5 resultados para IT-capabilities
em Universidad Politécnica de Madrid
Resumo:
When a firm decides to implement ERP softwares, the resulting consequences can pervade all levels, includ- ing organization, process, control and available information. Therefore, the first decision to be made is which ERP solution must be adopted from a wide range of offers and vendors. To this end, this paper describes a methodology based on multi-criteria factors that directly affects the process to help managers make this de- cision. This methodology has been applied to a medium-size company in the Spanish metal transformation sector which is interested in updating its IT capabilities in order to obtain greater control of and better infor- mation about business, thus achieving a competitive advantage. The paper proposes a decision matrix which takes into account all critical factors in ERP selection.
Resumo:
En los últimos años la externalización de TI ha ganado mucha importancia en el mercado y, por ejemplo, el mercado externalización de servicios de TI sigue creciendo cada año. Ahora más que nunca, las organizaciones son cada vez más los compradores de las capacidades necesarias mediante la obtención de productos y servicios de los proveedores, desarrollando cada vez menos estas capacidades dentro de la empresa. La selección de proveedores de TI es un problema de decisión complejo. Los gerentes que enfrentan una decisión sobre la selección de proveedores de TI tienen dificultades en la elaboración de lo que hay que pensar, además en sus discursos. También de acuerdo con un estudio del SEI (Software Engineering Institute) [40], del 20 al 25 por ciento de los grandes proyectos de adquisición de TI fracasan en dos años y el 50 por ciento fracasan dentro de cinco años. La mala gestión, la mala definición de requisitos, la falta de evaluaciones exhaustivas, que pueden ser utilizadas para llegar a los mejores candidatos para la contratación externa, la selección de proveedores y los procesos de contratación inadecuados, la insuficiencia de procedimientos de selección tecnológicos, y los cambios de requisitos no controlados son factores que contribuyen al fracaso del proyecto. La mayoría de los fracasos podrían evitarse si el cliente aprendiese a comprender los problemas de decisión, hacer un mejor análisis de decisiones, y el buen juicio. El objetivo principal de este trabajo es el desarrollo de un modelo de decisión para la selección de proveedores de TI que tratará de reducir la cantidad de fracasos observados en las relaciones entre el cliente y el proveedor. La mayor parte de estos fracasos son causados por una mala selección, por parte del cliente, del proveedor. Además de estos problemas mostrados anteriormente, la motivación para crear este trabajo es la inexistencia de cualquier modelo de decisión basado en un multi modelo (mezcla de modelos adquisición y métodos de decisión) para el problema de la selección de proveedores de TI. En el caso de estudio, nueve empresas españolas fueron analizadas de acuerdo con el modelo de decisión para la selección de proveedores de TI desarrollado en este trabajo. Dos softwares se utilizaron en este estudio de caso: Expert Choice, y D-Sight. ABSTRACT In the past few years IT outsourcing has gained a lot of importance in the market and, for example, the IT services outsourcing market is still growing every year. Now more than ever, organizations are increasingly becoming acquirers of needed capabilities by obtaining products and services from suppliers and developing less and less of these capabilities in-house. IT supplier selection is a complex and opaque decision problem. Managers facing a decision about IT supplier selection have difficulty in framing what needs to be thought about further in their discourses. Also according to a study from SEI (Software Engineering Institute) [40], 20 to 25 percent of large information technology (IT) acquisition projects fail within two years and 50 percent fail within five years. Mismanagement, poor requirements definition, lack of comprehensive evaluations, which can be used to come up with the best candidates for outsourcing, inadequate supplier selection and contracting processes, insufficient technology selection procedures, and uncontrolled requirements changes are factors that contribute to project failure. The majority of project failures could be avoided if the acquirer learns how to understand the decision problems, make better decision analysis, and good judgment. The main objective of this work is the development of a decision model for IT supplier selection that will try to decrease the amount of failures seen in the relationships between the client-supplier. Most of these failures are caused by a not well selection of the supplier. Besides these problems showed above, the motivation to create this work is the inexistence of any decision model based on multi model (mixture of acquisition models and decision methods) for the problem of IT supplier selection. In the case study, nine different Spanish companies were analyzed based on the IT supplier selection decision model developed in this work. Two software products were used in this case study, Expert Choice and D-Sight.
Resumo:
The security event correlation scalability has become a major concern for security analysts and IT administrators when considering complex IT infrastructures that need to handle gargantuan amounts of events or wide correlation window spans. The current correlation capabilities of Security Information and Event Management (SIEM), based on a single node in centralized servers, have proved to be insufficient to process large event streams. This paper introduces a step forward in the current state of the art to address the aforementioned problems. The proposed model takes into account the two main aspects of this ?eld: distributed correlation and query parallelization. We present a case study of a multiple-step attack on the Olympic Games IT infrastructure to illustrate the applicability of our approach.
Resumo:
Remote reprogramming capabilities are one of the major concerns in WSN platforms due to the limitations and constraints that low power wireless nodes poses, especially when energy efficiency during the reprogramming process is a critical factor for extending the battery life of the devices. Moreover, WSNs are based on low-rate protocols in which as greater the amount of data is sent, the more the possibility to lose packets during the transmitting process is. In order to overcome these limitations, in this work a novel on-the-fly reprogramming technique for modifying and updating the application running on the wireless sensor nodes is designed and implemented, based on a partial reprogramming mechanism that significantly reduces the size of the files to be downloaded to the nodes, therefore diminishing their power/time consumption. This powerful mechanism also addresses multi-experimental capabilities because it provides the possibility to download, manage, test and debug multiple applications into the wireless nodes, based on a memory map segmentation of the core. Being an on-the-fly reprogramming process, no additional resources to store and download the configuration file are needed.
Resumo:
Auxetic materials (or metamaterials) have negative Poisson ratios (NPR) and display the unexpected properties of lateral expansion when stretched, and equal and opposing densification when compressed. Such auxetic materials are being used more frequently in the development of novel products, especially in the fields of intelligent expandable actuators, shape-morphing structures, and minimally invasive implantable devices. Although several micromanufacturing technologies have already been applied to the development of auxetic materials and devices, additional precision is needed to take full advantage of their special mechanical properties. In this study, we present a very promising approach for the development of auxetic materials and devices based on the use of deep reactive ion etching (DRIE). The process stands out for its precision and its potential applications to mass production. To our knowledge, it represents the first time this technology has been applied to the manufacture of auxetic materials with nanometric details. We take into account the present capabilities and challenges linked to the use of DRIE in the development of auxetic materials and auxetic-based devices.