26 resultados para Infrastructure and Construction Projects
em Universidad Politécnica de Madrid
Resumo:
(Matsukawa and Habeck, 2007) analyse the main instruments for risk mitigation in infrastructure financing with Multilateral Financial Institutions (MFIs). Their review coincided with the global financial crisis of 2007-08, and is highly relevant in current times considering the sovereign debt crisis, the lack of available capital and the increases in bank regulation in Western economies. The current macroeconomic environment has seen a slowdown in the level of finance for infrastructure projects, as they pose a higher credit risk given their requirements for long term investments. The rationale for this work is to look for innovative solutions that are focused on the credit risk mitigation of infrastructure and energy projects whilst optimizing the economic capital allocation for commercial banks. This objective is achieved through risk-sharing with MFIs and looking for capital relief in project finance transactions. This research finds out the answer to the main question: "What is the impact of risk-sharing with MFIs on project finance transactions to increase their efficiency and viability?", and is developed from the perspective of a commercial bank assessing the economic capital used and analysing the relevant variables for it: Probability of Default, Loss Given Default and Recovery Rates, (Altman, 2010). An overview of project finance for the infrastructure and energy sectors in terms of the volume of transactions worldwide is outlined, along with a summary of risk-sharing financing with MFIs. A review of the current regulatory framework beneath risk-sharing in structured finance with MFIs is also analysed. From here, the impact of risk-sharing and the diversification effect in infrastructure and energy projects is assessed, from the perspective of economic capital allocation for a commercial bank. CreditMetrics (J. P. Morgan, 1997) is applied over an existing well diversified portfolio of project finance infrastructure and energy investments, working with the main risk capital measures: economic capital, RAROC, and EVA. The conclusions of this research show that economic capital allocation on a portfolio of project finance along with risk-sharing with MFIs have a huge impact on capital relief whilst increasing performance profitability for commercial banks. There is an outstanding diversification effect due to the portfolio, which is combined with risk mitigation and an improvement in recovery rates through Partial Credit Guarantees issued by MFIs. A stress test scenario analysis is applied to the current assumptions and credit risk model, considering a downgrade in the rating for the commercial bank (lender) and an increase of default in emerging countries, presenting a direct impact on economic capital, through an increase in expected loss and a decrease in performance profitability. Getting capital relief through risk-sharing makes it more viable for commercial banks to finance infrastructure and energy projects, with the beneficial effect of a direct impact of these investments on GDP growth and employment. The main contribution of this work is to promote a strategic economic capital allocation in infrastructure and energy financing through innovative risk-sharing with MFIs and economic pricing to create economic value added for banks, and to allow the financing of more infrastructure and energy projects. This work suggests several topics for further research in relation to issues analysed. (Matsukawa and Habeck, 2007) analizan los principales instrumentos de mitigación de riesgos en las Instituciones Financieras Multilaterales (IFMs) para la financiación de infraestructuras. Su presentación coincidió con el inicio de la crisis financiera en Agosto de 2007, y sus consecuencias persisten en la actualidad, destacando la deuda soberana en economías desarrolladas y los problemas capitalización de los bancos. Este entorno macroeconómico ha ralentizado la financiación de proyectos de infraestructuras. El actual trabajo de investigación tiene su motivación en la búsqueda de soluciones para la financiación de proyectos de infraestructuras y de energía, mitigando los riesgos inherentes, con el objeto de reducir el consumo de capital económico en los bancos financiadores. Este objetivo se alcanza compartiendo el riesgo de la financiación con IFMs, a través de estructuras de risk-sharing. La investigación responde la pregunta: "Cuál es el impacto de risk-sharing con IFMs, en la financiación de proyectos para aumentar su eficiencia y viabilidad?". El trabajo se desarrolla desde el enfoque de un banco comercial, estimando el consumo de capital económico en la financiación de proyectos y analizando las principales variables del riesgo de crédito, Probability of Default, Loss Given Default and Recovery Rates, (Altman, 2010). La investigación presenta las cifras globales de Project Finance en los sectores de infraestructuras y de energía, y analiza el marco regulatorio internacional en relación al consumo de capital económico en la financiación de proyectos en los que participan IFMs. A continuación, el trabajo modeliza una cartera real, bien diversificada, de Project Finance de infraestructuras y de energía, aplicando la metodología CreditMet- rics (J. P. Morgan, 1997). Su objeto es estimar el consumo de capital económico y la rentabilidad de la cartera de proyectos a través del RAROC y EVA. La modelización permite estimar el efecto diversificación y la liberación de capital económico consecuencia del risk-sharing. Los resultados muestran el enorme impacto del efecto diversificación de la cartera, así como de las garantías parciales de las IFMs que mitigan riesgos, mejoran el recovery rate de los proyectos y reducen el consumo de capital económico para el banco comercial, mientras aumentan la rentabilidad, RAROC, y crean valor económico, EVA. En escenarios económicos de inestabilidad, empeoramiento del rating de los bancos, aumentos de default en los proyectos y de correlación en las carteras, hay un impacto directo en el capital económico y en la pérdida de rentabilidad. La liberación de capital económico, como se plantea en la presente investigación, permitirá financiar más proyectos de infraestructuras y de energía, lo que repercutirá en un mayor crecimiento económico y creación de empleo. La principal contribución de este trabajo es promover la gestión activa del capital económico en la financiación de infraestructuras y de proyectos energéticos, a través de estructuras innovadoras de risk-sharing con IFMs y de creación de valor económico en los bancos comerciales, lo que mejoraría su eficiencia y capitalización. La aportación metodológica del trabajo se convierte por su originalidad en una contribución, que sugiere y facilita nuevas líneas de investigación académica en las principales variables del riesgo de crédito que afectan al capital económico en la financiación de proyectos.
Resumo:
The figure of the coordinator in health and safety issues in the construction sector first appeared in our legislation through the incorporation of the European Directives (in our case Royal Decree 1627/97 on the minimum health and safety regulations in construction works), and is viewed differently in different countries of the European Union regarding the way they are hired and their role in the construction industry. Coordinating health and safety issues is also a management process that requires certain competencies that are not only based on technical or professional training, but which, taking account of the work environment, require the use of strategies and tools that are related to experience and personal skills. Through a piece of research that took account of expert opinions in the matter, we have found which competencies need to be possessed by the health and safety coordinator in order to improve the safety in the works they are coordinating. The conclusions of the analyses performed using the appropriate statistical methods (comparing means and multivariate analysis techniques), will enable training programmes to be designed and ensure that the health and safety coordinators selected have the competencies required to carry out their duties.
Resumo:
The figure of the coordinator in health and safety issues in the construction sector first appeared in our legislation through the incorporation of the European Directives (in our case Royal Decree 1627/97 on the minimum health and safety regulations in construction works), and is viewed differently in different countries of the European Union regarding the way they are hired and their role in the construction industry. Coordinating health and safety issues is also a management process that requires certain competencies that are not only based on technical or professional training, but which, taking account of the work environment, require the use of strategies and tools that are related to experience and personal skills. Through a piece of research that took account of expert opinions in the matter, we have found which competencies need to be possessed by the health and safety coordinator in order to improve the safety in the works they are coordinating. The conclusions of the analyses performed using the appropriate statistical methods (comparing means and multivariate analysis techniques), will enable training programmes to be designed and ensure that the health and safety coordinators selected have the competencies required to carry out their duties.
Resumo:
This paper is presented in CIB: Management and Innovation Sustainable Built Environment 2011, as the study and analysis of the residential model of a rural area from the Iberian Peninsula, specifically applied to the case of the province of Cáceres, in the autonomous region of Extremadura, in Spain. To this end, from a database made up of building projects whose real costs are known, it is intended to establish the links of the different parameters studied through the corresponding functions of statistical analysis. One of the main objectives of this process is constituted by the possibility of establishing those design variables of higher economic importance, so as to keep an economic control of these parameters, generally geometrical and typological, from the very start of the project. And, in general, a higher optimization of resources in the construction of dwellings in the rural environment from their design is intended.
Resumo:
La comparación de las diferentes ofertas presentadas en la licitación de un proyecto,con el sistema de contratación tradicional de medición abierta y precio unitario cerrado, requiere herramientas de análisis que sean capaces de discriminar propuestas que teniendo un importe global parecido pueden presentar un impacto económico muy diferente durante la ejecución. Una de las situaciones que no se detecta fácilmente con los métodos tradicionales es el comportamiento del coste real frente a las variaciones de las cantidades realmente ejecutadas en obra respecto de las estimadas en el proyecto. Este texto propone abordar esta situación mediante un sistema de análisis cuantitativo del riesgo como el método de Montecarlo. Este procedimiento, como es sabido, consiste en permitir que los datos de entrada que definen el problema varíen unas funciones de probabilidad definidas, generar un gran número de casos de prueba y tratar los resultados estadísticamente para obtener los valores finales más probables,con los parámetros necesarios para medir la fiabilidad de la estimación. Se presenta un modelo para la comparación de ofertas, desarrollado de manera que puede aplicarse en casos reales aplicando a los datos conocidos unas condiciones de variación que sean fáciles de establecer por los profesionales que realizan estas tareas. ABSTRACT: The comparison of the different bids in the tender for a project, with the traditional contract system based on unit rates open to and re-measurement, requires analysis tools that are able to discriminate proposals having a similar overall economic impact, but that might show a very different behaviour during the execution of the works. One situation not easily detected by traditional methods is the reaction of the actual cost to the changes in the exact quantity of works finally executed respect of the work estimated in the project. This paper intends to address this situation through the Monte Carlo method, a system of quantitative risk analysis. This procedure, as is known, is allows the input data defining the problem to vary some within well defined probability functions, generating a large number of test cases, the results being statistically treated to obtain the most probable final values, with the rest of the parameters needed to measure the reliability of the estimate. We present a model for the comparison of bids, designed in a way that it can be applied in real cases, based on data and assumptions that are easy to understand and set up by professionals who wish to perform these tasks.
Resumo:
This paper describes an infrastructure for the automated evaluation of semantic technologies and, in particular, semantic search technologies. For this purpose, we present an evaluation framework which follows a service-oriented approach for evaluating semantic technologies and uses the Business Process Execution Language (BPEL) to define evaluation workflows that can be executed by process engines. This framework supports a variety of evaluations, from different semantic areas, including search, and is extendible to new evaluations. We show how BPEL addresses this diversity as well as how it is used to solve specific challenges such as heterogeneity, error handling and reuse
Resumo:
Ponencia en el congreso internacional RESTAPIA 2012 que recoge los resultados de los trabajos de investigación realizados en el yacimiento arqueológico colonial de Piura la Vieja, La Matanza (Piura, Perú).
Resumo:
Ponencia presentada en el congreso internacional organizado por el Comité Internacional de Arquitectura Vernácula de ICOMOS - UNESCO.
Resumo:
La gestión de riesgos debe ser entendida como una determinación de vínculos entre lo que se asume como vulnerabilidad, y la forma en la que se determinarían o estimarían la probabilidad en la concurrencia de un determinado hecho, partiendo de la idea de la concurrencia de un fenómeno y las acciones necesarias que deberán llevarse a cabo. El tema de vulnerabilidad y riesgo, cada día toma más importancia a nivel mundial, a medida que pasa el tiempo es más notoria la vulnerabilidad de ciertas poblaciones ante la presencia de determinados peligros naturales como son: inundaciones, desbordes de ríos, deslizamientos de tierra y movimientos sísmicos. La vulnerabilidad aumenta, a medida que crece la deforestación. La construcción en lugares de alto riesgo, como por ejemplo, viviendas a orillas de los ríos, está condicionada por la localización y las condiciones de uso del suelo, infraestructura, construcciones, viviendas, distribución y densidad de población, capacidad de organización, etc. Es ahora donde la gestión de riesgos, juega un papel muy importante en la sociedad moderna, siendo esta cada vez más exigente con los resultados y calidad de productos y servicios, además de cumplir también, con la responsabilidad jurídica que trae la concepción, diseño y construcción de proyectos en zonas inundables. El presente trabajo de investigación, se centra en identificar los riesgos, aplicando soluciones estructurales y recomendaciones resilientes para edificaciones que se encuentren emplazadas en zonas inundables. Disminuyendo así el riesgo de fallo estructural y el número de víctimas considerablemente. Concluyendo con un Catálogo de Riesgos y Soluciones para edificaciones en zonas inundables. Risk management should be understood as a determination of links between what is assumed to be vulnerable , and how that would be determined or would estimate the probability in the occurrence of a certain event, based on the idea of the occurrence of a phenomenon and necessary actions to be carried out . The issue of vulnerability and risk, every day takes more importance globally, as time passes is more notorious vulnerability of certain populations in the presence of certain natural hazards such as floods, swollen rivers, landslides and earthquakes. Vulnerability increases as it grows deforestation. The construction in high-risk locations, such as homes on the banks of rivers, is conditioned by the location and conditions of land use, infrastructure, construction, housing, distribution and population density, organizational skills, etc. Now where risk management plays a very important role in modern society, is being increasingly demanding with the results and quality of products and services, and also comply with the legal responsibility that brings the conception, design and construction projects in flood zones. This research focuses on identifying risks, implementing structural solutions and resilients’ recommendations for buildings that are emplaced in flood zones. Thus decreasing the risk of structural failure and the number of victims significantly. Concluding with a Catalogue of Risks and Solutions for buildings in flood zones.
Resumo:
Diseño conceptual de puentes de alta velocidad ferroviarios. Railroad bridges, in general, and those for high speed railways, in particular, demand very special conditions. The traffic loads are much higher than for road bridges. Loads due to braking and acceleration determine, due to their magnitude, the structural layout. Because of the speed of the vehicles there are specific dynamic effects which need to be considered. In order to ensure passenger comfort, compatible with speeds of up to 350 km/h, it is necessary to meet very demanding conditions with respect to stiffness, displacements and dynamic behavior. In this paper these conditions are briefly described and different typological possibilities to satisfy them are presented as well as the main construction methods applicable to this kind of bridges.
Resumo:
Building-integrated Photovoltaics (BIPV) is one of the most promising technologies enabling buildings to generate on-site part of their electricity needs while performing architectural functionalities. A clear example of BIPV products consists of semi-transparent photovoltaic modules (STPV), designed to replace the conventional glazing solutions in building façades. Accordingly, the active building envelope is required to perform multiple requirements such as provide solar shading to avoid overheating, supply solar gains and thermal insulation to reduce heat loads and improve daylight utilization. To date, various studies into STPV systems have focused on their energy performance based on existing simulation programs, or on the modelling, normally validated by limited experimental data, of the STPV modules thermal behaviour. Taking into account that very limited experimental research has been conducted on the energy performance of STPV elements and that the characterization in real operation conditions is necessary to promote an energetically efficient integration of this technology in the building envelope, an outdoor testing facility has been designed, developed and built at the Solar Energy Institute of the Technical University of Madrid. In this work, the methodology used in the definition of the testing facility, its capability and limitations are presented and discussed.
Resumo:
The Barriga Dam (Burgos, Spain) is a unique case study because its trapezoid spillway is located on the dam body and is composed of wedge-shaped concrete blocks (WSB) that include certain relevant improvements. This note summarizes the main features of the studies, the key aspects of the final design of the WSB and their placement on the dam, and important details of the spillway design. The design team concluded the study by showing the suitability of this enhanced technology for application to small dams and ponds in the short term, even with unit flows above 5 m2/s.
Resumo:
Abstract The Tower of Martín González, also known as castle of La Raya, is placed in the actual border between the Spanish provinces of Soria and Zaragoza and in the historical limit between the Crowns of Castile and Aragon: this is the reason for its name. The castle dominates the hedge of the plain-moors that surround the Valley of Nágima River. It is a castle with courtyard and a high tower in the western flank. The paper analyzes the castle in four main levels. All references about the castle are studied to draw a historical narration and to relate with the territory and other fortifications, both Castilian and Aragonese. Despite its advanced state of ruin, it preserves many rests that allow making an analysis of its defensive elements and constructive aspects. Resumen La torre de Martín González, también conocida como el castillo de La Raya, se sitúa en el límite actual entre las provincias de Soria y Zaragoza y en el límite histórico entre las coronas de Castilla y Aragón. Domina el extremo de los páramos que circundan el río Nágima. Es un castillo de tipo torrejón con patio de armas y una torre del homenaje adosada a su flanco occidental. El análisis contempla cuatro niveles fundamentales para el entendimiento de la arquitectura fortificada. La comunicación revisa la documentación existente sobre los elementos históricos que se ponen en relación, mediante el análisis territorial, con el sistema fortificado de frontera. A pesar de su avanzado estado de ruina, conserva restos que permiten realizar una lectura interpretativa de sus elementos defensivos y de sus aspectos constructivos.
Resumo:
Increasing foreign private investment in developing countries explains why the Public-Private Investment (PPI) is becoming a key tool to reach the development goal. This article analyzes the relation between PPI in infrastructure and agricultural exports in developing countries. We use the panel data approach (52 countries and 17 years). Results show that PPI in infrastructure has a positive impact on agricultural exports of developing countries. The impact is greater in developing countries with higher income rates. This suggests that the lower income countries require the intervention of public sector without which private investment cannot help to economic development.
Resumo:
En el Código Técnico de la Edificación se define el riesgo como medida del alcance del peligro que representa un evento no deseado para las personas, expresado en términos de probabilidad vinculada a las consecuencias de un evento, también se expresa como Exigencia Básica de Resistencia y Estabilidad, que estas serán las adecuadas para que no se generen riesgos indebidos manteniendo la resistencia y estabilidad frente a las acciones e influencias previsibles durante la construcción y usos previstos de los edificios, y que además, los posibles eventos extraordinarios que puedan producirse no originen consecuencias desproporcionadas respecto a la causa original. Es ahora donde la gestión de riesgos juega un papel muy importante en la sociedad moderna, siendo esta cada vez más exigente con los resultados y calidad de productos y servicios, además de cumplir también con la responsabilidad jurídica que trae la concepción, diseño y construcción de proyectos de gran envergadura como los son la obra civil y edificación. La obra civil destinada al sector industrial debe ser ejecutada con la mayor precisión posible, pues requiere la instalación de complejos equipos y sistemas productivos que pueden producir esfuerzos dinámicos que muchas veces no se consideran en el diseño de los cimientos que lo soportan, razón por la cual interviene la gestión de riesgos para conocer y reducir los posibles riesgos de fallos que se puedan generar y así intentar aproximarse cada vez más al desarrollo de diseños eficientes y confiables, afianzando la exactitud y minimizando errores en la producción y elaboración de piezas, sistemas y equipos de las distintas áreas productivas de la industria. El presente trabajo de investigación se centra en el estudio de los riesgos técnicos existentes en el diseño y ejecución de cimentaciones para maquinarias, mediante la aplicación de varios métodos de investigación, a fin de intentar cubrir los aspectos más importantes que puedan incurrir en una posible causa de fallo de la estructura, evaluando el acoplamiento entre el sistema máquina-cimiento-suelo. Risk is defined, by the Technical Building Code (Código Técnico de la Edificación, CTE) as a measure of the scope of the hazard of an undesired event for people, expressed in terms of probability related to the consequences of an event, also is expressed as a Basic Requirement Strength and Stability these will be appropriate to not cause undue risk maintaining strength and stability against predictable actions and influences during construction and expected uses of the buildings. Nowadays, Risk Management is an important process in modern society, becoming ever more demanding about the results and quality of products and services, and also complies with the legal responsibility that brings the conception, design and construction of large projects as are civil engineering and construction projects. Civil work as a part of industry must be performed as accurately as possible, requiring the installation of sophisticated equipment and production systems which can produce dynamic forces that often are not considered in the design of the foundations, this is the reason why risk management is involved to understand and reduce the risks of failures that may arise and try to move closer to the development of efficient and reliable designs, strengthening the accuracy and minimizing errors in the production and processing of parts, systems and equipments from different production areas of the industry. This paper is a study of existing technical risks in the design and execution of foundations for machinery, through the application of various research methods, in order to try to cover the most important aspects that may produce the failure of the structure, evaluating the union between the machine-foundation system and soil.