7 resultados para Contracts
em Universidad Politécnica de Madrid
Resumo:
In this genre analysis research paper, we compare U.S. patents, contracts, and regulations on technical matters with a focus upon the relation between vagueness and communicative purposes and subpurposes of these three genres. Our main interest is the investigation of intergeneric conventions across the three genres, based on the software analysis of three corpora (one for each genre, 1 million words per corpus). The result of the investigation is that intergeneric conventions are found at the level of types of expressed linguistic vagueness, but that intergeneric conventions at the level of actual formulations are rare. The conclusion is that at this latter level the influence from the situation type underlying the individual genre is more important than the overarching legal character of the genres, when we talk about introducing explicit vagueness in the text.
Resumo:
El agua es un recurso cada vez más escaso y valioso. Por ello, los recursos hídricos disponibles deben asignarse de una forma eficiente entre los diferentes usos. El cambio climático aumentará la frecuencia y severidad de los eventos extremos, y podría incrementar la demanda de agua de los cultivos. El empleo de mecanismos flexibles de asignación de agua puede ser imprescindible para hacer frente a este aumento en la variabilidad del balance hídrico y para asegurar que los riesgos de suministro, y no solo los recursos, son compartidos de manera eficiente entre los usuarios. Los mercados de agua permiten la reasignación de los recursos hídricos, favoreciendo su transferencia desde los usos de menor a los de mayor valor. Diferentes tipos de mercados de agua se han establecido en diferentes partes del mundo, ayudando a los participantes a afrontar los problemas de escasez de agua en esas zonas. En España, los intercambios de agua están permitidos desde 1999, aunque la participación de los usuarios en el mercado ha sido limitada. Hay varios aspectos de los mercados de agua en España que deben mejorarse. Esta tesis, además de proponer una serie de cambios en el marco regulatorio, propone la introducción de contratos de opción de agua como una posible mejora. La principal ventaja de este tipo de contratos es la estabilidad legal e institucional que éstos proporcionan tanto a compradores como vendedores. Para apoyar esta propuesta, se han llevado a cabo diferentes análisis que muestran el potencial de los contratos de opción como herramienta de reducción del riesgo asociado a una oferta de agua inestable. La Cuenca del Segura (Sureste de España), la Cuenca del Tajo y el Acueducto Tajo- Segura han sido seleccionados como casos de estudio. Tres análisis distintos aplicados a dicha región se presentan en esta tesis: a) una evaluación de los contratos de opción como mecanismo para reducir los riesgos de disponibilidad de agua sufridos por los regantes en la Cuenca del Segura; b) un marco teórico para analizar las preferencias de los regantes por diferentes mecanismos de gestión del riesgo de disponibilidad de agua, su disposición a pagar por ellos y los precios aproximados de estos instrumentos (seguro de sequía y contratos de opción de agua); y c) una evaluación del papel de los contratos de opción en las decisiones de aprovisionamiento de agua de una comunidad de regantes ante una oferta de agua incierta. Los resultados muestran el potencial de reducción del riesgo de los contratos de opción para regantes en España, pero pueden ser extrapolados a otros sectores o regiones. Las principales conclusiones de esta tesis son: a) la agricultura será uno de los sectores más afectados por el cambio climático. Si los precios del agua aumentan, la rentabilidad de los cultivos puede caer hasta niveles negativos, lo que podría dar lugar al abandono de cultivos de regadío en algunas zonas de España. Las políticas de cambio climático y de agua deben estar estrechamente coordinadas para asegurar un uso de agua eficiente y la rentabilidad de la agricultura; b) aunque los mercados de agua han ayudado a algunos usuarios a afrontar problemas de disponibilidad del recurso en momentos de escasez, hay varios aspectos que deben mejorarse; c) es necesario desarrollar mercados de agua más flexibles y estables para garantizar una asignación eficiente de los recursos entre los usuarios de agua; d) los resultados muestran los beneficios derivados del establecimiento de un contrato de opción entre usuarios de agua del Tajo y del Segura para reducir el riesgo de disponibilidad de agua en la cuenca receptora; e) la disposición a pagar de los regantes por un contrato de opción de agua o un seguro de sequía hidrológica, que representa el valor que tienen estos mecanismos para aquellos usuarios de agua que se enfrentan a riesgos relacionados con la disponibilidad del recurso, es consistente con los resultados obtenidos en estudios previos y superior al precio de mercado de estos instrumentos, lo que favorece la viabilidad de estos mecanismos de gestión del riesgo ; y f) los contratos de opción podrían ayudar a optimizar las decisiones de aprovisionamiento de agua bajo incertidumbre, proporcionando más estabilidad y flexibilidad que los mercados temporales de agua. ABSTRACT Water is becoming increasingly scarce and valuable. Thus, existing water resources need to be efficiently allocated among users. Climate change is expected to increase the frequency and severity of extreme events, and it may also increase irrigated crops' water demand. The implementation of flexible allocation mechanisms could be essential to cope with this increased variability of the water balance and ensure that supply risks, and not only water resources, are also efficiently shared and managed. Water markets allow for the reallocation of water resources from low to high value uses. Different water trading mechanisms have been created in different parts of the world and have helped users to alleviate water scarcity problems in those areas. In Spain, water trading is allowed since 1999, although market activity has been limited. There are several issues in the Spanish water market that should be improved. This thesis, besides proposing several changes in the legislative framework, proposes the introduction of water option contracts as a potential improvement. The main advantage for both buyer and seller derived from an option contract is the institutional and legal stability it provides. To support this proposal, different analyses have been carried out that show the potential of option contracts as a risk reduction tool to manage water supply instability. The Segura Basin (Southeast Spain), the Tagus Basin and the Tagus-Segura inter-basin Transfer have been selected as the case study. Three different analyses applied to this region are presented in this thesis: a) an evaluation of option contracts as a mechanisms to reduce water supply availability risks in the Segura Basin; b) a theoretical framework for analyzing farmer’s preferences for different water supply risk management tools and farmers’ willingness to pay for them, together with the assessment of the prices of these mechanisms (drought insurance and water option contracts); and c) an evaluation of the role of option contracts in water procurement decisions under uncertainty. Results show the risk-reduction potential of option contracts for the agricultural sector in Spain, but these results can be extrapolated to other sectors or regions. The main conclusions of the thesis are: a) agriculture would be one of the most affected sectors by climate change. With higher water tariffs, crop’s profitability can drop to negative levels, which may result in the abandoning of the crop in many areas. Climate change and water policies must be closely coordinated to ensure efficient water use and crops’ profitability; b) although Spanish water markets have alleviated water availability problems for some users during water scarcity periods, there are several issues that should be improved; c) more flexible and stable water market mechanisms are needed to allocate water resources and water supply risks among competing users; d) results show the benefits derived from the establishment of an inter-basin option contract between water users in the Tagus and the Segura basins for reducing water supply availability risks in the recipient area; e) irrigators’ willingness to pay for option contracts or drought insurance, that represent the value that this kind of trading mechanisms has for water users facing water supply reliability problems, are consistent with results obtained in previous works and higher than the prices of this risk management tools, which shows the feasibility of these mechanisms; and f) option contracts would help to optimize water procurement decisions under uncertainty, providing more flexibility and stability than the spot market.
Resumo:
Considerable evidence from different countries has revealed important shortcomings in most road public-private partnership (PPP) models. In this paper a new PPP model is presented that overcomes some of the problems found in PPP road contracts. The new model is based on separating user tolls from the fees paid to PPP contractors and setting up new institutional arrangements to oversee PPPs.
Resumo:
Changes in the roles of the government and the private sector in the provision of public services along with budget constraints are resulting in an increasing use of the concession approach for financing and managing roads. In the last few years, many of these contracts set up incentives linked to bonuses to encourage the concessionaire to render a better service to the users. Road safety is one the aspects on the basis of which concessionaires can be rewarded according to their performance. The goal of this paper is to evaluate whether road safety incentives are being defined in the right way nowadays in different European countries and also identify what incentives would need to be implemented to achieve a socially optimal road safety level. To that end, we develop a specific incentive for road concession contracts that encourages companies to achieve the optimal level. We apply this methodology to three case studies of concessions recently awarded in order to determine to what extend the incentives they set up are closer or farther to the optimum.
Resumo:
Users in the Mediterranean region face significant water supply risks. Water markets mechanisms can provide flexibility to water systems run in tight situations. The largest water infrastructure in the Iberian Peninsula connects the Segura and Tagus Basins. Stakeholders and politicians in the Tagus Basin have asked that water transfers between the two basins be eventually phased out. The need to increase the statutory minimum environmental flow in the middle Tagus and to meet new urban demands is going to result in a redefinition of the Transfer?s management rules, leading to a reduction in the transferable volumes. To minimise the consequences of such restrictions to irrigators in the Segura Basin who depend on the transferred volumes, we propose the establishment of water option contracts between both basins that represents an institutional innovation with respect to previous inter-basin spot market experiences. Based on the draft of the new Tagus Basin Plan, we propose both a modification of the Transfer?s management rule and an innovative inter-basin option contract. The main goal of the paper is to define this contract and evaluate it with respect to non-market scenarios. We also assess the resulting impact on environmental flows in the Tagus River and water availability for users in the Segura Basin, together with the economic impacts of such contract on both basins. Our results show that the proposed option contract would reduce the impact of a change in the transfer?s management rule, and reduce the supply risks of the recipient area.
Resumo:
This paper discusses a model based on the agency theory to analyze the optimal transfer of construction risk in public works contracts. The base assumption is that of a contract between a principal (public authority) and an agent (firm), where the payment mechanism is linear and contains an incentive mechanism to enhance the effort of the agent to reduce construction costs. A theoretical model is proposed starting from a cost function with a random component and assuming that both the public authority and the firm are risk averse. The main outcome of the paper is that the optimal transfer of construction risk will be lower when the variance of errors in cost forecast, the risk aversion of the firm and the marginal cost of public funds are larger, while the optimal transfer of construction risk will grow when the variance of errors in cost monitoring and the risk aversion of the public authority are larger
Resumo:
Water supply instability is one of the main risks faced by irrigation districts and farmers. Water procurement decision optimisation is essential in order to increase supply reliability and reduce costs. Water markets, such as spot purchases or water supply option contracts, can make this decision process more flexible. We analyse the potential interest in an option contract for an irrigation district that has access to several water sources. We apply a stochastic recursive mathematical programming model to simulate the water procurement decisions of an irrigation district?s board operating in a context of water supply uncertainty in south-eastern Spain. We analyse what role different option contracts could play in securing its water supply. Results suggest that the irrigation district would be willing to accept the proposed option contract in most cases subject to realistic values of the option contract financial terms. Of nine different water sources, desalination and the option contract are the main substitutes, where the use of either depends on the contract parameters. The contract premium and optioned volume are the variables that have a greater impact on the irrigation district?s decisions. Key words: Segura Basin, stochastic recursive programming, water markets, water supply option contract, water supply risk.