6 resultados para Biomass energy

em Universidad Politécnica de Madrid


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Biomass has always been associated with the development of the population in the Canary Islands as the first source of elemental energy that was in the archipelago and the main cause of deforestation of forests, which over the years has been replaced by forest fossil fuels. The Canary Islands store a large amount of energy in the form of biomass. This may be important on a small scale for the design of small power plants with similar fuels from agricultural activities, and these plants could supply rural areas that could have self-sufficiency energy. The problem with the Canary Islands for a boost in this achievement is to ensure the supply to the consumer centers or power plants for greater efficiency that must operate continuously, allowing them to have a resource with regularity, quality and at an acceptable cost. In the Canary Islands converge also a unique topography with a very rugged terrain that makes it greater difficult to use and significantly more expensive. In this work all these aspects are studied, giving conclusions, action paths and theoretical potentials.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

En el presente trabajo se estudia la producción potencial de biomasa procedente de los cultivos de centeno y triticale en las seis comarcas agrarias de la Comunidad de Madrid (CM) y la posibilidad de su aplicación a la producción de bioelectricidad en cada una de ellas. En primer lugar se realiza un estudio bibliográfico de la situación actual de la bioelectricidad. Uno de los principales datos a tener en cuenta es que en el PER 2011- 2020 se estima que el total de potencia eléctrica instalada a partir de biomasa en España en el año 2020 sea de 1.350 MW, unas dos veces y media la existente a finales de 2010. Además, se comenta el estado de la incentivación del uso de biomasa de cultivos energéticos para producción de electricidad, la cual se regula actualmente según el Real Decreto-ley 9/2013, de 12 de Julio, por el que se adoptaron medidas urgentes para garantizar la estabilidad financiera del sistema eléctrico, y se consideran los criterios de sostenibilidad en el uso de biocombustibles sólidos. Se realiza una caracterización de las seis comarcas agrarias que forman la Comunidad Autónoma de Madrid: Área Metropolitana, Campiña, Guadarrama, Lozoya- Somosierra, Sur-Occidental y Vegas, la cual consta de dos partes: una descripción de la climatología y otra de la distribución de la superficie dedicada a barbecho y cultivos herbáceos. Se hace una recopilación bibliográfica de los modelos de simulación más representativos de crecimiento de los cultivos (CERES y Cereal YES), así como de ensayos realizados con los cultivos de centeno y triticale para la producción de biomasa y de estudios efectuados mediante herramientas GIS y técnicas de análisis multicriterio para la ubicación de centrales de bioelectricidad y el estudio de la logística de la biomasa. Se propone un modelo de simulación de la productividad de biomasa de centeno y de triticale para la CM, que resulta de la combinación de un modelo de producción de grano en base a datos climatológicos y a la relación biomasa/grano media de ambos cultivos obtenida en una experiencia previa. Los modelos obtenidos responden a las siguientes ecuaciones (siendo TN = temperatura media normalizada a 9,9 ºC y PN = precipitación acumulada normalizada a 496,7 mm): - Producción biomasa centeno (t m.s./ha) = 2,785 * [1,078 * ln(TN + 2*PN) + 2,3256] - Producción biomasa triticale (t m.s./ha) = 2,595 * [2,4495 * ln(TN + 2*PN) + 2,6103] Posteriormente, aplicando los modelos desarrollados, se cuantifica el potencial de producción de biomasa de centeno y triticale en las distintas comarcas agrarias de la CM en cada uno de los escenarios establecidos, que se consideran según el uso de la superficie de barbecho de secano disponible (25%, 50%, 75% y 100%). Las producciones potenciales de biomasa, que se podrían alcanzar en la CM utilizando el 100% de la superficie de barbecho de secano, en base a los cultivos de centeno y triticale, se estimaron en 169.710,72 - 149.811,59 - 140.217,54 - 101.583,01 - 26.961,88 y 1.886,40 t anuales para las comarcas de Campiña - Vegas, Sur - Occidental - Área Metropolitana - Lozoya-Somosierra y Guadarrama, respectivamente. Se realiza un análisis multicriterio basado en la programación de compromiso para definir las comarcas agrarias con mejores características para la ubicación de centrales de bioelectricidad en base a los criterios de potencial de biomasa, infraestructura eléctrica, red de carreteras, espacios protegidos y superficie de núcleos urbanos. Al efectuar el análisis multicriterio, se obtiene la siguiente ordenación jerárquica en base a los criterios establecidos: Campiña, Sur Occidental, Vegas, Área Metropolitana, Lozoya-Somosierra y Guadarrama. Mediante la utilización de técnicas GIS se estudia la localización más conveniente de una central de bioelectricidad de 2,2 MW en cada una de las comarcas agrarias y según el uso de la superficie de barbecho de secano disponible (25%, 50%, 75% y 100%), siempre que exista potencial suficiente. Para el caso de la biomasa de centeno y de triticale en base seca se considera un PCI de 3500 kcal/kg, por lo que se necesitarán como mínimo 17.298,28 toneladas para satisfacer las necesidades de cada una de las centrales de 2,2 MW. Se analiza el potencial máximo de bioelectricidad en cada una de las comarcas agrarias en base a los cultivos de centeno y triticale como productores de biomasa. Según se considere el 25% o el 100% del barbecho de secano para producción de biomasa, la potencia máxima de bioelectricidad que se podría instalar en cada una de las comarcas agrarias variaría entre 5,4 y 21,58 MW en la comarca Campiña, entre 4,76 y 19,05 MW en la comarca Vegas, entre 4,46 y 17,83 MW en la comarca Sur Occidental, entre 3,23 y 12,92 MW en la comarca Área Metropolitana, entre 0,86 y 3,43 MW en la comarca Lozoya Somosierra y entre 0,06 y 0,24 MW en la comarca Guadarrama. La potencia total que se podría instalar en la CM a partir de la biomasa de centeno y triticale podría variar entre 18,76 y 75,06 MW según que se utilice el 25% o el 100% de las tierras de barbecho de secano para su cultivo. ABSTRACT In this work is studied the potential biomass production from rye and triticale crops in the six Madrid Community (MC) agricultural regions and the possibility of its application to the bioelectricity production in each of them. First is performed a bibliographical study of the current situation of bioelectricity. One of the main elements to be considered is that in the PER 2011-2020 is estimated that the total installed electric power from biomass in Spain in 2020 was 1.350 MW, about two and a half times as at end 2010. Also is discussed the status of enhancing the use of biomass energy crops for electricity production, which is currently regulated according to the Real Decreto-ley 9/2013, of July 12, by which urgent measures were adopted to ensure financial stability of the electrical system, and there are considered the sustainability criteria in the use of solid biofuels. A characterization of the six Madrid Community agricultural regions is carried out: Area Metropolitana, Campiña, Guadarrama, Lozoya-Somosierra, Sur-Occidental and Vegas, which consists of two parts: a description of the climatology and another about the distribution of the area under fallow and arable crops. It makes a bibliographic compilation of the most representative crop growth simulation models (CERES and Cereal YES), as well as trials carried out with rye and triticale crops for biomass production and studies conducted by GIS tools and techniques multicriteria analysis for the location of bioelectricity centrals and the study of the logistics of biomass. Is proposed a biomass productivity simulation model for rye and triticale for MC that results from the combination of grain production model based on climatological data and the average relative biomass/grain of both crops obtained in a prior experience. The models obtained correspond to the following equations (where TN = normalized average temperature and PN = normalized accumulated precipitation): - Production rye biomass (t d.m./ha) = 2.785 * [1.078 * ln (TN + 2*PN) + 2.3256] - Production triticale biomass (t d.m./ha) = 2,595 * [2.4495 * ln (TN + 2*PN) + 2.6103] Subsequently, applying the developed models, the biomass potential of the MC agricultural regions is quantified in each of the scenarios established, which are considered as the use of dry fallow area available (25%, 50%, 75 % and 100%). The potential biomass production that can be achieved within the MC using 100% of the rainfed fallow area based on rye and triticale crops, were estimated at 169.710,72 - 149.811,59 - 140.217,54 - 101.583,01 - 26.961,88 and 1.886,40 t annual for the regions of Campiña, Vegas, Sur Occidental, Area Metropolitana, Lozoya- Somosierra and Guadarrama, respectively. A multicriteria analysis is performed, based on compromise programming to define the agricultural regions with better features for the location of bioelectricity centrals, on the basis of biomass potential, electrical infrastructure, road network, protected areas and urban area criteria. Upon multicriteria analysis, is obtained the following hierarchical order based on criteria: Campiña, Sur Occidental, Vegas, Area Metropolitana, Lozoya-Somosierra and Guadarrama. Likewise, through the use of GIS techniques, the most suitable location for a 2,2 MW bioelectricity plant is studied in each of the agricultural regions and according to the use of dry fallow area available (25%, 50% , 75% and 100%), if there is sufficient potential. In the case of biomass rye and triticale dry basis is considered a PCI of 3500 kcal/kg, so it will take at least 17,298.28 t to satisfy the needs of each plant. Is analyzed the maximum bioelectricity potential on each of the agricultural regions on the basis of the rye and triticale crops as biomass producers. As deemed 25% or 100% dry fallow for biomass, the maximum bioelectricity potential varies between 5,4 and 21,58 MW in the Campiña region, between 4,76 and 19,05 MW in the Vegas region, between 4,46 and 17,83 MW in the Sur Occidental region, between 3,23 and 12,92 MW in the Area Metropolitana region, between 0,86 and 3,43 MW in the Lozoya-Somosierra region and between 0,06 and 0,24 MW in the Guadarrama region. The total power that could be installed in the CM from rye and triticale biomass could vary between 18.76 and 75.06 MW if is used the 25% or 100% of fallow land for rainfed crop.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The recognition of the relevance of energy, especially of the renewable energies generated by the sun, water, wind, tides, modern biomass or thermal is growing significantly in the global society based on the possibility it has to improve societies′ quality of life, to support poverty reduction and sustainable development. Renewable energy, and mainly the energy generated by large hydropower generation projects that supply most of the renewable energy consumed by developing countries, requires many technical, legal, financial and social complex processes sustained by innovations and valuable knowledge. Besides these efforts, renewable energy requires a solid infrastructure to generate and distribute the energy resources needed to solve the basic needs of society. This demands a proper construction performance to deliver the energy projects planned according to specifications and respecting environmental and social concerns, which implies the observance of sustainable construction guidelines. But construction projects are complex and demanding and frequently face time and cost overruns that may cause negative impacts on the initial planning and thus on society. The renewable energy issue and the large renewable energy power generation and distribution projects are particularly significant for developing countries and for Latin America in particular, as this region concentrates an important hydropower potential and installed capacity. Using as references the performance of Venezuelan large hydropower generation projects and the Guri dam construction, this research evaluates the tight relationship existing between sustainable construction and knowledge management and their impact to achieve sustainability goals. The knowledge management processes are proposed as a basic strategy to allow learning from successes and failures obtained in previous projects and transform the enhancement opportunites into actions to improve the performance of the renewable energy power generation and distribution projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper investigates the gasification of two biomass types (pine wood and olive stones) in a laboratory scale bubbling fluidized bed reactor, in order to evaluate comparatively their potential in the production of syngas.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The use of residual biomass for energy purposes is of great interest in isolated areas like Majorca for waste reduction, energy sufficiency and renewable energies development. In addition, densification processes lead to easy-to-automate solid biofuels which additionally have higher energy density. The present study aims at (i) the estimation of the potential of residual biomass from woody crops as well as from agri-food and wood industries in Majorca, and (ii) the analysis of the optimal location of potential pellet plants by means of a GIS approach (location-allocation analysis) and a cost evaluation of the pellets production chain. The residual biomass potential from woody crops in Majorca Island was estimated at 35,874 metric tons dry matter (t DM) per year, while the wood and agri-food industries produced annually 21,494 t DM and 2717 t DM, respectively. Thus, there would be enough resource available for the installation of 10 pellet plants of 6400 t·year−1 capacity. These plants were optimally located throughout the island of Mallorca with a maximum threshold distance of 28 km for biomass transport from the production points. Values found for the biomass cost at the pellet plant ranged between 57.1 €·t−1 and 63.4 €·t−1 for biomass transport distance of 10 and 28 km. The cost of pelleting amounted to 56.7 €·t−1; adding the concepts of business fee, pellet transport and profit margin (15%), the total cost of pelleting was estimated at 116.6 €·t−1. The present study provides a proposal for pellet production from residual woody biomass that would supply up to 2.8% of the primary energy consumed by the domestic and services sector in the Balearic Islands.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this paper, a general vision of cogeneration penetration in the European Union is shown; after this, a case study is included, evaluating as a function of two factors (electricity and emission allowance prices) the suitability of installing, for an industry with a determined thermal demand, two different options. The first one is a gas turbine cogeneration plant generating steam through a heat recovery steam generator (HRSG). The second one consists of installing a natural gas boiler for steam production covering the electricity demand from the grid. The CO2 emissions from both options are compared regarding different kinds of generation mixes from the electricity grid in the case of using the industrial boiler; taking into account the advantages of using biomass in relation to emissions, a last comparison has been carried out considering a biomass boiler instead of the natural gas boiler.