42 resultados para Finishes in the construction
em Universidad Politécnica de Madrid
Resumo:
This paper presents the application of the Integral Masonry System (IMS) to the construction of earthquake resistant houses and its experimental study. To verify the security of this new type of building in seismic areas of the third world two prototypes have been tested, one with adobe and the other with hollow brick. In both cases it’s a two-story 6x6x6 m3 house built to scale 1/2. The tests are carried out at the Laboratory of Antiseismic Structures of the Department of Engineering, Pontifical Catholic University of Peru in Lima, in collaboration with the UPM (Technical University of Madrid). This article shows the design process of the prototypes to test, including the sizing of the reinforcements, the characteristics of the tests and the results obtained. These results show that the IMS with adobe or brick remains stable with no significant cracks faced with a severe earthquake, with an estimated acceleration of 1.8 g. Este artículo presenta una aplicación del Sistema de Albañilería Integral (SAI) a la construcción de viviendas sismorresistentes y su estudio experimental. Para verificar su seguridad para su construcción en zonas sísmicas del tercer mundo se han ensayado dos prototipos, uno con adobe, y otro con ladrillo hueco. Se trata de una vivienda de 6x6x6 m3 y dos plantas que se construyen a escala 1/2. Los ensayos se realizaron en el Laboratorio de Estructuras Antisísmicas del Departamento de Ingeniería de la Pontificia Católica Universidad del Perú (PUCP) de Lima en colaboración con la UPM (Universidad Politécnica de Madrid). Este artículo muestra el proceso de diseño de los prototipos a ensayar, incluido el dimensionado de los refuerzos, las características de los ensayos y los resultados obtenidos. Estos resultados muestran que el SAI con adobe o ladrillo permanece estable sin grietas significativas ante un sismo severo, con una aceleración estimada de 1,8 g.
Resumo:
The construction of a Gothic vault implied the solution of several technical challenges. The literature on Gothic vault construction is quite large and its growth continues steadily. The main challenge of any structure is that, during and after construction, it must be "safe", that is, it must not collapse. Indeed, it must be amply safe, able to support different loads for long periods of time. Masonry architecture has shown its structural safety for centuries or millennia. The Pantheon of Rome stands today after almost 2,000 years without having needed any structural reinforcement (of course, the survival of any building implies continuous maintenance) . Hagia Sophia in Istanbul, finished in the 6th century AD, has withstood not only the dead loads but also many severe earthquakes . Finally, the Gothic cathedrals, with their appearance of weakness, are• more than a half millennium old. The question arises of what the source of this amazing strength is and how the illiterate master masons were able to design such daring and safe structures . This question is usually evaded in manuals of Gothic architecture. This is quite surprising, the structure being a fundamental part of Gothic buildings. The present article aims to give such an explanation, which has been studied in detail elsewhere. In the first part, the Gothic design methods "V ill be discussed. In the second part, the validity of these methods wi11 be verified within the frame of the modern theory of masonry structures . References have been reduced to a minimum to make the text simpler and more direct.
Resumo:
The art of construction is a risky activity that directly affects the life and physical integrity of persons. Since the approval of Law 31/1995, of November 8, Prevention of Occupational Risks was the first legislation that established the current basis in all sectors and then transposed into Spanish law Directive 92/57/CEE called Royal Decree 1627/1997 of October 24, on minimum safety and health dispositions in construction works, measures have been proposed to develop a mixed body of scientific literature composed of researchers and professionals in the field of occupational safety and health, but even today there is still no clear and firm proposal, showing a lack of awareness in the occupational risk prevention and, therefore, a consolidation of the culture of prevention in society. Therefore, the technicians, who make up the building process, can incur in very high responsibilities, such as: Author of the project, Coordinator of Safety and Health during the preparation of the project and during the execution of works, Site Management: Site Manager. This involves the immediate creation of a general training in prevention for all architects starting when still studying, as well as specific training, appropriate and complementary to all the architects that will be devoted to the specialty of occupational safety and health in construction works. That is, first, we must make the responsible bodies aware of the urgent need to integrate risk prevention in the curricula of architecture and later in the continuing education of the profession. It is necessary that our teaching must conform to the laws on safety and health, due to the fact that the law recognizes our academic degrees and professional qualifications to perform functions in that area
Resumo:
A modified winding layout for three-phase transformers with PCB windings is proposed in this paper. This modified layout can be used in high current transformers with many PCB layers to simplify the fabrication process. One of the key factors that might increase the cost and complexity in the construction of planar transformers is the number of layers of each PCB winding. This issue becomes even more important in medium-high power three-phase transformers, where the number of PCB layers is higher. In addition to that, the proposed method allows the use of commercial core shapes that are commonly used to design single-phase transformers. This fact makes possible the reduction of cost and flexibility of the design solutions. The proposed solution has been validated and compared using the conventional and the proposed methodologies to design a high power (20 kW) transformer.
Resumo:
The intense activity in the construction sector during the last decade has generated huge volumes of construction and demolition (C&D) waste. In average, Europe has generated around 890 million tonnes of construction and demolition waste per year. Although now the activity has entered in a phase of decline, due to the change of the economic cycle, we don’t have to forget all the problems caused by such waste, or rather, by their management which is still far from achieving the overall target of 70% for C&D waste --excludes soil and stones not containing dangerous substances-- should be recycled in the EU Countries by 2020 (Waste Framework Directive). But in fact, the reality is that only 50% of the C&D waste generated in EU is recycled and 40% of it corresponds to the recycling of soil and stones not containing dangerous substances. Aware of this situation, the European Countries are implementing national policies as well as different measures to prevent the waste that can be avoidable and to promote measures to increase recycling and recovering. In this aspect, this article gives an overview of the amount of C&D waste generated in European countries, as well as the amount of this waste that is being recycled and the different measures that European countries have applied to solve this situation.
Resumo:
The construction industry, one of the most important ones in the development of a country, generates unavoidable impacts on the environment. The social demand towards greater respect for the environment is a high and general outcry. Therefore, the construction industry needs to reduce the impact it produces. Proper waste management is not enough; we must take a further step in environmental management, where new measures need to be introduced for the prevention at source, such as good practices to promote recycling. Following the amendment of the legal frame applicable to Construction and Demolition Waste (C&D waste), important developments have been incorporated in European and International laws, aiming to promote the culture of reusing and recycling. This change of mindset, that is progressively taking place in society, is allowing for the consideration of C&D waste no longer as an unusable waste, but as a reusable material. The main objective of the work presented in this paper is to enhance C&D waste management systems through the development of preventive measures during the construction process. These measures concern all the agents intervening in the construction process as only the personal implication of all of them can ensure an efficient management of the C&D waste generated. Finally, a model based on preventive measures achieves organizational cohesion between the different stages of the construction process, as well as promoting the conservation of raw materials through the use and waste minimization. All of these in order to achieve a C&D waste management system, whose primary goal is zero waste generation
Resumo:
In the year 1999 approves the Law of Construction Building (LOE, in Spanish) to regulate a sector such as construction, which contained some shortcomings from the legal point of view. Currently, the LOE has been in force 12 years, changing the spanish world of the construction, due to influenced by internationalization. Within the LOE, there regulating the different actors involved in the construction building, as the Projects design, the Director of Construction, the developer, The builder, Director of execution of the construction (actor only in Spain, similar as construcion engineer and abroad in), control entities and the users, but lacks figure Project manager will assume the delegation of the promoter helping and you organize, direct and management the process. This figure assumes that the market and contracts are not legally regulated in Spain, then should define and establish its regulation in the LOE. (Spain Construction Law) The translation in spanish of the words "Project Manager is owed to Professor Rafael de Heredia in his book Integrated Project Management, as agent acting on behalf of the organization and promoter assuming control of the project, ie Integraded Project Management . Already exist in Spain, AEDIP (Spanish Association Integrated of Project Construction management) which comprises the major companies in “Project Management” in Spain, and MeDIP (Master in Integrated Construction Project) the largest and most advanced studies at the Polytechnic University of Madrid, in "Construction Project Management" they teach which is also in Argentina. The Integrated Project ("Project Management") applied to the construction process is a methodological technique that helps to organize, control and manage the resources of the promoters in the building process. When resources are limited (which is usually most situations) to manage them efficiently becomes very important. Well, we find that in this situation, the resources are not only limited, but it is limited, so a comprehensive control and monitoring of them becomes not only important if not crucial. The alternative of starting from scratch with a team that specializes in developing these follow directly intervening to ensure that scarce resources are used in the best possible way requires the use of a specific methodology (Manual DIP, Matrix Foreign EDR breakdown structure EDP Project, Risk Management and Control, Design Management, et ..), that is the methodology used by "Projects managers" to ensure that the initial objectives of the promoters or investors are met and all actors in process, from design to construction company have the mind aim of the project will do, trying to get their interests do not prevail over the interests of the project. Among the agents listed in the building process, "Project Management" or DIPE (Director Comprehensive building process, a proposed name for possible incorporation into the LOE, ) currently not listed as such in the LOE (Act on Construction Planning ), one of the agents that exist within the building process is not regulated from the legal point of view, no obligations, ie, as is required by law to have a project, a builder, a construction management, etc. DIPE only one who wants to hire you as have been advanced knowledge of their services by the clients they have been hiring these agents, there being no legal obligation as mentioned above, then the market is dictating its ruling on this new figure, as if it were necessary, he was not hired and eventually disappeared from the building process. As the aim of this article is regular the process and implement the name of DIPE in the Spanish Law of buildings construction (LOE)
Resumo:
This paper shows the influence of the semantic content of urban sounds in the subjective evaluation of outer spaces. The study is based on the analysis conducted in three neighboring and integrated urban spaces with a different form of social ownership in the city of Cordoba, Argentina. It shows that the type of sound source present at each site influence, by its semantic content, in the user´s identification and permanence in the place. The noise present in a soundscape is able to have a high semantic content, and therefore the sound has a particular meaning for the perceiver. Every particular social group influences the production of their own sounds and how they perceive them. This allows to consider the sound as one of the factors that define the sense of "place" or "no place" of a certain urban space. Evidently the sounds, and their ability to evoke and characterize the environment, cannot be ignored in the construction and recovery of anthropological sites. This urban culture is unique and specific to every society. Thepublic spaces, with their soundscape, are part of the construction of the urban identity of a city. It is shown that for identical general sound levels present in each of the spaces, the level of annoyance or discomfort, in relation to the subjective acoustic quality, is different. This is the result of the influence of semantic content of the sounds present in each urban space. Coinciding with other similar research, the level of discomfort or annoyance decreases as the presence of natural sounds such as water, the wind in the trees or the birds singing increases, even when the objective values of noise level of natural sounds are higher.
Resumo:
Inside COBRA 2011 RICS International Research Conference, the present paper is linked to analyze the liability of the construction professional in his practice as a expert witness in the Spanish legal framework. In a large number of legal procedures related to the building it is necessary the intervention of the expert witness to report on the subject of litigation, and to give an opinion about possible causes and solutions. This field is increasingly importantly for the practice of construction professional that requires an important specialization. The expert provides his knowledge to the judge in the matter he is dealing with (construction, planning, assessment, legal, ...), providing arguments or reasons as the base for his case and acting as part of the evidence. Although the importance of expert intervention in the judicial process, the responsibilities arising from their activity is a slightly studied field. Therefore, the study has as purpose to think about the regulation of professional activities raising different aims. The first is to define the action of the construction professional-expert witness and the need for expert evidence, establishing the legal implications of this professional activity. The different types of responsibilities (the civil, criminal and administrative) have been established as well as the economic, penal or disciplinary damages that can be derived from the expert report
Resumo:
The need of the Bourbon monarchy to build a Naval Base in the Bay of Cartagena (Spain) during the eighteenth century, implied performing various actions on the environment which allowed the construction of the new dock. One of the priority actions was the transformation of the watershed of the streams that flowed into Mandaraches´s sea. For this reason, a dike was designed and constructed in the northern part of the city. The design of this great work, which was designed as a fortification of the city, was subject to considerable uncertainties. Its proximity to the city involved the demolition of several buildings in the San Roque´s neighborhood. The greater or lesser number of affected buildings and the value of the just indemnification for the expropriation of them, become decisive factors to determine if the work was viable for the Royal Estate or not.
Resumo:
The new highway M-410 in Madrid was constructed in the year 2007. This motorway near to Parla city crosses the road from Madrid to Toledo. To solve this crossing it was needed to constructed three bridges, the central with two spans over de existing motorway and the other two with one span at each side of the previous one. All the bridges where with deep foundations with piles of 1,00 m diameter separated 1,25 m.
Resumo:
Rehabilitation of two bridges in construction in the motorway M-410 in Madrid (Spain)
Resumo:
Ponencia en el congreso internacional RESTAPIA 2012 que recoge los resultados de los trabajos de investigación realizados en el yacimiento arqueológico colonial de Piura la Vieja, La Matanza (Piura, Perú).
Resumo:
Sexpartite vaults constitute one of the most interesting chapters in European Gothic architecture. Originally, the use of the square cross-ribbed vault was limited to relatively small spaces, but when the need arose to cover spaces of considerable size, a new vault with very peculiar characteristics appeared. This new vault was a cross-ribbed vault that was reinforced in the centre by a rib that was parallel to the transverse ribs which effectively divided the vault in half. This configuration breaks the side arch into two fragments, creating a pair of windows on each side. The volumetrics of these vaults is extremely complex and the difficulties involved in their construction perhaps explain why they were abandoned in favour of the simple cross ribbed vault, now with rectangular sections. The existence of the sexpartite vault barely lasted more than fifty years, from the end of the XII century and the beginning of the XIII. Towards the end of the 19th century Viollet-le-Duc gave a succinct explanation of this type of vault. A. Choisy also, later, devotes some pages to the French sexpartite vault; since then, the subject has only been broached in a few references in later studies on Gothic architecture. However, despite its short period of existence, the sexpartite vault spread throughout Europe and was used to build important vaulting. Viollet-le-Duc's sexpartite vault could be considered to be the prototype of them all, while it is true that the studies that we have conducted so far lead us to affirm that there is a wide variety of vaults, with different volumetric spaces and different construction strategies. Therefore, we believe that this chapter of international Gothic deserves further study applying the knowledge and resources that are available today. This paper has been written to explore the most significant European sexpartite vaults. New measurement technology has led to a revolution in research into the history of construction, allowing studies to be conducted that were hitherto impossible. Thorough data collection using total station and photogrammetry has enabled us to identify the stereotomy of the voussoirs, tas-de-charges and keystones, as well as the bonding of the surfaces of the severies. A comparison of the construction techniques employed in the different vaults studied reveals common construction features and aspects that are specific to each country. Thus we are able to establish the relationship between sexpartite vaults in different European countries and their influence on each other.
Resumo:
The traditional architecture of the centre of the city of Arequipa has been analyzed by comparing floor-plans of houses from the eighteenth and nineteenth centuries in order to explain the reasons behind the arrangement of their constructional elements and the evolution of said elements and floor-plans. The historic centre of Arequipa, a city located in the South of Perú, South America (Latitude 16°23' South, Longitude 71 °31' West), is based on a ground plan from 1540 that was set during the city's Spanish foundation. It was declared Patrimony of the Humanity by UNESCO. The manorial architecture is widely known for its decorated fronts and one-of-a-kind designs, but its differences with respect to the popular architecture are not based exclusively on decorative aspects. Peru's colonial period finished around 1825, but the barrel-vault, construction style continued in Arequipa through 1868, when an earthquake destroyed the city. Thereafter, the vaults were replaced by roofs made of rails, with cinders made out of the lava stone. The stately houses belonged to the founding families who settled around the main square on forty nine blocks that formed a square-grid, street layout. Also belonging to this category are the houses of landlords and traders from post-colonial times.