3 resultados para Human Resource Development in Hotel Industry

em Universidad Politécnica de Madrid


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Development projects of different types mainly aim to alleviate poverty and ameliorate the livelihoods of local people. One of the strategies commonly used is to focus on organizations and build from their existing capacities in order to improve their living standards or try to build new organizations to work in a common project. Social and human capitals are two key components of these organizations and they might be crucial to the success of the actions that they accomplish. Both can be considered as part of the social capacity of the local organization. This capacity can be enforced with development projects through capacity building. This term means much more than training activities as it includes not only human resource development but also organizational and institutional development (UNESCO, 2010). Capacity and capacity building concepts, as well as capacity measurements in this context are explored to build a framework to evaluate the social capacity generated with the interventions and better plan the actions to be undertaken by the projects to succeed. The focus is set on rural development projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Mediterranean region is one of the world's climate change hotspots. Future climate projections envisage dramatic implications for the agricultural and water sectors that will endanger economic development and lead to natural resources degradation and social instability.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Although others regulations regarding feed-in tariffs for photovoltaics (PV) existed in Spain previously, the one that meant a paradigm change was the introduction in 2007 of law R.D.661/2007 which established a feed-in tariff of 41,75 cents/kWh if the installed capacity was greater than 100KWp and 44,04 cents/kWh if it was smaller. The high level of the subsidies together with the lack of a limit for the total installed capacity originates the well-known Spanish photovoltaic boom. In September 2008 the installed PV capacity accounted for 3.2GWp (while the official objective stated in the national renewable roadmap was only 400MWp). To avoid this situation a new law, R.D. 1578/2008, was proclaimed which established a decreasing feed-in tariff of 32 cents/kWh (for ground installations) and 34 cents/kWh (for rooftops) and it limited the annual installed capacity to 500MWp. Although it was successful in limiting the PV subsidies total costs, the successive and sudden changes in regulations resulted very harmful to the local PV industry. In this article, the strong influence of feed-in tariff in the development of PV installed capacity and market evolution in Spain will be analyzed in detail. In addition, a comparison with other subsidized technologies which installed capacity has had a smoother evolution, as wind energy, will be presented.