11 resultados para Contract and incentives

em Universidad Politécnica de Madrid


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Irrigators face the risk of not having enough water to meet their crops’ demand. There are different mechanisms to cope with this risk, including water markets (option contracts) or insurance. A farmer will purchase them when the expected utility change derived from the tool is positive. This paper presents a theoretical assessment of the farmer’s expected utility under two different option contracts, a drought insurance and a combination of an option contract and the insurance. We analyze the conditions that determine farmer’s reference for one instrument or the other and perform a numerical application that is relevant for a Spanish region.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

With the rising prices of the retail electricity and the decreasing cost of the PV technology, grid parity with commercial electricity will soon become a reality in Europe. This fact, together with less attractive PV feed-in-tariffs in the near future and incentives to promote self-consumption suggest, that new operation modes for the PV Distributed Generation should be explored; differently from the traditional approach which is only based on maximizing the exported electricity to the grid. The smart metering is experiencing a growth in Europe and the United States but the possibilities of its use are still uncertain, in our system we propose their use to manage the storage and to allow the user to know their electrical power and energy balances. The ADSM has many benefits studied previously but also it has important challenges, in this paper we can observe and ADSM implementation example where we propose a solution to these challenges. In this paper we study the effects of the Active Demand-Side Management (ADSM) and storage systems in the amount of consumed local electrical energy. It has been developed on a prototype of a self-sufficient solar house called “MagicBox” equipped with grid connection, PV generation, lead–acid batteries, controllable appliances and smart metering. We carried out simulations for long-time experiments (yearly studies) and real measures for short and mid-time experiments (daily and weekly studies). Results show the relationship between the electricity flows and the storage capacity, which is not linear and becomes an important design criterion.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Infrastructure concession is an alternative widely used by governments to increase investment. In the case of the road sector, the main characteristics of the concessions are: long-term projects, high investments in the early years of the contract and high risks. A viability analysis must be carried out for each concession and consider the characteristics of the project. When the infrastructure is located in a developing country, political and market growth uncertainties should be add in the concession project analysis, as well as economic instability, because they present greater risks. This paper is an analysis of state bank participation in road infrastructure finance in developing countries. For this purpose, we studied road infrastructure financing and its associated risks, and also the features of developing countries. Furthermore, we considered the issue of state banks and multilateral development banks that perform an important role by offering better credit lines than the private banks, in terms of cost, interest and grace period. Based on this study, we analyzed the Brazilian Development Bank - BNDES – and their credit supply to road infrastructure concessions. The results show that BNDES is the main financing agent for long-term investment in the sector, offering loans with low interest rates in Brazilian currency. From this research we argue that a single state bank should not alone support the increasing demand for finance in Brazil. Therefore, we conclude that there is a need to expand the supply of credit in Brazil, by strengthening private banks in the long-term lending market.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

En la situación actual, tanto las posibilidades de contratar como los resultados económicos de un astillero, dependen de su capacidad para construir un buque en el plazo mas corto posible. Dentro de los trabajos de diseño y construcción de de un buque el trabajo de tuberías ha sido el que tradicionalmente ha condicionado los plazos de construcción. En este estudio se considerara que se han tenido en cuenta los criterios necesarios para que las instalaciones del buque funcionen correctamente y se verá como los sistemas de diseño influyen en el coste y plazo del buque y, por tanto, en la productividad del astillero. Se estudian los distintos procesos de diseño, fabricación y montaje de tuberías, la evolución de estos procesos a lo largo del tiempo, los módulos de armamento que se realizan en los astilleros, los modelos de cámara de máquinas, y los sistemas de ayuda al diseño por ordenador. El autor, en su puesto de Jefe de la Oficina Tecnológica de la Factoría de Sevilla de Astilleros Españoles en los últimos 12 años, ha tomado parte activa en esta evolución, formando parte de un equipo que ha situado a este astillero entre los mas avanzarlos de Europa. Todo lo anterior sirve de base para la segunda parte de este estudio, donde se abordan las que, en opinión del autor, son las nuevas tendencias en el diseño de tuberías en la construcción naval. V Integración del CAD/CAM o CIM : CAD = computer aided design o diseño asistido por ordenador, CAM = computer aided manufacturing o fabricación asistida por ordenador, CIM = computer integrated manufacturing o fabricación integrada por ordenador. Se estudia la integración de los procesos de diseño con el resto de los procesos de gestión y de producción de un astillero, proponiéndose un modelo de cómo el autor ve esta integración. Se comenta la actual tendencia a pasar de las automatizaciones duras con maquinas especializadas para cada proceso, a las automatizaciones blandas en las que un robot puede realizar distintos procesos modificando su programación. Se estudian las nuevas posibilidades de la normal i zacio'n, de los planos parametrizados y de la tecnología de grupos aportando algunos ejemplos. Se estudia también como los procesos anteriores conducirán a una optimización del producto en sí, es decir a conseguir mejores buques. En las conclusiones destacamos como el camino que tienen los países desarrollados, como el nuestro, para mantener una industria competitiva de construcción naval va por la mecanización de los procesos constructivos siguiendo las tendencias anteriores y obteniendo buques optimizados. vi SUMMARY Under the present situation the possibilities to contract and the economical results of a Shipyard depend on its capacity to build a ship within the shortest time. i Within the works of design and construction of a ship, piping work has traditionally conditioned the construction time. In this study it shall be considered that the necessary criteria for the ship installations to operate correctly have been taken into account and it shall be noticed how the design systems influence on the cost and time of a ship and therefore on the Shipyard's productivity. Studies are made of different design processes, manufacturing and installation of piping, evolution of these processes along the time, outfitting modules made in the Shipyard, engine room models and computerized design aid systems. The author, in his post of Chief of the Technological Office of Sevilla Shipyard of Astilleros Españoles for the last 12 years, has taken an active part in this evolution, making part of a team which has placed this Shipyard among the most advanced in Europe. All of the above is used for the second part of this study, whereby an approach is made to those who, in the author's opinion, are the new trends in the piping design of shipbuilding. vii Integration of CAD/CAM or CIM: CAD = computer aided design, CAM = computer aided manufacturing, CIM = computer integrated manufacturing. i A study is made of the integration of design processes with the remaining step and production Shipyard processes, proposing a model of how the author views this integration. Comments are made on the present trend to go from hard automations with specialized machines for each process to soft automations, in which a robot can carry out different processes modifying its programmes. Studies are made of: New possibility of standardization, parametrized drawings and group technology, bringing some examples. It is also studied how the above processes shall lead to optimize the product itself, that is, to obtain better ships. In the conclusions we stand out how the way of developed countries (as ours) to maintain a competitive shipbuilding industry is by computerizing constructive processes, following the above trends and obtaining better ships.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The price formation of the Iberian Energy Derivatives Market-the power futures market-starting in July 2006, is assessed until November 2011, through the evolution of the difference between forward and spot prices in the delivery period (“ex-post forward risk premium”) and the comparison with the forward generation costs from natural gas (“clean spark spread”). The premium tends to be positive in all existing mechanisms (futures, Over-the-Counter and auctions for catering part of the last resort supplies). Since year 2011, the values are smaller due to regulatorily recognized prices for coal power plants. The power futures are strongly correlated with European gas prices. The spreads built with prompt contracts tend also to be positive. The biggest ones are for the month contract, followed by the quarter contract and then by the year contract. Therefore, gas fired generation companies can maximize profits trading with contracts of shorter maturity.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

El mercado ibérico de futuros de energía eléctrica gestionado por OMIP (“Operador do Mercado Ibérico de Energia, Pólo Português”, con sede en Lisboa), también conocido como el mercado ibérico de derivados de energía, comenzó a funcionar el 3 de julio de 2006. Se analiza la eficiencia de este mercado organizado, por lo que se estudia la precisión con la que sus precios de futuros predicen el precio de contado. En dicho mercado coexisten dos modos de negociación: el mercado continuo (modo por defecto) y la contratación mediante subasta. En la negociación en continuo, las órdenes anónimas de compra y de venta interactúan de manera inmediata e individual con órdenes contrarias, dando lugar a operaciones con un número indeterminado de precios para cada contrato. En la negociación a través de subasta, un precio único de equilibrio maximiza el volumen negociado, liquidándose todas las operaciones a ese precio. Adicionalmente, los miembros negociadores de OMIP pueden liquidar operaciones “Over-The-Counter” (OTC) a través de la cámara de compensación de OMIP (OMIClear). Las cinco mayores empresas españolas de distribución de energía eléctrica tenían la obligación de comprar electricidad hasta julio de 2009 en subastas en OMIP, para cubrir parte de sus suministros regulados. De igual manera, el suministrador de último recurso portugués mantuvo tal obligación hasta julio de 2010. Los precios de equilibrio de esas subastas no han resultado óptimos a efectos retributivos de tales suministros regulados dado que dichos precios tienden a situarse ligeramente sesgados al alza. La prima de riesgo ex-post, definida como la diferencia entre los precios a plazo y de contado en el periodo de entrega, se emplea para medir su eficiencia de precio. El mercado de contado, gestionado por OMIE (“Operador de Mercado Ibérico de la Energía”, conocido tradicionalmente como “OMEL”), tiene su sede en Madrid. Durante los dos primeros años del mercado de futuros, la prima de riesgo media tiende a resultar positiva, al igual que en otros mercados europeos de energía eléctrica y gas natural. En ese periodo, la prima de riesgo ex-post tiende a ser negativa en los mercados de petróleo y carbón. Los mercados de energía tienden a mostrar niveles limitados de eficiencia de mercado. La eficiencia de precio del mercado de futuros aumenta con el desarrollo de otros mecanismos coexistentes dentro del mercado ibérico de electricidad (conocido como “MIBEL”) –es decir, el mercado dominante OTC, las subastas de centrales virtuales de generación conocidas en España como Emisiones Primarias de Energía, y las subastas para cubrir parte de los suministros de último recurso conocidas en España como subastas CESUR– y con una mayor integración de los mercados regionales europeos de energía eléctrica. Se construye un modelo de regresión para analizar la evolución de los volúmenes negociados en el mercado continuo durante sus cuatro primeros años como una función de doce indicadores potenciales de liquidez. Los únicos indicadores significativos son los volúmenes negociados en las subastas obligatorias gestionadas por OMIP, los volúmenes negociados en el mercado OTC y los volúmenes OTC compensados por OMIClear. El número de creadores de mercado, la incorporación de agentes financieros y compañías de generación pertenecientes a grupos integrados con suministradores de último recurso, y los volúmenes OTC compensados por OMIClear muestran una fuerte correlación con los volúmenes negociados en el mercado continuo. La liquidez de OMIP está aún lejos de los niveles alcanzados por los mercados europeos más maduros (localizados en los países nórdicos (Nasdaq OMX Commodities) y Alemania (EEX)). El operador de mercado y su cámara de compensación podrían desarrollar acciones eficientes de marketing para atraer nuevos agentes activos en el mercado de contado (p.ej. industrias consumidoras intensivas de energía, suministradores, pequeños productores, compañías energéticas internacionales y empresas de energías renovables) y agentes financieros, captar volúmenes del opaco OTC, y mejorar el funcionamiento de los productos existentes aún no líquidos. Resultaría de gran utilidad para tales acciones un diálogo activo con todos los agentes (participantes en el mercado, operador de mercado de contado, y autoridades supervisoras). Durante sus primeros cinco años y medio, el mercado continuo presenta un crecimento de liquidez estable. Se mide el desempeño de sus funciones de cobertura mediante la ratio de posición neta obtenida al dividir la posición abierta final de un contrato de derivados mensual entre su volumen acumulado en la cámara de compensación. Los futuros carga base muestran la ratio más baja debido a su buena liquidez. Los futuros carga punta muestran una mayor ratio al producirse su menor liquidez a través de contadas subastas fijadas por regulación portuguesa. Las permutas carga base liquidadas en la cámara de compensación ubicada en Madrid –MEFF Power, activa desde el 21 de marzo de 2011– muestran inicialmente valores altos debido a bajos volúmenes registrados, dado que esta cámara se emplea principalmente para vencimientos pequeños (diario y semanal). Dicha ratio puede ser una poderosa herramienta de supervisión para los reguladores energéticos cuando accedan a todas las transacciones de derivados en virtud del Reglamento Europeo sobre Integridad y Transparencia de los Mercados de Energía (“REMIT”), en vigor desde el 28 de diciembre de 2011. La prima de riesgo ex-post tiende a ser positiva en todos los mecanismos (futuros en OMIP, mercado OTC y subastas CESUR) y disminuye debido a la curvas de aprendizaje y al efecto, desde el año 2011, del precio fijo para la retribución de la generación con carbón autóctono. Se realiza una comparativa con los costes a plazo de generación con gas natural (diferencial “clean spark spread”) obtenido como la diferencia entre el precio del futuro eléctrico y el coste a plazo de generación con ciclo combinado internalizando los costes de emisión de CO2. Los futuros eléctricos tienen una elevada correlación con los precios de gas europeos. Los diferenciales de contratos con vencimiento inmediato tienden a ser positivos. Los mayores diferenciales se dan para los contratos mensuales, seguidos de los trimestrales y anuales. Los generadores eléctricos con gas pueden maximizar beneficios con contratos de menor vencimiento. Los informes de monitorización por el operador de mercado que proporcionan transparencia post-operacional, el acceso a datos OTC por el regulador energético, y la valoración del riesgo regulatorio pueden contribuir a ganancias de eficiencia. Estas recomendaciones son también válidas para un potencial mercado ibérico de futuros de gas, una vez que el hub ibérico de gas –actualmente en fase de diseño, con reuniones mensuales de los agentes desde enero de 2013 en el grupo de trabajo liderado por el regulador energético español– esté operativo. El hub ibérico de gas proporcionará transparencia al atraer más agentes y mejorar la competencia, incrementando su eficiencia, dado que en el mercado OTC actual no se revela precio alguno de gas. ABSTRACT The Iberian Power Futures Market, managed by OMIP (“Operador do Mercado Ibérico de Energia, Pólo Português”, located in Lisbon), also known as the Iberian Energy Derivatives Market, started operations on 3 July 2006. The market efficiency, regarding how well the future price predicts the spot price, is analysed for this energy derivatives exchange. There are two trading modes coexisting within OMIP: the continuous market (default mode) and the call auction. In the continuous trading, anonymous buy and sell orders interact immediately and individually with opposite side orders, generating trades with an undetermined number of prices for each contract. In the call auction trading, a single price auction maximizes the traded volume, being all trades settled at the same price (equilibrium price). Additionally, OMIP trading members may settle Over-the-Counter (OTC) trades through OMIP clearing house (OMIClear). The five largest Spanish distribution companies have been obliged to purchase in auctions managed by OMIP until July 2009, in order to partly cover their portfolios of end users’ regulated supplies. Likewise, the Portuguese last resort supplier kept that obligation until July 2010. The auction equilibrium prices are not optimal for remuneration purposes of regulated supplies as such prices seem to be slightly upward biased. The ex-post forward risk premium, defined as the difference between the forward and spot prices in the delivery period, is used to measure its price efficiency. The spot market, managed by OMIE (Market Operator of the Iberian Energy Market, Spanish Pool, known traditionally as “OMEL”), is located in Madrid. During the first two years of the futures market, the average forward risk premium tends to be positive, as it occurs with other European power and natural gas markets. In that period, the ex-post forward risk premium tends to be negative in oil and coal markets. Energy markets tend to show limited levels of market efficiency. The price efficiency of the Iberian Power Futures Market improves with the market development of all the coexistent forward contracting mechanisms within the Iberian Electricity Market (known as “MIBEL”) – namely, the dominant OTC market, the Virtual Power Plant Auctions known in Spain as Energy Primary Emissions, and the auctions catering for part of the last resort supplies known in Spain as CESUR auctions – and with further integration of European Regional Electricity Markets. A regression model tracking the evolution of the traded volumes in the continuous market during its first four years is built as a function of twelve potential liquidity drivers. The only significant drivers are the traded volumes in OMIP compulsory auctions, the traded volumes in the OTC market, and the OTC cleared volumes by OMIClear. The amount of market makers, the enrolment of financial members and generation companies belonging to the integrated group of last resort suppliers, and the OTC cleared volume by OMIClear show strong correlation with the traded volumes in the continuous market. OMIP liquidity is still far from the levels reached by the most mature European markets (located in the Nordic countries (Nasdaq OMX Commodities) and Germany (EEX)). The market operator and its clearing house could develop efficient marketing actions to attract new entrants active in the spot market (e.g. energy intensive industries, suppliers, small producers, international energy companies and renewable generation companies) and financial agents as well as volumes from the opaque OTC market, and to improve the performance of existing illiquid products. An active dialogue with all the stakeholders (market participants, spot market operator, and supervisory authorities) will help to implement such actions. During its firs five and a half years, the continuous market shows steady liquidity growth. The hedging performance is measured through a net position ratio obtained from the final open interest of a month derivatives contract divided by its accumulated cleared volume. The base load futures in the Iberian energy derivatives exchange show the lowest ratios due to good liquidity. The peak futures show bigger ratios as their reduced liquidity is produced by auctions fixed by Portuguese regulation. The base load swaps settled in the clearing house located in Spain – MEFF Power, operating since 21 March 2011, with a new denomination (BME Clearing) since 9 September 2013 – show initially large values due to low registered volumes, as this clearing house is mainly used for short maturity (daily and weekly swaps). The net position ratio can be a powerful oversight tool for energy regulators when accessing to all the derivatives transactions as envisaged by European regulation on Energy Market Integrity and Transparency (“REMIT”), in force since 28 December 2011. The ex-post forward risk premium tends to be positive in all existing mechanisms (OMIP futures, OTC market and CESUR auctions) and diminishes due to the learning curve and the effect – since year 2011 – of the fixed price retributing the indigenous coal fired generation. Comparison with the forward generation costs from natural gas (“clean spark spread”) – obtained as the difference between the power futures price and the forward generation cost with a gas fired combined cycle plant taking into account the CO2 emission rates – is also performed. The power futures are strongly correlated with European gas prices. The clean spark spreads built with prompt contracts tend to be positive. The biggest clean spark spreads are for the month contract, followed by the quarter contract and then by the year contract. Therefore, gas fired generation companies can maximize profits trading with contracts of shorter maturity. Market monitoring reports by the market operator providing post-trade transparency, OTC data access by the energy regulator, and assessment of the regulatory risk can contribute to efficiency gains. The same recommendations are also valid for a potential Iberian gas futures market, once an Iberian gas hub – currently in a design phase, with monthly meetings amongst the stakeholders in a Working Group led by the Spanish energy regulatory authority since January 2013 – is operating. The Iberian gas hub would bring transparency attracting more shippers and improving competition and thus its efficiency, as no gas price is currently disclosed in the existing OTC market.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Farming practices that lead to declining returns and inputs of carbon to soils pose a threat to key soil functions. The EU FP 7 interdisciplinary project Smart SOIL is using scientific testing and modeling to identify management practices that can optimize soil carbon storage and crop productivity. A consultation with advisors and policymakers in six European case study regions seeks to identify barriers to, and incentives for, uptake of such practices. Results from preliminary interviews are reported. Overall advisor and farmer awareness of management practices specifically directed towards soil carbon. is low. Most production- related decisions are taken in the short term, but managing soil carbon needs a long- term approach. Key barriers to uptake of practices include: perceived scientifi c uncertainty about the effi cacy of practices; lack of real life ?best practice? examples to show farmers; diffi culty in demonstrating the positive effects of soil carbon management practices and economic benefi ts over a long time scale; and advisors being unable to provide suitable advice due to inadequate information or training. Most farmers are unconvinced of the economic benefi ts of practices for managing soil carbon. Incentives are therefore needed, either as subsidies or as evidence of the cost effectiveness of practices. All new measures and advice should be integrated into existing programmes to avoid a fragmented policy approach.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

La evolución de los roles de la Administración y empresas en la prestación de servicios públicos, así como las crecientes restricciones presupuestarias para financiarlos, están propiciando una cada vez mayor utilización del sistema concesional para la financiación y gestión de carreteras. Ante esta situación, cabe cuestionarse si la regulación de las prestaciones a obtener se está introduciendo de forma adecuada en los contratos. Uno de los aspectos más relevantes en este sentido es el relacionado con la seguridad de la infraestructura, sobre el cual la empresa concesionaria tiene capacidad de actuación pero, en un sentido económico estricto, pocos incentivos para mejorarla. Todo ello a pesar de los elevados costes sociales derivados de la accidentalidad. Esta tesis analiza la idoneidad de los indicadores e incentivos de seguridad vial que se vienen aplicando en concesiones de carreteras, encontrándose una gran heterogeneidad e incluso incorrecciones técnicas en su formulación. Además se pone de manifiesto la poca vinculación que tienen con la estructura de costes y beneficios de las actuaciones de mejora de seguridad vial, por lo que su introducción en los contratos resulta anodina. Con el objeto de superar esta situación, en esta tesis se analizan en profundidad los aspectos que intervienen en la formulación de indicadores e incentivos de seguridad vial. De este análisis se deduce la ecuación que liga, por tipología de carretera, el beneficio social derivado del nivel de seguridad de la carretera y el coste para alcanzarlo. A través de esta ecuación se determina el nivel de seguridad óptimo desde el punto de vista económico‐social. La investigación continúa extrapolando métodos de la teoría microeconómica de incentivos al campo de las concesiones de carreteras, a fin de determinar la formulación del incentivo de seguridad vial teóricamente óptimo. Asimismo, la tesis toma en consideración la experiencia en la aplicación práctica de incentivos en concesiones vigentes, realizándose una propuesta para superar las controversias que se están produciendo actualmente en España. Además, se ha simulado la aplicación de la formulación propuesta a diversas concesiones con un doble objetivo: verificar la viabilidad económica de su aplicación y corroborar en qué medida se adecua mejor al óptimo económico‐social. Como resultado, se proponen un indicador y un incentivo concretos que inducen a las concesionarias a orientar su gestión hacia la consecución del nivel de seguridad vial óptimo desde el punto de vista económico‐social, todo ello dentro de un marco de viabilidad presupuestaria. Changes in the roles of Government and the Private Sector in the provision of public services along with the budget constraints to finance them are resulting in an increasing use of the concession system for financing and managing roads. Taking this into account, the question is whether the regulation of quality criteria is being properly introduced in the contracts or not. One of the most important aspects at this respect is the road safety. On the one hand, concessionaires are able to manage this aspect up to a point. On the other hand, from an strict economic point of view, they have little incentive to improve it, despite the high social costs of accidents. This thesis has analyzed the suitability of indicators and incentives usually introduced in road concession contracts, finding high heterogeneity, and even technical inaccuracies on their formulation. It has also been found the lack of connection between these incentives and the costs of measures to improve road safety, therefore they are not expected to fulfil their purpose. In order to overcome this situation, this thesis firstly analyzes in depth the issues involved in the development of road safety indicators and incentives. This analysis yields the equation which links the social benefit derived from the level of road safety and the cost to achieve it. In its turn, through this equation it is possible to meet the optimal road safety level from the socio‐economic point of view. Secondly, this thesis extrapolates microeconomic methods to the field of highway concessions, with the aim of determining the formulation of the optimal road safety incentive. Furthermore, the thesis takes into account the experience in the practical application of incentives on existing concessions, performing a proposal to settle the disputes between concessionaires and the Public Administrations. Finally, the thesis simulates the implementation of the proposed indicator and incentive to real concessions with the aim of verifying the economic feasibility of their application and confirming how they match the socio‐economic optimum. As a result, this thesis proposes an indicator and incentive that induce companies to drive the management of the concession towards achieving the optimal road safety level, all within a framework of the budgetary feasibility.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Users in the Mediterranean region face significant water supply risks. Water markets mechanisms can provide flexibility to water systems run in tight situations. The largest water infrastructure in the Iberian Peninsula connects the Segura and Tagus Basins. Stakeholders and politicians in the Tagus Basin have asked that water transfers between the two basins be eventually phased out. The need to increase the statutory minimum environmental flow in the middle Tagus and to meet new urban demands is going to result in a redefinition of the Transfer?s management rules, leading to a reduction in the transferable volumes. To minimise the consequences of such restrictions to irrigators in the Segura Basin who depend on the transferred volumes, we propose the establishment of water option contracts between both basins that represents an institutional innovation with respect to previous inter-basin spot market experiences. Based on the draft of the new Tagus Basin Plan, we propose both a modification of the Transfer?s management rule and an innovative inter-basin option contract. The main goal of the paper is to define this contract and evaluate it with respect to non-market scenarios. We also assess the resulting impact on environmental flows in the Tagus River and water availability for users in the Segura Basin, together with the economic impacts of such contract on both basins. Our results show that the proposed option contract would reduce the impact of a change in the transfer?s management rule, and reduce the supply risks of the recipient area.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Las empresas en situación económica negativa, recurren en España a los Expedientes de Regulación de Empleo que es la figura legal que permite ajustar sus plantillas y cuya utilización se acrecienta en épocas de crisis. El objetivo de esta investigación se focaliza en la integración de la Teoría de Opciones Reales en los proyectos organizativos de recursos humanos, en particular en el estudio y aplicación de la opción de contracción y de la opción de aplazamiento a los proyectos de desarrollo de los Expedientes de Regulación de Empleo. Las opciones reales son una herramienta de gestión, novedosa y contrastada, que posibilita realizar la valoración de los Expedientes de Regulación de Empleo tomando en consideración las incertidumbres futuras, lo que permite cuantificar mejor el resultado de la decisión y supone un avance sobre la valoración realizada de forma estática. Dos aspectos clave ha sido necesario resolver. En primer lugar determinar la fuente de incertidumbre que ponga en valor las opciones reales para este tipo de proyectos y como consecuencia desarrollar los procedimientos para obtener el valor de la opción. La puesta en valor de la opción de contracción permite, a partir de la consideración de la demanda como factor de incertidumbre, desarrollar un modelo que proporciona el valor óptimo del número de contratos de trabajo a extinguir, de modo que sitúa a la organización en la mejor posición para la toma de decisiones. La resolución del modelo se logra con la ayuda de la herramienta “The Newsvendor Model”, que facilita la obtención el valor óptimo. En la aplicación de la opción de aplazamiento se ha concluido asimismo, que la volatilidad de la demanda es la fuente de incertidumbre que hace viable la opción y a partir de dicha incertidumbre se ha desarrollado un procedimiento basado en el árbol binomial que permite obtener su valor. Una vez desarrollados los dos modelos para las opciones de contracción y aplazamiento, se ha elaborado un modelo conjunto con ambas opciones, integrando los resultados obtenidos en cada caso. Para validar los modelos obtenidos se presenta su aplicación al caso real de una empresa en situación económica negativa que requiere la necesidad de llevar a cabo un Expediente de Regulación de Empleo, lo que ha permitido comprobar la utilidad de dichos desarrollos, al obtener resultados que facilitan la toma de decisiones y que presentan soluciones que pueden ser más equilibradas para los trabajadores de la empresa, aspecto clave a tener en cuenta, dado el coste personal, familiar y social de este tipo de proyectos. La integración de las opciones reales en la gestión de recursos humanos tiene un amplio campo de aplicación, dadas las diferentes inversiones que se pueden llevar a cabo sobre el capital humano. Aunque esta investigación se ha focalizado en la opcionalidad de las inversiones para el ajuste de plantilla, existen otro tipo de inversiones en recursos humanos, como son las dedicadas a formación, motivación, adecuación o incorporación de personal, que también estarán sujetas a opcionalidad si existen incertidumbres a futuro. Con el objetivo de avanzar en el estudio y aplicación de las opciones reales a estas inversiones, se presenta un marco conceptual que identifica las bases de partida en lo referente a los retornos de las inversiones y las incertidumbres futuras. Con los resultados obtenidos en esta investigación se entiende que se ha conseguido el objetivo de aplicar la Teoría de Opciones Reales a los Expedientes de Regulación de Empleo y con ello establecer la posibilidad de mejorar las implicaciones sociales de estos proyectos dentro de la empresa y en la sociedad. ABSTRACT During crisis times, like the one Spain has been going through on the last years, the Collective Dismissal Procedure is an important issue to be considered within companies that are having a negative economic situation. This research focuses on the integration of the Real Options Theory for organizational projects in the management of human resources, and particularly the study and inclusion of the option to contract and the deferral option in Collective Dismissal Procedures. The Real Options Theory, an innovative management tool that has been proven as correct, help to improve the assessment of the Collective Dismissal Procedures using the dynamic demand instead of the static demand, giving a better quantification of the decision that is going to be taken. Two main issues which are hoped to be resolve are examined: the search for a source of uncertainty to make the real options viable for this type of projects, and consequently the development of a procedure to obtain the value of the option. The option to contract allows, from the consideration of the demand as a factor of uncertainty, to develop a model obtaining the optimal value in the reduction of the workforce, therefore allowing the organization to place itself in the best position for the decision making. The resolution of this model is achieved with the help of "The Newsvendor Model" tool, which facilitates obtaining the optimal value. The analysis performed in the deferral option also concluded that the volatility of demand is the source of the uncertainty that makes the option viable and the procedure developed by the binomial tree is the tool that enables the value of the option to be found. Once developed two models for contraction and deferment options, a joint model has been developed including both options by integrating the results obtained in each case. To validate the models, the real case of a company in negative economic situation requiring the need to carry out a procedure for collective redundancies is applied. This has demonstrated the usefulness of this kind of development that can deliver results to improve the decision making and provide more balanced solutions for company employees, key consideration given the impact on personal, family life and social environment of these Collective Dismissal Procedures. The integration of real options in the management of human resources has broad scope, given the different investments that can be performed on the human capital. Although this research has focused on the optionality of investments for downsizing, there are other investments in human resources for training, motivation, arrangement or incorporation of staff that are also subject to optionality if there are future uncertainties. With the aim of advancing the study and application of real options to these investments, a conceptual framework is presented that identifies the basis of research in terms of the investment returns and future uncertainties. With the results obtained on this research it is clearly defined the objectives for which this work was started for, the application of the Real Options Theory to the Collective Dismissal Procedure. And thereby achieve the final goal of improving the social impact of these projects within a company and society.