40 resultados para Exploit the images in the building
em Universidad Politécnica de Madrid
Resumo:
The European Union has been promoting linguistic diversity for many years as one of its main educational goals. This is an element that facilitates student mobility and student exchanges between different universities and countries and enriches the education of young undergraduates. In particular, a higher degree of competence in the English language is becoming essential for engineers, architects and researchers in general, as English has become the lingua franca that opens up horizons to internationalisation and the transfer of knowledge in today’s world. Many experts point to the Integrated Approach to Contents and Foreign Languages System as being an option that has certain benefits over the traditional method of teaching a second language that is exclusively based on specific subjects. This system advocates teaching the different subjects in the syllabus in a language other than one’s mother tongue, without prioritising knowledge of the language over the subject. This was the idea that in the 2009/10 academic year gave rise to the Second Language Integration Programme (SLI Programme) at the Escuela Arquitectura Técnica in the Universidad Politécnica Madrid (EUATM-UPM), just at the beginning of the tuition of the new Building Engineering Degree, which had been adapted to the European Higher Education Area (EHEA) model. This programme is an interdisciplinary initiative for the set of subjects taught during the semester and is coordinated through the Assistant Director Office for Educational Innovation. The SLI Programme has a dual goal; to familiarise students with the specific English terminology of the subject being taught, and at the same time improve their communication skills in English. A total of thirty lecturers are taking part in the teaching of eleven first year subjects and twelve in the second year, with around 120 students who have voluntarily enrolled in a special group in each semester. During the 2010/2011 academic year the degree of acceptance and the results of the SLI Programme have been monitored. Tools have been designed to aid interdisciplinary coordination and to analyse satisfaction, such as coordination records and surveys. The results currently available refer to the first and second year and are divided into specific aspects of the different subjects involved and into general aspects of the ongoing experience.
Resumo:
Métodos estadísticos para análisis de MRI PSIR
Resumo:
Insulating materials in buildings are one of the main factors that should be taken into account when talking about sustainability since with a correct application it could imply important savings for the citizens. In the course of its life, a building requires a series of supplies to perform the duties it has been built for, generating an impact on the environment. The selection of one material or another will establish partly the global environmental impact of the building. Choosing the right insulating material will determine the building's general degree of sustainability, both in its heating savings (energy consumption) and in the environmental impacts caused by its LCA (greenhouse gas emissions). Therefore, we propose to establish guidelines to characterize the insulating material with a better environmental performance in all the stages of its life cycle, taking into account the construction system, the use of the building and its location.
Resumo:
The European Union has been promoting linguistic diversity for many years as one of its main educational goals. This is an element that facilitates student mobility and student exchanges between different universities and countries and enriches the education of young undergraduates. In particular,a higher degree of competence in the English language is becoming essential for engineers, architects and researchers in general, as English has become the lingua franca that opens up horizons to internationalisation and the transfer of knowledge in today’s world. Many experts point to the Integrated Approach to Contents and Foreign Languages System as being an option that has certain benefits over the traditional method of teaching a second language that is exclusively based on specific subjects. This system advocates teaching the different subjects in the syllabus in a language other than one’s mother tongue, without prioritising knowledge of the language over the subject. This was the idea that in the 2009/10 academic year gave rise to the Second Language Integration Programme (SLI Programme) at the Escuela Arquitectura Tecnica in the Universidad Politecnica Madrid (EUATM-UPM), just at the beginning of the tuition of the new Building Engineering Degree, which had been adapted to the European Higher Education Area (EHEA) model. This programme is an interdisciplinary initiative for the set of subjects taught during the semester and is coordinated through the Assistant Director Office for Educational Innovation. The SLI Programme has a dual goal; to familiarise students with the specific English terminology of the subject being taught, and at the same time improve their communication skills in English. A total of thirty lecturers are taking part in the teaching of eleven first year subjects and twelve in the second year, with around 120 students who have voluntarily enrolled in a special group in each semester. During the 2010/2011 academic year the degree of acceptance and the results of the SLI Programme are being monitored. Tools have been designed to aid interdisciplinary coordination and to analyse satisfaction, such as coordination records and surveys. The results currently available refer to the first semester of the year and are divided into specific aspects of the different subjects involved and into general aspects of the ongoing experience.
Resumo:
La presente tesis doctoral se enmarca dentro del concepto de la sistematización del conocimiento en arquitectura, más concretamente en el campo de las construcciones arquitectónicas y la toma de decisiones en la fase de proyecto de envolventes arquitectónicas multicapa. Por tanto, el objetivo principal es el establecimiento de las bases para una toma de decisiones informadas durante el proyecto de una envolvente multicapa con el fin de colaborar en su optimización. Del mismo modo que la historia de la arquitectura está relacionada con la historia de la innovación en construcción, la construcción está sujeta a cambios como respuesta a los fracasos anteriores. En base a esto, se identifica la toma de decisiones en la fase de proyecto como el estadio inicial para establecer un punto estratégico de reflexión y de control sobre los procesos constructivos. La presente investigación, conceptualmente, define los parámetros intervinientes en el proyecto de envolventes arquitectónicas multicapa a partir de una clasificación y sistematización de todos los componentes (elementos, unidades y sistemas constructivos) utilizados en las fachadas multicapa. Dicha sistematización se materializa en una hoja matriz de datos en la que, dentro de una organización a modo de árbol, se puede acceder a la consulta de cada componente y de su caracterización. Dicha matriz permite la incorporación futura de cualquier componente o sistema nuevo que aparezca en el mercado, relacionándolo con aquellos con los que comparta ubicación, tipo de material, etc. Con base en esa matriz de datos, se diseña la sistematización de la toma de decisiones en la fase de proyecto de una envolvente arquitectónica, en concreto, en el caso de una fachada. Operativamente, el resultado se presenta como una herramienta que permite al arquitecto o proyectista reflexionar y seleccionar el sistema constructivo más adecuado, al enfrentarse con las distintas decisiones o elecciones posibles. La herramienta se basa en las elecciones iniciales tomadas por el proyectista y se estructura, a continuación y sucesivamente, en distintas aproximaciones, criterios, subcriterios y posibilidades que responden a los distintos avances en la definición del sistema constructivo. Se proponen una serie de fichas operativas de comprobación que informan sobre el estadio de decisión y de definición de proyecto alcanzados en cada caso. Asimismo, el sistema permite la conexión con otros sistemas de revisión de proyectos para fomentar la reflexión sobre la normalización de los riesgos asociados tanto al proprio sistema como a su proceso constructivo y comportamiento futuros. La herramienta proporciona un sistema de ayuda para ser utilizado en el proceso de toma de decisiones en la fase de diseño de una fachada multicapa, minimizando la arbitrariedad y ofreciendo una cualificación previa a la cuantificación que supondrá la elaboración del detalle constructivo y de su medición en las sucesivas fases del proyecto. Al mismo tiempo, la sistematización de dicha toma de decisiones en la fase del proyecto puede constituirse como un sistema de comprobación en las diferentes fases del proceso de decisión proyectual y de definición de la envolvente de un edificio. ABSTRACT The central issue of this doctoral Thesis is founded on the framework of the concept of the systematization of knowledge in architecture, in particular, in respect of the field of building construction and the decision making in the design stage of multilayer building envelope projects. Therefore, the main objective is to establish the bases for knowledgeable decision making during a multilayer building envelope design process, in order to collaborate with its optimization. Just as the history of architecture is connected to the history of innovation in construction, construction itself is subject to changes as a response to previous failures. On this basis, the decisions made during the project design phase are identified as the initial state to establish an strategic point for reflection and control, referred to the constructive processes. Conceptually, this research defines the parameters involving the multilayer building envelope projects, on the basis of a classification and systematization for all the components (elements, constructive units and constructive systems) used in multilayer façades. The mentioned systematization is materialized into a data matrix sheet in which, following a tree‐like organization, the access to every single component and its characterization is possible. The above data matrix allows the future inclusion of any new component or system that may appear in the construction market. That new component or system can be put into a relationship with another, which it shares location, type of material,… with. Based on the data matrix, the systematization of the decision making process for a building envelope design stage is designed, more particularly in the case of a façade. Putting this into practice, it is represented as a tool which allows the architect or the designer, to reflect and to select the appropriate building system when facing the different elections or the different options. The tool is based on the initial elections taken by the designer. Then and successively, it is shaped on the form of different operative steps, criteria, sub‐criteria and possibilities which respond to a different progress in the definition of the building construction system. In order to inform about the stage of the decision and the definition reached by the project in every particular case, a range of operative sheets are proposed. Additionally, the system allows the connection with other reviewing methods for building projects. The aim of this last possibility is to encourage the reflection on standardization of the associated risks to the building system itself and its future performance. The tool provides a helping system to be used during the decision making process for a multilayer façade design. It minimizes the arbitrariness and offers a qualification previous to the quantification that will be done with the development of the construction details and their bill of quantities, that in subsequent project stages will be executed. At the same time, the systematization of the mentioned decision making during the design phase, can be found as a checking system in the different stages of the decision making design process and in the different stages of the building envelope definition.
Resumo:
PV Off-Grid systems have demonstrated to be a good solution for the electrification of remote areas [1]. A hybrid system is one kind of these systems. The principal characteristic is that it uses PV as the main generator and has a backup power supply, like a diesel generator, for instance, that is used when the CPV generation is not enough to meet demand. To study the use of CPV in these systems, ISFOC has installed a demonstration hybrid system at its headquarters. This hybrid system uses CPV technology as main generator and the utility grid as the backup generator. A group of batteries have been mounted as well to store the remaining energy from the CPV generator when nedeed. The energy flows are managed by a SMA system based on Sunny Island inverters and a Multicluster-Box (figure 1). The Load is the air-conditioning system of the building, as it has a consumption profile higher than the CPV generator and can be controlled by software [2]. The first results of this system, as well as the first chances of improvement, as the need of a bigger CPV generator and a better management of the energy stored in the batteries, are presented in this paper.
Resumo:
Análisis de ciclo de vida de una nueva solución arquitectónica que mejora el rendimiento térmico de la envolvente del edificio: fachada natural aljibe.
Resumo:
In 2008, the City Council of Rivas-Vaciamadrid (Spain) decided to promote the construction of “Rivasecopolis”, a complex of sustainable buildings in which a new prototype of a zero-energy house would become the office of the Energy Agency. According to the initiative of the City Council, it was decided to recreate the dwelling prototype “Magic-box” which entered the 2005 Solar Decathlon Competition. The original project has been adapted to a new necessities programme, by adding the necessary spaces that allows it to work as an office. A team from university has designed and carried out the direction of the construction site. The new Solar House is conceived as a “testing building”. It is going to become the space for attending citizens in all questions about saving energy, energy efficiency and sustainable construction, having a permanent small exhibition space additional to the working places for the information purpose. At the same time, the building includes the use of experimental passive architecture systems and a monitoring and control system. Collected data will be sent to University to allow developing research work about the experimental strategies included in the building. This paper will describe and analyze the experience of transforming a prototype into a real durable building and the benefits for both university and citizens in learning about sustainability with the building
Resumo:
Desde los años 60, crece en Europa y Estados Unidos la preocupación y la necesidad de mejorar los procesos de gerencia de los proyectos de construcción al volverse estos más complejos. Esto ha llevado a la continua aparición de nuevos profesionales desde la fecha citada hasta nuestros días. De ahí la complejidad de conocer las cualidades de cada uno de ellos, así como las funciones a realizar o la formación que deben tener para poder desarrollar el puesto de trabajo según el papel que desempeñan para cada actividad. Muchos agentes son los que pueden intervenir en la edificación, muchas son las funciones que llevan a cabo estos agentes, muchas son las habilidades que se necesitan para realizar estas misiones, y una buena gestión de la edificación es la que hay que desarrollar para lograr el gran éxito. El presente trabajo fin de máster, dirigido a arquitectos, arquitectos técnicos, ingenieros, abogados, economistas y todos los profesionales del sector inmobiliario y de la construcción, trata de resolver todas aquellas dudas sobre los diferentes sujetos que estarán presentes desde la definición del proyecto en la fase inicial hasta el final de la obra, pasando por las fases de pre-construcción, construcción y post-construcción. (ENGLISH VERSION) Since the 1960s, most construction projects have become more and more complex, and new concerns and necessities related to the management of a project have been on the rise in Europe and in the United States. Thence, the need for more specialized professionals in the field has become a common fact, as well as the inclusion of new curricular subjects in most building engineering studies. There are different agents that play a relevant role in a building project; some of them are expected to perform a highly specialized set of functions that require specific management skills for the work to be successful. This research work—aimed mainly at engineers, quantity surveyors, lawyers, economists, real estate and construction professionals—shows the major implications of the building construction process including both pre-tender/construction and post-tender/construction stages as far as the main expert agents are involved.
Resumo:
In this paper we present a global overview of the recent study carried out in Spain for the new hazard map, which final goal is the revision of the Building Code in our country (NCSE-02). The study was carried our for a working group joining experts from The Instituto Geografico Nacional (IGN) and the Technical University of Madrid (UPM) , being the different phases of the work supervised by an expert Committee integrated by national experts from public institutions involved in subject of seismic hazard. The PSHA method (Probabilistic Seismic Hazard Assessment) has been followed, quantifying the epistemic uncertainties through a logic tree and the aleatory ones linked to variability of parameters by means of probability density functions and Monte Carlo simulations. In a first phase, the inputs have been prepared, which essentially are: 1) a project catalogue update and homogenization at Mw 2) proposal of zoning models and source characterization 3) calibration of Ground Motion Prediction Equations (GMPE’s) with actual data and development of a local model with data collected in Spain for Mw < 5.5. In a second phase, a sensitivity analysis of the different input options on hazard results has been carried out in order to have criteria for defining the branches of the logic tree and their weights. Finally, the hazard estimation was done with the logic tree shown in figure 1, including nodes for quantifying uncertainties corresponding to: 1) method for estimation of hazard (zoning and zoneless); 2) zoning models, 3) GMPE combinations used and 4) regression method for estimation of source parameters. In addition, the aleatory uncertainties corresponding to the magnitude of the events, recurrence parameters and maximum magnitude for each zone have been also considered including probability density functions and Monte Carlo simulations The main conclusions of the study are presented here, together with the obtained results in terms of PGA and other spectral accelerations SA (T) for return periods of 475, 975 and 2475 years. The map of the coefficient of variation (COV) are also represented to give an idea of the zones where the dispersion among results are the highest and the zones where the results are robust.
Resumo:
Governments are working in new policies to slow down total energy consumption and greenhouse gases (GHG) emissions, promoting the deployment of electric vehicles (EVs) in all countries. In order to facilitate this deployment and help to reduce the final costs of their batteries, additional utilization of EVs when those are parked has been proposed. EVs can be used to minimize the total electricity cost of buildings (named vehicle to building applications, V2B). In this paper an economic evaluation of EVs in the Building Energy Management System is shown. The optimal storage capacity and its equivalent number of EVs are determined. This value is then used for determining the optimal charging schedule to be applied to the batteries. From this schedule, the total expected profit is derived for the case of a real hotel in Spain.
Resumo:
The objective of this paper is the development of a building cost estimation model whose purpose is to quickly and precisely evaluate rebuilding costs for historic heritage buildings affected by catastrophic events. Specifically, this study will be applied to the monumental buildings owned by the Catholic Church that were affected by two earthquakes on May 11, 2011 in the town of Lorca. To estimate the initial total replacement cost new, calculation model will be applied which, on the one hand, will use two-dimensional metric exterior parameters and, on the other, three-dimensional interior cubic parameters. Based on the total of the analyzed buildings, and considering damage caused by the seismic event, the final reconstruction cost for the building units ruined by the earthquakes can be estimated. The proposed calculation model can also be applied to other emergency scenarios and situations for the quick estimation of construction costs necessary for rebuilding historic heritage buildings which have been affected by catastrophic events that deteriorate or ruin their structural or constructive configuration.
Resumo:
The automation of domestic services began to be implemented in buildings since the late nineteenth century, and today we are used to terms like ‘intelligent buildings’, ‘digital home’ or ‘domotic buildings’. These concepts tell us about constructions which integrate new technologies in order to improve comfort, optimize energy consumption or enhance the security of users. In conjunction, building regulations have been updated to suit the needs of society and to regulate these new facilities in such structures. However, we are not always sure about how far, from the quantitative or qualitative point of view, legislation should regulate certain aspects of the building activity. Consequently, content analysis is adopted in this research to determine the influence of building regulations in the implementation of new technologies in the construction process. This study includes the analysis of different European regulations, the collection and documentation of such guidelines that have been established and a study of the impact that all of these have had in the way we start thinking an architectural project. The achievements of the research could be explained in terms of the regulatory requirements that must be taken into account in order to achieve a successful implementation of a home automation system, and the key finding has been the confirmation of how the design of smart buildings may be promoted through specific regulatory requirements while other factors, such as the global economic situation, do not seem to affect directly the rate of penetration of home automation in construction.
Resumo:
The opening of new windows on the façade is proposed as a refurbishment strategy in an existing building in Málaga to facilitate cross ventilation of dwellings. The building is a residential block of 140 public housing units for rent for people with low income in Málaga (Spain), property of the City Council. By modeling with Computational Fluid Dynamics (CFD), eleven configurations of openings are studied in two different areas of the main housing type of the building. The quantity of introduced/extracted air into/from the room and the generated airflow patterns are obtained. The modeling allows comparing the different openings configurations to determine the most appropriate ventilation option for every room.
Resumo:
The influence of training in labor risk prevention and the development of the resulting pre-emptive culture are analyzed within this paper. In order to achieve this, a quantitative analysis of the students of Building Degree in the Technic University of Madrid has been developed. This study has been made in all grades, valuating the previous knowledge acquired during compulsory education. It must be kept in mind that the students in 3rd and 4th grade have received general and specific compulsory training in prevention and safety in the building sector.