10 resultados para BIM collaboration

em Universidad Politécnica de Madrid


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper analyzes the relationship among research collaboration, number of documents and number of citations of computer science research activity. It analyzes the number of documents and citations and how they vary by number of authors. They are also analyzed (according to author set cardinality) under different circumstances, that is, when documents are written in different types of collaboration, when documents are published in different document types, when documents are published in different computer science subdisciplines, and, finally, when documents are published by journals with different impact factor quartiles. To investigate the above relationships, this paper analyzes the publications listed in the Web of Science and produced by active Spanish university professors between 2000 and 2009, working in the computer science field. Analyzing all documents, we show that the highest percentage of documents are published by three authors, whereas single-authored documents account for the lowest percentage. By number of citations, there is no positive association between the author cardinality and citation impact. Statistical tests show that documents written by two authors receive more citations per document and year than documents published by more authors. In contrast, results do not show statistically significant differences between documents published by two authors and one author. The research findings suggest that international collaboration results on average in publications with higher citation rates than national and institutional collaborations. We also find differences regarding citation rates between journals and conferences, across different computer science subdisciplines and journal quartiles as expected. Finally, our impression is that the collaborative level (number of authors per document) will increase in the coming years, and documents published by three or four authors will be the trend in computer science literature.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Twelve years ago a group of teachers began to work in educational innovation. In 2002 we received an award for educational innovation, undergoing several stages. Recently, we have decided to focus on being teachers of educational innovation. We create a web scheduled in Joomla offering various services, among which we emphasize teaching courses of educational innovation. The “Instituto de Ciencias de la Educacion” in “Universidad Politécnica de Madrid” has recently incorporated two of these courses, which has been highly praised. These courses will be reissued in new calls, and we are going to offer them to more Universities. We are in contact with several institutions, radio programs, the UNESCO Chair of Mining and Industrial Heritage, and we are working with them in the creation of heritage courses using methods that we have developed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Ponencia publicada en las Actas del Congreso Internacional de la EAHN (EUROPEAN ARCHITECTURAL HISTORY NETWORK), celebrado en Bruselas del 31 Mayo -3 Junio 2012.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Cognitive Wireless Sensor Network (CWSN) is a new paradigm which integrates cognitive features in traditional Wireless Sensor Networks (WSNs) to mitigate important problems such as spectrum occupancy. Security in Cognitive Wireless Sensor Networks is an important problem because these kinds of networks manage critical applications and data. Moreover, the specific constraints of WSN make the problem even more critical. However, effective solutions have not been implemented yet. Among the specific attacks derived from new cognitive features, the one most studied is the Primary User Emulation (PUE) attack. This paper discusses a new approach, based on anomaly behavior detection and collaboration, to detect the PUE attack in CWSN scenarios. A nonparametric CUSUM algorithm, suitable for low resource networks like CWSN, has been used in this work. The algorithm has been tested using a cognitive simulator that brings important results in this area. For example, the result shows that the number of collaborative nodes is the most important parameter in order to improve the PUE attack detection rates. If the 20% of the nodes collaborates, the PUE detection reaches the 98% with less than 1% of false positives.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

AFRICA BUILD (AB) is a Coordination Action project under the 7th European Framework Programme having the aim of improving the capacities for health research and education in Africa through Information and Communication Technologies (ICT). This project, started in 2012, has promoted health research, education and evidence-based practice in Africa through the creation of centers of excellence, by using ICT,?know-how?, eLearning and knowledge sharing, through Web-enabled virtual communities.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Semantic interoperability is essential to facilitate efficient collaboration in heterogeneous multi-site healthcare environments. The deployment of a semantic interoperability solution has the potential to enable a wide range of informatics supported applications in clinical care and research both within as ingle healthcare organization and in a network of organizations. At the same time, building and deploying a semantic interoperability solution may require significant effort to carryout data transformation and to harmonize the semantics of the information in the different systems. Our approach to semantic interoperability leverages existing healthcare standards and ontologies, focusing first on specific clinical domains and key applications, and gradually expanding the solution when needed. An important objective of this work is to create a semantic link between clinical research and care environments to enable applications such as streamlining the execution of multi-centric clinical trials, including the identification of eligible patients for the trials. This paper presents an analysis of the suitability of several widely-used medical ontologies in the clinical domain: SNOMED-CT, LOINC, MedDRA, to capture the semantics of the clinical trial eligibility criteria, of the clinical trial data (e.g., Clinical Report Forms), and of the corresponding patient record data that would enable the automatic identification of eligible patients. Next to the coverage provided by the ontologies we evaluate and compare the sizes of the sets of relevant concepts and their relative frequency to estimate the cost of data transformation, of building the necessary semantic mappings, and of extending the solution to new domains. This analysis shows that our approach is both feasible and scalable.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

El objetivo del siguiente Proyecto Fin de Carrera consiste en definir y describir de forma ordenada, clara y precisa el procedimiento a seguir en el desarrollo de un trabajo mediante técnicas BIM (Building Information Modeling - Modelado de Información de Construcción)con la finalidad añadida de que pueda servir como un protocolo general para los profesionales relacionados con el ámbito de estas materias. Este proyecto se ocupará de las siguientes tareas: 1.-Terminología, normativa, ámbitos de aplicación, metodología y flujo de trabajo empleados en la utilización de técnicas denominadas BIM. 2.- Aplicación sobre el yacimiento arqueológico Mleiha zona 5 situado en Emiratos Árabes Unidos, incluyendo la elaboración de un modelo de reconstrucción virtual de este cementerio y sus antiguos panteones. Para ello contaremos con la topografía y cartografía de la zona, en una superficie aproximada de 1 Hectárea, procedente de un levantamiento a escala 1:200 realizado en Mayo de 2013.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

La presente investigación se inicia planteando el objetivo de identificar los parámetros geométricos que son exclusivos del proceso de generación de la Forma y relacionarlos con los invariantes relacionados con la Fabricación digital aplicada a la Arquitectura. Con ello se pretende recuperar la geometría como herramienta principal del proceso de Proyecto ampliando su ámbito de actuación al encontrar una relación con los procesos de fabricación digital. El primer capítulo describe los antecedentes y contexto histórico centrándose especialmente en la influencia de la capacidad de definir geometrías complejas digitalmente mediante la aplicación de algoritmos. En los primeros ejemplos la aproximación del Arquitecto a proyectos con geometrías complejas no euclídeas aún se emplea sin precisión en la comunicación de la geometría ideada para su puesta en obra. Las técnicas constructivas obligan a asumir una tolerancia de desviación entre proyecto y obra y la previsión del comportamiento de esa geometría no permite asegurar su comportamiento final. No será hasta la introducción de herramientas CAD en el proceso de ideación arquitectónica cuando el Arquitecto se capacite para generar geometrías no representables de forma analógica. Sin embargo, la imposibilidad de trasladar la geometría proyectada a la praxis constructiva impedirá la plasmación de un proceso completo, salvo en las contadas ocasiones que se recogen en este texto. “El análisis cronológico de las referencias establece como aspecto esencial para la construcción de geometrías complejas la capacidad primero para definir y comunicar de forma precisa e inequívoca la geometría y después la capacidad de analizar el desempeño prestacional de dicha propuesta geométrica”. La presente investigación se inicia planteando el objetivo de identificar los parámetros geométricos que son exclusivos del proceso de generación de la Forma y relacionarlos con los invariantes relacionados con la Fabricación digital aplicada a la Arquitectura. Con ello se pretende recuperar la geometría como herramienta principal del proceso de Proyecto ampliando su ámbito de actuación al encontrar una relación con los procesos de fabricación digital. El primer capítulo describe los antecedentes y contexto histórico centrándose especialmente en la influencia de la capacidad de definir geometrías complejas digitalmente mediante la aplicación de algoritmos. En los primeros ejemplos la aproximación del Arquitecto a proyectos con geometrías complejas no euclídeas aún se emplea sin precisión en la comunicación de la geometría ideada para su puesta en obra. Las técnicas constructivas obligan a asumir una tolerancia de desviación entre proyecto y obra y la previsión del comportamiento de esa geometría no permite asegurar su comportamiento final. No será hasta la introducción de herramientas CAD en el proceso de ideación arquitectónica cuando el Arquitecto se capacite para generar geometrías no representables de forma analógica. Sin embargo, la imposibilidad de trasladar la geometría proyectada a la praxis constructiva impedirá la plasmación de un proceso completo, salvo en las contadas ocasiones que se recogen en este texto. “El análisis cronológico de las referencias establece como aspecto esencial para la construcción de geometrías complejas la capacidad primero para definir y comunicar de forma precisa e inequívoca la geometría y después la capacidad de analizar el desempeño prestacional de dicha propuesta geométrica”. Establecida la primera conclusión, el capítulo de contexto histórico continúa enfocándose sobre la aplicación de las técnicas digitales en el Proceso de proyecto primero, y en la puesta en obra después. Los casos de estudio identifican claramente como un punto de inflexión para la generación de formas complejas mediante un software CAD el Museo Guggenheim de Bilbao en 1992. El motivo esencial para elegir este proyecto como el primer proyecto digital es el uso de la herramienta de definición digital de la geometría para su reproducción inequívoca en obra. “La revolución digital ha aportado al Arquitecto la posibilidad de abandonar las tipologías arquitectónicas basados en restricciones geométricas-constructivas. La aplicación de técnicas de fabricación digital ha permitido la capacidad de diseñar con independencia del sistema constructivo y libertad formal. En este nuevo contexto las prestaciones suponen los nuevos límites conceptuales, ya que el acceso y disposición de la información del comportamiento de las alternativas que cada geometría conlleva demanda del Arquitecto la jerarquización de los objetivos y la formulación en un conjunto coherente de parámetros”. Los proyectos que emplean herramientas digitales para la resolución de las distintas etapas del proceso proyectual se verán incrementados de forma exponencial desde 1992 hasta nuestros días. A pesar del importante auge de las técnicas de diseño asistido por ordenador el principal desafío sigue siendo la vinculación de las geometrías y materiales propuestos con las capacidades de las técnicas de manufactura y puesta en obra. El proceso de diseño para fabricación en un entorno digital es una tecnología madura en otras industrias como la aeroespacial o la automovilística, incluso la de productos de consumo y decoración, sin embargo en el sector de Construcción es un sistema inmaduro e inconexo. Las particularidades de la industria de la construcción aún no han sido abordadas en su totalidad y las propuestas de investigación realizadas en este ámbito se han centrado hasta 2015 en partes del proceso y no en el proceso total. “El principal obstáculo para la estandarización e implantación globalizada de un proceso digital desde el origen de la forma hasta la construcción es la inexistencia de un protocolo integrado que integre las limitaciones de fabricación, económicas y de puesta en obra junto a la evaluación de desempeño prestacional durante la fases iniciales de proyecto”. En el capítulo número 3 se estudian los distintos procesos de generación de la forma. Se propone una definición específica para el ámbito de la investigación de “forma” en el entendemos que se incluye la envolvente exterior y el conjunto organizativo de espacios interiores conectados. Por lo tanto no es excluyente del interior. El objetivo de este estudio es analizar y clasificar los procesos para la generación digital de formas en los distintos proyectos seleccionados como emblemáticos de cada tipología. Se concluye que la aproximación a este proceso es muy variada y compleja, con aplicación segregada y descoordinada entre los distintos agentes que han intervenir. En un proceso de generación formal analógico los parámetros que intervienen son en parte conscientes y en parte inconscientes o aprendidos. El Arquitecto sólo tiene control sobre la parte consciente de los parámetros a integrar en el diseño, de acuerdo a sus conocimientos y capacidades será capaz de manejar un número limitado de parámetros. La parte aprendida permanece en el inconsciente y dirige el proceso analógico, aportando prejuicios estéticos incorporados durante el proceso formativo y propio del entorno cultural. “El empleo de herramientas digitales basadas en la evaluación prestacional durante el proceso de selección formal permite al Arquitecto conocer “en tiempo real” el desempeño en el conjunto de prestaciones evaluadoras del conjunto de alternativas geométricas a la propuesta previamente definida por la intuición arquitectónica. El proceso definido no persigue identificar una solución óptima sino asistir al Arquitecto en el proceso de generación de la forma mediante la evaluación continua de los vectores direccionales más idóneos que el procedimiento generativo plantea”. La definición de complejidad en generación y producción de formas en relación con el proceso de diseño digital paramétrico global o integrado, es esencial para establecer un protocolo que optimice su gestión. “Se propone como definición de complejidad como factor resultante de multiplicar el número de agentes intervinientes por el número de parámetros e interacciones comunes que intervienen en el proceso de generación de la forma, dividido por la complejidad de intercambio de información digital desde el origen hasta la fase de fabricación y construcción”. Una vez analizados los procesos de generación digital de Arquitectura se propone identificar los parámetros geométricos que definen el proceso de Diseño digital, entendiendose por Diseño el proceso que engloba desde la proposición de una forma inicial basada en la intuición del Arquitecto, la generación y evaluación de variantes y posterior definición digital para producción, tanto de un objeto, un sistema o de la totalidad del Proyecto. En la actualidad el proceso de Diseño es discontinuo y lineal organizandose los parámetros por disciplinas en las que está estructurada las atribuciones profesionales en la industria de la construcción. Para simplificar la identificación y listado se han agrupado siguiendo estos grupos de conocimiento. Entendemos parametros invariables aquellos que son independientes de Tipologías arquitectónicas o que dependen del mismo proceso de generación de la Forma. “El listado de los parámetros que intervienen en un proceso de generación formal es una abstracción de una realidad compleja. La parametrización de las decisiones que intervienen en la selección de una forma determinada mediante “well defined problems” es imposible. El proceso que esta tesis describe entiende esta condición como un elemento que pone en valor el propio procedimiento generativo por la riqueza que la subjetividad que el equipo de diseño aporta”. La segunda parte esencial de esta investigación pretende extraer las restricciones propias del estado del arte de la fabricación digital para posteriormente incorporarlos en los procesos digitales de definición de la Forma arquitectónica. “La integración de las restricciones derivadas de las técnicas de fabricación y construcción digitales en el proceso de generación de formas desde el ámbito de la Arquitectura debe referirse a los condicionantes geométricos asociados a cada sistema constructivo, material y técnica de fabricación. La geometría es además el vínculo que permite asociar el conjunto de parámetros prestacionales seleccionados para un Proyecto con los sistemas de fabricación digital”. A estos condicionantes geométricos obtenidos del análisis de cada sistema de fabricación digital se les ha denominado “invariantes geométricos”. Bajo este término se engloban tanto límites dimensionales de fabricación, como materiales compatibles, tolerancias de manufactura e instalación y cualidades prestacionales asociadas. El objetivo de esta propuesta es emplear la geometría, herramienta fundamental y propia del Arquitecto, como nexo de unión entre el conjunto complejo y heterogéneo de parámetros previamente listados y analizados. Para ello se han simplificado en tablas específicas para cada parámetro prestacional los condicionantes geométricos que se derivan de los Sistemas de fabricación digital compatibles (ver apéndice 1). El estudio y evaluación de las capacidades y objetivos de las distintas plataformas de software disponibles y de las experiencias profesionales evaluadas en los proyectos presentados, permiten concluir que la propuesta de plataforma digital de diseño integral multi-paramétrico de formas arquitectónicas requiere de un protocolo de interoperatibilidad específico aún no universalmente establecido. Actualmente el enfoque de la estrategia para normalizar y universalizar el contexto normativo para regular la interoperatibilidad se centra en figura del gestor denominado “BIM manager”. Las atribuciones y roles de esta figura se enfocan a la gestión del continente y no del contenido (Definición de los formatos de intercambio, niveles de desarrollo (LOD) de los componentes o conjuntos constructivos, detección de interferencias y documentación del propio modelo). Siendo este ámbito un desarrollo necesario para la propuesta de universalización del sistema de diseño para fabricación digital integrado, la presente investigación aporta un organigrama y protocolo asociado. El protocolo: 1. Establece la responsabilidad de identificar y definir la Información que debe determinar el proceso de generación y desarrollo de la forma arquitectónica. 2. Define la forma digital apropiada para generar la geometría del Proyecto, incluyendo la precisión necesaria para cada componente y el nivel de detalle necesario para su exportación inequívoca al proceso de fabricación. 3. Define el tempo de cada etapa de diseño identificando un nivel de detalle acorde. 4. Acopla este organigrama dentro de las estructuras nuevas que se proponen en un entorno BIM para asegurar que no se producen solapes o vacíos con las atribuciones que se identifican para el BIM Manager. “El Arquitecto debe dirigir el protocolo de generación coordinada con los sistemas de producción digital para conseguir que la integración completa. El protocolo debe asistir al proceso de generación de forma mediante la evaluación del desempeño prestacional de cada variante en tiempo real. La comunicación entre herramientas digitales es esencial para permitir una ágil transmisión de información. Es necesario establecer un protocolo adaptado a los objetivos y las necesidades operativas de cada proyecto ya que la estandarización de un protocolo único no es posible”. Una decisión estratégica a la hora de planificar una plataforma de diseño digital común es establecer si vamos a optar por un Modelo digital único o diversos Modelos digitales federados. Cada uno de los modos de trabajo tiene fortalezas y debilidades, no obstante en el ámbito de investigación se ha concluido que un proceso integrado de Diseño que incorpore la evaluación prestacional y conceptual definida en el Capítulo 3, requiere necesariamente de varios modelos de software distintos que han de relacionarse entre sí mediante un protocolo de comunicación automatizado. Una plataforma basada en un modelo federado consiste en establecer un protocolo de comunicación entre los programas informáticos empleados por cada disciplina. En este modelo de operación cada equipo de diseño debe establecer las bases de comunicación en función del número y tipo de programas y procesos digitales a emplear. En esta investigación se propone un protocolo basado en los estándares de intercambio de información que estructura cualquier proceso de generación de forma paramétrico “La investigación establece el empleo de algoritmos evolutivos como el sistema actual óptimo para desarrollar un proceso de generación de formas basadas en la integración y coordinación de invariantes geométricos derivados de un conjunto de objetivos prestacionales y constructivos. No obstante, para la aplicación en el caso práctico realizado se ha podido verificar que la evaluación del desempeño aún no puede realizarse en una única herramienta y por lo tanto el proceso de selección de las variantes genéticas óptimas ha de ejecutarse de forma manual y acumulativa. El proceso debe realizarse de manera federada para la selección evolutiva de los invariantes geométricos dimensionales”. La evaluación del protocolo de integración y los condicionantes geométricos obtenidos como parámetros geométricos que controlan las posibles formas compatibles se realiza mediante su aplicación en un caso práctico. El ejercicio simula la colaboración multidisciplinar con modelos federados de plataformas distintas. La elección del tamaño y complejidad constructiva del proyecto se ha modulado para poder alcanzar un desarrollo completo de cada uno de los parámetros prestacionales seleccionados. Continuando con el mismo objetivo propuesto para los parámetros prestacionales, la tipología constructiva-estructural seleccionada para el ejercicio permite la aplicación la totalidad de invariantes geométricos asociados. El objetivo de este caso práctico es evaluar la capacidad alterar la forma inicialmente propuesta mediante la evaluación del desempeño prestacional de conjunto de variantes geométricas generadas a partir de un parámetro dimensional determinado. Para que este proceso tenga sentido, cada una de las variantes debe ser previamente validada conforme a las limitaciones geométricas propias de cada sistema de fabricación y montaje previstos. El interés de las conclusiones obtenidas es la identificación de una variante geométrica distante a la solución simétrica inicialmente como la solución óptima para el conjunto de parámetros seleccionados. Al tiempo se ha comprobado como la participación de un conjunto de parámetros multi-disciplinares que representan la realidad compleja de los objetivos arquitectónicos favorecen la aparición de variaciones genéticas con prestaciones mejoradas a la intuición inicial. “La herencias tipológicas suponen un límite para la imaginación de variantes formales al proceso de ideación arquitectónica. El ejercicio realizado demuestra que incluso en casos donde aparentemente la solución óptima aparenta ser obvia una variante aleatoria puede mejorar su desempeño global. La posibilidad de conocer las condiciones geométricas de las técnicas de fabricación digital compatibles con el conjunto de parámetros seleccionados por el Arquitecto para dirigir el proceso asegura que los resultados del algoritmo evolutivo empleado sean constructivamente viables. La mejora de imaginación humana con la aportación de geometrías realmente construibles supone el objetivo último de esta tesis”. ABSTRACT Architectural form generation process is shifting from analogical to digital. Digital technology has changed the way we design empowering Architects and Engineers to precisely define any complex geometry envisioned. At the same time, the construction industry, following aeronautical and automotive industries, is implementing digital manufacturing techniques to improve efficiency and quality. Consequently construction complexity will no longer be related to geometry complexity and it is associated to coordination with digital manufacturing capacities. Unfortunately it is agreed that non-standard geometries, even when proposed with performance optimization criteria, are only suitable for projects with non-restricted budgets. Furthemore, the lack of coordinated exportation protocol and geometry management between design and construction is avoiding the globalization of emergence process in built projects Present research first objective is to identify exclusive form-generation parameters related to digital manufacturing geometrical restraints. The intention was to use geometry as the form-generation tool and integrate the digital manufacturing capacities at first stages of the project. The first chapter of this text describes the investigation historical context focusing on the influence between accurate geometry definition at non-standard forms and its construction. At first examples of non-Euclidean geometries built the communication between design and construction were based on analogical partial and imprecise documentation. Deficient communication leads to geometry adaptation on site leaving the final form uncontrolled by the Architect. Computer Aided Design enable Architects to define univocally complex geometries that previously where impossible to communicate. “The univocally definition of the Form, and communication between design and construction is essential for complex geometry Projects”. The second chapter is focused on digital technologies application in form finding process and site construction. The case studies selected identifies a clear inflexion node at 1992 with the Guggenheim Museum in Bilbao. The singularity of this project was the use of Aeronautics software to define digitally the external envelope complex geometry to enable the contractor to build it. “The digital revolution has given the Architect the capacity to design buildings beyond the architectural archetypes driven by geometric-constructive limitations. The application of digital manufacturing techniques has enabled a free-form construction without geometrical limitations. In this new context performance shall be the responsible to set new conceptual boundaries, since the behavior of each possible geometry can be compare and analyze beforehand. The role of the Architect is to prioritize the performance and architectural objectives of each project in a complete and coherent set of parameters”. Projects using digital tools for solving various stages of the design process were increased exponentially since 1992 until today. Despite the significant rise of the techniques of computer-aided design the main challenge remains linking geometries and materials proposed at each design with the capabilities of digital manufacturing techniques. Design for manufacturing in a digital environment is a mature technology in other industries such as aerospace and automotive, including consumer products and decoration, but in the construction sector is an immature and disjointed system. The peculiarities of the construction industry have not yet been addressed in its entirety and research proposals made in this area until 2015 have focused in separate parts of the process and not the total process. “The main obstacle to global standardization and implementation of a complete digital process from the form-finding to construction site is the lack of an integrated protocol that integrates manufacturing, economic and commissioning limitations, together with the performance evaluation of each possible form”. The different form generation processes are studied at chapter number 3. At the introduction of this chapter there is a specific definition of "form" for the research field. Form is identified with the outer envelope geometry, including the organizational set of connected indoor spaces connected to it. Therefore it is not exclusive of the interior. The aim of this study is to analyze and classify the main digital form generation processes using different selected projects as emblematic of each type. The approach to this process is complex, with segregated and uncoordinated different actors have to intervene application. In an analogical form-generation process parameters involved are partly conscious and partly unconscious or learned. The architect has control only over limited part of the parameters to be integrated into the design, according to their knowledge and. There is also a learned aesthetical prejudice that leads the form generation process to a specific geometry leaving the performance and optimization criteria apart from the decision making process. “Using performance evaluation digital tools during form finding process provides real-time comparative information to the Architect enabling geometry selection based on its performance. The generative form generation process described at this document does not ambition to identify the optimum geometry for each set of parameters. The objective is to provide quick information at each generation of what direction is most favorable for the performance parameters selected”. Manufacturing complexity definition in relation to a global and integral process of digital design for manufacture is essential for establishing an efficient managing protocol. “The definition of complexity associated to design for production in Architecture is proposed as the factor between number of different agents involved in the process by the number of interactions required between them, divided by the percentage of the interchange of information that is standardized and proof of information loss”. Design in architecture is a multi-objective process by definition. Therefore, addressing generation process linked to a set of non-coherent parameters requires the selection of adequate generative algorithm and the interaction of the architect. During the second half of the twentieth century and early twenty-first century it have been developed various mathematical algorithms for multi-parametric digital design. Heuristic algorithms are the most adequate algorithms for architectural projects due to its nature. The advantage of such algorithms is the ability to efficiently handle large scale optimization cases where a large number of design objectives and variables are involved. These generative processes do not pursue the optimum solution, in fact it will be impossible to proof with such algorithm. This is not a problem in architectural design where the final goal is to guide the form finding process towards a better performance within the initial direction provided by the architect. This research has focused on genetic algorithms due to its capacity to generate geometric alternatives in multiple directions and evaluate the fitness against a set of parameters specified in a single process. "Any protocol seeks to achieve standardization. The design to manufacturing protocol aims to provide a coordinated and coherent form generation process between a set of design parameters and the geometrical requirements of manufacturing technique. The protocol also provides an information exchange environment where there is a communication path and the level of information is ensured. The research is focused on the process because it is considered that each project will have its own singularities and parameters but the process will stay the same. Again the development of a specific tool is not a goal for the research, the intention is to provide an open source protocol that is valid for any set of tools”. Once the digital generation processes are being analized and classified, the next step is to identify the geometric parameters that define the digital design process. The definition of design process is including from the initial shape proposal based on the intuition of the architect to the generation, evaluation, selection and production of alternatives, both of an object , system or of the entire project . The current design process in Architecture is discontinuous and linear, dividing the process in disciplines in which the construction industry is structured. The proposal is to unify all relevant parameters in one process. The parameters are listed in groups of knowledge for internal classification but the matrix used for parameter relationship determination are combined. “A multi-parameter determination of the form-finding process is the integration all the measurable decisions laying behind Architect intuition. It is not possible to formulate and solve with an algorithm the design in Architecture. It is not the intention to do so with the proposal of this research. The process aims to integrate in one open protocol a selection of parameters by using geometry as common language. There is no optimum solution for any step of the process, the outcome is an evaluation of performance of all the form variations to assist the Architect for the selection of the preferable solution for the project”. The research follows with the geometrical restrictions of today Digital manufacturing techniques. Once determined it has been integrated in the form-finding process. “Digital manufacturing techniques are integrated in the form-finding process using geometry as common language. Geometric restraints define the boundary for performance parametric form-finding process. Geometrical limitations are classified by material and constructive system”. Choose between one digital model or several federate models is a strategic decision at planning a digital design for manufacturing protocol. Each one of the working models have strengths and weakens, nevertheless for the research purposes federated models are required to manage the different performance evaluation software platforms. A protocol based on federated models shall establish a communication process between software platforms and consultants. The manager shall integrate each discipline requirements defining the communication basis. The proposed protocol is based on standards on information exchange with singularities of the digital manufacturing industry. “The research concludes evolutionary algorithms as current best system to develop a generative form finding process based on the integration and coordination of a set of performance and constructive objectives. However, for application in professional practice and standardize it, the performance evaluation cannot be done in only one tool and therefore the selection of optimal genetic variants must be run in several iterations with a cumulative result. Consequently, the evaluation process within the geometrical restraints shall be carried out with federated models coordinated following the information exchange protocol”. The integration protocol and geometric constraints evaluation is done by applying in a practical case study. The exercise simulates multidisciplinary collaboration across software platforms with federated models. The choice of size and construction complexity of the project has been modulated to achieve the full development of each of the parameters selected. Continuing with the same objective proposed for the performance parameters the constructive and structural type selected for the exercise allows the application all geometric invariants associated to the set of parameters selected. The main goal of the case study is to proof the capacity of the manufacturing integrated form finding process to generate geometric alternatives to initial form with performance improved and following the restrictions determined by the compatible digital manufacturing technologies. The process is to be divided in consecutive analysis each one limited by the geometrical conditions and integrated in a overall evaluation. The interest of this process is the result of a non-intuitive form that performs better than a double symmetrical form. The second conclusion is that one parameter evaluation alone will not justify the exploration of complex geometry variations, but when there is a set of parameters with multidisciplinary approach then the less obvious solution emerge as the better performing form. “Architectural typologies impose limitation for Architects capacity to imagine formal variations. The case study and the research conclusions proof that even in situations where the intuitive solution apparently is the optimum solution, random variations can perform better when integrating all parameters evaluation. The capacity of foreseing the geometrical properties linking each design parameter with compatible manufacturing technologies ensure the result of the form-finding process to be constructively viable. Finally, the propose of a complete process where the geometry alternatives are generated beyond the Architect intuition and performance evaluated by a set of parameters previously selected and coordinated with the manufacturing requirements is the final objective of the Thesis”.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

El presente trabajo se basa en la filosofía de la Construcción sin Pérdidas (“Lean Construction”), analizando la situación de esta filosofía en el sector de la edificación en el contexto internacional y español, respondiendo las siguientes preguntas: 1. ¿Cómo surge el “Lean Construction”? 2. ¿Cuáles son sus actividades, funciones y cometidos? 3. ¿Existe regulación del ¨Lean Construction” en otros países? 4. ¿Existe demanda del ¨Lean Construction” en España? 5. ¿Existe regulación del ¨Lean Construction” en España? 6. ¿Cómo debería ser la regulación ¨Lean Construction” en España? 7. ¿Cuál es la relación del “Lean Construction” con el “Project & Construction Management”? 8. ¿Cómo debería ser la regulación de “Lean Construction” en España considerando su relación con el “Project & Construction Management”? Las preguntas indicadas las hemos respondido detalladamente en el presente trabajo, a continuación se resume las respuestas a dichas preguntas: 1. El “Lean Construction” surge en agosto de 1992, cuando el investigador finlandés Lauri Koskela publicó en la Universidad de Stanford el reporte TECHNICAL REPORT N° 72 titulado “Application of the New Production Philosophy to Construction”. Un año más tarde el Dr. Koskela invitó a un grupo de especialistas en construcción al primer workshop de esta materia en Finlandia, dando origen al International Group for Lean Construction (IGLC) lo que ha permitido extender la filosofía a EEUU, Europa, América, Asia, Oceanía y África. “Lean Construction” es un sistema basado en el enfoque “Lean Production” desarrollado en Japón por Toyota Motors a partir de los años cincuenta, sistema que permitió a sus fábricas producir unidades con mayor eficiencia que las industrias americanas, con menores recursos, en menor tiempo, y con un número menor de errores de fabricación. 2. El sistema “Lean Construction” busca maximizar el valor y disminuir las pérdidas de los proyectos generando una coordinación eficiente entre los involucrados, manejando un proyecto como un sistema de producción, estrechando la colaboración entre los participantes de los proyectos, capacitándoles y empoderándoles, fomentando una cultura de cambio. Su propósito es desarrollar un proceso de construcción en el que no hayan accidentes, ni daños a equipos, instalaciones, entorno y comunidad, que se realice en conformidad con los requerimientos contractuales, sin defectos, en el plazo requerido, respetando los costes presupuestados y con un claro enfoque en la eliminación o reducción de las pérdidas, es decir, las actividades que no generen beneficios. El “Last Planner System”, o “Sistema del Último Planificador”, es un sistema del “Lean Construction” que por su propia naturaleza protege a la planificación y, por ende, ayuda a maximizar el valor y minimizar las pérdidas, optimizando de manera sustancial los sistemas de seguridad y salud. El “Lean Construction” se inició como un concepto enfocado a la ejecución de las obras, posteriormente se aplicó la filosofía a todas las etapas del proyecto. Actualmente considera el desarrollo total de un proyecto, desde que nace la idea hasta la culminación de la obra y puesta en marcha, considerando el ciclo de vida completo del proyecto. Es una filosofía de gestión, metodologías de trabajo y una cultura empresarial orientada a la eficiencia de los procesos y flujos. La filosofía “Lean Construction” se está expandiendo en todo el mundo, además está creciendo en su alcance, influyendo en la gestión contractual de los proyectos. Su primera evolución consistió en la creación del sistema “Lean Project Delivery System”, que es el concepto global de desarrollo de proyectos. Posteriormente, se proponen el “Target Value Design”, que consiste en diseñar de forma colaborativa para alcanzar los costes y el valor requerido, y el “Integrated Project Delivery”, en relación con sistemas de contratos relacionales (colaborativos) integrados, distintos a los contratos convencionales. 3. Se verificó que no existe regulación específica del ¨Lean Construction” en otros países, en otras palabras, no existe el agente con el nombre específico de “Especialista en Lean Construction” o similar, en consecuencia, es un agente adicional en el proyecto de la edificación, cuyas funciones y cometidos se pueden solapar con los del “Project Manager”, “Construction Manager”, “Contract Manager”, “Safety Manager”, entre otros. Sin embargo, se comprobó la existencia de formatos privados de contratos colaborativos de Integrated Project Delivery, los cuales podrían ser tomados como unas primeras referencias para futuras regulaciones. 4. Se verificó que sí existe demanda del ¨Lean Construction” en el desarrollo del presente trabajo, aunque aún su uso es incipiente, cada día existe más interesados en el tema. 5. No existe regulación del ¨Lean Construction” en España. 6. Uno de los objetivos fundamentales de esta tesis es el de regular esta figura cuando actúe en un proyecto, definir y realizar una estructura de Agente de la Edificación, según la Ley de Ordenación de la Edificación (LOE), y de esta manera poder introducirla dentro de la Legislación Española, protegiéndola de eventuales responsabilidades civiles. En España existe jurisprudencia (sentencias de los tribunales de justicia españoles) con jurisdicción civil basada en la LOE para absolver o condenar a agentes de la edificación que son definidos en los tribunales como “gestores constructivos” o similares. Por este motivo, en un futuro los tribunales podrían dictaminar responsabilidades solidarias entre el especialista “Lean Construction” y otros agentes del proyecto, dependiendo de sus actuaciones, y según se implemente el “Lean Project Delivery System”, el “Target Value Design” y el “Integrated Project Delivery”. Por otro lado, es posible que el nivel de actuación del especialista “Lean Construcción” pueda abarcar la gestión del diseño, la gestión de la ejecución material (construcción), la gestión de contratos, o la gestión integral de todo el proyecto de edificación, esto último, en concordancia con la última Norma ISO 21500:2012 o UNE-ISO 21500:2013 Directrices para la dirección y gestión de proyectos. En consecuencia, se debería incorporar adecuadamente a uno o más agentes de la edificación en la LOE de acuerdo a sus funciones y responsabilidades según los niveles de actuación del “Especialista en Lean Construction”. Se propone la creación de los siguientes agentes: Gestor del Diseño, Gestor Constructivo y Gestor de Contratos, cuyas definiciones están desarrolladas en este trabajo. Estas figuras son definidas de manera general, puesto que cualquier “Project Manager” o “DIPE”, gestor BIM (Building Information Modeling), o similar, puede actuar como uno o varios de ellos. También se propone la creación del agente “Gestor de la Construcción sin Pérdidas”, como aquel agente que asume las actuaciones del “gestor de diseño”, “gestor constructivo” y “gestor de contratos” con un enfoque en los principios del Lean Production. 7. En la tesis se demuestra, por medio del uso de la ISO 21500, que ambos sistemas son complementarios, de manera que los proyectos pueden tener ambos enfoques y ser compatibilizados. Un proyecto que use el “Project & Construction Management” puede perfectamente apoyarse en las herramientas y técnicas del “Lean Construction” para asegurar la eliminación o reducción de las pérdidas, es decir, las actividades que no generen valor, diseñando el sistema de producción, el sistema de diseño o el sistema de contratos. 8. Se debería incorporar adecuadamente al agente de la edificación “Especialista en Lean Construction” o similar y al agente ¨Especialista en Project & Construction Management” o DIPE en la Ley de Ordenación de la Edificación (LOE) de acuerdo a sus funciones y responsabilidades, puesto que la jurisprudencia se ha basado para absolver o condenar en la referida Ley. Uno de los objetivos fundamentales de esta tesis es el de regular la figura del “Especialista en Lean Construction” cuando actúa simultáneamente con el DIPE, y realizar una estructura de Agente de la Edificación según la LOE, y de esta manera protegerlo de eventuales responsabilidades solidarias. Esta investigación comprueba que la propuesta de definición del agente de edificación DIPE, según la LOE, presentada en la tesis doctoral del Doctor Manuel Soler Severino es compatible con las nuevas definiciones propuestas. El agente DIPE puede asumir los roles de los diferentes gestores propuestos en esta tesis si es que se especializa en dichas materias, o, si lo estima pertinente, recomendar sus contrataciones. ABSTRACT This work is based on the Lean Construction philosophy; an analysis is made herein with regard to the situation of this philosophy in the building sector within the international and Spanish context, replying to the following questions: 1. How did the concept of Lean Construction emerge? 2. Which are the activities, functions and objectives of Lean Construction? 3. Are there regulations on Lean Construction in other countries? 4. Is there a demand for Lean Construction in Spain? 5. Are there regulations on Lean Construction in Spain? 6. How should regulations on Lean Construction be developed in Spain? 7. What is the relationship between Lean Construction and the Project & Construction Management? 8. How should regulations on Lean Construction be developed in Spain considering its relationship with the Project & Construction Management? We have answered these questions in detail here and the replies are summarized as follows: 1. The concept of Lean Construction emerged in august of 1992, when Finnish researcher Lauri Koskela published in Stanford University TECHNICAL REPORT N° 72 entitled “Application of the New Production Philosophy to Construction”. A year later, Professor Koskela invited a group of construction specialists to Finland to the first workshop conducted on this matter; thus, the International Group for Lean Construction (IGLC) was established, which has contributed to extending the philosophy to the United States, Europe, the Americas, Asia, Oceania, and Africa. Lean Construction is a system based on the Lean Production approach, which was developed in Japan by Toyota Motors in the 1950s. Thanks to this system, the Toyota plants were able to produce more units, with greater efficiency than the American industry, less resources, in less time, and with fewer manufacturing errors. 2. The Lean Construction system aims at maximizing the value of projects while reducing waste, producing an effective coordination among those involved; it manages projects as a production system, enhancing collaboration between the parties that participate in the projects while building their capacities, empowering them, and promoting a culture of change. Its purpose is to develop a construction process free of accidents, without damages to the equipment, facilities, environment and community, flawless, in accordance with contractual requirements, within the terms established, respecting budgeted costs, and with a clear approach to eliminating or reducing waste, that is, activities that do not generate benefits. The Last Planner System is a Lean Construction system, which by its own nature protects planning and, therefore, helps to maximize the value and minimize waste, optimizing substantially the safety and health systems. Lean Construction started as a concept focused on the execution of works, and subsequently the philosophy was applied to all the stages of the project. At present it considers the project’s total development, since the time ideas are born until the completion and start-up of the work, taking into account the entire life cycle of the project. It is a philosophy of management, work methodologies, and entrepreneurial culture aimed at the effectiveness of processes and flows. The Lean Construction philosophy is extending all over the world and its scope is becoming broader, having greater influence on the contractual management of projects. It evolved initially through the creation of the Lean Project Delivery System, a global project development concept. Later on, the Target Value Design was developed, based on collaborative design to achieve the costs and value required, as well as the Integrated Project Delivery, in connection with integrated relational (collaborative) contract systems, as opposed to conventional contracts. 3. It was verified that no specific regulations on Lean Construction exist in other countries, in other words, there are no agents with the specific name of “Lean Construction Specialist” or other similar names; therefore, it is an additional agent in building projects, which functions and objectives can overlap those of the Project Manager, Construction Manager, Contract Manager, or Safety Manager, among others. However, the existence of private collaborative contracts of Integrated Project Delivery was confirmed, which could be considered as first references for future regulations. 4. There is a demand for Lean Construction in the development of this work; even though it is still emerging, there is a growing interest in this topic. 5. There are no regulations on Lean Construction in Spain. 6. One of the main objectives of this thesis is to regulate this role when acting in a project, and to define and develop a Building Agent structure, according to the Building Standards Law (LOE by its acronym in Spanish), in order to be able to incorporate it into the Spanish law, protecting it from civil liabilities. In Spain there is jurisprudence in civil jurisdiction based on the LOE to acquit or convict building agents, which are defined in the courts as “construction managers” or similar. For this reason, courts could establish in the future joint and several liabilities between the Lean Construction Specialist and other agents of the project, depending on their actions and based on the implementation of the Lean Project Delivery System, the Target Value Design, and the Integrated Project Delivery. On the other hand, it is possible that the level of action of the Lean Construction Specialist may comprise design management, construction management and contract management, or the integral management of the entire building project in accordance with the last ISO 21500:2012 or UNE-ISO 21500:2013, guidelines for the management of projects. Accordingly, one or more building agents should be appropriately incorporated into the LOE according to their functions and responsibilities and based on the levels of action of the Lean Construction Specialist. The creation of the following agents is proposed: Design Manager, Construction Manager, and Contract Manager, which definitions are developed in this work. These agents are defined in general, since any Project Manager or DIPE, Building Information Modeling (BIM) Manager or similar, may act as one or as many of them. The creation of the Lean Construction Manager is also proposed, as the agent that takes on the role of the Design Manager, Construction Manager and Contract Manager with a focus on the Lean Production principles. 7. In the thesis it is demonstrated that through the implementation of the ISO 21500, both systems are supplementary, so projects may have both approaches and be compatible. A project that applies the Project & Construction Management may perfectly have the support of the tools, techniques and practices of Lean Construction to ensure the elimination or reduction of losses, that is, those activities that do not generate value, thus designing the production system, the design system, or the contract system. 8. The Lean Construction Specialist or similar and the Specialist in Project & Construction Management should be incorporated appropriately into the LOE according to their functions and responsibilities, since jurisprudence has been based on such Law to acquit or convict. One of the main objectives of this thesis is the regulate the role of the Lean Construction Specialist when acting simultaneously with the DIPE, and to develop a structure of the building agent, according to the LOE, and in this way protect such agent from joint and several liabilities. This research proves that the proposal to define the DIPE building agent, according to the LOE, and presented in the doctoral dissertation of Manuel Soler Severino, Ph.D. is compatible with the new definitions proposed. The DIPE agent may assume the roles of the different managers proposed in this thesis if he specializes in those topics or, if deemed pertinent, recommends that they be engaged.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Los procesos de diseño y construcción en Arquitectura han mostrado un desarrollo de optimización históricamente muy deficiente cuando se compara con las restantes actividades típicamente industriales. La aspiración constante a una industrialización efectiva, tanto en aras de alcanzar mayores cotas de calidad así como de ahorro de recursos, recibe hoy una oportunidad inmejorable desde el ámbito informático: el Building Information Modelling o BIM. Lo que en un inicio puede parecer meramente un determinado tipo de programa informático, en realidad supone un concepto de “proceso” que subvierte muchas rutinas hoy habituales en el desarrollo de proyectos y construcciones arquitectónicas. La inclusión y desarrollo de datos ligados al proyecto, desde su inicio hasta el fin de su ciclo de vida, conlleva la oportunidad de crear una realidad virtual dinámica y actualizable, que por añadidura posibilita su ensayo y optimización en todos sus aspectos: antes y durante su ejecución, así como vida útil. A ello se suma la oportunidad de transmitir eficientemente los datos completos de proyecto, sin apenas pérdidas o reelaboración, a la cadena de fabricación, lo que facilita el paso a una industrialización verdaderamente significativa en edificación. Ante una llamada mundial a la optimización de recursos y el interés indudable de aumentar beneficios económicos por medio de la reducción del factor de incertidumbre de los procesos, BIM supone un opción de mejora indudable, y así ha sido reconocido a través de la inminente implantación obligatoria por parte de los gobiernos (p. ej. Gran Bretaña en 2016 y España en 2018). La modificación de procesos y roles profesionales que conlleva la incorporación de BIM resulta muy significativa y marcará el ejercicio profesional de los futuros graduados en las disciplinas de Arquitectura, Ingeniería y Construcción (AEC por sus siglas en inglés). La universidad debe responder ágilmente a estas nuevas necesidades incorporando esta metodología en la enseñanza reglada y aportando una visión sinérgica que permita extraer los beneficios formativos subyacentes en el propio marco BIM. En este sentido BIM, al aglutinar el conjunto de datos sobre un único modelo virtual, ofrece un potencial singularmente interesante. La realidad tridimensional del modelo, desarrollada y actualizada continuamente, ofrece al estudiante una gestión radicalmente distinta de la representación gráfica, en la que las vistas parciales de secciones y plantas, tan complejas de asimilar en los inicios de la formación universitaria, resultan en una mera petición a posteriori, para ser extraída según necesidad del modelo virtual. El diseño se realiza siempre sobre el propio modelo único, independientemente de la vista de trabajo elegida en cada momento, permaneciendo los datos y sus relaciones constructivas siempre actualizados y plenamente coherentes. Esta descripción condensada de características de BIM preconfiguran gran parte de las beneficios formativos que ofrecen los procesos BIM, en especial, en referencia al desarrollo del diseño integrado y la gestión de la información (incluyendo TIC). Destacan a su vez las facilidades en comprensión visual de elementos arquitectónicos, sistemas técnicos, sus relaciones intrínsecas así como procesos constructivos. A ello se une el desarrollo experimental que la plataforma BIM ofrece a través de sus software colaborativos: la simulación del comportamiento estructural, energético, económico, entre otros muchos, del modelo virtual en base a los datos inherentes del proyecto. En la presente tesis se describe un estudio de conjunto para explicitar tanto las cualidades como posibles reservas en el uso de procesos BIM, en el marco de una disciplina concreta: la docencia de la Arquitectura. Para ello se ha realizado una revisión bibliográfica general sobre BIM y específica sobre docencia en Arquitectura, así como analizado las experiencias de distintos grupos de interés en el marco concreto de la enseñanza de la en Arquitectura en la Universidad Europea de Madrid. El análisis de beneficios o reservas respecto al uso de BIM se ha enfocado a través de la encuesta a estudiantes y la entrevista a profesionales AEC relacionados o no con BIM. Las conclusiones del estudio permiten sintetizar una implantación de metodología BIM que para mayor claridad y facilidad de comunicación y manejo, se ha volcado en un Marco de Implantación eminentemente gráfico. En él se orienta sobre las acciones docentes para el desarrollo de competencias concretas, valiéndose de la flexibilidad conceptual de los Planes de Estudio en el contexto del Espacio Europeo de Educación Superior (Declaración de Bolonia) para incorporar con naturalidad la nueva herramienta docente al servicio de los objetivos formativo legalmente establecidos. El enfoque global del Marco de Implementación propuesto facilita la planificación de acciones formativas con perspectiva de conjunto: combinar los formatos puntuales o vehiculares BIM, establecer sinergias transversales y armonizar recursos, de modo que la metodología pueda beneficiar tanto la asimilación de conocimientos y habilidades establecidas para el título, como el propio flujo de aprendizaje o learn flow BIM. Del mismo modo reserva, incluso visualmente, aquellas áreas de conocimiento en las que, al menos en la planificación actual, la inclusión de procesos BIM no se considera ventajosa respecto a otras metodologías, o incluso inadecuadas para los objetivos docentes establecidos. Y es esta última categorización la que caracteriza el conjunto de conclusiones de esta investigación, centrada en: 1. la incuestionable necesidad de formar en conceptos y procesos BIM desde etapas muy iniciales de la formación universitaria en Arquitectura, 2. los beneficios formativos adicionales que aporta BIM en el desarrollo de competencias muy diversas contempladas en el currículum académico y 3. la especificidad del rol profesional del arquitecto que exigirá una implantación cuidadosa y ponderada de BIM que respete las metodologías de desarrollo creativo tradicionalmente efectivas, y aporte valor en una reorientación simbiótica con el diseño paramétrico y fabricación digital que permita un diseño finalmente generativo. ABSTRACT The traditional architectural design and construction procedures have proven to be deficient where process optimization is concerned, particularly when compared to other common industrial activities. The ever‐growing strife to achieve effective industrialization, both in favor of reaching greater quality levels as well as sustainable management of resources, has a better chance today than ever through a mean out of the realm of information technology, the Building Information Modelling o BIM. What may initially seem to be merely another computer program, in reality turns out to be a “process” concept that subverts many of today’s routines in architectural design and construction. Including and working with project data from the very beginning to the end of its full life cycle allows for creating a dynamic and updatable virtual reality, enabling data testing and optimizing throughout: before and during execution, all the way to the end of its lifespan. In addition, there is an opportunity to transmit complete project data efficiently, with hardly any loss or redeveloping of the manufacture chain required, which facilitates attaining a truly significant industrialization within the construction industry. In the presence of a world‐wide call for optimizing resources, along with an undeniable interest in increasing economic benefits through reducing uncertainty factors in its processes, BIM undoubtedly offers a chance for improvement as acknowledged by its imminent and mandatory implementation on the part of governments (for example United Kingdom in 2016 and Spain in 2018). The changes involved in professional roles and procedures upon incorporating BIM are highly significant and will set the course for future graduates of Architecture, Engineering and Construction disciplines (AEC) within their professions. Higher Education must respond to such needs with swiftness by incorporating this methodology into their educational standards and providing a synergetic vision that focuses on the underlying educational benefits inherent in the BIM framework. In this respect, BIM, in gathering data set under one single virtual model, offers a uniquely interesting potential. The three‐dimensional reality of the model, under continuous development and updating, provides students with a radically different graphic environment, in which partial views of elevation, section or plan that tend characteristically to be difficult to assimilate at the beginning of their studies, become mere post hoc requests to be ordered when needed directly out the virtual model. The design is always carried out on the sole model itself, independently of the working view chosen at any particular moment, with all data and data relations within construction permanently updated and fully coherent. This condensed description of the features of BIM begin to shape an important part of the educational benefits posed by BIM processes, particularly in reference to integrated design development and information management (including ITC). At the same time, it highlights the ease with which visual understanding is achieved regarding architectural elements, technology systems, their intrinsic relationships, and construction processes. In addition to this, there is the experimental development the BIM platform grants through its collaborative software: simulation of structural, energetic, and economic behavior, among others, of the virtual model according to the data inherent to the project. This doctoral dissertation presents a broad study including a wide array of research methods and issues in order to specify both the virtues and possible reservations in the use of BIM processes within the framework of a specific discipline: teaching Architecture. To do so, a literature review on BIM has been carried out, specifically concerning teaching in the discipline of Architecture, as well as an analysis of the experience of different groups of interest delimited to Universidad Europea de Madrid. The analysis of the benefits and/or limitations of using BIM has been approached through student surveys and interviews with professionals from the AEC sector, associated or not, with BIM. Various diverse educational experiences are described and academic management for experimental implementation has been analyzed. The conclusions of this study offer a synthesis for a Framework of Implementation of BIM methodology, which in order to reach greater clarity, communication ease and user‐friendliness, have been posed in an eminently graphic manner. The proposed framework proffers guidance on teaching methods conducive to the development of specific skills, taking advantage of the conceptual flexibility of the European Higher Education Area guidelines based on competencies, which naturally facilitate for the incorporation of this new teaching tool to achieve the educational objectives established by law. The global approach of the Implementation Framework put forth in this study facilitates the planning of educational actions within a common perspective: combining exceptional or vehicular BIM formats, establishing cross‐disciplinary synergies, and sharing resources, so as to purport a methodology that contributes to the assimilation of knowledge and pre‐defined competencies within the degree program, and to the flow of learning itself. At the same time, it reserves, even visually, those areas of knowledge in which the use of BIM processes is not considered necessarily an advantage over other methodologies, or even inadequate for the learning outcomes established, at least where current planning is concerned. It is this last category which characterizes the research conclusions as a whole, centering on: 1. The unquestionable need for teaching BIM concepts and processes in Architecture very early on, in the initial stages of higher education; 2. The additional educational benefits that BIM offers in a varied array of competency development within the academic curriculum; and 3. The specific nature of the professional role of the Architect, which demands a careful and balanced implementation of BIM that respects the traditional teaching methodologies that have proven effective and creative, and adds value by a symbiotic reorientation merged with parametric design and digital manufacturing so to enable for a finally generative design.