3 resultados para Inflation, Near-Money, Welfare Cost.

em Universidad Politécnica de Madrid


Relevância:

30.00% 30.00%

Publicador:

Resumo:

This article presents an alternative approach to the decision-making process in transport strategy design. The study explores the possibility of integrating forecasting, assessment and optimization procedures in support of a decision-making process designed to reach the best achievable scenario through mobility policies. Long-term evaluation, as required by a dynamic system such as a city, is provided by a strategic Land-Use and Transport Interaction (LUTI) model. The social welfare achieved by implementing mobility LUTI model policies is measured through a cost-benefit analysis and maximized through an optimization process throughout the evaluation period. The method is tested by optimizing a pricing policy scheme in Madrid on a cordon toll in a context requiring system efficiency, social equity and environmental quality. The optimized scheme yields an appreciable increase in social surplus through a relatively low rate compared to other similar pricing toll schemes. The results highlight the different considerations regarding mobility impacts on the case study area, as well as the major contributors to social welfare surplus. This leads the authors to reconsider the cost-analysis approach, as defined in the study, as the best option for formulating sustainability measures.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This article presents an alternative approach to the decision-making process in transport strategy design. The study explores the possibility of integrating forecasting, assessment and optimization procedures in support of a decision-making process designed to reach the best achievable scenario through mobility policies. Long-term evaluation, as required by a dynamic system such as a city, is provided by a strategic Land-Use and Transport Interaction (LUTI) model. The social welfare achieved by implementing mobility LUTI model policies is measured through a cost-benefit analysis and maximized through an optimization process throughout the evaluation period. The method is tested by optimizing a pricing policy scheme in Madrid on a cordon toll in a context requiring system efficiency, social equity and environmental quality. The optimized scheme yields an appreciable increase in social surplus through a relatively low rate compared to other similar pricing toll schemes. The results highlight the different considerations regarding mobility impacts on the case study area, as well as the major contributors to social welfare surplus. This leads the authors to reconsider the cost-analysis approach, as defined in the study, as the best option for formulating sustainability measures.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Dynamic measurements will become a standard for bridge monitoring in the near future. This fact will produce an important cost reduction for maintenance. US Administration has a long term intensive research program in order to diminish the estimated current maintenance cost of US$7 billion per year over 20 years. An optimal intervention maintenance program demands a historical dynamical record, as well as an updated mathematical model of the structure to be monitored. In case that a model of the structure is not actually available it is possible to produce it, however this possibility does not exist for missing measurement records from the past. Current acquisition systems to monitor structures can be made more efficient by introducing the following improvements, under development in the Spanish research Project “Low cost bridge health monitoring by ambient vibration tests using wireless sensors”: (a) a complete wireless system to acquire sensor data, (b) a wireless system that permits the localization and the hardware identification of the whole sensor system. The applied localization system has been object of a recent patent, and (c) automatization of the modal identification process, aimed to diminish human intervention. This system is assembled with cheap components and allows the simultaneous use of a large number of sensors at a low placement cost. The engineer’s intervention is limited to the selection of sensor positions, probably based on a preliminary FE analysis. In case of multiple setups, also the position of a number of fixed reference sensors has to be decided. The wireless localization system will obtain the exact coordinates of all these sensors positions. When the selection of optimal positions is difficult, for example because of the lack of a proper FE model, this can be compensated by using a higher number of measuring (also reference) points. The described low cost acquisition system allows the responsible bridge administration to obtain historical dynamic identification records at reasonable costs that will be used in future maintenance programs. Therefore, due to the importance of the baseline monitoring record of a new bridge, a monitoring test just after its construction should be highly recommended, if not compulsory.