa (Francia y Alemania), a Asia, a América del Sur y a Oceanía. - En todos los paises estudiados (Estados Unidos, Reino Unido, Francia y Alemania) existe una regulación sobre el ¨Project & Construction Management” que me ha servido de base comparativa para introducirla en España. - Hay muchas empresas en España (Nacionales e Internacionales) que ejercen su actividad dentro de este sector, por lo que para realizar un estudio más profundo, hice una muestra de las 30 empresas más significativas, prepare un cuestionario, dividido en 5 apartados: Organizativo, Sectorial, Cualitativo, Cuantitativo y Profesional para obtener una radiogradía de la situación real del sector, y así valorar cual es la importancia de este agente. - Estudié las posibles regulaciones del ¨Project & Construction Management” en España y no encontré ninguna. - El lugar idóneo para que se regule al ¨Project & Construction Management” es la Ley de Ordenación de la Edificación (LOE), ya que la jurisprudencia (sentencias de los tribunales de justicia españoles) le ha asimilado con los agentes de la LOE y se ha basado para absolver o condenar en la Ley de Ordenación de la Edificación. Por lo que el Objetivo fundamental de esta tesis ha sido regular la figura del ¨Project & Construction Management”, traducirla al Castellano, definirla y realizar una estructura de Agente de la Edificación, según la LOE, para poder introducirla dentro de la Legislación Española, con el objeto de mejorar la calidad de la edificación, proteger al usuario, estableciendo responsabilidades y garantías y proteger al ¨Project & Construction Management” de las responsabilidades solidarias. ABSTRACT This Doctoral Thesis figure emerges from the Integrated Building Project ("Project & Construction Management") and his analysis of the regulatory situation in the Spanish legislation. The first approach was to think of the current situation of this figure in the international context, to analyze its impact on the building sector, which I conducted the following questions that I have met in this research. - How did the “Project & Construction Management "? - What are your activities, functions and duties? - Is there a “Project & Construction Management "in other countries? - Is there regulation “Project & Construction Management "in these countries? - How is regulation of ¨ Project & Construction Management "? - Is there demand “Project & Construction Management "in Spain? - How is that demand in Spain, and as you can quantify? - Is there regulation “Project & Construction Management "in Spain? - How should regulation ¨Project & Construction Management "in Spain? All the above questions have been answered with this study, leading to a series of responses, which are reflected in the development of this study and are summarized: - The ¨ Project & Construction Management "comes early twentieth century in the USA, developed as a discipline with its own methodology and extending other countries. - The ¨ Project & Construction Management "is a discipline based on a metodology own tools and techniques to organize any project of any kind, but in this case a building project, for which I have defined in detail this figure. - The origin of ¨Project & Construction Management "is Anglo-Saxon, particularly in USA, then spreading to the UK, Europe (France and Germany), Asia, South America and Oceania. - In all countries studied (USA, UK, France and Germany) there is a regulation on ¨Project & Construction Management "has helped me to introduce comparative base in Spain. - There are many companies in Spain (National and International) who perform work within this sector, so for further study, I made a sample of the 30 most important companies, prepare a questionnaire, divided into five sections: Organizational , Sector, Qualitative, Quantitative and Professional radiography for a real situation of the sector, and thus assess which is the importance of this agent. - Study the possible regulations ¨Project & Construction Management "in Spain and found none. - The place to be regulated to ¨Project & Construction Management "is the Law of Construction Planning (LOE), as the case law (judgments of the courts Spanish) has assimilated LOE agents and has been based to absolve or condemn Law Construction Planning. So the objective of this thesis has been regular figure ¨ Project & Construction Management ", translated to spanish, define and perform an Agent structure of the Building, as the LOE, to enter into Spanish law, in order to improve the quality of the building, protecting the user, establishing responsibilities and guarantees and protect the ¨ Project & Construction Management "solidarity responsibilities.
Resumo:
The new highway M-410 in Madrid was constructed in the year 2007. This motorway near to Parla city crosses the road from Madrid to Toledo. To solve this crossing it was needed to constructed three bridges, the central with two spans over de existing motorway and the other two with one span at each side of the previous one. All the bridges where with deep foundations with piles of 1,00 m diameter separated 1,25 m.
Resumo:
Ponencia sobre elementos constructivos elaborados con materiales reciclados
Resumo:
For centuries, earth has been used as a construction material. Nevertheless, the normative in this matter is very scattered, and the most developed countries, to carry out a construction with this material implies a variety of technical and legal problems. In this paper we review, in an international level, the normative panorama about earth constructions. It analyzes ninety one standards and regulations of countries all around the five continents. These standards represent the state of art that normalizes the earth as a construction material. In this research we analyze the international standards to earth construction, focusing on durability test (spray and drip erosion tests). It analyzes the differences between methods of test. Also we show all results about these tests in two types of compressed earth block.
Resumo:
Desde los años 60, crece en Europa y Estados Unidos la preocupación y la necesidad de mejorar los procesos de gerencia de los proyectos de construcción al volverse estos más complejos. Esto ha llevado a la continua aparición de nuevos profesionales desde la fecha citada hasta nuestros días. De ahí la complejidad de conocer las cualidades de cada uno de ellos, así como las funciones a realizar o la formación que deben tener para poder desarrollar el puesto de trabajo según el papel que desempeñan para cada actividad. Muchos agentes son los que pueden intervenir en la edificación, muchas son las funciones que llevan a cabo estos agentes, muchas son las habilidades que se necesitan para realizar estas misiones, y una buena gestión de la edificación es la que hay que desarrollar para lograr el gran éxito. El presente trabajo fin de máster, dirigido a arquitectos, arquitectos técnicos, ingenieros, abogados, economistas y todos los profesionales del sector inmobiliario y de la construcción, trata de resolver todas aquellas dudas sobre los diferentes sujetos que estarán presentes desde la definición del proyecto en la fase inicial hasta el final de la obra, pasando por las fases de pre-construcción, construcción y post-construcción. (ENGLISH VERSION) Since the 1960s, most construction projects have become more and more complex, and new concerns and necessities related to the management of a project have been on the rise in Europe and in the United States. Thence, the need for more specialized professionals in the field has become a common fact, as well as the inclusion of new curricular subjects in most building engineering studies. There are different agents that play a relevant role in a building project; some of them are expected to perform a highly specialized set of functions that require specific management skills for the work to be successful. This research work—aimed mainly at engineers, quantity surveyors, lawyers, economists, real estate and construction professionals—shows the major implications of the building construction process including both pre-tender/construction and post-tender/construction stages as far as the main expert agents are involved.
Resumo:
Se describen las variaciones de temperaturas y de tensiones durante la construcción de presas de hormigón compactado. The curing of concrete is an exothermic process. The heat of hydration generated induces temperature increases in the concrete, which will disappear in the long term by heat conduction in the concrete mass and thermal exchanges with the environment. The problem is of particularly interest for large concrete masses, as is the case of dams, because the time involved in the heat diffusion process grows with the square of the dimensions and a hotter dam interior implies the possibility of cracking the exposed surfaces of the dam. The Cuira dam, currently being built in Venezuela using roller compacted concrete, is a 134 m high, arch-gravity dam. In support of the design, different strategies were analysed, including various combinations of cooling of the water and the aggregate in order to achieve acceptable results. The calculations were conducted with Abaqus, taking into account all the necessary mechanical and thermal characteristics, as well as the relevant non-linearities. The analyses led to the conclusion that no cooling was required, even taking into account the stress state imposed by an early and rapid filling of the reservoir.
Resumo:
Rehabilitation of two bridges in construction in the motorway M-410 in Madrid (Spain)
Resumo:
Ponencia en el congreso internacional RESTAPIA 2012 que recoge los resultados de los trabajos de investigación realizados en el yacimiento arqueológico colonial de Piura la Vieja, La Matanza (Piura, Perú).
Resumo:
Ponencia presentada en el congreso internacional organizado por el Comité Internacional de Arquitectura Vernácula de ICOMOS - UNESCO.
Resumo:
La comparación de las diferentes ofertas presentadas en la licitación de un proyecto,con el sistema de contratación tradicional de medición abierta y precio unitario cerrado, requiere herramientas de análisis que sean capaces de discriminar propuestas que teniendo un importe global parecido pueden presentar un impacto económico muy diferente durante la ejecución. Una de las situaciones que no se detecta fácilmente con los métodos tradicionales es el comportamiento del coste real frente a las variaciones de las cantidades realmente ejecutadas en obra respecto de las estimadas en el proyecto. Este texto propone abordar esta situación mediante un sistema de análisis cuantitativo del riesgo como el método de Montecarlo. Este procedimiento, como es sabido, consiste en permitir que los datos de entrada que definen el problema varíen unas funciones de probabilidad definidas, generar un gran número de casos de prueba y tratar los resultados estadísticamente para obtener los valores finales más probables,con los parámetros necesarios para medir la fiabilidad de la estimación. Se presenta un modelo para la comparación de ofertas, desarrollado de manera que puede aplicarse en casos reales aplicando a los datos conocidos unas condiciones de variación que sean fáciles de establecer por los profesionales que realizan estas tareas. ABSTRACT: The comparison of the different bids in the tender for a project, with the traditional contract system based on unit rates open to and re-measurement, requires analysis tools that are able to discriminate proposals having a similar overall economic impact, but that might show a very different behaviour during the execution of the works. One situation not easily detected by traditional methods is the reaction of the actual cost to the changes in the exact quantity of works finally executed respect of the work estimated in the project. This paper intends to address this situation through the Monte Carlo method, a system of quantitative risk analysis. This procedure, as is known, is allows the input data defining the problem to vary some within well defined probability functions, generating a large number of test cases, the results being statistically treated to obtain the most probable final values, with the rest of the parameters needed to measure the reliability of the estimate. We present a model for the comparison of bids, designed in a way that it can be applied in real cases, based on data and assumptions that are easy to understand and set up by professionals who wish to perform these tasks.
Resumo:
The research is an exhaustive study of the microstructure and of the stress-strain curves of structural steel S460N at temperatures typical of a fire. It includes a fractographic study of the fracture suifaces of cylindrical specimens, tensile tested at different fire scenarios, explaining the relationship between the failure micromechanisms and temperature. The paper ends with the comparison between the experimentally found strain-stress curves with that one's proposed by the EUROCODE EC3, resulting that in the case of steel S460N these are on the side ofsafety.