16 resultados para Construction works
em Universidad Politécnica de Madrid
Resumo:
The art of construction is a risky activity that directly affects the life and physical integrity of persons. Since the approval of Law 31/1995, of November 8, Prevention of Occupational Risks was the first legislation that established the current basis in all sectors and then transposed into Spanish law Directive 92/57/CEE called Royal Decree 1627/1997 of October 24, on minimum safety and health dispositions in construction works, measures have been proposed to develop a mixed body of scientific literature composed of researchers and professionals in the field of occupational safety and health, but even today there is still no clear and firm proposal, showing a lack of awareness in the occupational risk prevention and, therefore, a consolidation of the culture of prevention in society. Therefore, the technicians, who make up the building process, can incur in very high responsibilities, such as: Author of the project, Coordinator of Safety and Health during the preparation of the project and during the execution of works, Site Management: Site Manager. This involves the immediate creation of a general training in prevention for all architects starting when still studying, as well as specific training, appropriate and complementary to all the architects that will be devoted to the specialty of occupational safety and health in construction works. That is, first, we must make the responsible bodies aware of the urgent need to integrate risk prevention in the curricula of architecture and later in the continuing education of the profession. It is necessary that our teaching must conform to the laws on safety and health, due to the fact that the law recognizes our academic degrees and professional qualifications to perform functions in that area
Resumo:
The figure of the coordinator in health and safety issues in the construction sector first appeared in our legislation through the incorporation of the European Directives (in our case Royal Decree 1627/97 on the minimum health and safety regulations in construction works), and is viewed differently in different countries of the European Union regarding the way they are hired and their role in the construction industry. Coordinating health and safety issues is also a management process that requires certain competencies that are not only based on technical or professional training, but which, taking account of the work environment, require the use of strategies and tools that are related to experience and personal skills. Through a piece of research that took account of expert opinions in the matter, we have found which competencies need to be possessed by the health and safety coordinator in order to improve the safety in the works they are coordinating. The conclusions of the analyses performed using the appropriate statistical methods (comparing means and multivariate analysis techniques), will enable training programmes to be designed and ensure that the health and safety coordinators selected have the competencies required to carry out their duties.
Resumo:
The figure of the coordinator in health and safety issues in the construction sector first appeared in our legislation through the incorporation of the European Directives (in our case Royal Decree 1627/97 on the minimum health and safety regulations in construction works), and is viewed differently in different countries of the European Union regarding the way they are hired and their role in the construction industry. Coordinating health and safety issues is also a management process that requires certain competencies that are not only based on technical or professional training, but which, taking account of the work environment, require the use of strategies and tools that are related to experience and personal skills. Through a piece of research that took account of expert opinions in the matter, we have found which competencies need to be possessed by the health and safety coordinator in order to improve the safety in the works they are coordinating. The conclusions of the analyses performed using the appropriate statistical methods (comparing means and multivariate analysis techniques), will enable training programmes to be designed and ensure that the health and safety coordinators selected have the competencies required to carry out their duties.
Resumo:
The design of collective protections of construction works is a topic that is integrated within one of the MBTI subjects. This paper presents an experience for teaching the design of collective protection in building works. Teaching has been done in a bended way. This subject is taught as part of the content of a wider subject included in the Master "Building Technological Innovation" (MBTI) of the Universidad Politécnica de Madrid (UPM). This Master's degree is a postgraduate of research nature. Graduating in MBTI implies that students are in a position to begin their PhD thesis. At this stage, often students are not able to follow the rigour established by the schedule of classes. For this reason it is interesting that part of the teaching is developed in a non-classroom based way.
Resumo:
A maritime construction is usually a slender line in the ocean.It is usual to see just its narrow surface strip and not analyse the large amount of submerged material the latter is supporting.Without doubt,it is the ground to which a notable load is transmitted in an environment subjected to periodic,alternating stresses,dynamic forces which the sea's media constitute. Both an outer and inner maritime construction works in a complex fashion.A granular solid(breakwater)breathes with the incident wave flow,dissipating part of the wave energy between its gaps.The backflow tries to extract the different items from the solid block,setting a balance between effective and neutral tensions that follow Terzaghui's principle. On some occasions,fluidification of the armour layer has caused the breakwater to collapse(Sines,Portugal,February 1978).On others,siphoning or liquefaction of sand supporting monoliths(vertical breakwaters)lead them to destruction or collapse(New Barcelona Harbour Mouth,Spain,November 2001). This is why the ground-force-structure interaction is a complicated analysis with joint design tools still in an incipient state. The purpose of this article is to describe two singular failures in inner maritime constructions in Spain deriving from ground problems(Malaga,July 2004and Barcelona,January 2007).They occurred recently and the causes are the subject of reflection and analysis.
Resumo:
La figura del coordinador en materia de seguridad y salud en el sector de la construcción, aparecida en nuestra legislación a través de las trasposiciones de las Directivas Europeas, (en nuestro caso en el RD 1627/97 sobre disposiciones mínimas de seguridad y salud en las obras de construcción), se encuentra identificada, en cuanto a su posible contratación y actuación dentro de este sector, de forma diferente en distintos países de la Unión Europea. La coordinación en materia de seguridad y salud también es un proceso de gestión que requiere de unas competencias, no solamente basadas en la formación técnica o profesional, si no que, considerando el entorno de trabajo, precisan de la aplicación de estrategias y herramientas relacionadas con la experiencia y con las habilidades personales. A través de una primera fase de investigación realizada y considerando la opinión de expertos en la materia, se han detectado cuáles son estas competencias que debe poseer el coordinador en materia de seguridad y salud para fortalecer el cumplimiento de sus obligaciones y así, mejorar su actividad de coordinación. El resultado de los análisis realizados permitirá construir un modelo que sirva de referencia para la certificación de los coordinadores en materia de seguridad y salud basado en sus competencias. Las conclusiones recogidas en esta Tesis doctoral proporcionarán criterios para establecer el diseño de programas formativos y construir metodologías para la selección de los coordinadores en materia de seguridad y salud en base a sus competencias. ABSTRACT The figure of the health and safety coordinator in the construction sector appeared in our legislation through the incorporation of the European Directives. In our case, Royal Decree 1627/97 on the minimum health and safety regulations in construction works. This figure is viewed differently, in terms of recruitment and performance, in different countries of the European Union. The coordination of health and safety issues is a management process that requires certain competencies not only based on technical or professional training. It is also necessary, depending on the work environment, the implementation of strategies and tools that are related to experience and personal skills. The skill requirements for the health and safety coordinator have been defined considering the opinion of experts in this field, gained through the realization of a first phase of research. These competences should be used to strengthen the performance of their duties and thereby improve their coordination activity.
Resumo:
Tras la denominación de Real Sitio a mediados del siglo XVIII, bajo el reinado de Fernando VI, su sucesor Carlos III procedió a la incorporación a su Patrimonio de todos los Montes y Bosques de El Pardo. Comenzó entonces el proceso de planeamiento urbano y de construcción arquitectónica que finalizó en torno al año 1800. En lo sucesivo, no sólo se mantiene el curso de la conservación y consolidación de los edificios principales, sino que se realiza obra nueva de índole civil. Algunos edificios cambiaron de propiedad y de uso hasta que tras la Guerra Civil se procedió a la mayor transformación vivida por el Real Sitio. El intervalo que aquí se trata (1885 a 1965), no ha suscitado, en los estudios sobre El Pardo, atención suficiente al no acontecer obra nueva de carácter patrimonial ni ha sido objeto de análisis el trazado y la fisonomía del centro urbano residencial del pueblo que Carlos III configuró. Sin embargo se estima relevante analizar los cambios en la actividad residencial; en primer lugar porque coexiste con la arquitectura oficial y, por tanto, se entiende necesario un análisis global del conjunto y en segundo lugar porque facilita la comprensión sobre la imagen original de carácter histórico del conjunto de finales del siglo XVIII. Este marco temporal determina tres partes principales de estudio que estructuran la presente tesis, cuyas fechas establecen los intervalos históricos clave: Actuaciones sobre el núcleo urbano consolidado (1885-1931). Cese de la actividad constructiva (1931-1939). Propuestas regeneradoras y crecimiento acelerado (1939-1965). Dentro de ellos se establecen, a su vez, dos subcapítulos diferenciados con la finalidad de explicar los sucesos que pautaron los cambios trascendentales en la historia de El Pardo. En el estudio del estado de la cuestión se observa que en El Pardo, al igual que sucede en otros Reales Sitios, se investigan los edificios destacados como el Palacio, la Casita del Príncipe, la Casa de Oficios y la Casa de Infantes desde el punto de vista de su historia pero no desde la arquitectura ni de cómo esta afecta al desarrollo del trazado y por tanto al contexto urbano. Se manifiestan determinadas carencias de tratamiento gráfico que facilitarían la comprensión histórica mediante el análisis de la forma y cómo esta ha ido variando sustancialmente. El concepto de escala y orientación reordena el estudio, no sólo de estos edificios protagonistas sino de los que se entretejen a su alrededor y componen el conjunto histórico, lo cual aporta nuevas conclusiones al estado de la cuestión que aquí compete. El principal objetivo de la tesis es, por tanto, contribuir a la dimensión patrimonial mediante el estudio de la arquitectura residencial del pueblo de El Pardo y en cómo esta ha ido conformando y consolidando el entramado urbano original en torno a edificios de la realeza y corte. Analizar aquellos edificios que perduran, los que fueron reconstruidos, rehabilitados, y apuntar acontecimientos históricos que formularon la actual fisonomía. Sistematizar y reordenar sobre la traza actual los edificios que desaparecieron, nos da las pistas sobre las modificaciones en concepto de escala arquitectónica y urbana. El estudio de las fuentes y establecer una metodología de conexión de estas, ayuda a detectar dónde no se han dirigido aún los focos de interés así como las lagunas que han quedado por explorar con el fin de responder a nuevas hipótesis, conceder conclusiones y abrir otras líneas de investigación. Como conclusiones generales, la tesis aporta documentación nueva sobre el objeto de estudio, no solicitada, digitalizada o publicada con anterioridad. En ella se analizan los procesos de configuración, consolidación y transformación en el Real Sitio mediante la sistematización de estados comparativos. Con respecto al estudio de los diferentes contextos natural y urbano la tesis analiza cómo los accidentes naturales, el desarrollo de infraestructuras y el impulso de la agronomía afectaron a El Pardo a partir del siglo XIX, y estudia los procesos de configuración, consolidación y transformación en el Real Sitio mediante la sistematización de la documentación encontrada de manera gráfica y escrita. En relación al marco patrimonial arquitectónico, la tesis analiza los procesos edificatorios históricos. Se estudian, a su vez, cambios de ocupación o uso que derivaron en reformas, ampliaciones, obras de nueva planta e incluso en derribos, así como los proyectos no materializados o que se llevaron a cabo de manera parcial. Con respecto al análisis del momento histórico, la tesis analiza las posibles afectaciones, políticas, sociales y económicas en las etapas de Monarquía, Segunda República, Guerra Civil y Posguerra. Por último, la tesis abre cuatro vías de investigación (que ya se han tratado y avanzado en parte pero que escapan a los límites de este trabajo) que pueden plantear nuevas hipótesis, reportando así respuestas sobre objetos de estudio complementarios y paralelos al presente. Estas refieren a análisis más concretos sobre El Palacio Real de El Pardo y la Casa de Oficios, el Camino Real de Madrid a El Pardo desde la Puerta de Hierro, los cuarteles, puertas y portilleras del Monte de El Pardo y los proyectos desarrollados por el arquitecto Diego Méndez en los Reales Sitios para el Patrimonio Nacional. ABSTRACT Following the Royal Site denomination being granted in the mid-18th Century, during the reign of Ferdinand VI, his successor Charles III proceeded to include all the Forests and Woodlands of El Pardo in his heritage. That then gave rise to the process of town planning and architectural construction that was completed around 1800. Thereafter, not only the process of conservation and consolidation of the main buildings has been maintained, but new civil engineering works have also been carried out. Some buildings changed ownership and use until, after the Civil War, the greatest transformation experienced by the Royal Site was undertaken. The time frame this paper concerns (1885 to 1965), has not attracted sufficient attention in studies of El Pardo due to there having been no new works with heritage status, nor has there been an analysis of the layout and external appearance of the residential centre in the town once conceived by Charles III. However, it is considered relevant to analyse the changes in residential activity, firstly, because it coexists with the official architecture and, thus, it is considered necessary to perform a global analysis of the complex and, secondly, because it facilitates a historical understanding of the original appearance of the complex at the end of the 18th Century. This time framework defines three main parts of the study that provide the structure of this thesis, the dates of which establish the key historical time frames: Actions in the consolidated town centre (1885-1931). Cessation of construction works (1931-1939). Proposals of regeneration and accelerated growth (1939-1965). Two distinct sub-chapters are also established within these, in order to explain the events that marked the transcendental changes in the history of El Pardo. When studying the subject matter, it is noted that in El Pardo, as is the case in other Royal Sites, outstanding buildings such as the Palace, the Prince's Cottage, the Trades House and the Infantes House are usually researched strictly from the point of view of their history, but not from an architectural perspective, nor analysing how that affects the development of the site layout and thus the urban area. Specific shortcomings are evident in the graphic treatment that would have otherwise facilitated a historical understanding through the analysis of the shape and the way it has gradually undergone substantial variation. The concept of scale and orientation reorganises the study, not only of these key buildings, but also of those that are woven around them and make up the historic complex, allowing entirely new conclusions concerning the subject matter analysed herein. Therefore, the main purpose of this thesis is to outline our heritage through the study of the residential architecture of the town of El Pardo and the analysis of the way the original town has been built up and consolidated around the buildings erected by royalty and the court; to analyse the buildings that still remain, those that were rebuilt, refurbished, and to note historic events that shaped its current appearance. To this end, a systematic classification and reorganisation on the current urban layout of the buildings that have disappeared will give us the key to understand changes in the concept of architectural and urban scale. Studying the sources and establishing a methodology to connect them will help us detect those areas where the focus of interest has not concentrated yet, and will also reveal the gaps that remain unexplored, in order to respond to new hypotheses, reach new conclusions and open up new lines of research. As general conclusions, this thesis provides new documentation on the subject matter that had not been requested, digitized or published before. There we find an analysis of the processes of configuration, consolidation and transformation of the Royal Site through a systematic classification of comparative states. With regard to the study of the multiple natural and urban environments, this thesis analyses the way natural features, development of infrastructures and agricultural driving forces affected El Pardo as of the 19th Century, and it studies the processes of configuration, consolidation and transformation of the Royal Site by systematically classifying the documentation found in graphic and written documents. In relation to the architectural heritage framework, this thesis analyses historical building processes. Likewise, a study is also performed on the changes in land occupation or use that led to reforms, extensions, new buildings and even to demolitions, as well as on unrealized projects, or even on those that were partially implemented. As for the analysis of the historical time period, this thesis assesses the potential political, social and economic effects of the Monarchy, Second Republic, Civil War and Post-War Periods. Finally, this thesis opens up four lines of investigation (that have already been discussed and partially advanced, but which fall beyond the scope of this work) that could pose new hypotheses, thus giving answer to other subject matters parallel and complementary to the one assessed herein. These refer to more specific analyses of El Palacio Real de El Pardo (Royal Palace of El Pardo) and the Casa de Oficios (Trades House), the Royal Highway from Madrid to El Pardo from Puerta de Hierro, the barracks, gates and entrances to estates in the Woodlands of El Pardo and the projects developed on the Royal Sites by the architect Diego Méndez for the National Heritage.
Resumo:
En el sector de la edificación, las grandes constructoras comienzan a considerar aspectos medioambientales, no limitándose a lo establecido por la legislación vigente, y buscando la implementación de buenas prácticas. Si bien este hecho es una realidad para las grandes empresas constructoras, todavía falta que la gran mayoría de las empresas del sector (pequeñas y medianas) adopten ésta tendencia. En este sentido, las publicaciones y estadísticas consultadas revelan que el sector de la construcción sigue siendo el sector con menor número de Sistemas de Gestión Ambiental (SGA) certificados en comparación con otros sectores industriales, debido principalmente a las peculiaridades de su actividad. Por otra parte, el sector de la construcción genera grandes cantidades de residuos de construcción y demolición (RCD). Aunque, en los últimos años la actividad de la construcción ha disminuido, debido a la crisis económica del país, no hay que olvidar todos los problemas causados por este tipo de residuos, o mejor dicho, por su gestión. La gestión de los RCD actual está lejos de alcanzar la meta propuesta en la Directiva Marco de Residuos (DMR), la cual exige un objetivo global para el año 2020 en el que el 70% de todos los RCD generados deberán ser reciclados en los países de la UE. Pero, la realidad es que sólo el 50% de la RCD generados en la Unión Europea se recicla. Por este motivo, en los últimos años se ha producido una completa modificación del régimen jurídico aplicable a los RCD, incorporando importantes novedades a nuestro ordenamiento interno como son: la redacción de un Estudio de gestión de RCD (en fase de diseño) y un Plan de gestión de RCD (en fase de ejecución). Entre estas medidas destaca el poder conocer, con la antelación suficiente, la cantidad y el momento en que los RCD son generados, para así poder planificar la gestión más adecuada para cada categoría de RCD. Es por ello que el desarrollo de cualquier instrumento que determine la estimación de RCD así como iniciativas para su control debe ser considerado como una herramienta para dar respuestas reales en el campo de la sostenibilidad en la edificación. Por todo lo anterior, el principal objetivo de la Tesis Doctoral es mejorar la gestión actual de los RCD, a través de la elaboración e implementación en obra de un Sistema de gestión de RCD en fase de ejecución que podrá ser incluido en el Sistema de Gestión Ambiental de las empresas constructoras. Para ello, se ha identificado la actividad que más residuo genera, así como las diferentes categorías de RCD generadas durante su ejecución, a través del análisis de nueve obras de edificación de nueva planta. Posteriormente, se han determinado y evaluado, en función de su eficacia y viabilidad, veinte buenas prácticas encaminadas a reducir la generación de RCD. También, se han identificado y evaluado, en función de su coste económico, cinco alternativas de gestión para cada categoría de RCD generada. Por último, se ha desarrollado e implementado un Sistema de Gestión de RCD en una empresa de construcción real. En definitiva, el Sistema de Gestión de RCD propuesto contiene una herramienta de estimación de RCD y también proporciona una relación de buenas prácticas, según su viabilidad y eficacia, sobre los aspectos más significativos en cuanto a la gestión de RCD se refiere. El uso de este Sistema de gestión de RCD ayudará a los técnicos de la construcción en el desarrollo de los documentos "Estudio de gestión de RCD " y "Plan de gestión de RCD " - requeridos por ley -. Además, el Sistema promueve la gestión ambiental de la empresa, favoreciendo la cohesión del proceso constructivo, estableciendo responsabilidades en el ámbito de RCD y proporcionando un mayor control sobre el proceso. En conclusión, la implementación de un sistema de gestión de RCD en obra ayuda a conseguir una actividad de edificación, cuyo principal objetivo sea la generación de residuos cero. ABSTRACT Currently, in the building sector, the main construction companies are considering environmental issues, not being limited to the current legislation, and seeking the implementation of good practices. While this fact is a reality for large construction companies, still the vast majority of construction companies (small and medium enterprises) need to accept this trend. In this sense, official publications and statistics reveal that the construction sector remains with the lowest number of certified Environmental Management Systems (EMS) compared to other industrial sectors, mainly due to the peculiarities of its activity. Moreover, the construction industry in Spain generates large volumes of construction and demolition waste (CDW) achieving a low recycling rate compared to other European Union countries and to the target set for 2020. Despite the complete change in the legal regime for CDW in Spain, there are still several difficulties for their application at the construction works. Among these difficulties the following can be highlighted: onsite segregation, estimating CDW generation and managing different CDW categories. Despite these difficulties, the proper CDW management must be one of the main aspects considered by construction companies in the EMS. However, at present the EMS used in construction companies consider very superficially CDW management issues. Therefore, current EMS should go a step further and include not only procedures for managing CDW globally, but also specific procedures for each CDW category, taking into account best practices for prevention, minimization and proper CDW management in order to achieve building construction works with zero waste generation. The few scientific studies analysing EMS implementation in construction enterprises focus on studying the benefits and barriers of their implementation. Despite the drawbacks found, implementing an EMS would bring benefits such as improving the corporate image in relation to the environment, ensuring compliance with the law or reducing environmental risks. Also, the international scientific community has shown great interest in defining models to estimate in advance the CDW that will be generated during the building construction or rehabilitation works. These studies analyse the overall waste generation and its different CDW categories. However, despite the many studies found on CDW quantification, analysing its evolution throughout the construction activities is a factor that must be further studied and discussed in greater depth, as results would be of great significance when planning the CDW management. According to the scientific studies analysing the implementation of good environmental practices in construction sites, it seems that, in general, the CDW collection system is done in a decentralized manner by each subcontracted company. In addition, the corporate image generated when poor practices are done may adversely affect the company's reputation and can result in loss of contracts. Finally, although there are numerous guides and manuals of good practices for CDW management, no references have been found implementing these measures in the Environmental Management System of the construction companies. From all the above, this thesis aims to provide answers to reduce the environmental impact caused by CDW generation in building construction works, in order to get a building process with zero waste generation. In this sense, is essential to generate new knowledge in order to implement a system which can carry out comprehensive management of CDW generated onsite, at the design stage until the end of its life cycle, taking into account both technical and economic criteria. Therefore, the main objective of this thesis is to define and implement a CDW management system for residential building construction works, helping construction agents not only to manage the CDW in accordance with current legislation, but also minimizing their generation on site by applying best practices, resulting in achieving the goal of zero waste in building works.
Resumo:
Para el proyecto y cálculo de estructuras metálicas, fundamentalmente pórticos y celosías de cubierta, la herramienta más comúnmente utilizada son los programas informáticos de nudos y barras. En estos programas se define la geometría y sección de las barras, cuyas características mecánicas son perfectamente conocidas, y sobre las cuales obtenemos unos resultados de cálculo concretos en cuanto a estados tensionales y de deformación. Sin embargo el otro componente del modelo, los nudos, presenta mucha mayor complejidad a la hora de establecer sus propiedades mecánicas, fundamentalmente su rigidez al giro, así como de obtener unos resultados de estados tensionales y de deformación en los mismos. Esta “ignorancia” sobre el comportamiento real de los nudos, se salva generalmente asimilando a los nudos del modelo la condición de rígidos o articulados. Si bien los programas de cálculo ofrecen la posibilidad de introducir nudos con una rigidez intermedia (nudos semirrígidos), la rigidez de cada nudo dependerá de la geometría real de la unión, lo cual, dada la gran variedad de geometrías de uniones que en cualquier proyecto se nos presentan, hace prácticamente inviable introducir los coeficientes correspondientes a cada nudo en los modelos de nudos y barras. Tanto el Eurocódigo como el CTE, establecen que cada unión tendrá asociada una curva momento-rotación característica, que deberá ser determinada por los proyectistas mediante herramientas de cálculo o procedimientos experimentales. No obstante, este es un planteamiento difícil de llevar a cabo para cada proyecto. La consecuencia de esto es, que en la práctica, se realizan extensas comprobaciones y justificaciones de cálculo para las barras de las estructuras, dejando en manos de la práctica común la solución y puesta en obra de las uniones, quedando sin justificar ni comprobar la seguridad y el comportamiento real de estas. Otro aspecto que conlleva la falta de caracterización de las uniones, es que desconocemos como afecta el comportamiento real de éstas en los estados tensionales y de deformación de las barras que acometen a ellas, dudas que con frecuencia nos asaltan, no sólo en la fase de proyecto, sino también a la hora de resolver los problemas de ejecución que inevitablemente se nos presentan en el desarrollo de las obras. El cálculo mediante el método de los elementos finitos, es una herramienta que nos permite introducir la geometría real de perfiles y uniones, y nos permite por tanto abordar el comportamiento real de las uniones, y que está condicionado por su geometría. Por ejemplo, un caso típico es el de la unión de una viga a una placa o a un soporte soldando sólo el alma. Es habitual asimilar esta unión a una articulación. Sin embargo, el modelo por elementos finitos nos ofrece su comportamiento real, que es intermedio entre articulado y empotrado, ya que se transmite un momento y el giro es menor que el del apoyo simple. No obstante, la aplicación del modelo de elementos finitos, introduciendo la geometría de todos los elementos estructurales de un entramado metálico, tampoco resulta en general viable desde un punto de vista práctico, dado que requiere invertir mucho tiempo en comparación con el aumento de precisión que obtenemos respecto a los programas de nudos y barras, mucho más rápidos en la fase de modelización de la estructura. En esta tesis se ha abordado, mediante la modelización por elementos finitos, la resolución de una serie de casos tipo representativos de las uniones más comúnmente ejecutadas en obras de edificación, como son las uniones viga-pilar, estableciendo el comportamiento de estas uniones en función de las variables que comúnmente se presentan, y que son: •Ejecución de uniones viga-pilar soldando solo por el alma (unión por el alma), o bien soldando la viga al pilar por todo su perímetro (unión total). •Disposición o no de rigidizadores en los pilares •Uso de pilares de sección 2UPN en cajón o de tipo HEB, que son los tipos de soporte utilizados en casi el 100% de los casos en edificación. Para establecer la influencia de estas variables en el comportamiento de las uniones, y su repercusión en las vigas, se ha realizado un análisis comparativo entre las variables de resultado de los casos estudiados:•Estados tensionales en vigas y uniones. •Momentos en extremo de vigas •Giros totales y relativos en nudos. •Flechas. Otro de los aspectos que nos permite analizar la casuística planteada, es la valoración, desde un punto de vista de costos de ejecución, de la realización de uniones por todo el perímetro frente a las uniones por el alma, o de la disposición o no de rigidizadores en las uniones por todo el perímetro. Los resultados a este respecto, son estrictamente desde un punto de vista económico, sin perjuicio de que la seguridad o las preferencias de los proyectistas aconsejen una solución determinada. Finalmente, un tercer aspecto que nos ha permitido abordar el estudio planteado, es la comparación de resultados que se obtienen por el método de los elementos finitos, más próximos a la realidad, ya que se tiene en cuenta los giros relativos en las uniones, frente a los resultados obtenidos con programas de nudos y barras. De esta forma, podemos seguir usando el modelo de nudos y barras, más versátil y rápido, pero conociendo cuáles son sus limitaciones, y en qué aspectos y en qué medida, debemos ponderar sus resultados. En el último apartado de la tesis se apuntan una serie de temas sobre los que sería interesante profundizar en posteriores estudios, mediante modelos de elementos finitos, con el objeto de conocer mejor el comportamiento de las uniones estructurales metálicas, en aspectos que no se pueden abordar con los programas de nudos y barras. For the project and calculation of steel structures, mainly building frames and cover lattices, the tool more commonly used are the node and bars model computer programs. In these programs we define the geometry and section of the bars, whose mechanical characteristics are perfectly known, and from which we obtain the all calculation results of stresses and displacements. Nevertheless, the other component of the model, the nodes, are much more difficulty for establishing their mechanical properties, mainly the rotation fixity coefficients, as well as the stresses and displacements. This "ignorance" about the real performance of the nodes, is commonly saved by assimilating to them the condition of fixed or articulated. Though the calculation programs offer the possibility to introducing nodes with an intermediate fixity (half-fixed nodes), the fixity of every node will depend on the real connection’s geometry, which, given the great variety of connections geometries that in a project exist, makes practically unviable to introduce the coefficients corresponding to every node in the models of nodes and bars. Both Eurocode and the CTE, establish that every connection will have a typical moment-rotation associated curve, which will have to be determined for the designers by calculation tools or experimental procedures. Nevertheless, this one is an exposition difficult to carry out for each project. The consequence of this, is that in the practice, in projects are extensive checking and calculation reports about the bars of the structures, trusting in hands of the common practice the solution and execution of the connections, resulting without justification and verification their safety and their real behaviour. Another aspect that carries the lack of the connections characterization, is that we don´t know how affects the connections real behaviour in the stresses and displacements of the bars that attack them, doubts that often assault us, not only in the project phase, but also at the moment of solving the execution problems that inevitably happen in the development of the construction works. The calculation by finite element model is a tool that allows us to introduce the real profiles and connections geometry, and allows us to know about the real behaviour of the connections, which is determined by their geometry. Typical example is a beam-plate or beam-support connection welding only by the web. It is usual to assimilate this connection to an articulation or simple support. Nevertheless, the finite element model determines its real performance, which is between articulated and fixed, since a moment is transmitted and the relative rotation is less than the articulation’s rotation. Nevertheless, the application of the finite element model, introducing the geometry of all the structural elements of a metallic structure, does not also turn out to be viable from a practical point of view, provided that it needs to invest a lot of time in comparison with the precision increase that we obtain opposite the node and bars programs, which are much more faster in the structure modelling phase. In this thesis it has been approached, by finite element modelling, the resolution of a representative type cases of the connections commonly used in works of building, since are the beam-support connections, establishing the performance of these connections depending on the variables that commonly are present, which are: •Execution of beam-support connections welding only the web, or welding the beam to the support for the whole perimeter. •Disposition of stiffeners in the supports •Use 2UPN in box section or HEB section, which are the support types used in almost 100% building cases. To establish the influence of these variables in the connections performance, and the repercussion in the beams, a comparative analyse has been made with the resulting variables of the studied cases: •Stresses states in beams and connections. •Bending moments in beam ends. •Total and relative rotations in nodes. •Deflections in beams. Another aspect that the study allows us to analyze, is the valuation, from a costs point of view, of the execution of connections for the whole perimeter opposite to the web connections, or the execution of stiffeners. The results of this analyse, are strictly from an economic point of view, without prejudice that the safety or the preferences of the designers advise a certain solution. Finally, the third aspect that the study has allowed us to approach, is the comparison of the results that are obtained by the finite element model, nearer to the real behaviour, since the relative rotations in the connections are known, opposite to the results obtained with nodes and bars programs. So that, we can use the nodes and bars models, more versatile and quick, but knowing which are its limitations, and in which aspects and measures, we must weight the results. In the last part of the tesis, are relationated some of the topics on which it would be interesting to approach in later studies, with finite elements models, in order to know better the behaviour of the structural steel connections, in aspects that cannot be approached by the nodes and bars programs.
Resumo:
Over the last decade the intense activity of the building sector has generated large quantities of construction and demolition waste (CDW). In particular, in Europe around 890 million tons of CDW is generated every year; however, only 50% of them are recycled. In Spain, over the last years 40 millions of tons of construction and demolition waste have been generated. On the other hand, since the implementation of the Technical Building Code regulation the use of mineral wools as building insulation materials has become a widespread solution in both rehabilitation and new construction works, and because of that, this kind of insulation waste is increasing. This research analyzes the potential of a new composite (gypsum and fiber waste) including several mineral wools waste into a plaster matrix. For this purpose, an experimental plan, characterizing the physical and mechanical behaviour as well as the Shore C hardness of the new composite, was elaborated fulfilling UNE Standards.
Resumo:
México es de los pocos países en el mundo que ha realizado dos grandes programas para la construcción de autopistas en colaboración con el sector privado. El primero, fue realizado entre 1989 y 1994, con resultados adversos por el mal diseño del esquema de concesiones; y, el segundo con mejores resultados, en operación desde 2003 mediante nuevos modelos de asociación público-privada (APP). El objetivo de la presente investigación es estudiar los modelos de asociación público-privada empleados en México para la provisión de infraestructura carretera, realizando el análisis y la evaluación de la distribución de riesgos entre el sector público y privado en cada uno de los modelos con el propósito de establecer una propuesta de reasignación de riesgos para disminuir el costo global y la incertidumbre de los proyectos. En la primera parte se describe el estado actual del conocimiento de las asociaciones público-privadas para desarrollar proyectos de infraestructura, incluyendo los antecedentes, la definición y las tipologías de los esquemas APP, así como la práctica internacional de programas como el modelo británico Private Finance Initiative (PFI), resultados de proyectos en la Unión Europea y programas APP en otros países. También, se destaca la participación del sector privado en el financiamiento de la infraestructura del transporte de México en la década de 1990. En los capítulos centrales se aborda el estudio de los modelos APP que se han utilizado en el país en la construcción de la red de carreteras de alta capacidad. Se presentan las características y los resultados del programa de autopistas 1989-94, así como el rescate financiero y las medidas de reestructuración de los proyectos concesionados, aspectos que obligaron a las autoridades mexicanas a cambiar la normatividad para la aprobación de los proyectos según su rentabilidad, modificar la legislación de caminos y diseñar nuevos esquemas de colaboración entre el gobierno y el sector privado. Los nuevos modelos APP vigentes desde 2003 son: nuevo modelo de concesiones para desarrollar autopistas de peaje, modelo de proyectos de prestación de servicios (peaje sombra) para modernizar carreteras existentes y modelo de aprovechamiento de activos para concesionar autopistas de peaje en operación a cambio de un pago. De estos modelos se realizaron estudios de caso en los que se determinan medidas de desempeño operativo (niveles de tráfico, costos y plazos de construcción) y rentabilidad financiera (tasa interna de retorno y valor presente neto). En la última parte se efectúa la identificación, análisis y evaluación de los riesgos que afectaron los costos, el tiempo de ejecución y la rentabilidad de los proyectos de ambos programas. Entre los factores de riesgo analizados se encontró que los más importantes fueron: las condiciones macroeconómicas del país (inflación, producto interno bruto, tipo de cambio y tasa de interés), deficiencias en la planificación de los proyectos (diseño, derecho de vía, tarifas, permisos y estimación del tránsito) y aportaciones públicas en forma de obra. Mexico is one of the few countries in the world that has developed two major programs for highway construction in collaboration with the private sector. The first one was carried out between 1989 and 1994 with adverse outcomes due to the wrong design of concession schemes; and, the second one, in operation since 2003, through new public-private partnership models (PPPs). The objective of this research is to study public-private partnership models used in Mexico for road infrastructure provision, performing the analysis and evaluation of risk’s distribution between the public and the private sector in each model in order to draw up a proposal for risk’s allocation to reduce the total cost and the uncertainty of projects. The first part describes the current state of knowledge in public-private partnership to develop infrastructure projects, including the history, definition and types of PPP models, as well as international practice of programs such as the British Private Finance Initiative (PFI) model, results in the European Union and PPP programs in other countries. Also, it stands out the private sector participation in financing of Mexico’s transport infrastructure in 1990s. The next chapters present the study of public-private partnerships models that have been used in the country in the construction of the high capacity road network. Characteristics and outcomes of the highway program 1989-94 are presented, as well as the financial bailout and restructuring measures of the concession projects, aspects that forced the Mexican authorities to change projects regulations, improve road’s legislation and design new schemes of cooperation between the Government and the private sector. The new PPP models since 2003 are: concession model to develop toll highways, private service contracts model (shadow toll) to modernize existing roads and highway assets model for the concession of toll roads in operation in exchange for a payment. These models were analyzed using case studies in which measures of operational performance (levels of traffic, costs and construction schedules) and financial profitability (internal rate of return and net present value) are determined. In the last part, the analysis and assessment of risks that affect costs, execution time and profitability of the projects are carried out, for both programs. Among the risk factors analyzed, the following ones were found to be the most important: country macroeconomic conditions (inflation, gross domestic product, exchange rate and interest rate), deficiencies in projects planning (design, right of way, tolls, permits and traffic estimation) and public contributions in the form of construction works.
Resumo:
The difficulty of dealing with construction and demolition waste (CDW) on construction sites is not new and continues to be a significant environmental problem. Currently the CDW collection system in Spain is done in a decentralized manner by each sub-contracted company, being necessary to implement effective waste management measures ensuring a correct management and minimization. During the last years several measures have been launched in order to improve and encourage the reuse and recycling of CDW. A widespread solution for CDW recovery is using them as a landscaping aggregate or for road bases and sub-bases. However, measures encouraging onsite prevention still need to be enhanced. This paper studies the major work stage generating CDW and analyses the categories of CDW produced during its execution. For this, several real building sites have been analysed in order to quantify the estimation of CDW generated. Results of this study show that a significant contributor to the CDW generation on building construction sites in Spain are the masonry works. Finally, a Best Practices Manual (BPM) is proposed containing several strategies on masonry works aimed not only at CDW prevention, but also at improving their management and minimization. The use of this BPM together with the Study and Plan of CDW management --required by law--, promotes the environmental management of the company, favouring the cohesion of the construction process organization at all stages giving rise to establishing responsibilities in the field of waste and providing a greater control over the process. Keywords: construction and demolition waste, management, masonry works, good practice measures, prevention.
Resumo:
La comparación de las diferentes ofertas presentadas en la licitación de un proyecto,con el sistema de contratación tradicional de medición abierta y precio unitario cerrado, requiere herramientas de análisis que sean capaces de discriminar propuestas que teniendo un importe global parecido pueden presentar un impacto económico muy diferente durante la ejecución. Una de las situaciones que no se detecta fácilmente con los métodos tradicionales es el comportamiento del coste real frente a las variaciones de las cantidades realmente ejecutadas en obra respecto de las estimadas en el proyecto. Este texto propone abordar esta situación mediante un sistema de análisis cuantitativo del riesgo como el método de Montecarlo. Este procedimiento, como es sabido, consiste en permitir que los datos de entrada que definen el problema varíen unas funciones de probabilidad definidas, generar un gran número de casos de prueba y tratar los resultados estadísticamente para obtener los valores finales más probables,con los parámetros necesarios para medir la fiabilidad de la estimación. Se presenta un modelo para la comparación de ofertas, desarrollado de manera que puede aplicarse en casos reales aplicando a los datos conocidos unas condiciones de variación que sean fáciles de establecer por los profesionales que realizan estas tareas. ABSTRACT: The comparison of the different bids in the tender for a project, with the traditional contract system based on unit rates open to and re-measurement, requires analysis tools that are able to discriminate proposals having a similar overall economic impact, but that might show a very different behaviour during the execution of the works. One situation not easily detected by traditional methods is the reaction of the actual cost to the changes in the exact quantity of works finally executed respect of the work estimated in the project. This paper intends to address this situation through the Monte Carlo method, a system of quantitative risk analysis. This procedure, as is known, is allows the input data defining the problem to vary some within well defined probability functions, generating a large number of test cases, the results being statistically treated to obtain the most probable final values, with the rest of the parameters needed to measure the reliability of the estimate. We present a model for the comparison of bids, designed in a way that it can be applied in real cases, based on data and assumptions that are easy to understand and set up by professionals who wish to perform these tasks.
Resumo:
The Olvés Church is a Lhree naves basilica. From its construction in 1767, it sufTercd important damages and successivc reparations. The church is built on a claycy hillock on top of the village with vcry fort slopcs. The retaining walls Lhat surround the church havc sufTered movements. A soil sludy was done to know its propcrtics and the reason of the movement. Also, the structural roof is broken and it is not fixed to thc walls that can movc. Thc first phase is done, with a pavcd squa rc ovcr an ancient cemetery. The next phase is a new roof structure to support the lean walls. Al'ter that done, the repair inside can start.
Resumo:
This paper discusses a model based on the agency theory to analyze the optimal transfer of construction risk in public works contracts. The base assumption is that of a contract between a principal (public authority) and an agent (firm), where the payment mechanism is linear and contains an incentive mechanism to enhance the effort of the agent to reduce construction costs. A theoretical model is proposed starting from a cost function with a random component and assuming that both the public authority and the firm are risk averse. The main outcome of the paper is that the optimal transfer of construction risk will be lower when the variance of errors in cost forecast, the risk aversion of the firm and the marginal cost of public funds are larger, while the optimal transfer of construction risk will grow when the variance of errors in cost monitoring and the risk aversion of the public authority are larger