10 resultados para Discrete-event simulations
em Universidad Politécnica de Madrid
Resumo:
Purpose – The purpose of this paper is to present a simulation‐based evaluation method for the comparison of different organizational forms and software support levels in the field of supply chain management (SCM). Design/methodology/approach – Apart from widely known logistic performance indicators, the discrete event simulation model considers explicitly coordination cost as stemming from iterative administration procedures. Findings - The method is applied to an exemplary supply chain configuration considering various parameter settings. Curiously, additional coordination cost does not always result in improved logistic performance. Influence factor variations lead to different organizational recommendations. The results confirm the high importance of (up to now) disregarded dimensions when evaluating SCM concepts and IT tools. Research limitations/implications – The model is based on simplified product and network structures. Future research shall include more complex, real world configurations. Practical implications – The developed method is designed for the identification of improvement potential when SCM software is employed. Coordination schemes based only on ERP systems are valid alternatives in industrial practice because significant investment IT can be avoided. Therefore, the evaluation of these coordination procedures, in particular the cost due to iterations, is of high managerial interest and the method provides a comprehensive tool for strategic IT decision making. Originality/value – Reviewed literature is mostly focused on the benefits of SCM software implementations. However, ERP system based supply chain coordination is still widespread industrial practice but associated coordination cost has not been addressed by researchers.
Resumo:
Los sistemas transaccionales tales como los programas informáticos para la planificación de recursos empresariales (ERP software) se han implementado ampliamente mientras que los sistemas analíticos para la gestión de la cadena de suministro (SCM software) no han tenido el éxito deseado por la industria de tecnología de información (TI). Aunque se documentan beneficios importantes derivados de las implantaciones de SCM software, las empresas industriales son reacias a invertir en este tipo de sistemas. Por una parte esto es debido a la falta de métodos que son capaces de detectar los beneficios por emplear esos sistemas, y por otra parte porque el coste asociado no está identificado, detallado y cuantificado suficientemente. Los esquemas de coordinación basados únicamente en sistemas ERP son alternativas válidas en la práctica industrial siempre que la relación coste-beneficio esta favorable. Por lo tanto, la evaluación de formas organizativas teniendo en cuenta explícitamente el coste debido a procesos administrativos, en particular por ciclos iterativos, es de gran interés para la toma de decisiones en el ámbito de inversiones en TI. Con el fin de cerrar la brecha, el propósito de esta investigación es proporcionar métodos de evaluación que permitan la comparación de diferentes formas de organización y niveles de soporte por sistemas informáticos. La tesis proporciona una amplia introducción, analizando los retos a los que se enfrenta la industria. Concluye con las necesidades de la industria de SCM software: unas herramientas que facilitan la evaluación integral de diferentes propuestas de organización. A continuación, la terminología clave se detalla centrándose en la teoría de la organización, las peculiaridades de inversión en TI y la tipología de software de gestión de la cadena de suministro. La revisión de la literatura clasifica las contribuciones recientes sobre la gestión de la cadena de suministro, tratando ambos conceptos, el diseño de la organización y su soporte por las TI. La clasificación incluye criterios relacionados con la metodología de la investigación y su contenido. Los estudios empíricos en el ámbito de la administración de empresas se centran en tipologías de redes industriales. Nuevos algoritmos de planificación y esquemas de coordinación innovadoras se desarrollan principalmente en el campo de la investigación de operaciones con el fin de proponer nuevas funciones de software. Artículos procedentes del área de la gestión de la producción se centran en el análisis de coste y beneficio de las implantaciones de sistemas. La revisión de la literatura revela que el éxito de las TI para la coordinación de redes industriales depende en gran medida de características de tres dimensiones: la configuración de la red industrial, los esquemas de coordinación y las funcionalidades del software. La literatura disponible está enfocada sobre todo en los beneficios de las implantaciones de SCM software. Sin embargo, la coordinación de la cadena de suministro, basándose en el sistema ERP, sigue siendo la práctica industrial generalizada, pero el coste de coordinación asociado no ha sido abordado por los investigadores. Los fundamentos de diseño organizativo eficiente se explican en detalle en la medida necesaria para la comprensión de la síntesis de las diferentes formas de organización. Se han generado varios esquemas de coordinación variando los siguientes parámetros de diseño: la estructura organizativa, los mecanismos de coordinación y el soporte por TI. Las diferentes propuestas de organización desarrolladas son evaluadas por un método heurístico y otro basado en la simulación por eventos discretos. Para ambos métodos, se tienen en cuenta los principios de la teoría de la organización. La falta de rendimiento empresarial se debe a las dependencias entre actividades que no se gestionan adecuadamente. Dentro del método heurístico, se clasifican las dependencias y se mide su intensidad basándose en factores contextuales. A continuación, se valora la idoneidad de cada elemento de diseño organizativo para cada dependencia específica. Por último, cada forma de organización se evalúa basándose en la contribución de los elementos de diseño tanto al beneficio como al coste. El beneficio de coordinación se refiere a la mejora en el rendimiento logístico - este concepto es el objeto central en la mayoría de modelos de evaluación de la gestión de la cadena de suministro. Por el contrario, el coste de coordinación que se debe incurrir para lograr beneficios no se suele considerar en detalle. Procesos iterativos son costosos si se ejecutan manualmente. Este es el caso cuando SCM software no está implementada y el sistema ERP es el único instrumento de coordinación disponible. El modelo heurístico proporciona un procedimiento simplificado para la clasificación sistemática de las dependencias, la cuantificación de los factores de influencia y la identificación de configuraciones que indican el uso de formas organizativas y de soporte de TI más o menos complejas. La simulación de eventos discretos se aplica en el segundo modelo de evaluación utilizando el paquete de software ‘Plant Simulation’. Con respecto al rendimiento logístico, por un lado se mide el coste de fabricación, de inventario y de transporte y las penalizaciones por pérdida de ventas. Por otro lado, se cuantifica explícitamente el coste de la coordinación teniendo en cuenta los ciclos de coordinación iterativos. El método se aplica a una configuración de cadena de suministro ejemplar considerando diversos parámetros. Los resultados de la simulación confirman que, en la mayoría de los casos, el beneficio aumenta cuando se intensifica la coordinación. Sin embargo, en ciertas situaciones en las que se aplican ciclos de planificación manuales e iterativos el coste de coordinación adicional no siempre conduce a mejor rendimiento logístico. Estos resultados inesperados no se pueden atribuir a ningún parámetro particular. La investigación confirma la gran importancia de nuevas dimensiones hasta ahora ignoradas en la evaluación de propuestas organizativas y herramientas de TI. A través del método heurístico se puede comparar de forma rápida, pero sólo aproximada, la eficiencia de diferentes formas de organización. Por el contrario, el método de simulación es más complejo pero da resultados más detallados, teniendo en cuenta parámetros específicos del contexto del caso concreto y del diseño organizativo. ABSTRACT Transactional systems such as Enterprise Resource Planning (ERP) systems have been implemented widely while analytical software like Supply Chain Management (SCM) add-ons are adopted less by manufacturing companies. Although significant benefits are reported stemming from SCM software implementations, companies are reluctant to invest in such systems. On the one hand this is due to the lack of methods that are able to detect benefits from the use of SCM software and on the other hand associated costs are not identified, detailed and quantified sufficiently. Coordination schemes based only on ERP systems are valid alternatives in industrial practice because significant investment in IT can be avoided. Therefore, the evaluation of these coordination procedures, in particular the cost due to iterations, is of high managerial interest and corresponding methods are comprehensive tools for strategic IT decision making. The purpose of this research is to provide evaluation methods that allow the comparison of different organizational forms and software support levels. The research begins with a comprehensive introduction dealing with the business environment that industrial networks are facing and concludes highlighting the challenges for the supply chain software industry. Afterwards, the central terminology is addressed, focusing on organization theory, IT investment peculiarities and supply chain management software typology. The literature review classifies recent supply chain management research referring to organizational design and its software support. The classification encompasses criteria related to research methodology and content. Empirical studies from management science focus on network types and organizational fit. Novel planning algorithms and innovative coordination schemes are developed mostly in the field of operations research in order to propose new software features. Operations and production management researchers realize cost-benefit analysis of IT software implementations. The literature review reveals that the success of software solutions for network coordination depends strongly on the fit of three dimensions: network configuration, coordination scheme and software functionality. Reviewed literature is mostly centered on the benefits of SCM software implementations. However, ERP system based supply chain coordination is still widespread industrial practice but the associated coordination cost has not been addressed by researchers. Fundamentals of efficient organizational design are explained in detail as far as required for the understanding of the synthesis of different organizational forms. Several coordination schemes have been shaped through the variation of the following design parameters: organizational structuring, coordination mechanisms and software support. The different organizational proposals are evaluated using a heuristic approach and a simulation-based method. For both cases, the principles of organization theory are respected. A lack of performance is due to dependencies between activities which are not managed properly. Therefore, within the heuristic method, dependencies are classified and their intensity is measured based on contextual factors. Afterwards the suitability of each organizational design element for the management of a specific dependency is determined. Finally, each organizational form is evaluated based on the contribution of the sum of design elements to coordination benefit and to coordination cost. Coordination benefit refers to improvement in logistic performance – this is the core concept of most supply chain evaluation models. Unfortunately, coordination cost which must be incurred to achieve benefits is usually not considered in detail. Iterative processes are costly when manually executed. This is the case when SCM software is not implemented and the ERP system is the only available coordination instrument. The heuristic model provides a simplified procedure for the classification of dependencies, quantification of influence factors and systematic search for adequate organizational forms and IT support. Discrete event simulation is applied in the second evaluation model using the software package ‘Plant Simulation’. On the one hand logistic performance is measured by manufacturing, inventory and transportation cost and penalties for lost sales. On the other hand coordination cost is explicitly considered taking into account iterative coordination cycles. The method is applied to an exemplary supply chain configuration considering various parameter settings. The simulation results confirm that, in most cases, benefit increases when coordination is intensified. However, in some situations when manual, iterative planning cycles are applied, additional coordination cost does not always lead to improved logistic performance. These unexpected results cannot be attributed to any particular parameter. The research confirms the great importance of up to now disregarded dimensions when evaluating SCM concepts and IT tools. The heuristic method provides a quick, but only approximate comparison of coordination efficiency for different organizational forms. In contrast, the more complex simulation method delivers detailed results taking into consideration specific parameter settings of network context and organizational design.
Resumo:
Void growth in ductile materials is an important problem from the fundamental and technological viewpoint. Most of the models developed to quantify and understand the void growth process did not take into account two important factors: the anisotropic nature of plastic flow in single crystals and the size effects that appear when plastic flow is confined into very small regions.
Resumo:
Discrete element method (DEM) is a numerical technique widely used for simulating the mechanical behavior of granular materials involved in many food and agricultural industry processes. Additionally, this technique is also a powerful tool to understand many complex phenomena related to the mechanics of granular materials. However, to make use of the potential of this technique it is necessary to develop DEM models capable of representing accurately the reality. For that, among some other questions, it is essential that the values of the microscopic material properties used to define the numerical model are accurately determined.
Resumo:
In this correspondence, the conditions to use any kind of discrete cosine transform (DCT) for multicarrier data transmission are derived. The symmetric convolution-multiplication property of each DCT implies that when symmetric convolution is performed in the time domain, an element-by-element multiplication is performed in the corresponding discrete trigonometric domain. Therefore, appending symmetric redun-dancy (as prefix and suffix) into each data symbol to be transmitted, and also enforcing symmetry for the equivalent channel impulse response, the linear convolution performed in the transmission channel becomes a symmetric convolution in those samples of interest. Furthermore, the channel equalization can be carried out by means of a bank of scalars in the corresponding discrete cosine transform domain. The expressions for obtaining the value of each scalar corresponding to these one-tap per subcarrier equalizers are presented. This study is completed with several computer simulations in mobile broadband wireless communication scenarios, considering the presence of carrier frequency offset (CFO). The obtained results indicate that the proposed systems outperform the standardized ones based on the DFT.
Resumo:
The Integrated Safety Assessment (ISA) methodology, developed by the Spanish Nuclear Safety Council (CSN), has been applied to a thermo-hydraulical analysis of a Westinghouse 3-loop PWR plant by means of the dynamic event trees (DET) for Steam Generator Tube Rupture (SGTR) sequences. The ISA methodology allows obtaining the SGTR Dynamic Event Tree taking into account the operator actuation times. Simulations are performed with SCAIS (Simulation Code system for Integrated Safety Assessment), which includes a dynamic coupling with MAAP thermal hydraulic code. The results show the capability of the ISA methodology and SCAIS platform to obtain the DET of complex sequences.
Resumo:
The dimensionality effect is avoided by the use of sufficient statistics in event probability estimators realised by importance sampling. If the system function is not a sufficient statistic, an approach is proposed to reduce the dimensionality effect in the estimators. Simulation results of false-alarm probability estimations, applied to radar detection, confirm a clear concordance with the theoretical results
Resumo:
The linear instability and breakdown to turbulence induced by an isolated roughness element in a boundary layer at Mach 2:5, over an isothermal flat plate with laminar adiabatic wall temperature, have been analysed by means of direct numerical simulations, aided by spatial BiGlobal and three-dimensional parabolized (PSE-3D) stability analyses. It is important to understand transition in this flow regime since the process can be slower than in incompressible flow and is crucial to prediction of local heat loads on next-generation flight vehicles. The results show that the roughness element, with a height of the order of the boundary layer displacement thickness, generates a highly unstable wake, which is composed of a low-velocity streak surrounded by a three-dimensional high-shear layer and is able to sustain the rapid growth of a number of instability modes. The most unstable of these modes are associated with varicose or sinuous deformations of the low-velocity streak; they are a consequence of the instability developing in the three-dimensional shear layer as a whole (the varicose mode) or in the lateral shear layers (the sinuous mode). The most unstable wake mode is of the varicose type and grows on average 17% faster tan the most unstable sinuous mode and 30 times faster than the most unstable boundary layer mode occurring in the absence of a roughness element. Due to the high growthrates registered in the presence of the roughness element, an amplification factor of N D 9 is reached within 50 roughness heights from the roughness trailing edge. The independently performed Navier–Stokes, spatial BiGlobal and PSE-3D stability results are in excellent agreement with each other, validating the use of simplified theories for roughness-induced transition involving wake instabilities. Following the linear stages of the laminar–turbulent transition process, the roll-up of the three-dimensional shear layer leads to the formation of a wedge of turbulence, which spreads laterally at a rate similar to that observed in the case of compressible turbulent spots for the same Mach number.
Resumo:
Los ensayos virtuales de materiales compuestos han aparecido como un nuevo concepto dentro de la industria aeroespacial, y disponen de un vasto potencial para reducir los enormes costes de certificación y desarrollo asociados con las tediosas campañas experimentales, que incluyen un gran número de paneles, subcomponentes y componentes. El objetivo de los ensayos virtuales es sustituir algunos ensayos por simulaciones computacionales con alta fidelidad. Esta tesis es una contribución a la aproximación multiescala desarrollada en el Instituto IMDEA Materiales para predecir el comportamiento mecánico de un laminado de material compuesto dadas las propiedades de la lámina y la intercara. La mecánica de daño continuo (CDM) formula el daño intralaminar a nivel constitutivo de material. El modelo de daño intralaminar se combina con elementos cohesivos para representar daño interlaminar. Se desarrolló e implementó un modelo de daño continuo, y se aplicó a configuraciones simples de ensayos en laminados: impactos de baja y alta velocidad, ensayos de tracción, tests a cortadura. El análisis del método y la correlación con experimentos sugiere que los métodos son razonablemente adecuados para los test de impacto, pero insuficientes para el resto de ensayos. Para superar estas limitaciones de CDM, se ha mejorado la aproximación discreta de elementos finitos enriqueciendo la cinemática para incluir discontinuidades embebidas: el método extendido de los elementos finitos (X-FEM). Se adaptó X-FEM para un esquema explícito de integración temporal. El método es capaz de representar cualitativamente los mecanismos de fallo detallados en laminados. Sin embargo, los resultados muestran inconsistencias en la formulación que producen resultados cuantitativos erróneos. Por último, se ha revisado el método tradicional de X-FEM, y se ha desarrollado un nuevo método para superar sus limitaciones: el método cohesivo X-FEM estable. Las propiedades del nuevo método se estudiaron en detalle, y se concluyó que el método es robusto para implementación en códigos explícitos dinámicos escalables, resultando una nueva herramienta útil para la simulación de daño en composites. Virtual testing of composite materials has emerged as a new concept within the aerospace industry. It presents a very large potential to reduce the large certification costs and the long development times associated with the experimental campaigns, involving the testing of a large number of panels, sub-components and components. The aim of virtual testing is to replace some experimental tests by high-fidelity numerical simulations. This work is a contribution to the multiscale approach developed in Institute IMDEA Materials to predict the mechanical behavior of a composite laminate from the properties of the ply and the interply. Continuum Damage Mechanics (CDM) formulates intraply damage at the the material constitutive level. Intraply CDM is combined with cohesive elements to model interply damage. A CDM model was developed, implemented, and applied to simple mechanical tests of laminates: low and high velocity impact, tension of coupons, and shear deformation. The analysis of the results and the comparison with experiments indicated that the performance was reasonably good for the impact tests, but insuficient in the other cases. To overcome the limitations of CDM, the kinematics of the discrete finite element approximation was enhanced to include mesh embedded discontinuities, the eXtended Finite Element Method (X-FEM). The X-FEM was adapted to an explicit time integration scheme and was able to reproduce qualitatively the physical failure mechanisms in a composite laminate. However, the results revealed an inconsistency in the formulation that leads to erroneous quantitative results. Finally, the traditional X-FEM was reviewed, and a new method was developed to overcome its limitations, the stable cohesive X-FEM. The properties of the new method were studied in detail, and it was demonstrated that the new method was robust and can be implemented in a explicit finite element formulation, providing a new tool for damage simulation in composite materials.
Resumo:
The problem of channel estimation for multicarrier communications is addressed. We focus on systems employing the Discrete Cosine Transform Type-I (DCT1) even at both the transmitter and the receiver, presenting an algorithm which achieves an accurate estimation of symmetric channel filters using only a small number of training symbols. The solution is obtained by using either matrix inversion or compressed sensing algorithms. We provide the theoretical results which guarantee the validity of the proposed technique for the DCT1. Numerical simulations illustrate the good behaviour of the proposed algorithm.