Resumo:
Inside COBRA 2011 RICS International Research Conference, the present paper is linked to analyze the liability of the construction professional in his practice as a expert witness in the Spanish legal framework. In a large number of legal procedures related to the building it is necessary the intervention of the expert witness to report on the subject of litigation, and to give an opinion about possible causes and solutions. This field is increasingly importantly for the practice of construction professional that requires an important specialization. The expert provides his knowledge to the judge in the matter he is dealing with (construction, planning, assessment, legal, ...), providing arguments or reasons as the base for his case and acting as part of the evidence. Although the importance of expert intervention in the judicial process, the responsibilities arising from their activity is a slightly studied field. Therefore, the study has as purpose to think about the regulation of professional activities raising different aims. The first is to define the action of the construction professional-expert witness and the need for expert evidence, establishing the legal implications of this professional activity. The different types of responsibilities (the civil, criminal and administrative) have been established as well as the economic, penal or disciplinary damages that can be derived from the expert report
Resumo:
In the year 1999 approves the Law of Construction Building (LOE, in Spanish) to regulate a sector such as construction, which contained some shortcomings from the legal point of view. Currently, the LOE has been in force 12 years, changing the spanish world of the construction, due to influenced by internationalization. Within the LOE, there regulating the different actors involved in the construction building, as the Projects design, the Director of Construction, the developer, The builder, Director of execution of the construction (actor only in Spain, similar as construcion engineer and abroad in), control entities and the users, but lacks figure Project manager will assume the delegation of the promoter helping and you organize, direct and management the process. This figure assumes that the market and contracts are not legally regulated in Spain, then should define and establish its regulation in the LOE. (Spain Construction Law) The translation in spanish of the words "Project Manager is owed to Professor Rafael de Heredia in his book Integrated Project Management, as agent acting on behalf of the organization and promoter assuming control of the project, ie Integraded Project Management . Already exist in Spain, AEDIP (Spanish Association Integrated of Project Construction management) which comprises the major companies in “Project Management” in Spain, and MeDIP (Master in Integrated Construction Project) the largest and most advanced studies at the Polytechnic University of Madrid, in "Construction Project Management" they teach which is also in Argentina. The Integrated Project ("Project Management") applied to the construction process is a methodological technique that helps to organize, control and manage the resources of the promoters in the building process. When resources are limited (which is usually most situations) to manage them efficiently becomes very important. Well, we find that in this situation, the resources are not only limited, but it is limited, so a comprehensive control and monitoring of them becomes not only important if not crucial. The alternative of starting from scratch with a team that specializes in developing these follow directly intervening to ensure that scarce resources are used in the best possible way requires the use of a specific methodology (Manual DIP, Matrix Foreign EDR breakdown structure EDP Project, Risk Management and Control, Design Management, et ..), that is the methodology used by "Projects managers" to ensure that the initial objectives of the promoters or investors are met and all actors in process, from design to construction company have the mind aim of the project will do, trying to get their interests do not prevail over the interests of the project. Among the agents listed in the building process, "Project Management" or DIPE (Director Comprehensive building process, a proposed name for possible incorporation into the LOE, ) currently not listed as such in the LOE (Act on Construction Planning ), one of the agents that exist within the building process is not regulated from the legal point of view, no obligations, ie, as is required by law to have a project, a builder, a construction management, etc. DIPE only one who wants to hire you as have been advanced knowledge of their services by the clients they have been hiring these agents, there being no legal obligation as mentioned above, then the market is dictating its ruling on this new figure, as if it were necessary, he was not hired and eventually disappeared from the building process. As the aim of this article is regular the process and implement the name of DIPE in the Spanish Law of buildings construction (LOE)
Resumo:
El presente trabajo de Tesis Doctoral surge de la Figura de la Dirección Integrada de Proyecto en Edificación (“Project & Construction Management”) y su analisis de la situación regulatoria en la legislación española. El primer planteamiento fue pensar en la situación actual de esta figura en el contexto internacional, para analizar su repercusión en el sector de la edificación, lo cual me llevo a cabo las siguientes preguntas que he reuelto en esta investigación. ¿ Como surge el ¨Project & Construction Management”? ¿ Cuales son sus actividades, funciones y cometidos? ¿ Existe el ¨Project & Construction Management” en otros países? ¿Hay regulación del ¨Project & Construction Management” en esos paises? ¿Cómo es la regulación del ¨Project & Construction Management”? ¿Existe demanda del ¨Project & Construction Management” en España? ¿Cómo es esa demanda en España, y como se puede cuantificar? ¿Existe regulación del ¨Project & Construction Management” en España? ¿ Como debería ser la regulación del ¨Project & Construction Management” en España? Todas las preguntas anteriores las he ido respondiendo con el presente trabajo, llegando a una serie de respuestas, que están reflejadas en el desarrollo del presente trabajo y que resumo: - EL ¨Project & Construction Management” surge a principios del siglo XX en USA, desarrollándose como una disciplina con metodología propia y extendiéndose por otros países. - EL ¨Project & Construction Management” es una disciplina, basada en una metodología propia con herramientas y técnicas para organizar cualquier 14 proyecto de cualquier tipo, pero en este caso un proyecto de edificación, para lo cual he definido con todo detalle esta figura. - El origen del ¨Project & Construction Management” es anglosajón, concretamente en USA, extendiendose luego al Reino Unido, a Europa (Francia y Alemania), a Asia, a América del Sur y a Oceanía. - En todos los paises estudiados (Estados Unidos, Reino Unido, Francia y Alemania) existe una regulación sobre el ¨Project & Construction Management” que me ha servido de base comparativa para introducirla en España. - Hay muchas empresas en España (Nacionales e Internacionales) que ejercen su actividad dentro de este sector, por lo que para realizar un estudio más profundo, hice una muestra de las 30 empresas más significativas, prepare un cuestionario, dividido en 5 apartados: Organizativo, Sectorial, Cualitativo, Cuantitativo y Profesional para obtener una radiogradía de la situación real del sector, y así valorar cual es la importancia de este agente. - Estudié las posibles regulaciones del ¨Project & Construction Management” en España y no encontré ninguna. - El lugar idóneo para que se regule al ¨Project & Construction Management” es la Ley de Ordenación de la Edificación (LOE), ya que la jurisprudencia (sentencias de los tribunales de justicia españoles) le ha asimilado con los agentes de la LOE y se ha basado para absolver o condenar en la Ley de Ordenación de la Edificación. Por lo que el Objetivo fundamental de esta tesis ha sido regular la figura del ¨Project & Construction Management”, traducirla al Castellano, definirla y realizar una estructura de Agente de la Edificación, según la LOE, para poder introducirla dentro de la Legislación Española, con el objeto de mejorar la calidad de la edificación, proteger al usuario, estableciendo responsabilidades y garantías y proteger al ¨Project & Construction Management” de las responsabilidades solidarias. ABSTRACT This Doctoral Thesis figure emerges from the Integrated Building Project ("Project & Construction Management") and his analysis of the regulatory situation in the Spanish legislation. The first approach was to think of the current situation of this figure in the international context, to analyze its impact on the building sector, which I conducted the following questions that I have met in this research. - How did the “Project & Construction Management "? - What are your activities, functions and duties? - Is there a “Project & Construction Management "in other countries? - Is there regulation “Project & Construction Management "in these countries? - How is regulation of ¨ Project & Construction Management "? - Is there demand “Project & Construction Management "in Spain? - How is that demand in Spain, and as you can quantify? - Is there regulation “Project & Construction Management "in Spain? - How should regulation ¨Project & Construction Management "in Spain? All the above questions have been answered with this study, leading to a series of responses, which are reflected in the development of this study and are summarized: - The ¨ Project & Construction Management "comes early twentieth century in the USA, developed as a discipline with its own methodology and extending other countries. - The ¨ Project & Construction Management "is a discipline based on a metodology own tools and techniques to organize any project of any kind, but in this case a building project, for which I have defined in detail this figure. - The origin of ¨Project & Construction Management "is Anglo-Saxon, particularly in USA, then spreading to the UK, Europe (France and Germany), Asia, South America and Oceania. - In all countries studied (USA, UK, France and Germany) there is a regulation on ¨Project & Construction Management "has helped me to introduce comparative base in Spain. - There are many companies in Spain (National and International) who perform work within this sector, so for further study, I made a sample of the 30 most important companies, prepare a questionnaire, divided into five sections: Organizational , Sector, Qualitative, Quantitative and Professional radiography for a real situation of the sector, and thus assess which is the importance of this agent. - Study the possible regulations ¨Project & Construction Management "in Spain and found none. - The place to be regulated to ¨Project & Construction Management "is the Law of Construction Planning (LOE), as the case law (judgments of the courts Spanish) has assimilated LOE agents and has been based to absolve or condemn Law Construction Planning. So the objective of this thesis has been regular figure ¨ Project & Construction Management ", translated to spanish, define and perform an Agent structure of the Building, as the LOE, to enter into Spanish law, in order to improve the quality of the building, protecting the user, establishing responsibilities and guarantees and protect the ¨ Project & Construction Management "solidarity responsibilities.
Resumo:
Land value bears significant weight in house prices in historical town centers. An essential aim for regulating the mortgage market, particularly in the financial and property crisis that countries such as Spain are undergoing, is to have at hand objective procedures for its valuation, whatever the conditions (location, construction, planning). Of all the factors contributing to house price make-up, the land is the only one whose value does not depend on acquisition cost, but rather on the location-time binomial. That is to say, the specific circumstances at that point and at the exact moment of valuation. For this reason, the most commonly applied procedure for land valuation in town centers is the use of the residual method: once the selling price of new housing in a district is known, the other necessary costs and expenses of development are deducted, including those of building and the developer’s profit. The value left is that of the land. To apply these procedures it is vital to have figures such as building costs, technical fees, tax costs, etc. But, above all, it is essential to obtain the selling price of the new housing. This is not always feasible, on account of the lack of newbuild development in this location. This shortage of information occurs in historical town cities, where urban renewal is slight due to the heritage-protection policies, and where, nevertheless there is substantial activity in the secondary market. In these circumstances, as an alternative for land valuation in consolidated urban areas, we have the adaptation of the residual method to the particular characteristics of the secondary market. To these ends, there is the proposal for the appreciation of the dwelling which follows, in a backwards direction, the application of traditional depreciation methods proposed by the various valuation manuals and guidelines. The reliability of the results obtained is analyzed by contrasting it with published figures for newly-built properties, according to different rules applied in administrative appraisals in Spain and the incidence of an eventual correction due to conservation state.
Resumo:
Acourse focused on the acquisition of integration competencies in ship production engineering, organized in collaboration with selected industry partners, is presented in this paper. The first part of the course is dedicated to Project Management: the students acquire skills in defining, using MS-PROJECT, the work breakdown structure (WBS), and the organization breakdown structure (OBS) in Engineering projects, through a series of examples of increasing complexity with the final one being the construction planning of a vessel. The second part of the course is dedicated to the use of a database manager, MS-ACCESS, in managing production related information.Aseries of increasing complexity examples is treated, the final one being the management of the piping database of a real vessel. This database consists of several thousand pipes, for which a production timing frame is defined connecting this part of the course with the first one. Finally, the third part of the course is devoted to working withFORAN,an Engineering Production application developed bySENERand widely used in the shipbuilding industry. With this application, the structural elements where all the outfittings will be located are defined through cooperative work by the students, working simultaneously in the same 3D model. In this paper, specific details about the learning process are given. Surveys have been posed to the students in order to get feedback from their experience as well as to assess their satisfaction with the learning process, compared to more traditional ones. Results from these surveys are discussed in the paper.
Resumo:
Bridge building is a highly uncertain endeavour that entails considerable risk, as attested to by the succession of construction-related incidents and accidents recently reported in Spain and elsewhere. While efforts are being made to improve on-site safety, many issues are still outstanding, such as the establishment of reliability requirements for the ancillary systems used. The problems that must be dealt with in everyday practice, however, are more elementary and often attributable to human error. The overall organisation of the use of bridge construction equipment is in need of improvement. Close cooperation between the bridge engineers responsible for construction planning and ancillary element suppliers is imperative, for flawed interaction between building equipment and the bridge under construction may generate structural vulnerability. External quality assurance should likewise be mandatory
Resumo:
En el presente proyecto, se han abordado las distintas soluciones constructivas para tratar las principales exigencias en edificación: aislamiento acústico, acondicionamiento acústico y ruido y vibraciones de las instalaciones. Estas soluciones constructivas, se enmarcan dentro de un conjunto de leyes vigentes en España, provenientes de la trasposición de la legislación Europea. Basándose en el Documento Básico HR Protección frente al ruido, donde se encuentran las soluciones constructivas, comentadas anteriormente, se ha llevado a cabo un estudio exhaustivo de las mismas, con la finalidad de crear una herramienta de consulta de fácil y rápido acceso para cualquier persona. En especial, se enfoca a una finalidad didáctica accesible al personal universitario. Se pretende que cualquier persona, con base mínima en la materia, pueda acceder y entender la herramienta creada. Para lograr a esta finalidad, se ha analizado otra documentación, como la Guía de aplicación del DB HR, donde se explica de forma más detallada el Documento Básico HR Protección frente al ruido. Además, se han consultado diferentes normativas españolas, para conseguir que la información aportada al usuario sea completa y no sea necesario acudir a diferentes documentos externos. De esta manera, un usuario podrá realizar un proyecto para: aislar, acondicionar o controlar el ruido y vibraciones de las instalaciones, en una edificación, acudiendo a esta herramienta. Con el objeto de que sea un proyecto enmarcado en un contexto didáctico, con fácil acceso y tratando que sea lo más intuitivo posible, se buscó una plataforma de acceso gratuito y disponible para distintos equipos y sistemas operativos. El programa empleado ha sido tomado del paquete Office creado por Microsoft. El programa se denomina OneNote. Se trata de un programa para realizar, compartir y gestionar notas de forma rápida y sencilla. Los archivos creados en él, se almacenan en OneDrive, por lo tanto, el usuario puede acceder a ellos desde cualquier parte, en cualquier momento y plataforma disponible. ABSTRACT. The aforementioned project approaches the diverse solutions available to accomplish the chief edification requirements in the Spanish Legal System, remarkably influenced by the European Law, in Construction Planning. The key elements of those solutions are acoustic isolation, acoustic conditioning and noise and vibration of installations. Basing most part of our research in the academic report “Documento Básico HR Protección frente al ruido”, which addresses effective solutions about the mentioned queries, but also implements a useful tool that supplies access to the broad public to obtain a wide variety of answers regarding those issues. Its main aim is to improve the knowledge about that subject, however also the access and usage to that system, of every person, although its previous experience. In order to achieve that purpose, the paper also combines an analysis of the study “Guía de aplicación del DB HR” where different elements of the report “Documento Básico HR Protección frente al ruido” are examined in further detail. It is important to remark that all the information provided comply with the current legislation present in Spain at the time this paper was written, so the reader may work on a project of isolation, conditioning or control of noise and vibrations of installations without the requirement of applying external resources. Conclusively, with the intention of giving the paper an educational usage, with intuitive and easy access, the reader is able to join to the platform OneNote by Microsoft Office, software available in utmost part of operating systems and devices. This program allows us to produce, share and manage notes swiftly and efficiently, but also it stores them in The Cloud called OneDrive, so the user can get access to them anywhere and anytime.
Resumo:
The authors are from UPM and are relatively grouped, and all have intervened in different academic or real cases on the subject, at different times as being of different age. With precedent from E. Torroja and A. Páez in Madrid Spain Safety Probabilistic models for concrete about 1957, now in ICOSSAR conferences, author J.M. Antón involved since autumn 1967 for euro-steel construction in CECM produced a math model for independent load superposition reductions, and using it a load coefficient pattern for codes in Rome Feb. 1969, practically adopted for European constructions, giving in JCSS Lisbon Feb. 1974 suggestion of union for concrete-steel-al.. That model uses model for loads like Gumbel type I, for 50 years for one type of load, reduced to 1 year to be added to other independent loads, the sum set in Gumbel theories to 50 years return period, there are parallel models. A complete reliability system was produced, including non linear effects as from buckling, phenomena considered somehow in actual Construction Eurocodes produced from Model Codes. The system was considered by author in CEB in presence of Hydraulic effects from rivers, floods, sea, in reference with actual practice. When redacting a Road Drainage Norm in MOPU Spain an optimization model was realized by authors giving a way to determine the figure of Return Period, 10 to 50 years, for the cases of hydraulic flows to be considered in road drainage. Satisfactory examples were a stream in SE of Spain with Gumbel Type I model and a paper of Ven Te Chow with Mississippi in Keokuk using Gumbel type II, and the model can be modernized with more varied extreme laws. In fact in the MOPU drainage norm the redacting commission acted also as expert to set a table of return periods for elements of road drainage, in fact as a multi-criteria complex decision system. These precedent ideas were used e.g. in wide Codes, indicated in symposia or meetings, but not published in journals in English, and a condensate of contributions of authors is presented. The authors are somehow involved in optimization for hydraulic and agro planning, and give modest hints of intended applications in presence of agro and environment planning as a selection of the criteria and utility functions involved in bayesian, multi-criteria or mixed decision systems. Modest consideration is made of changing in climate, and on the production and commercial systems, and on others as social and financial.
Resumo:
The relevance of renewable energy has grown significantly in our global society. Important efforts are oriented to sustain it. Renewable energy depends on different technical, financial environmental and social complex processes. From the point of view of industrial construction sector this research evaluates some of the current trends in energy generation and use in Venezuela as well as environmental consequences and risks that derive from these. Additionally, authors highlight the importance of infrastructure as key issue to sustain renewable energy generation and use. The study present references of some energy renewable projects in process in Venezuela and the main problems that constrain their performance. Conclusions evidence the complex nature of industrial construction and suggest the need to improve industrial construction competitivenes as a strategy oriented to enhance renewable energy offer in the country. Additionally it is proposed to all stakeholders to work toghether to correct the conditions that currently limit industrial construction development. This is part of ongoing research.
Resumo:
The 12 January 2010, an earthquake hit the city of Port-au-Prince, capital of Haiti. The earthquake reached a magnitude Mw 7.0 and the epicenter was located near the town of Léogâne, approximately 25 km west of the capital. The earthquake occurred in the boundary region separating the Caribbean plate and the North American plate. This plate boundary is dominated by left-lateral strike slip motion and compression, and accommodates about 20 mm/y slip, with the Caribbean plate moving eastward with respect to the North American plate (DeMets et al., 2000). Initially the location and focal mechanism of the earthquake seemed to involve straightforward accommodation of oblique relative motion between the Caribbean and North American plates along the Enriquillo-Plantain Garden fault system (EPGFZ), however Hayes et al., (2010) combined seismological observations, geologic field data and space geodetic measurements to show that, instead, the rupture process involved slip on multiple faults. Besides, the authors showed that remaining shallow shear strain will be released in future surface-rupturing earthquakes on the EPGFZ. In December 2010, a Spanish cooperation project financed by the Politechnical University of Madrid started with a clear objective: Evaluation of seismic hazard and risk in Haiti and its application to the seismic design, urban planning, emergency and resource management. One of the tasks of the project was devoted to vulnerability assessment of the current building stock and the estimation of seismic risk scenarios. The study was carried out by following the capacity spectrum method as implemented in the software SELENA (Molina et al., 2010). The method requires a detailed classification of the building stock in predominant building typologies (according to the materials in the structure and walls, number of stories and age of construction) and the use of the building (residential, commercial, etc.). Later, the knowledge of the soil characteristics of the city and the simulation of a scenario earthquake will provide the seismic risk scenarios (damaged buildings). The initial results of the study show that one of the highest sources of uncertainties comes from the difficulty of achieving a precise building typologies classification due to the craft construction without any regulations. Also it is observed that although the occurrence of big earthquakes usually helps to decrease the vulnerability of the cities due to the collapse of low quality buildings and the reconstruction of seismically designed buildings, in the case of Port-au-Prince the seismic risk in most of the districts remains high, showing very vulnerable areas. Therefore the local authorities have to drive their efforts towards the quality control of the new buildings, the reinforcement of the existing building stock, the establishment of seismic normatives and the development of emergency planning also through the education of the population.
Resumo:
The recognition of the relevance of energy, especially of the renewable energies generated by the sun, water, wind, tides, modern biomass or thermal is growing significantly in the global society based on the possibility it has to improve societies′ quality of life, to support poverty reduction and sustainable development. Renewable energy, and mainly the energy generated by large hydropower generation projects that supply most of the renewable energy consumed by developing countries, requires many technical, legal, financial and social complex processes sustained by innovations and valuable knowledge. Besides these efforts, renewable energy requires a solid infrastructure to generate and distribute the energy resources needed to solve the basic needs of society. This demands a proper construction performance to deliver the energy projects planned according to specifications and respecting environmental and social concerns, which implies the observance of sustainable construction guidelines. But construction projects are complex and demanding and frequently face time and cost overruns that may cause negative impacts on the initial planning and thus on society. The renewable energy issue and the large renewable energy power generation and distribution projects are particularly significant for developing countries and for Latin America in particular, as this region concentrates an important hydropower potential and installed capacity. Using as references the performance of Venezuelan large hydropower generation projects and the Guri dam construction, this research evaluates the tight relationship existing between sustainable construction and knowledge management and their impact to achieve sustainability goals. The knowledge management processes are proposed as a basic strategy to allow learning from successes and failures obtained in previous projects and transform the enhancement opportunites into actions to improve the performance of the renewable energy power generation and distribution projects.
Resumo:
El presente trabajo se basa en la filosofía de la Construcción sin Pérdidas (“Lean Construction”), analizando la situación de esta filosofía en el sector de la edificación en el contexto internacional y español, respondiendo las siguientes preguntas: 1. ¿Cómo surge el “Lean Construction”? 2. ¿Cuáles son sus actividades, funciones y cometidos? 3. ¿Existe regulación del ¨Lean Construction” en otros países? 4. ¿Existe demanda del ¨Lean Construction” en España? 5. ¿Existe regulación del ¨Lean Construction” en España? 6. ¿Cómo debería ser la regulación ¨Lean Construction” en España? 7. ¿Cuál es la relación del “Lean Construction” con el “Project & Construction Management”? 8. ¿Cómo debería ser la regulación de “Lean Construction” en España considerando su relación con el “Project & Construction Management”? Las preguntas indicadas las hemos respondido detalladamente en el presente trabajo, a continuación se resume las respuestas a dichas preguntas: 1. El “Lean Construction” surge en agosto de 1992, cuando el investigador finlandés Lauri Koskela publicó en la Universidad de Stanford el reporte TECHNICAL REPORT N° 72 titulado “Application of the New Production Philosophy to Construction”. Un año más tarde el Dr. Koskela invitó a un grupo de especialistas en construcción al primer workshop de esta materia en Finlandia, dando origen al International Group for Lean Construction (IGLC) lo que ha permitido extender la filosofía a EEUU, Europa, América, Asia, Oceanía y África. “Lean Construction” es un sistema basado en el enfoque “Lean Production” desarrollado en Japón por Toyota Motors a partir de los años cincuenta, sistema que permitió a sus fábricas producir unidades con mayor eficiencia que las industrias americanas, con menores recursos, en menor tiempo, y con un número menor de errores de fabricación. 2. El sistema “Lean Construction” busca maximizar el valor y disminuir las pérdidas de los proyectos generando una coordinación eficiente entre los involucrados, manejando un proyecto como un sistema de producción, estrechando la colaboración entre los participantes de los proyectos, capacitándoles y empoderándoles, fomentando una cultura de cambio. Su propósito es desarrollar un proceso de construcción en el que no hayan accidentes, ni daños a equipos, instalaciones, entorno y comunidad, que se realice en conformidad con los requerimientos contractuales, sin defectos, en el plazo requerido, respetando los costes presupuestados y con un claro enfoque en la eliminación o reducción de las pérdidas, es decir, las actividades que no generen beneficios. El “Last Planner System”, o “Sistema del Último Planificador”, es un sistema del “Lean Construction” que por su propia naturaleza protege a la planificación y, por ende, ayuda a maximizar el valor y minimizar las pérdidas, optimizando de manera sustancial los sistemas de seguridad y salud. El “Lean Construction” se inició como un concepto enfocado a la ejecución de las obras, posteriormente se aplicó la filosofía a todas las etapas del proyecto. Actualmente considera el desarrollo total de un proyecto, desde que nace la idea hasta la culminación de la obra y puesta en marcha, considerando el ciclo de vida completo del proyecto. Es una filosofía de gestión, metodologías de trabajo y una cultura empresarial orientada a la eficiencia de los procesos y flujos. La filosofía “Lean Construction” se está expandiendo en todo el mundo, además está creciendo en su alcance, influyendo en la gestión contractual de los proyectos. Su primera evolución consistió en la creación del sistema “Lean Project Delivery System”, que es el concepto global de desarrollo de proyectos. Posteriormente, se proponen el “Target Value Design”, que consiste en diseñar de forma colaborativa para alcanzar los costes y el valor requerido, y el “Integrated Project Delivery”, en relación con sistemas de contratos relacionales (colaborativos) integrados, distintos a los contratos convencionales. 3. Se verificó que no existe regulación específica del ¨Lean Construction” en otros países, en otras palabras, no existe el agente con el nombre específico de “Especialista en Lean Construction” o similar, en consecuencia, es un agente adicional en el proyecto de la edificación, cuyas funciones y cometidos se pueden solapar con los del “Project Manager”, “Construction Manager”, “Contract Manager”, “Safety Manager”, entre otros. Sin embargo, se comprobó la existencia de formatos privados de contratos colaborativos de Integrated Project Delivery, los cuales podrían ser tomados como unas primeras referencias para futuras regulaciones. 4. Se verificó que sí existe demanda del ¨Lean Construction” en el desarrollo del presente trabajo, aunque aún su uso es incipiente, cada día existe más interesados en el tema. 5. No existe regulación del ¨Lean Construction” en España. 6. Uno de los objetivos fundamentales de esta tesis es el de regular esta figura cuando actúe en un proyecto, definir y realizar una estructura de Agente de la Edificación, según la Ley de Ordenación de la Edificación (LOE), y de esta manera poder introducirla dentro de la Legislación Española, protegiéndola de eventuales responsabilidades civiles. En España existe jurisprudencia (sentencias de los tribunales de justicia españoles) con jurisdicción civil basada en la LOE para absolver o condenar a agentes de la edificación que son definidos en los tribunales como “gestores constructivos” o similares. Por este motivo, en un futuro los tribunales podrían dictaminar responsabilidades solidarias entre el especialista “Lean Construction” y otros agentes del proyecto, dependiendo de sus actuaciones, y según se implemente el “Lean Project Delivery System”, el “Target Value Design” y el “Integrated Project Delivery”. Por otro lado, es posible que el nivel de actuación del especialista “Lean Construcción” pueda abarcar la gestión del diseño, la gestión de la ejecución material (construcción), la gestión de contratos, o la gestión integral de todo el proyecto de edificación, esto último, en concordancia con la última Norma ISO 21500:2012 o UNE-ISO 21500:2013 Directrices para la dirección y gestión de proyectos. En consecuencia, se debería incorporar adecuadamente a uno o más agentes de la edificación en la LOE de acuerdo a sus funciones y responsabilidades según los niveles de actuación del “Especialista en Lean Construction”. Se propone la creación de los siguientes agentes: Gestor del Diseño, Gestor Constructivo y Gestor de Contratos, cuyas definiciones están desarrolladas en este trabajo. Estas figuras son definidas de manera general, puesto que cualquier “Project Manager” o “DIPE”, gestor BIM (Building Information Modeling), o similar, puede actuar como uno o varios de ellos. También se propone la creación del agente “Gestor de la Construcción sin Pérdidas”, como aquel agente que asume las actuaciones del “gestor de diseño”, “gestor constructivo” y “gestor de contratos” con un enfoque en los principios del Lean Production. 7. En la tesis se demuestra, por medio del uso de la ISO 21500, que ambos sistemas son complementarios, de manera que los proyectos pueden tener ambos enfoques y ser compatibilizados. Un proyecto que use el “Project & Construction Management” puede perfectamente apoyarse en las herramientas y técnicas del “Lean Construction” para asegurar la eliminación o reducción de las pérdidas, es decir, las actividades que no generen valor, diseñando el sistema de producción, el sistema de diseño o el sistema de contratos. 8. Se debería incorporar adecuadamente al agente de la edificación “Especialista en Lean Construction” o similar y al agente ¨Especialista en Project & Construction Management” o DIPE en la Ley de Ordenación de la Edificación (LOE) de acuerdo a sus funciones y responsabilidades, puesto que la jurisprudencia se ha basado para absolver o condenar en la referida Ley. Uno de los objetivos fundamentales de esta tesis es el de regular la figura del “Especialista en Lean Construction” cuando actúa simultáneamente con el DIPE, y realizar una estructura de Agente de la Edificación según la LOE, y de esta manera protegerlo de eventuales responsabilidades solidarias. Esta investigación comprueba que la propuesta de definición del agente de edificación DIPE, según la LOE, presentada en la tesis doctoral del Doctor Manuel Soler Severino es compatible con las nuevas definiciones propuestas. El agente DIPE puede asumir los roles de los diferentes gestores propuestos en esta tesis si es que se especializa en dichas materias, o, si lo estima pertinente, recomendar sus contrataciones. ABSTRACT This work is based on the Lean Construction philosophy; an analysis is made herein with regard to the situation of this philosophy in the building sector within the international and Spanish context, replying to the following questions: 1. How did the concept of Lean Construction emerge? 2. Which are the activities, functions and objectives of Lean Construction? 3. Are there regulations on Lean Construction in other countries? 4. Is there a demand for Lean Construction in Spain? 5. Are there regulations on Lean Construction in Spain? 6. How should regulations on Lean Construction be developed in Spain? 7. What is the relationship between Lean Construction and the Project & Construction Management? 8. How should regulations on Lean Construction be developed in Spain considering its relationship with the Project & Construction Management? We have answered these questions in detail here and the replies are summarized as follows: 1. The concept of Lean Construction emerged in august of 1992, when Finnish researcher Lauri Koskela published in Stanford University TECHNICAL REPORT N° 72 entitled “Application of the New Production Philosophy to Construction”. A year later, Professor Koskela invited a group of construction specialists to Finland to the first workshop conducted on this matter; thus, the International Group for Lean Construction (IGLC) was established, which has contributed to extending the philosophy to the United States, Europe, the Americas, Asia, Oceania, and Africa. Lean Construction is a system based on the Lean Production approach, which was developed in Japan by Toyota Motors in the 1950s. Thanks to this system, the Toyota plants were able to produce more units, with greater efficiency than the American industry, less resources, in less time, and with fewer manufacturing errors. 2. The Lean Construction system aims at maximizing the value of projects while reducing waste, producing an effective coordination among those involved; it manages projects as a production system, enhancing collaboration between the parties that participate in the projects while building their capacities, empowering them, and promoting a culture of change. Its purpose is to develop a construction process free of accidents, without damages to the equipment, facilities, environment and community, flawless, in accordance with contractual requirements, within the terms established, respecting budgeted costs, and with a clear approach to eliminating or reducing waste, that is, activities that do not generate benefits. The Last Planner System is a Lean Construction system, which by its own nature protects planning and, therefore, helps to maximize the value and minimize waste, optimizing substantially the safety and health systems. Lean Construction started as a concept focused on the execution of works, and subsequently the philosophy was applied to all the stages of the project. At present it considers the project’s total development, since the time ideas are born until the completion and start-up of the work, taking into account the entire life cycle of the project. It is a philosophy of management, work methodologies, and entrepreneurial culture aimed at the effectiveness of processes and flows. The Lean Construction philosophy is extending all over the world and its scope is becoming broader, having greater influence on the contractual management of projects. It evolved initially through the creation of the Lean Project Delivery System, a global project development concept. Later on, the Target Value Design was developed, based on collaborative design to achieve the costs and value required, as well as the Integrated Project Delivery, in connection with integrated relational (collaborative) contract systems, as opposed to conventional contracts. 3. It was verified that no specific regulations on Lean Construction exist in other countries, in other words, there are no agents with the specific name of “Lean Construction Specialist” or other similar names; therefore, it is an additional agent in building projects, which functions and objectives can overlap those of the Project Manager, Construction Manager, Contract Manager, or Safety Manager, among others. However, the existence of private collaborative contracts of Integrated Project Delivery was confirmed, which could be considered as first references for future regulations. 4. There is a demand for Lean Construction in the development of this work; even though it is still emerging, there is a growing interest in this topic. 5. There are no regulations on Lean Construction in Spain. 6. One of the main objectives of this thesis is to regulate this role when acting in a project, and to define and develop a Building Agent structure, according to the Building Standards Law (LOE by its acronym in Spanish), in order to be able to incorporate it into the Spanish law, protecting it from civil liabilities. In Spain there is jurisprudence in civil jurisdiction based on the LOE to acquit or convict building agents, which are defined in the courts as “construction managers” or similar. For this reason, courts could establish in the future joint and several liabilities between the Lean Construction Specialist and other agents of the project, depending on their actions and based on the implementation of the Lean Project Delivery System, the Target Value Design, and the Integrated Project Delivery. On the other hand, it is possible that the level of action of the Lean Construction Specialist may comprise design management, construction management and contract management, or the integral management of the entire building project in accordance with the last ISO 21500:2012 or UNE-ISO 21500:2013, guidelines for the management of projects. Accordingly, one or more building agents should be appropriately incorporated into the LOE according to their functions and responsibilities and based on the levels of action of the Lean Construction Specialist. The creation of the following agents is proposed: Design Manager, Construction Manager, and Contract Manager, which definitions are developed in this work. These agents are defined in general, since any Project Manager or DIPE, Building Information Modeling (BIM) Manager or similar, may act as one or as many of them. The creation of the Lean Construction Manager is also proposed, as the agent that takes on the role of the Design Manager, Construction Manager and Contract Manager with a focus on the Lean Production principles. 7. In the thesis it is demonstrated that through the implementation of the ISO 21500, both systems are supplementary, so projects may have both approaches and be compatible. A project that applies the Project & Construction Management may perfectly have the support of the tools, techniques and practices of Lean Construction to ensure the elimination or reduction of losses, that is, those activities that do not generate value, thus designing the production system, the design system, or the contract system. 8. The Lean Construction Specialist or similar and the Specialist in Project & Construction Management should be incorporated appropriately into the LOE according to their functions and responsibilities, since jurisprudence has been based on such Law to acquit or convict. One of the main objectives of this thesis is the regulate the role of the Lean Construction Specialist when acting simultaneously with the DIPE, and to develop a structure of the building agent, according to the LOE, and in this way protect such agent from joint and several liabilities. This research proves that the proposal to define the DIPE building agent, according to the LOE, and presented in the doctoral dissertation of Manuel Soler Severino, Ph.D. is compatible with the new definitions proposed. The DIPE agent may assume the roles of the different managers proposed in this thesis if he specializes in those topics or, if deemed pertinent, recommends that they be engaged.