7 resultados para Biggs, Leonard Vivian - Pictorial works
em Universidad Politécnica de Madrid
Resumo:
This paper proposes a method of landscape characterisation and assessment of public works associated with fluvial landscapes, which is validated in the middle section of the Tajo River. In this method, a set of criteria is identified that unifies various characteristics of the landscape associated to the infrastructures. A specific weight is then assigned to each criterion in such a way as to produce a semi-quantitative value ranging from a minimum value of 0 to a maximum value of 10. Taken together, these criteria enable us to describe and assess the value of the public works selected for study, in this case helping us to evaluate the sections of the River Tajo analysed in our study area. Accordingly, the value of all the infrastructures associated to a stretch of the river covering several hundred kilometres was determined and after dividing this stretch into sections, they were compared under equivalent conditions to provide a hierarchal ranking.
Resumo:
The proximity between Europe and Africa and the fact that the Strait of Gibraltar has historically acted as a link between races, cultures and religions have made absolutely necessary to establish a relationship between the Northern African coast and the Southern European equivalent. From the Nineteenth Century the possibility of building a permanent link between both continents through the Strait of Gibraltar has been taken into account. In order to establish that relationship it is necessary to have coastal zones completely geo-referenced, under the same geodetic system and with a unique projection system. The paper describes the work carried out in the Strait of Gibraltar for this purpose.
Resumo:
The Olvés Church is a Lhree naves basilica. From its construction in 1767, it sufTercd important damages and successivc reparations. The church is built on a claycy hillock on top of the village with vcry fort slopcs. The retaining walls Lhat surround the church havc sufTered movements. A soil sludy was done to know its propcrtics and the reason of the movement. Also, the structural roof is broken and it is not fixed to thc walls that can movc. Thc first phase is done, with a pavcd squa rc ovcr an ancient cemetery. The next phase is a new roof structure to support the lean walls. Al'ter that done, the repair inside can start.
Resumo:
The design of collective protections of construction works is a topic that is integrated within one of the MBTI subjects. This paper presents an experience for teaching the design of collective protection in building works. Teaching has been done in a bended way. This subject is taught as part of the content of a wider subject included in the Master "Building Technological Innovation" (MBTI) of the Universidad Politécnica de Madrid (UPM). This Master's degree is a postgraduate of research nature. Graduating in MBTI implies that students are in a position to begin their PhD thesis. At this stage, often students are not able to follow the rigour established by the schedule of classes. For this reason it is interesting that part of the teaching is developed in a non-classroom based way.
Resumo:
The difficulty of dealing with construction and demolition waste (CDW) on construction sites is not new and continues to be a significant environmental problem. Currently the CDW collection system in Spain is done in a decentralized manner by each sub-contracted company, being necessary to implement effective waste management measures ensuring a correct management and minimization. During the last years several measures have been launched in order to improve and encourage the reuse and recycling of CDW. A widespread solution for CDW recovery is using them as a landscaping aggregate or for road bases and sub-bases. However, measures encouraging onsite prevention still need to be enhanced. This paper studies the major work stage generating CDW and analyses the categories of CDW produced during its execution. For this, several real building sites have been analysed in order to quantify the estimation of CDW generated. Results of this study show that a significant contributor to the CDW generation on building construction sites in Spain are the masonry works. Finally, a Best Practices Manual (BPM) is proposed containing several strategies on masonry works aimed not only at CDW prevention, but also at improving their management and minimization. The use of this BPM together with the Study and Plan of CDW management --required by law--, promotes the environmental management of the company, favouring the cohesion of the construction process organization at all stages giving rise to establishing responsibilities in the field of waste and providing a greater control over the process. Keywords: construction and demolition waste, management, masonry works, good practice measures, prevention.
Resumo:
The Chinchón Saint Claire Convent is a Count Foundation of 1653. Some repair works were made around 1965, but some important cracks were remained. This paper describes the soil study made to know, its properties, the reason of these movements and its consequences to the convent and the repair works done. A high swelling phenomenon has been detected. The convent is on a high plasticity clayey soil with soil sandy insertions. The soil water has a high content of sulphates. In addition, some sewer system piping was broken around the convent and frequently flooded the convent crypt. A micropiles underpinning was made and the water leaked has lead to the sewer system to avoid the crypt flooding, also a drainage system has been made and the ground around the church has been paved.