13 resultados para Asset map
em Universidad Politécnica de Madrid
Resumo:
Spatial Data Infrastructures have become a methodological and technological benchmark enabling distributed access to historical-cartographic archives. However, it is essential to offer enhanced virtual tools that imitate the current processes and methodologies that are carried out by librarians, historians and academics in the existing map libraries around the world. These virtual processes must be supported by a generic framework for managing, querying, and accessing distributed georeferenced resources and other content types such as scientific data or information. The authors have designed and developed support tools to provide enriched browsing, measurement and geometrical analysis capabilities, and dynamical querying methods, based on SDI foundations. The DIGMAP engine and the IBERCARTO collection enable access to georeferenced historical-cartographical archives. Based on lessons learned from the CartoVIRTUAL and DynCoopNet projects, a generic service architecture scheme is proposed. This way, it is possible to achieve the integration of virtual map rooms and SDI technologies bringing support to researchers within the historical and social domains.
Resumo:
The influence of applying European default traffic values to the making of a noise map was evaluated in a typical environment like Palma de Mallorca. To assess these default traffic values, a first model has been created and compared with measured noise levels. Subsequently a second traffic model, improving the input data used for the first one, has been created and validated according to the deviations. Different methodologies were also examined for collecting model input data that would be of higher quality, by analysing the improvement generated in the reduction in the uncertainty of the noise map introduced by the road traffic noise emission
Resumo:
When mapping is formulated in a Bayesian framework, the need of specifying a prior for the environment arises naturally. However, so far, the use of a particular structure prior has been coupled to working with a particular representation. We describe a system that supports inference with multiple priors while keeping the same dense representation. The priors are rigorously described by the user in a domain-specific language. Even though we work very close to the measurement space, we are able to represent structure constraints with the same expressivity as methods based on geometric primitives. This approach allows the intrinsic degrees of freedom of the environment’s shape to be recovered. Experiments with simulated and real data sets will be presented
Resumo:
At the present time almost all map libraries on the Internet are image collections generated by the digitization of early maps. This type of graphics files provides researchers with the possibility of accessing and visualizing historical cartographic information keeping in mind that this information has a degree of quality that depends upon elements such as the accuracy of the digitization process and proprietary constraints (e.g. visualization, resolution downloading options, copyright, use constraints). In most cases, access to these map libraries is useful only as a first approach and it is not possible to use those maps for scientific work due to the sparse tools available to measure, match, analyze and/or combine those resources with different kinds of cartography. This paper presents a method to enrich virtual map rooms and provide historians and other professional with a tool that let them to make the most of libraries in the digital era.
Resumo:
A main factor to the success of any organization process improvement effort is the Process Asset Library implementation that provides a central database accessible by anyone at the organization. This repository includes any process support materials to help process deployment. Those materials are composed of organization's standard software process, software process related documentation, descriptions of the software life cycles, guidelines, examples, templates, and any artefacts that the organization considers useful to help the process improvement. This paper describe the structure and contents of the Web-based Process Asset Library for Small businesses and small groups within large organizations. This library is structured using CMMI as reference model in order to implement those Process Areas described by this model.
Resumo:
This paper focuses on identifying and analysing the elements of Strategic Management for infrastructure and engineering assets. These elements are contended to involve an understanding of governance, corporate policy, corporate objectives, corporate strategy and interagency collaboration and will in turn, allow the ability determine a broader and more comprehensive framework for engineering asset management, ie a ‘staged approach’ to understanding how assets are managed within organisations. While the assets themselves have often been the sole concern for good management practices, other social and contextual elements have come into the mix in order to promote strategic asset management. The development of an integrated approach to asset management is at the base of the research question. What are the considerations and implications for adopting and implementing an integrated strategic asset management (ISAM) framework? While operational matters have been given prominence, a subset of corporate governance, Asset Governance, details the policies and processes needed to acquire, utilise, maintain and account for an organisation’s assets. Asset governance stems from the organisation’s overarching corporate governance principles; as a result it defines the management context in which engineering asset management is implemented. This aspect will be examined to determine the appropriate relationship between organisational strategic management and strategic asset management to further the theoretical engagement with the maturity of strategy,policy and governance for infrastructure and engineered assets. Asset governance stems from the organisation’s overarching corporate governance principles; as a result it defines the management context in which engineering asset management is implemented. The research proceeds by a document analysis of corporate reports and policy recommendations in terms of infrastructure and engineered assets. The paper concludes that incorporating an integrated asset management framework can promote a more robust conceptualisation of public assets and how they combine to provide a comprehensive system of service outcomes.
Resumo:
distribuciones diamétricas con ALS
Resumo:
From the moment we enter a large office building until we leave it, we receive a lot of attentions served by the management of services to the user. However, it is usually quite inappreciable the work that is being developed to keep things running smoothly.The services provided in a building are carried out by people. However, we often tend to forget these people when we talk about the tasks that make that a building operates properly 24 hours a day, 365 days a year.But, for example, what would happen if one day the service provided by the reception in a large building did not function as it should? What would it be like if one day the person performing the service of maintenance of the building's cleaning were not at his post? How would the working day develop if there were not a correct air handling system?People are the foundation of the proper functioning of a building. The work of the Facilities Manager and the Facility Management is the management of their functions: the responsible management of the team.
Resumo:
We study dynamics of the bistable logistic map with delayed feedback, under the influence of white Gaussian noise and periodic modulation applied to the variable. This system may serve as a model to describe population dynamics under finite resources in noisy environment with seasonal fluctuations. While a very small amount of noise has no effect on the global structure of the coexisting attractors in phase space, an intermediate noise totally eliminates one of the attractors. Slow periodic modulation enhances the attractor annihilation.
Resumo:
People, management and social responsability. The team: the main asset of any management. En colaboración con Dña. Montserrat Castellanos Moreno. Profesora Asociada de la Universidad Europea. Journal of Management and Marketing. Thomson Reuters. Zilina. Slovakia
Resumo:
From the moment we enter a large office building until we leave it, we receive a lot of attentions served by the management of services to the user. However, it is usually quite inappreciable the work that is being developed to keep things running smoothly. The services provided in a building are carried out by people. However, we often tend to forget these people when we talk about the tasks that make that a building operates properly 24 hours a day, 365 days a year. But, for example, what would happen if one day the service provided by the reception in a large building did not function as it should? What would it be like if one day the person performing the service of maintenance of the building's cleaning were not at his post? How would the working day develop if there were not a correct air handling system? People are the foundation of the proper functioning of a building. The work of the Facilities Manager and the Facility Management is the management of their functions: the responsible management of the team.
Resumo:
This paper introduces a road map for ICTs (Information and communication technologies) supporting planning, operation and management of energy systems in smart cities. The road map summarises different elements that form energy systems in cities and proposes research and technical development (RTD) and innovation activities for the development and innovation of ICTs for holistic design, planning and operation of energy systems. In addition, synergies with other ICT systems for smart cities are considered. There are four main target groups for the road map: 1) citizen; 2) building sector; 3) energy sector; and 4) municipality level. As an example for enabling active participation of citizens, the road map proposes how ICT can enable citizens? involvement among others into building design. The building sector roadmap proposes how ICTs can support the planning of buildings and renovations in the future, as well as how to manage building energy systems. The energy sector road map focuses on city?s energy systems and their planning and management, including e.g. demand side management, management of different district level energy systems, energy performance validation and management, energy data models, and smarter use of open energy data. Moreover, the municipality level road map proposes among others ICTs for better integration of city systems and city planning enabling maximised energy efficiency. In addition, one road map section suggests development needs related to open energy data, including among others the use of energy data and the development and harmonisation of energy data models. The road map has been assembled in the READY4SmartCities project (funded by EU 7th Framework Programme), which focuses on the energy system at the city level, consisting of centralised energy systems and connections to the national level energy grids, as well as interconnections to the neighbourhood and building level energy systems.
Resumo:
El sector energético, en España en particular, y de forma similar en los principales países de Europa, cuenta con una significativa sobrecapacidad de generación, debido al rápido y significativo crecimiento de las energías renovables en los últimos diez años y la reducción de la demanda energética, como consecuencia de la crisis económica. Esta situación ha hecho que las centrales térmicas de generación de electricidad, y en concreto los ciclos combinados de gas, operen con un factor de utilización extremadamente bajo, del orden del 10%. Además de la reducción de ingresos, esto supone para las plantas trabajar continuamente fuera del punto de diseño, provocando una significativa pérdida de rendimiento y mayores costes de explotación. En este escenario, cualquier contribución que ayude a mejorar la eficiencia y la condición de los equipos, es positivamente considerada. La gestión de activos está ganando relevancia como un proceso multidisciplinar e integrado, tal y como refleja la reciente publicación de las normas ISO 55000:2014. Como proceso global e integrado, la gestión de activos requiere el manejo de diversos procesos y grandes volúmenes de información, incluso en tiempo real. Para ello es necesario utilizar tecnologías de la información y aplicaciones de software. Esta tesis desarrolla un concepto integrado de gestión de activos (Integrated Plant Management – IPM) aplicado a centrales de ciclo combinado y una metodología para estimar el beneficio aportado por el mismo. Debido a las incertidumbres asociadas a la estimación del beneficio, se ha optado por un análisis probabilístico coste-beneficio. Así mismo, el análisis cuantitativo se ha completado con una validación cualitativa del beneficio aportado por las tecnologías incorporadas al concepto de gestión integrada de activos, mediante una entrevista realizada a expertos del sector de generación de energía. Los resultados del análisis coste-beneficio son positivos, incluso en el desfavorable escenario con un factor de utilización de sólo el 10% y muy prometedores para factores de utilización por encima del 30%. ABSTRACT The energy sector particularly in Spain, and in a similar way in Europe, has a significant overcapacity due to the big growth of the renewable energies in the last ten years, and it is seriously affected by the demand decrease due to the economic crisis. That situation has forced the thermal plants and in particular, the combined cycles to operate with extremely low annual average capacity factors, very close to 10%. Apart from the incomes reduction, working in out-of-design conditions, means getting a worse performance and higher costs than expected. In this scenario, anything that can be done to improve the efficiency and the equipment condition is positively received. Asset Management, as a multidisciplinary and integrated process, is gaining prominence, reflected in the recent publication of the ISO 55000 series in 2014. Dealing Asset Management as a global, integrated process needs to manage several processes and significant volumes of information, also in real time, that requires information technologies and software applications to support it. This thesis proposes an integrated asset management concept (Integrated Plant Management-IPM) applied to combined cycle power plants and develops a methodology to assess the benefit that it can provide. Due to the difficulties in getting deterministic benefit estimation, a statistical approach has been adopted for the cot-benefit analysis. As well, the quantitative analysis has been completed with a qualitative validation of the technologies included in the IPM and their contribution to key power plant challenges by power generation sector experts. The cost- benefit analysis provides positive results even in the negative scenario of annual average capacity factor close to 10% and is promising for capacity factors over 30%.