Flash floods are of major relevance in natural disaster management in the Mediterranean region. In many cases, the damaging effects of flash floods can be mitigated by adequate management of flood control reservoirs. This requires the development of suitable models for optimal operation of reservoirs. A probabilistic methodology for calibrating the parameters of a reservoir flood control model (RFCM) that takes into account the stochastic variability of flood events is presented. This study addresses the crucial problem of operating reservoirs during flood events, considering downstream river damages and dam failure risk as conflicting operation criteria. These two criteria are aggregated into a single objective of total expected damages from both the maximum released flows and stored volumes (overall risk index). For each selected parameter set the RFCM is run under a wide range of hydrologic loads (determined through Monte Carlo simulation). The optimal parameter set is obtained through the overall risk index (balanced solution) and then compared with other solutions of the Pareto front. The proposed methodology is implemented at three different reservoirs in the southeast of Spain. The results obtained show that the balanced solution offers a good compromise between the two main objectives of reservoir flood control management

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Three broken steel bars from a sewed crack in a dam are reported. The inspection of the fracture surfaces of the prestressed bars suggests that fractures were triggered by small cracks and by the inherent brittleness of the bars, as fracture toughness was about 40 MPa m1/2. The analysis of the failures shows that the usual design requirements for prestressing bars fail to warn against brittle failures if some damage exists. Some recommendations, based on the concept of damage tolerance, are suggested to avoid similar unfortunate incidents.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper aims to present and validate a numerical technique for the simulation of the overtopping and onset of failure in rockfill dams due to mass sliding. This goal is achieved by coupling a fluid dynamic model for the simulation of the free surface and through-flow problems, with a numerical technique for the calculation of the rockfill response and deformation. Both the flow within the dam body and in its surroundings are taken into account. An extensive validation of the resulting computational method is performed by solving several failure problems on physical models of rockfill dams for which experimental results have been obtained by the authors.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

La gestión de estériles de una explotación minera es un punto clave en el desarrollo económico de una actividad extractiva, y en especial, del entorno natural y social en el que se emplaza dicho proyecto. La minería de metales preciosos lleva asociada la construcción de balsas de residuos muy peligrosos, fruto de su proceso extractivo, como por ejemplo la cianuración en el caso del oro. Para un correcto funcionamiento de dichos emplazamientos es necesario escoger correctamente el método constructivo a partir de estudios de reconocimiento previos, como estudios de estabilidad geotécnica, contexto geológico de la zona, sismicidad, hidrología, etc. Así mismo, han de llevarse a cabo unas exhaustivas medidas de control y vigilancia para asegurar las condiciones de seguridad exigidas. La ruptura de la balsa de decantación de Aurul S.A. en Baia Mare (Rumania) el 30 de Enero del año 2000 ha sido escogido como caso de estudio de estabilidad de diques. ABSTRACT Tailing's management of a mining exploitation is a key point in the economical development of the extractive activity and, especially, of the natural and social environment of the site. Precious metals mining has high hazardous embankment construction associated, product of its extractive process, i.e. gold cyanidation. A correct operation of those sites makes necessary to choose a suitable construction method, based on previous studies as geotechnical stability studies, geological context of the area, seismicity, hydrology, etc. At the same time, exhaustive control and monitoring must be carried out in order to assure the required safety conditions. Aurul's decantation pond failure in Baia Mare (Romania), on 30th January 2000, has been chosen as a stability analysis case-study.