4 resultados para CENTRAL SET

em Universidad Politécnica de Madrid


Relevância:

30.00% 30.00%

Publicador:

Resumo:

In the southern Duero Basin of central Spain, there are vast areas of aeolian sand sheets and dune fields. A comprehensive survey of the sand quarries in this area identified a number of palaeosols in sedimentary sequences. The identification and AMS radiocarbon dating of soil charcoal fragments collected in these palaeosols indicate the persistence of Pinus pinaster in this area throughout most of the Holocene. Although potential natural vegetation models have usually considered the Pinus pinaster forests in this inland area of artificial origin, soil charcoal analysis provides firm evidence of a natural origin. Our data fit perfectly with the pattern of Holocene vegetation development for inland areas of Iberia, which are characterised by stability of pine forests throughout the Holocene. Finally, the growing body of palaeobotanical evidence from Iberia (macrofossils and pollen) is contributing to improve our knowledge of P. pinaster ecology, showing that this species has been present in most Iberian regions during the Holocene, where it has inhabited areas characterised by a very diverse set of climatic and soil conditions.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Esta tesis realiza una contribución metodológica al problema de la gestión óptima de embalses hidroeléctricos durante eventos de avenidas, considerando un enfoque estocástico y multiobjetivo. Para ello se propone una metodología de evaluación de estrategias de laminación en un contexto probabilístico y multiobjetivo. Además se desarrolla un entorno dinámico de laminación en tiempo real con pronósticos que combina un modelo de optimización y algoritmos de simulación. Estas herramientas asisten a los gestores de las presas en la toma de decisión respecto de cuál es la operación más adecuada del embalse. Luego de una detallada revisión de la bibliografía, se observó que los trabajos en el ámbito de la gestión óptima de embalses en avenidas utilizan, en general, un número reducido de series de caudales o hidrogramas para caracterizar los posibles escenarios. Limitando el funcionamiento satisfactorio de un modelo determinado a situaciones hidrológicas similares. Por otra parte, la mayoría de estudios disponibles en este ámbito abordan el problema de la laminación en embalses multipropósito durante la temporada de avenidas, con varios meses de duración. Estas características difieren de la realidad de la gestión de embalses en España. Con los avances computacionales en materia de gestión de información en tiempo real, se observó una tendencia a la implementación de herramientas de operación en tiempo real con pronósticos para determinar la operación a corto plazo (involucrando el control de avenidas). La metodología de evaluación de estrategias propuesta en esta tesis se basa en determinar el comportamiento de éstas frente a un espectro de avenidas características de la solicitación hidrológica. Con ese fin, se combina un sistema de evaluación mediante indicadores y un entorno de generación estocástica de avenidas, obteniéndose un sistema implícitamente estocástico. El sistema de evaluación consta de tres etapas: caracterización, síntesis y comparación, a fin de poder manejar la compleja estructura de datos resultante y realizar la evaluación. En la primera etapa se definen variables de caracterización, vinculadas a los aspectos que se quieren evaluar (seguridad de la presa, control de inundaciones, generación de energía, etc.). Estas variables caracterizan el comportamiento del modelo para un aspecto y evento determinado. En la segunda etapa, la información de estas variables se sintetiza en un conjunto de indicadores, lo más reducido posible. Finalmente, la comparación se lleva a cabo a partir de la comparación de esos indicadores, bien sea mediante la agregación de dichos objetivos en un indicador único, o bien mediante la aplicación del criterio de dominancia de Pareto obteniéndose un conjunto de soluciones aptas. Esta metodología se aplicó para calibrar los parámetros de un modelo de optimización de embalse en laminación y su comparación con otra regla de operación, mediante el enfoque por agregación. Luego se amplió la metodología para evaluar y comparar reglas de operación existentes para el control de avenidas en embalses hidroeléctricos, utilizando el criterio de dominancia. La versatilidad de la metodología permite otras aplicaciones, tales como la determinación de niveles o volúmenes de seguridad, o la selección de las dimensiones del aliviadero entre varias alternativas. Por su parte, el entorno dinámico de laminación al presentar un enfoque combinado de optimización-simulación, permite aprovechar las ventajas de ambos tipos de modelos, facilitando la interacción con los operadores de las presas. Se mejoran los resultados respecto de los obtenidos con una regla de operación reactiva, aun cuando los pronósticos se desvían considerablemente del hidrograma real. Esto contribuye a reducir la tan mencionada brecha entre el desarrollo teórico y la aplicación práctica asociada a los modelos de gestión óptima de embalses. This thesis presents a methodological contribution to address the problem about how to operate a hydropower reservoir during floods in order to achieve an optimal management considering a multiobjective and stochastic approach. A methodology is proposed to assess the flood control strategies in a multiobjective and probabilistic framework. Additionally, a dynamic flood control environ was developed for real-time operation, including forecasts. This dynamic platform combines simulation and optimization models. These tools may assist to dam managers in the decision making process, regarding the most appropriate reservoir operation to be implemented. After a detailed review of the bibliography, it was observed that most of the existing studies in the sphere of flood control reservoir operation consider a reduce number of hydrographs to characterize the reservoir inflows. Consequently, the adequate functioning of a certain strategy may be limited to similar hydrologic scenarios. In the other hand, most of the works in this context tackle the problem of multipurpose flood control operation considering the entire flood season, lasting some months. These considerations differ from the real necessity in the Spanish context. The implementation of real-time reservoir operation is gaining popularity due to computational advances and improvements in real-time data management. The methodology proposed in this thesis for assessing the strategies is based on determining their behavior for a wide range of floods, which are representative of the hydrological forcing of the dam. An evaluation algorithm is combined with a stochastic flood generation system to obtain an implicit stochastic analysis framework. The evaluation system consists in three stages: characterizing, synthesizing and comparing, in order to handle the complex structure of results and, finally, conduct the evaluation process. In the first stage some characterization variables are defined. These variables should be related to the different aspects to be evaluated (such as dam safety, flood protection, hydropower, etc.). Each of these variables characterizes the behavior of a certain operating strategy for a given aspect and event. In the second stage this information is synthesized obtaining a reduced group of indicators or objective functions. Finally, the indicators are compared by means of an aggregated approach or by a dominance criterion approach. In the first case, a single optimum solution may be achieved. However in the second case, a set of good solutions is obtained. This methodology was applied for calibrating the parameters of a flood control model and to compare it with other operating policy, using an aggregated method. After that, the methodology was extent to assess and compared some existing hydropower reservoir flood control operation, considering the Pareto approach. The versatility of the method allows many other applications, such as determining the safety levels, defining the spillways characteristics, among others. The dynamic framework for flood control combines optimization and simulation models, exploiting the advantages of both techniques. This facilitates the interaction between dam operators and the model. Improvements are obtained applying this system when compared with a reactive operating policy, even if the forecasts deviate significantly from the observed hydrograph. This approach contributes to reduce the gap between the theoretical development in the field of reservoir management and its practical applications.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

- Context: Pinus pinea L. presents serious problems of natural regeneration in managed forest of Central Spain. The species exhibits specific traits linked to frugivore activity. Therefore, information on plant–animal interactions may be crucial to understand regeneration failure. - Aims: Determining the spatio-temporal pattern of P. pinea seed predation by Apodemus sylvaticus L. and the factors involved. Exploring the importance of A. sylvaticus L. as a disperser of P. pinea. Identifying other frugivores and their seasonal patterns. - Methods: An intensive 24-month seed predation trial was carried out. The probability of seeds escaping predation was modelled through a zero-inflated binomial mixed model. Experiments on seed dispersal by A. sylvaticus were conducted. Cameras were set up to identify other potential frugivores. - Results: Decreasing rodent population in summer and masting enhances seed survival. Seeds were exploited more rapidly nearby parent trees and shelters. A. sylvaticus dispersal activity was found to be scarce. Corvids marginally preyed upon P. pinea seeds. - Conclusions: Survival of P. pinea seeds is climate-controlled through the timing of the dry period together with masting occurrence. Should germination not take place during the survival period, establishment may be limited. A. sylvaticus mediated dispersal does not modify the seed shadow. Seasonality of corvid activity points to a role of corvids in dispersal.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

La metodología Integrated Safety Analysis (ISA), desarrollada en el área de Modelación y Simulación (MOSI) del Consejo de Seguridad Nuclear (CSN), es un método de Análisis Integrado de Seguridad que está siendo evaluado y analizado mediante diversas aplicaciones impulsadas por el CSN; el análisis integrado de seguridad, combina las técnicas evolucionadas de los análisis de seguridad al uso: deterministas y probabilistas. Se considera adecuado para sustentar la Regulación Informada por el Riesgo (RIR), actual enfoque dado a la seguridad nuclear y que está siendo desarrollado y aplicado en todo el mundo. En este contexto se enmarcan, los proyectos Safety Margin Action Plan (SMAP) y Safety Margin Assessment Application (SM2A), impulsados por el Comité para la Seguridad de las Instalaciones Nucleares (CSNI) de la Agencia de la Energía Nuclear (NEA) de la Organización para la Cooperación y el Desarrollo Económicos (OCDE) en el desarrollo del enfoque adecuado para el uso de las metodologías integradas en la evaluación del cambio en los márgenes de seguridad debidos a cambios en las condiciones de las centrales nucleares. El comité constituye un foro para el intercambio de información técnica y de colaboración entre las organizaciones miembro, que aportan sus propias ideas en investigación, desarrollo e ingeniería. La propuesta del CSN es la aplicación de la metodología ISA, especialmente adecuada para el análisis según el enfoque desarrollado en el proyecto SMAP que pretende obtener los valores best-estimate con incertidumbre de las variables de seguridad que son comparadas con los límites de seguridad, para obtener la frecuencia con la que éstos límites son superados. La ventaja que ofrece la ISA es que permite el análisis selectivo y discreto de los rangos de los parámetros inciertos que tienen mayor influencia en la superación de los límites de seguridad, o frecuencia de excedencia del límite, permitiendo así evaluar los cambios producidos por variaciones en el diseño u operación de la central que serían imperceptibles o complicados de cuantificar con otro tipo de metodologías. La ISA se engloba dentro de las metodologías de APS dinámico discreto que utilizan la generación de árboles de sucesos dinámicos (DET) y se basa en la Theory of Stimulated Dynamics (TSD), teoría de fiabilidad dinámica simplificada que permite la cuantificación del riesgo de cada una de las secuencias. Con la ISA se modelan y simulan todas las interacciones relevantes en una central: diseño, condiciones de operación, mantenimiento, actuaciones de los operadores, eventos estocásticos, etc. Por ello requiere la integración de códigos de: simulación termohidráulica y procedimientos de operación; delineación de árboles de sucesos; cuantificación de árboles de fallos y sucesos; tratamiento de incertidumbres e integración del riesgo. La tesis contiene la aplicación de la metodología ISA al análisis integrado del suceso iniciador de la pérdida del sistema de refrigeración de componentes (CCWS) que genera secuencias de pérdida de refrigerante del reactor a través de los sellos de las bombas principales del circuito de refrigerante del reactor (SLOCA). Se utiliza para probar el cambio en los márgenes, con respecto al límite de la máxima temperatura de pico de vaina (1477 K), que sería posible en virtud de un potencial aumento de potencia del 10 % en el reactor de agua a presión de la C.N. Zion. El trabajo realizado para la consecución de la tesis, fruto de la colaboración de la Escuela Técnica Superior de Ingenieros de Minas y Energía y la empresa de soluciones tecnológicas Ekergy Software S.L. (NFQ Solutions) con el área MOSI del CSN, ha sido la base para la contribución del CSN en el ejercicio SM2A. Este ejercicio ha sido utilizado como evaluación del desarrollo de algunas de las ideas, sugerencias, y los algoritmos detrás de la metodología ISA. Como resultado se ha obtenido un ligero aumento de la frecuencia de excedencia del daño (DEF) provocado por el aumento de potencia. Este resultado demuestra la viabilidad de la metodología ISA para obtener medidas de las variaciones en los márgenes de seguridad que han sido provocadas por modificaciones en la planta. También se ha mostrado que es especialmente adecuada en escenarios donde los eventos estocásticos o las actuaciones de recuperación o mitigación de los operadores pueden tener un papel relevante en el riesgo. Los resultados obtenidos no tienen validez más allá de la de mostrar la viabilidad de la metodología ISA. La central nuclear en la que se aplica el estudio está clausurada y la información relativa a sus análisis de seguridad es deficiente, por lo que han sido necesarias asunciones sin comprobación o aproximaciones basadas en estudios genéricos o de otras plantas. Se han establecido tres fases en el proceso de análisis: primero, obtención del árbol de sucesos dinámico de referencia; segundo, análisis de incertidumbres y obtención de los dominios de daño; y tercero, cuantificación del riesgo. Se han mostrado diversas aplicaciones de la metodología y ventajas que presenta frente al APS clásico. También se ha contribuido al desarrollo del prototipo de herramienta para la aplicación de la metodología ISA (SCAIS). ABSTRACT The Integrated Safety Analysis methodology (ISA), developed by the Consejo de Seguridad Nuclear (CSN), is being assessed in various applications encouraged by CSN. An Integrated Safety Analysis merges the evolved techniques of the usually applied safety analysis methodologies; deterministic and probabilistic. It is considered as a suitable tool for assessing risk in a Risk Informed Regulation framework, the approach under development that is being adopted on Nuclear Safety around the world. In this policy framework, the projects Safety Margin Action Plan (SMAP) and Safety Margin Assessment Application (SM2A), set up by the Committee on the Safety of Nuclear Installations (CSNI) of the Nuclear Energy Agency within the Organization for Economic Co-operation and Development (OECD), were aimed to obtain a methodology and its application for the integration of risk and safety margins in the assessment of the changes to the overall safety as a result of changes in the nuclear plant condition. The committee provides a forum for the exchange of technical information and cooperation among member organizations which contribute their respective approaches in research, development and engineering. The ISA methodology, proposed by CSN, specially fits with the SMAP approach that aims at obtaining Best Estimate Plus Uncertainty values of the safety variables to be compared with the safety limits. This makes it possible to obtain the exceedance frequencies of the safety limit. The ISA has the advantage over other methods of allowing the specific and discrete evaluation of the most influential uncertain parameters in the limit exceedance frequency. In this way the changes due to design or operation variation, imperceptibles or complicated to by quantified by other methods, are correctly evaluated. The ISA methodology is one of the discrete methodologies of the Dynamic PSA framework that uses the generation of dynamic event trees (DET). It is based on the Theory of Stimulated Dynamics (TSD), a simplified version of the theory of Probabilistic Dynamics that allows the risk quantification. The ISA models and simulates all the important interactions in a Nuclear Power Plant; design, operating conditions, maintenance, human actuations, stochastic events, etc. In order to that, it requires the integration of codes to obtain: Thermohydraulic and human actuations; Even trees delineation; Fault Trees and Event Trees quantification; Uncertainty analysis and risk assessment. This written dissertation narrates the application of the ISA methodology to the initiating event of the Loss of the Component Cooling System (CCWS) generating sequences of loss of reactor coolant through the seals of the reactor coolant pump (SLOCA). It is used to test the change in margins with respect to the maximum clad temperature limit (1477 K) that would be possible under a potential 10 % power up-rate effected in the pressurized water reactor of Zion NPP. The work done to achieve the thesis, fruit of the collaborative agreement of the School of Mining and Energy Engineering and the company of technological solutions Ekergy Software S.L. (NFQ Solutions) with de specialized modeling and simulation branch of the CSN, has been the basis for the contribution of the CSN in the exercise SM2A. This exercise has been used as an assessment of the development of some of the ideas, suggestions, and algorithms behind the ISA methodology. It has been obtained a slight increase in the Damage Exceedance Frequency (DEF) caused by the power up-rate. This result shows that ISA methodology allows quantifying the safety margin change when design modifications are performed in a NPP and is specially suitable for scenarios where stochastic events or human responses have an important role to prevent or mitigate the accidental consequences and the total risk. The results do not have any validity out of showing the viability of the methodology ISA. Zion NPP was retired and information of its safety analysis is scarce, so assumptions without verification or approximations based on generic studies have been required. Three phases are established in the analysis process: first, obtaining the reference dynamic event tree; second, uncertainty analysis and obtaining the damage domains; third, risk quantification. There have been shown various applications of the methodology and advantages over the classical PSA. It has also contributed to the development of the prototype tool for the implementation of the ISA methodology (SCAIS).