14 resultados para 680400 Construction Processes

em Universidad Politécnica de Madrid


Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper discusses the most relevant earth construction techniques that have been employed in the province of Soria (Spain). The objectives of the research are, first, to locate and catalogue each building techniques with earth within the geographic regions and environmental units and their relation to physical and human environment. Then, the second aim is analyze these techniques and characterize them in terms of material, components and construction processes. Three types are studied: the construction of rammed-earth walls, adobe masonry and timber frame filled with adobe.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

La tesis doctoral desarrolla una investigación original, dentro del marco disciplinario de la historia de la construcción, sobre los fundamentos constructivos de las fortificaciones bajomedievales fronterizas entre las Coronas de Castilla y Aragón en la actual provincia de Soria. En el título de la tesis ya queda expresado el objeto fundamental y fundacional, así como el ámbito temporal —desde la reconquista del oriente soriano por parte de Alfonso I el Batallador a principios del siglo XII hasta la unificación de las coronas hispánicas en el siglo XV bajo el común mandato de los Reyes Católicos— y la extensión territorial que delimita la investigación: aquéllas comarcas castellanas lindantes con Aragón pertenecientes a la actual provincia de Soria. Durante este período bajomedieval se produjeron una serie de enfrentamientos fronterizos que obligó a fortificar la frontera y las vías de comunicación entre ambas coronas. La falta de estudios de conjunto de estas fortificaciones entendiéndolas como participantes en un sistema fortificado ha constituido la justificación de la investigación, que se realiza en varios niveles de análisis: territorial, histórico, arquitectónico, poliorcético y constructivo. Así mismo, se ha detectado cierta falta de rigor acompañada de inexactitudes en las consideraciones constructivas publicadas sobre algunas de las fortificaciones del ámbito de estudio, lo que ha provocado errores en su datación al no más haber elementos de corte artístico o estilístico que marquen indudablemente la pertenencia a una época. En la tesis se ponen en duda las dataciones tradicionalmente aceptadas planteando la hipótesis que da pie a la investigación: ante la falta de elementos artísticos o estilísticos en unos sobrios edificios eminentemente funcionales es posible establecer con suficiente aproximación la fecha de construcción en base a criterios constructivos una vez formada una clasificación cronotipológica de cada técnica constructiva. La hipótesis, por lo tanto, plantea un objetivo principal —el estudio de la razón constructiva del sistema fortificado fronterizo— desarrollado en una serie de objetivos específicos cuya consecución programa los sucesivos niveles de análisis: - Conocer y detallar los elementos históricos que originaron los enfrentamientos entre las Coronas de Castilla y Aragón y su desarrollo mediante herramientas historiográficas y analizar las características naturales del territorio en litigio mediante instrumentos cartográficos. - Conocer y analizar los tipos arquitectónicos y las tradiciones constructivas empleadas en las construcciones castrenses en el ámbito temporal en que se enmarca la investigación. - Localizar, documentar y seleccionar para su análisis las fortalezas y construcciones militares erigidas durante dichas luchas fronterizas en la actual provincia de Soria a través del trabajo de campo y métodos cartográficos y bibliográficos. - Realizar un estudio general sobre el sistema fortificado a escala territorial - Investigar la tipología arquitectónica, poliorcética y constructiva del conjunto de estas fortificaciones bajomedievales fronterizas. - Analizar los fundamentos constructivos de los casos de estudio seleccionados entre estas construcciones y caracterizarlas en cuanto al material, elementos, sistemas y procesos constructivos. - Ordenar la información histórica dispersa y corregir errores para hacer una base sobre la que establecer un discurso histórico de cada caso de estudio. - Comparar y relacionar las técnicas constructivas empleadas en estas fortalezas con los utilizados en el mismo ámbito temporal. - Difundir para su debate los resultados de la investigación por los foros científicos habituales. El método empleado combina los trabajos de gabinete con una intensa labor de campo, en la que se han documentado cincuenta fortificaciones y se han redactado sus correspondientes fichas de toma de datos. La recopilación de datos se ha incluido en una base de datos que incluye aspectos generales, tipológicos, constructivos y bibliográficos básicos del conjunto, a modo de inventario, de fortificaciones de la provincia. Las fortificaciones seleccionadas se agrupan según una clasificación tipológica y constructiva que marca las líneas de estudio posteriores. Se desarrolla un capítulo de antecedentes en el que se estudia la historia de la construcción fortificada medieval tanto en Europa como en España analizando la evolución de los tipos arquitectónicos y las múltiples influencias culturales que surcaron el Mediterráneo desde el Oriente cruzado e islámico al Poniente donde se desarrollaba la empresa reconquistadora que mantuvo en estado de guerra continuo a la Península Ibérica durante ochocientos años. El análisis del territorio como contenedor del hecho fortificado revela que hay una relación íntima entre la ubicación de las fortificaciones y las formas naturales que definen las vías de comunicación entre los valles del Duero, del Ebro y del Tajo. En efecto, el ámbito de estudio ha supuesto desde la Antigüedad un territorio de paso fundamental en la articulación de las comunicaciones en la Península Ibérica. Este carácter de paso más que de frontera explica las inquietudes y la preocupación por su control tanto por Roma como por el califato cordobés como por los reinos cristianos medievales. El análisis de los elementos históricos se complementa con el estudio detallado de los enfrentamientos fronterizos entre Castilla y Aragón así como los aspectos sociales y políticos que provocaron la fortificación como sistema de definición de la frontera y de organización espacial, jurisdiccional, social y administrativa del territorio. La arquitectura fortificada es esencialmente funcional: su cometido es la defensa. En este sentido, tras un estudio morfológico de los castillos seleccionados se realiza un extenso análisis poliorcético de sus elementos, investigando su origen y aplicación para servir también de parámetros de datación. Siendo el objeto inaugural de la tesis el estudio de los fundamentos constructivos, se explican los distintos materiales de construcción empleados y se agrupan las fábricas de las fortificaciones seleccionadas en dos grandes grupos constructivos: las fábricas aparejadas y las fábricas encofradas. Se han destacado y estudiado la evolución histórica y la tipología y mensiología constructiva de tres técnicas destacadas: el uso del ladrillo, la tapia de cal y canto o mampostería encofrada y la tapia de tierra. Para el estudio de la componente histórica y de la dimensión constructiva de cada técnica ha sido necesario documentar numerosos casos tanto en el ámbito de estudio como en la Península Ibérica con el fin de establecer grupos cronotipológicos constructivos entre los que poder ubicar las fábricas de estas técnicas presentes en el ámbito de estudio. Se ha observado una evolución dimensional de las fábricas de tapia que es más evidente en las hispanomusulmanas al modularse en codos pero que también se advierte significativamente en las cristianas bajomedievales. De cada una de las técnicas analizadas se ha seleccionado un caso de estudio singular y representativo. El castillo de Arcos de Jalón es un ejemplo significativo del empleo de la fábrica mixta de mampostería con verdugadas de ladrillo, así como las murallas de la ciudad fortificada de Peñalcázar lo es de la fábrica de mampostería encofrada y el castillo de Serón de Nágima constituye un caso característico y principal de la utilización de la tapia de tierra en la arquitectura militar bajomedieval. Cada uno de estos tres casos de estudios se examina bajo los mismos cuatro niveles anteriormente mencionados: territorial, histórico, arquitectónico y defensivo y constructivo. El sistemático método de estudio ha facilitado el orden en la investigación y la obtención de unos resultados y conclusiones que verifican la hipótesis y cumplen los objetivos marcados al comienzo. Se ha revisado la datación en la construcción de las fortificaciones analizadas mediante el estudio cronotipológico de sus fábricas, pudiendo trasladarse el método a otros sistemas fortificados. La tesis abre, finalmente, dos vías principales de investigación encaminadas a completar el estudio del sistema fortificado fronterizo bajomedieval en la raya oriental soriana de Castilla: la caracterización y datación por métodos físico-químicos de las muestras de piezas de madera de construcción que se conservan embebidas en las fábricas y la búsqueda documental y archivística que pueda revelar nuevos datos respecto a la fundación, reparación, venta o cualquier aspecto económico, legislativo, organizativo o administrativo relativo a las fortificaciones en documentos coetáneos. ABSTRACT The doctoral thesis develops an original research, held in the field of the Construction History, about the constructive reason of the frontier fortifications in the Late Middle Age between the Crowns of Castile and Aragón in the actual province of Soria, Spain. In the title is expressed the main objective, and also the temporal scope —from the reconquest in the 12th Century by Alfonso the First of Aragón to the unification under the common kingdom of the Catholic Kings— and the territorial extension that the research delimits: those Castilian regions in the border with Aragón in the actual province of Soria. During this period, a series of border wars were been, and this is the reason for the fortification of the border line and the main roads between both Crowns. The lack of studies of these fortifications as participants in a fortified system is the justification of the research. There is several analysis levels: territorial, historical, architectonic, defensive and constructive. Likewise, there is a lack of strictness and inaccuracy in the constructive items in the publications about several fortifications of this study field. This aspect has caused mistakes in the dating because there is neither artistic nor stylistic elements which determines a epoch. The traditionally accepted datings are challenged. An hypothesis is formulated: in the absence of artistic or stylistic elements in a sober and functional buildings is possible to date the time of construction with sufficiently approximation based on construction criteria once formed a cronotypologic classification of each building technique. The hypothesis, therefore, propose a main aim: the study of the constructive reason of the fortified border system. This aim is developed in a series of specifically targets whose achievement programs the analysis levels: - To know and to detail the historical elements which started the wars between Castile and Aragon and its development using historiographical tools, and to analyze the natural characteristic of the territory through cartographical tools. - To understand and to analyze the different architectural types and the building traditions employed in the military buildings in the time researched. - To locate, to document, and to select for their analysis the fortresses and military constructions erected during these border wars in the actual province of Soria through fieldwork and bibliographical and cartographical methods. - To conduct a general study on the fortified system in territorial scale. - To research the architectural, constructive and defensive typology of the system of these border late medieval fortifications. - To analyze the construction logic of the selected case studies and to characterize in the items of material, elements, systems and construction processes. - To sort scattered historical information and to correct mistakes to make a base by which to establish a historic speech of each case study. - To compare and to relate the construction techniques employed in these fortresses with those used in the same time range . - To spread for discussion the research results in the usual scientists forums. The method combines the destock work with an intense fieldwork. Fifty fortifications have been documented and it has written their corresponding data collection card. Data collection has been included in a database that includes general aspects, typological, constructive and basic bibliographical data, as an inventory of fortifications in the province. The selected fortifications are grouped according to a typological and constructive classification which lead the lines of the later study. There is a chapter for the antecedents in which the history of the medieval fortified construction in Europe and in Spain is studied by analyzing the evolution of architectural types and the many cultural influences along the opposite seasides of the Mediterranean Sea, from the Islamic and Crusader East to the Iberian Peninsula in where there were a long and continuous war during eight hundred years. The territory is analyzed as a container of fortifications. This analysis reveals that there is an intimate relationship between the location of the fortifications and the natural forms that define the communication roads between the Duero, Ebro and Tajo valleys. Indeed, the study area has been a cross-territory from ancient times more than a frontierterritory. This communication character explains the concerns about its control both by Rome and by the Muslims of Córdoba as medieval Christian kingdoms. The analysis of historical elements is supplemented by detailed study of border war between Castile and Aragon and the social and political issues that led to the fortification as border definition system and spatial, jurisdictional, social and administrative planning. The fortified architecture is essentially functional: it is responsible for defense. In this sense, after a morphological study of selected castles is performed an extensive analysis of its defensive elements, investigating its origin and application. This analisis serves for the definition of parameters for dating. The purpose of the thesis is the study of the constructive logic. First, various building materials are explained. Then, masonry is grouped into two major constructive groups: rigged masonry and formwork masonry. The historical evolution and the constructive typology and mensiology are studied for each one of the three main techniques: the use of brickwork, the mortar wall and rammed-earth. Many case studies have been documented along the Iberian Peninsula and also in the study area. As conclusion, there is a dimensional evolution of the rammed-earth walls. This evolution is more evident into the Muslim masonry than in the late medieval walls: the reason is the use of the cubit as module. From each of the techniques discussed, a singular and representative case of study has been selected. The castle of Arcos de Jalon is a significant example of mix masonry of stone and brick rows. The walled city of Peñalcázar is built with masonry formwork. Serón de Nágima castle, at last, is a typical and main case of the use of the rammedearth wall of late medieval military architecture. Each of these three case studies were examined under the same four analysis levels above mentioned: territorial, historical, architectural and defensive and constructive. The systematic method of study has facilitated the order in the research and the obtaining of results and conclusions that verify the hypotheses and achieve the research objectives. Dating of the fortifications construction has been revised by studying the cronotypological issues of its masonry. The method can be transferred to the study of other fortified systems. Finally, the thesis describes two main research new ways aimed at completing the study of the late medieval fortified border of Castile in the actual province of Soria. The first of them is the characterization and datig by physicochemical methods the sample pieces of wood construction preserved embedded in the masonry. The second research way is the investigation of the documents in archives that may reveal new information about the foundation, repair, sale or any aspect to economic, legal, organizational or administrative concerning fortifications in contemporary documents.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

En la presente tesis doctoral se revisan las principales hipótesis que intentan aclarar los procesos constructivos llevados a cabo para edificar las pirámides egipcias de las Dinastías III y IV, organizándose dichas teorías desde el punto de vista de los posibles materiales constituyentes. La investigación se ha centrado en la hipótesis heterodoxa que propone, como medio para ejecutar estas construcciones, la manufactura completa de la pirámide con piedra caliza conglomerada. Con este fin, se profundiza en artículos que tienen por objeto el análisis de muestras de material de estos monumentos, de piedras calizas naturales y de piedras calizas geopoliméricas, con objeto de determinar si la hipótesis constructiva mencionada es viable. Tomando como referencia la hipótesis constructiva estudiada, se adicionan morteros de cal aérea con carbonato de sodio (natrón) y metacaolín, analizando posteriormente las nuevas características de estos conglomerantes. El cementante descrito en la teoría constructiva se enmarca dentro de la química y tecnología de los polímeros sintéticos inorgánicos activados alcalinamente, también denominados geopolímeros. Se desarrolla una primera mezcla basada en los datos extraídos de la investigación precedente. Posteriormente, se realizan varios grupos de mezclas, en las que se parte de unas proporciones iniciales correspondientes al geopolímero teórico de la hipótesis constructiva. Sobre dichas proporciones se realizan incrementos en la cantidad de cal, y los productos obtenidos son ensayados, tomando datos de: dureza Shore C, velocidad de ultrasonidos, densidades, resistencia a compresión y a flexión, difracción de rayos X, análisis térmicos y microscopía electrónica de barrido. Los resultados derivados de introducir las adiciones, en las proporciones estudiadas, mejoran notablemente algunas características de los morteros de cal convencionales. ABSTRACT In the present PhD thesis the main hypotheses about the construction processes to build the Egyptian pyramids of Dynasties III and IV are reviewed. These theories are addressed from the point of view of their possible constituent materials. The research focuses on the heterodox hypothesis that proposes, as a means to perform these constructions, the complete manufacturing of the pyramid with limestone conglomerate. In this regard, a state of the art is set on the analysis of samples of material of these monuments, natural limestone and limestone geopolymeric, to determine if the constructive hypothesis is viable. Using this constructive hypothesis as a reference, aerial lime mortars are added with sodium carbonate (natron) and metakaolin, and the new characteristics of these resulting binders are then analyzed. The cementing described in the constructive theory belongs to the chemistry and the technology of synthetic inorganic alkali-activated polymers, also called geopolymer. Based on data obtained from previous research, a first mix is prepared. Subsequently, several groups of mixes are made, starting from theoretical initial ratios corresponding to the geopolymer that was presumably used in the constructive hypothesis. Increments in the amount of lime are made upon such proportion, and the resulting products are tested for data collection about: Shore C hardness, ultrasound velocity, densities, compressive and flexural strength, X-ray diffraction, thermal analysis and scanning electron microscopy. The results allow to conclude that, if in the studied proportions, additions improve significantly some of the characteristics of conventional lime mortars.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Entre los años 1965 y 1985, arquitectos españoles irrumpieron con una serie de aportaciones singulares que abrieron nuevas líneas de exploración más allá de los límites que marcaba la tradición. Se trata de un conjunto de prácticas arquitectónicas que podríamos calificar de “experimentales”3. El carácter aislado y disperso de estas manifestaciones4, ha contribuido a su desconocimiento y falta de difusión tanto dentro como fuera de nuestras fronteras. Hasta la fecha no se ha realizado una revisión del tema en su conjunto. Con este estudio se pretende analizar la producción arquitectónica experimental de este periodo en su globalidad, generar una estructura que permita incluir las distintas vías experimentales, de idear y proyectar arquitectura, que podemos encontrar dentro de nuestro territorio, inscribiéndolas en un contexto más amplio. Se han identificado cuatro nichos de experimentación en torno a los cuales se estructura la producción experimental española en el arco temporal definido: “sistemas de organización espacial”, “interacción con el medio ambiente”, “lógica constructiva e imaginación material” y “el campo expandido del lenguaje y el proceso proyectual”. La comprensión de estas manifestaciones, con una mirada global, es la que mejor puede contribuir a la construcción de un corpus propio, que sea reconocible por sus diferencias y especificidades. Se trata igualmente de un estudio comparado, que busca facilitar la inscripción de las prácticas experimentales españolas en el marco de la cultura internacional, no como una excepción encerrada en su particularismo, ni como una derivación inmediata de tendencias externas, sino como una realidad donde apoyar una historia que entrelaza lo local y lo internacional. En definitiva, con esta investigación se pretende recuperar un fragmento reciente de la arquitectura en España, en un periodo clave, en el que comienza a abrirse al intercambio de teorías y prácticas, con el resto de Europa y América. Incluyendo voces paralelas al discurso central, que habían sido desplazadas durante el proceso de construcción del mismo, se quiere participar en la transmisión de un legado completo de nuestra cultura y práctica arquitectónica. ABSTRACT Between the years 1965 and 1985, Spanish architects burst in with unique contributions that could be described as "experimental"1. The isolated and dispersed nature of these occurrences2 has contributed to the oversight and lack of dissemination of the Spanish experimental architecture both within and beyond our borders. To date, there has been no review of the topic in its entirety. This study tries to examine the experimental architectural production of this period as a whole, generating a structure that allows for the inclusion of different experimental ways of envisioning and projecting architecture within our territory, registering them in a wider context. Four niches of experimentation have been identified around which the Spanish experimental production in the time span defined: "spatial organisation systems," "interaction with the environment", "constructive logic and equipment imagination" and” expanded field of language and the design process. " Understanding these manifestations, with a global perspective, can best contribute to the construction of our own corpus, which is recognisable by their differences and specificities. At the same time, it is a comparative study that seeks to facilitate the registration of the Spanish experimental practices within the framework of international culture, not as an exception enclosed in its particularity, not as an immediate derivation of external trends, but as a reality to support a story that weaves together the local and the international. In short, it deals with recovering a recent fragment of architecture, in a key period in which Spain begins to open to the exchange of cultural and architectural theories and practices with the rest of Europe and America. Including parallel voices to the central discourse, which until recently had been displaced during the construction processes of that same discourse, this research wants to participate in the transmission of a complete legacy of the history of our culture and architectural practice.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Esta es la búsqueda de respuestas a esa duda constante: De dónde venimos y que hemos ido dejando por el camino. ¿Está todo claro en este recorrido o hemos actuado por acumulación de errores heredados de procesos anteriores? Es la investigación a través del descubrimiento de nuestro pasado, de nuestros orígenes en materia de seguridad de protección contra incendios, y sobre todo de ejecución de una arquitectura pensada para ser recorrida con mayor seguridad y ser evacuada en un tiempo razonable. El trabajo investiga, a nivel nacional, la evolución de la sociedad y sus efectos sobre la manera de interpretar el problema de la seguridad contra incendios en los edificios. El interés fundamentalmente es poner en claro todos aquellos aspectos que afectan a la evacuación de las personas. Para ello se han estudiado los principales hitos de actuación, las preocupaciones principales surgidas en cada momento y las soluciones adoptadas. Se ha comprobado su aplicación o su demora hasta que se ha producido el siguiente gran suceso que ha motivado una nueva revisión de los procedimientos de diseño y control. En primer lugar, tratando de relacionar los incendios fundamentales que han influido en nuestra forma de abordar el problema en distintos momentos de la historia de España. En segundo lugar, haciendo un recorrido sobre la figura del arquitecto y su participación en los medios de control y legislación sobre la manera de intervenir en el servicio de incendios o de resolver los edificios en materia de protección contra incendios o evacuación de sus ocupantes. En definitiva, descubriendo los escritos de algunos especialistas, fundamentales para entender nuestra manera de abordar el problema de la protección en los edificios, a lo largo de la historia. Se ha revisado como se han producido los siniestros más importantes en teatros y otros locales públicos .Analizando la forma en que los arquitectos implicados han tratado de resolver las posibles deficiencias ante el riesgo. Se trata de la tipología edificatoria donde, por primera vez, surge la preocupación por adoptar medidas y procedimientos de seguridad en caso de incendio. Resultan locales con una importante siniestralidad, donde se desarrolla la principal actividad lúdica del momento, y que por el importante número de personas que albergan, son fuente de preocupación entre el público y las autoridades. Otras cuestiones en un tema tan amplio, que quedan simplemente esbozadas en este trabajo de investigación, son los procedimientos de los sistemas de extinción, la estructura organizativa de la ciudad, las primeras sociedades de seguros de incendios, la aparición de patentes a partir del desarrollo industrial del siglo XIX. Todo ello, con el hilo conductor de la reglamentación que se ha ido elaborando al respecto. Al principio, sobre espectáculos públicos, acotando el punto de partida en la materia de nuestra reglamentación. Anticipando sistemas constructivos y datos dimensionales de la evacuación. Llegados a mediados del siglo XX, abordando otros usos. Haciendo seguimiento de la modernización de los procesos edificatorios y la reglamentación sectorial. Recabando información de las organizaciones profesionales que comienzan a reclamar una coordinación nacional de los sistemas preventivos y que desemboca en el Proyecto de Reglamento de prevención contra el fuego que nunca será publicado. Toda esta etapa, plagada de documentos de carácter voluntario u obligatorio, local y nacional, van definiendo los criterios dimensionales con los que debe resolverse los elementos arquitectónicos susceptibles de servir para la evacuación. Se trata de una etapa intensa en documentación, cambiante, sujeta a los criterios que establecen los países del entorno más avanzados en la materia. Las dos últimas décadas del siglo, acotadas por la transición política y varios siniestros de graves consecuencias, definen el proceso normativo que culmina con el código técnico de la edificación que hoy conocemos. Es un periodo de aprendizaje y asimilación del capítulo de la seguridad, donde los métodos son variados. Donde la intencionalidad última es trasladar un sistema prescriptivo a un modelo prestacional propio de la madurez en el análisis del tema y en las corrientes de los países del entorno. ABSTRACT This is the search for answers to that constant question: Where do we come from and what have left along the way? Has everything been clear on this journey, or have we acted as a result of a collection of errors learned from prior processes? This has been research through exploration of our past, of our origins regarding fire protection safety, and, above all, of the endeavour to utilize architecture aimed at offering the highest level of safety and evacuation in a reasonable time. This project has researched society’s change nationwide and its effects on how to interpret the difficulty of fire protection safety in buildings. Its focus has fundamentally been to clarify those aspects that affect the evacuation of people. To this end, the main milestones of action, the principal concerns that have arisen at each step, and the solutions taken have all been studied. A check was performed on their application; or their delay until a significant event occurred that prompted a new revision of design and control procedures. Firstly, this was done by attempting to connect the main fires that have influenced how we handle the problem at different times in Spain’s history. Secondly, an examination was done on the figure of the architect and his participation in the means of control and legislation on how to intercede in fire services, or how the architect finds solutions for buildings in terms of fire protection, or the evacuation of their occupants. In short, the written works of certain specialists, who are essential to our understanding of how to deal with the problem of protection in buildings, were explored throughout history. A study was done on the most significant disasters in theatres and other public establishments. This was done by analysing the way the architects involved have aimed to solve possible points liable to risk. It is a classification of building where, for the first time, the concern arose to adopt safety measures and procedures in the event of fires. Public establishments with considerable accident rates emerged. Here the main entertainment activities of the time took place. These spaces were a source of worry among the public and authorities due to the high number of persons they accommodated. Other issues in such an extensive subject, which are only outlined in this research study, are procedures in extinguishing systems, the organizational structure of cities, the first fire insurance companies, and the appearance of patents after the industrial development of the 19th century. All of these aspects are joined by the common thread of regulations that have been created in this matter. At the beginning, these regulations were for public shows, thus defining the starting point for our regulations. This was done in anticipation of structural systems and size data of evacuations. With the arrival of the mid-20th century, different uses were addressed. A modernization of construction processes and the industry regulations were tracked. Information was gathered from professional organizations that began to demand a national coordination of prevention systems which led to the Regulation Project on fire prevention which will never be published. Throughout this stage, replete with voluntary and compulsory documents, both on the local and national level, the dimensional criteria to be used in the resolution of architectural elements open to use in evacuation were defined. This was a period that was filled with documentation, change, and subject to the criteria that the most advanced countries in the field established in this regard. The final two decades of the century, marked by political transition and several accidents with grave consequences, defined the regulation process that culminated with the building technical code known today. This was a period of learning and understanding in the chapter of safety, where the methods are varied. In this chapter, the ultimate goal is to insert a prescriptive-based standard into a performance-based code suitable for cultivated experience in analysis of the subject and the tendencies in countries dealing with this field.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Los nuevos comportamientos urbanos nos permiten observar cada vez con más frecuencia en nuestras calles y plazas realidades que siempre habíamos considerado domésticas. Al contrario también pasa, todos los días vivimos en nuestras casas situaciones que implican relacionarnos con personas que no son de nuestro núcleo familiar. El diseño doméstico de nuestras ciudades y el urbanismo del diseño de interiores parecen herramientas oportunas en el mundo que nos ha tocado vivir. Esto nos lleva a pensar que los espacios públicos y privados son términos simplificados, definidos en base a conceptos de propiedad para organizar la ciudad. En cambio, sus usos y vivencias, su gestión y sus comportamientos se han complejizado, distorsionando la terminología convencional hasta hacerla obsoleta. En este contexto, considerado también el marco socioeconómico actual, surgen las “acciones de abajo a arriba” como nuevo paradigma o modelo de renovación urbana, que entienden la involucración del ciudadano como parte activa en el proceso de construcción de la urbe desde la misma gestación del proyecto, frente a las acciones habituales que consideran al usuario como mero receptor de las propuestas. Un ciudadano que parece estar cada vez más radicalizado y una administración que parece asustarse ante el desconcierto que el acercamiento al ciudadano puede acarrear, han ocasionado por un lado, espacios “gueto” de carácter casi anárquico y, por el otro lado, lugares tan institucionalizados que derivan en espacios asociados a la administración y ajenos al ciudadano. Por ello, se considera imprescindible la colaboración entre ambos poderes. De acuerdo con el discurso que precede, dentro de un marco comparativo, se estudian 5 supuestos seleccionados de las ciudades Madrid y Zaragoza. Madrid porque es referencia nacional e internacional en el desarrollo urbano a través de procesos ‘abajo arriba’. Zaragoza porque es una ciudad ‘media’ que históricamente no se ha definido por estrategias urbanas claras, ya sean de carácter social o institucional. Sin embargo, en el momento actual se pueden identificar planteamientos relacionados con la recuperación de construcciones y espacios vacantes que pueden ser determinantes a la hora de alcanzar equilibrios con los intensos procesos institucionales acaecidos en las dos últimas décadas. De los procesos urbanos registrados en cada lugar, desarrollados en construcciones y espacios vacantes, he seleccionado: Construcciones Vacantes Madrid |Tabacalera de Lavapiés Zaragoza | Antiguo I.E.S. Luis Buñuel y antiguo Convento de Mínimos Espacios Vacantes Madrid | Campo de Cebada [solar] Zaragoza | Patio ‘antiguo I.E.S. Luis Buñuel [espacio libre] y plaza Eduardo Ibarra [espacio libre] El proyecto de investigación ha partido de las hipótesis de partida que siguen: UNA… Las ‘acciones de abajo arriba’ o renovación desde abajo no tienen cabida como elementos urbanos aislados sino conectados entre sí, posibilitando la producción de sinergias y la construcción de la ciudad; pudiendo ser consideradas acciones de desarrollo y enlace urbano, pues su objetivo es convertirse en motores del espacio público. Cuestión que es aplicable al resto de los procesos o acciones urbanas [‘horizontales’ o ‘institucionales’] DOS… La capacidad de adaptación manifestada por las ‘acciones de abajo arriba’ implica un marco ideológico de referencia asociado a la importancia de la construcción con mínimos recursos [Re-ocupación y/o Re- Construcción de estructuras urbanas en desuso] en los procesos urbanos descritos, como vía para comprender los concepto sostenibilidad y calidad figurativa de lo construido. Cuestión que es aplicable a la recuperación de aquellos aspectos de la arquitectura que la convierten en necesaria para la sociedad. Y tiene como objetivo: Identificar modelos de sostenibilidad urbana como una estrategia que va de lo individual a lo colectivo y que se transmite fundamentalmente con la acción, mezclando la innovación y la tecnología en múltiples ámbitos, utilizando los recursos naturales e intelectuales de una manera eficiente y entendiendo la inteligencia humana y sobre todo la inteligencia colectiva, como principio y justificación. Se han analizado los siguientes aspectos: sociales [participación ciudadana e implicación de la administración pública], urbanos [conexiones con otros colectivos o espacios urbanos / transformaciones urbanas a través de los procesos de gestión utilizados], constructivos [materiales utilizados en la re-construcción de construcciones y espacios vacantes / sistemas constructivos utilizados] y los relacionados con la sostenibilidad [sostenibilidad económica / sostenibilidad de mantenimiento / sostenibilidad funcional / inteligencia colectiva] El estudio de los aspectos considerados se ha desarrollado con las herramientas metodológicas siguientes: Entrevistas abiertas a expertos: se han obtenido respuestas de 25 personas expertas [5 por cada espacio o construcción vacante] relacionadas con las acciones urbanas sostenibles, la cultura y las relaciones sociales, y que también conocen los lugares y su entorno desde los puntos de vista urbano y construido. Son ‘tipos ideales’ asociados a uno de los cinco poderes que se manifiestan en la ciudad: el poder educativo [la universidad], el poder creativo [la cultura], el poder administrativo [la política], el poder empresarial [la empresa privada] y los usuarios [un usuario activo y representativo de cada lugar elegido que haya intervenido en la gestación del proceso]. Han sido personas que conocían el tejido social y urbano de la ciudad de Zaragoza y Madrid, ya que la herramienta ‘entrevista abierta a expertos’, recoge datos y opiniones planteadas en las construcciones y espacios vacantes ubicados en Zaragoza y Madrid. Entrevistas cerradas a usuarios: como la población de usuarios que se somete a la investigación es infinita o muy grande, resulta imposible o inconveniente realizar la obtención de los datos sobre todos aquellos elementos que la forman. Por lo tanto, he decidido estudiar sólo una parte de la población que denomino ‘tipos ideales’, obteniendo respuestas de 150 usuarios [30 personas por cada espacio o construcción vacante]. La selección de grupos de personas entrevistadas, debe permitir que los resultados sean representativos de la población total de usuarios. Además, la elección de ‘tipos ideales’ se ha identificado con los vecinos de los núcleos urbanos [o barrios] en los que se ubican las construcciones o espacios vacantes analizados. Observación estructurada: recoger información a través de la observación me ha permitido conocer las actuaciones y comportamientos de los ciudadanos en el medio urbano. Esto ha facilitado el estudio del medio a nivel práctico, valorando el uso que la sociedad da a las construcciones y a los espacios vacantes analizados. Es importante posicionar la estrategia en relación con el tema de investigación propuesto. Una estrategia que dibuje un panorama plural, desarrollado a través de herramientas sociales y constructivas que permitan que la arquitectura hable de cosas parecidas a lo que interesa a la ciudadanía. Para ello, propuse un catálogo de herramientas arquitectónicas que han permitido evaluar todas las propuestas. Un contexto de estrategias comunes que han descrito con los mismos códigos las distintas actuaciones analizadas. Estas herramientas tocan diferentes campos de interés. Desde las partes más tectónicas y constructivas, hasta las más ligadas con el desarrollo urbanístico y social. Acciones de participación colectiva: Experiencias o laboratorios urbanos participados por los alumnos del grado de arquitectura de la UNIZAR y los agentes sociales. Las acciones son una herramienta propositiva. Investigar y analizar proponiendo ha permitido que el análisis del contexto pueda llegar a capas de mucha más profundidad. No se ha trabajado estableciendo jerarquías de profesores y alumnos, sino que se ha intentado posibilitar la conexión de distintos agentes que trabajan coordinadamente durante el tiempo que han durado las acciones. Por un lado esto ha permite que cada integrante haya aportado al grupo lo que mejor sabe hacer y de la misma manera, que cada uno pueda aprender aquello de lo que tenga más ganas… y reflexionar sobre determinados aspectos objeto del análisis. Una vez interpretados los resultados, obtenidos a través de las herramientas metodológicas referenciadas, se ha concluido lo que sigue: Respecto de la Hipótesis de partida UNO LAS ACCIONES ‘ABAJO ARRIBA’ han revelado que no se puede entender ningún proceso de gestión urbana fuera de la participación ciudadana. El ‘ESPACIO LIBRE’ de una ciudad necesita lugares de autogestión, espacios de cogestión, movimientos de ‘arriba abajo’ y también modelos que todavía no sabemos ni que existen. LAS ACCIONES INSTITUCIONALES ‘ARRIBA ABAJO’ han demostrado que no han presentado permeabilidad ni relación con las circulaciones de entorno. Tampoco han tenido en cuenta a otras muchas personas, ‘usuarios productores’, a las que les interesan los procesos de búsqueda y las fórmulas de conexión más interactivas. Respecto de la hipótesis de partida DOS LAS ACCIONES ‘ABAJO ARRIBA’ han revelado que el ‘derecho a la ciudad’, paradigma defendido por Lefebvre desde el cual se piensa el urbanismo ciudadano, en estos supuestos podría entenderse como el ‘derecho a la infraestructura’. El ESPACIO LIBRE es infraestructura y se quiere para infraestructurar los derechos de cada uno. Y aunque también es verdad que estas acciones son simples destellos, han hecho visible otro paradigma de gestión y propuesta urbana que puede ser predominante en un futuro próximo. LAS ACCIONES INSTITUCIONALES ‘ARRIBA ABAJO’ han revelado que las intervenciones estuvieron enfocadas únicamente a la resolución de los procesos constructivos y a la incorporación del programa como un dato ‘problema’ que era necesario resolver para evitar la afección al diseño. ABSTRACT The new urban ways of behaviour let us watch more and more frequently in our streets and squares, realities that we had always considered as domestic. This also happens the other way round. Every day we have to go through situations at home which imply relationships with people who don’t belong to our family circle. The domestic design of our cities and the urban planning of indoor design seem to be adequate tools in the world we have to live in. This leads us to think that public and private spaces are simplified terms, defined according to concepts of property in order to organise the city. On the other hand, its uses and the experiences of people, its management and ways of behaviour is now more complex, changing the conventional terminology that has become outdated. In this context, ‘bottom-up’ actions arise as a new paradigm or model of urban renewal. These actions consider the active role of social participation in the process of building up the city from the very beginning, in comparison with the former way of acting that considered the user as mere receptor of the proposals. A citizen who seems to become more and more radical, and an administration that seems to be afraid of the unknown, have created both almost anarchic ghetto spaces and, on the other hand, spaces which have been so institutionalised that derive into areas associated to the administration but alienated from the citizen. For this reason, cowork of both forces is considered as crucial. In accordance with the above mentioned ideas and within a comparative framework, five situations chosen from the cities of Madrid and Zaragoza are studied. Madrid because is a national and international reference in urban development that uses “bottom-up” processes. Zaragoza because is a “medium-size” city that, historically, has not been defined by clear social or institutional urban strategies. Nevertheless, at the present time we can identify approaches on the recovery of constructions and empty areas that may be determining for reaching a balance with the intense institutional processes that have taken place in the two last decades. From the urban processes registered in every place and developed in vacant areas and constructions, I have chosen: Vacant constructions Madrid | Lavapiés Tobacco Factory Zaragoza | Old Secondary School Luis Buñuel and old Convent of the Minimos Vacant areas Madrid | Campo de Cebada [non-built site]. Zaragoza | Old courtyard of the secondary school and Eduardo Ibarra square [free space] The research project has been issued from the following starting hypotheses: ONE… “Bottom-up actions” or renewal from below have no place as isolated urban elements but as connected parts that can produce synergies and the construction of the city, and that can also be considered as actions producing urban development and links. This can also be applied to the rest of urban processes or actions [‘horizontal’ or ‘institutional’]. TWO… The capacity of adaptation shown by “bottom-up actions” implies an ideological framework of reference which is related to the importance of construction with minimal resources (re-occupation and/or reconstruction of urban structures in disuse) in the above mentioned urban processes, as a way for understanding the concepts of sustainability and the representational quality of what has been constructed. This can also be applied to the recovery of those architectural aspects that make architecture necessary for society. And its objective is: Identify models of urban sustainability as a strategy going from the individual to the collective, which are mainly transferred by action and that mix innovation and technology in many fields. Models that use natural and intellectual resources in an efficient way, and understand human intelligence and, above all, collective intelligence, as principle and justification. The following aspects have been analysed: social [civic participation and involvement of the public Administration], urban [connections with other collectives or urban spaces / urban transformation by the processes of administration used], constructive [materials used for the re-construction of empty spaces / construction systems used] and those focusing on sustainability [economic sustainability /maintenance sustainability /functional sustainability / collective intelligence]. For researching into the above mentioned aspects, the following methodological tools have been developed: Open interviews with experts: answers from 25 experts have been obtained [five for every vacant space or empty construction] on sustainable urban actions, culture and social relations, who also know the places and their environment from an urban and constructive point of view. These are “ideal types” linked to one of the five powers acting in the city: the educational power [University], the creative power [culture], the administration power [politics], the corporate power [private companies] and the users [an active and representative user for every place selected during the establishment of the process]. They were people who knew the social and urban fabric of Zaragoza and Madrid, since the “open interview for experts” tool collects data and points of view set out in vacant constructions and spaces of Zaragoza and Madrid. Close interviews with users: as the number of users targeted for the research is very big or infinite, it is impossible or inconvenient to get data from all its constituent parts. Therefore, I have decided to research into the part of the population that I call “ideal types”, obtaining answers from 150 users [30 people for every empty space or construction]. The selection of the groups of people interviewed must produce results which are representative of the total population of users. Furthermore, the election of “ideal types” has been identified with the inhabitants of urban areas [or city districts] in which the vacant spaces or constructions analysed are located. A structured observation: I have known the actions and ways of behaving of the citizens in the urban environment by means of collecting information after observation. Therefore, the practical research into the target environment has been easier by valuing the use that society gives to the empty constructions and spaces analysed. It is important to position the strategy with respect to the research subject proposed. It involves a strategy able to get an overview of a plural landscape, developed by social and constructive tools, allowing architecture to talk about topics which are interesting for city dwellers. Therefore, I proposed a set of architectural tools to evaluate all the proposals. A context of common strategies describing the different actions analysed by using the same codes. These tools focus on different fields of interests, from the most tectonic and constructive parts, to the most related to urban and social development. Actions on collective participation: experiences or urban laboratories shared by the students of architecture of the University of Zaragoza and social agents. The actions are a proactive tool. Researching and analysing by means of proposing, has allowed me to analyse the context and much deeper layers. This work has not been done by establishing ranks of professors and student, but trying to get an interaction between the different agents who work in close coordination during the implementation of the actions. This has allowed every agent to contribute the group what they do the best, and also every individual has had the possibility to learn what s/he prefers…, thinking about the different aspects targeted by the analysis. Once the different methodological tools have been interpreted, this is the conclusion: With regard to the initial hypothesis ONE “BOTTOM-UP” ACTIONS have proven that no process of urban management can be understood outside civic participation. The “FREE SPACE” of a city needs self-managed places, co-managed spaces, “up-bottom” movements, and also models whose existence is still ignored. “UP-BOTTOM” INSTITUTIONAL ACTIONS have proven that they have not presented neither permeability nor relation with local ideas. They have also disregarded many other people, the “usersproducers”, who are interested in the most interactive means of searching and connecting processes. With regard to the initial hypothesis TWO Under these premises, “BOTTOM-UP” ACTIONS have shown that the “right to the city”, a paradigm defended by Lefebvre and from which citizen-focused urbanism is conceived, could be considered as a “right to the infrastructures”. A FREE SPACE is an infrastructure and must be used to “infrastructure” the rights of every citizen. And, even though it is true that these actions are mere flashes, they have made visible another paradigm of management and urban proposal that can be prevailing in a near future. “UP-BOTTOM” INSTITUTIONAL ACTIONS have revealed that the interventions have only focused on resolving construction processes and the incorporation of the program as a “problem” data that was necessary to resolve in order to avoid its influence on the design.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

La presente Tesis Doctoral evalúa la contribución de una fachada activa, constituida por acristalamientos con circulación de agua, en el rendimiento energético del edificio. Con especial énfasis en la baja afección sobre su imagen, su integración ha de favorecer la calificación del edificio con el futuro estándar de Edificio de consumo de Energía Casi Nulo (EECN). El propósito consiste en cuantificar su aportación a limitar la demanda de climatización, como solución de fachada transparente acorde a las normas de la energía del 2020. En el primer capítulo se introduce el planteamiento del problema. En el segundo capítulo se desarrollan la hipótesis y el objetivo fundamental de la investigación. Para tal fin, en el tercer capítulo, se revisa el estado del arte de la tecnología y de la investigación científica, mediante el análisis de la literatura de referencia. Se comparan patentes, prototipos, sistemas comerciales asimilables, investigaciones en curso en Universidades, y proyectos de investigación y desarrollo, sobre envolventes que incorporan acristalamientos con circulación de agua. El método experimental, expuesto en el cuarto capítulo, acomete el diseño, la fabricación y la monitorización de un prototipo expuesto, durante ciclos de ensayos, a las condiciones climáticas de Madrid. Esta fase ha permitido adquirir información precisa sobre el rendimiento del acristalamiento en cada orientación de incidencia solar, en las distintas estaciones del año. En paralelo, se aborda el desarrollo de modelos teóricos que, mediante su asimilación a soluciones multicapa caracterizadas en las herramientas de simulación EnergyPlus y IDA-ICE (IDA Indoor Climate and Energy), reproducen el efecto experimental. En el quinto capítulo se discuten los resultados experimentales y teóricos, y se analiza la respuesta del acristalamiento asociado a un determinado volumen y temperatura del agua. Se calcula la eficiencia en la captación de la radiación y, mediante la comparativa con un acristalamiento convencional, se determina la reducción de las ganancias solares y las pérdidas de energía. Se comparan el rendimiento del acristalamiento, obtenido experimentalmente, con el ofrecido por paneles solares fototérmicos disponibles en el mercado. Mediante la traslación de los resultados experimentales a casos de células de tamaño habitable, se cuantifica la afección del acristalamiento sobre el consumo en refrigeración y calefacción. Diferenciando cada caso por su composición constructiva y orientación, se extraen conclusiones sobre la reducción del gasto en climatización, en condiciones de bienestar. Posteriormente, se evalúa el ahorro de su incorporación en un recinto existente, de construcción ligera, localizado en la Escuela de Arquitectura de la Universidad Politécnica de Madrid (UPM). Mediante el planteamiento de escenarios de rehabilitación energética, se estima su compatibilidad con un sistema de climatización mediante bomba de calor y extracción geotérmica. Se describe el funcionamiento del sistema, desde la perspectiva de la operación conjunta de los acristalamientos activos e intercambio geotérmico, en nuestro clima. Mediante la parametrización de sus funciones, se estima el beneficio adicional de su integración, a partir de la mejora del rendimiento de la bomba de calor COP (Coefficient of Performance) en calefacción, y de la eficiencia EER (Energy Efficiency Ratio) en refrigeración. En el recinto de la ETSAM, se ha analizado la contribución de la fachada activa en su calificación como Edificio de Energía Casi Nula, y estudiado la rentabilidad económica del sistema. En el sexto capítulo se exponen las conclusiones de la investigación. A la fecha, el sistema supone alta inversión inicial, no obstante, genera elevada eficiencia con bajo impacto arquitectónico, reduciéndose los costes operativos, y el dimensionado de los sistemas de producción, de mayor afección sobre el edificio. Mediante la envolvente activa con suministro geotérmico no se condena la superficie de cubierta, no se ocupa volumen útil por la presencia de equipos emisores, y no se reduce la superficie o altura útil a base de reforzar los aislamientos. Tras su discusión, se considera una alternativa de valor en procesos de diseño y construcción de Edificios de Energía Casi Nulo. Se proponen líneas de futuras investigación cuyo propósito sea el conocimiento de la tecnología de los acristalamientos activos. En el último capítulo se presentan las actividades de difusión de la investigación. Adicionalmente se ha proporcionado una mejora tecnológica a las fachadas activas existentes, que ha derivado en la solicitud de una patente, actualmente en tramitación. ABSTRACT This Thesis evaluates the contribution of an active water flow glazing façade on the energy performance of buildings. Special emphasis is made on the low visual impact on its image, and the active glazing implementation has to encourage the qualification of the building with the future standard of Nearly Zero Energy Building (nZEB). The purpose is to quantify the façade system contribution to limit air conditioning demand, resulting in a transparent façade solution according to the 2020 energy legislation. An initial approach to the problem is presented in first chapter. The second chapter develops the hypothesis and the main objective of the research. To achieve this purpose, the third chapter reviews the state of the art of the technology and scientific research, through the analysis of reference literature. Patents, prototypes, assimilable commercial systems, ongoing research in other universities, and finally research and development projects incorporating active fluid flow glazing are compared. The experimental method, presented in fourth chapter, undertakes the design, manufacture and monitoring of a water flow glazing prototype exposed during test cycles to weather conditions in Madrid. This phase allowed the acquisition of accurate information on the performance of water flow glazing on each orientation of solar incidence, during different seasons. In parallel, the development of theoretical models is addressed which, through the assimilation to multilayer solutions characterized in the simulation tools EnergyPlus and IDA-Indoor Climate and Energy, reproduce the experimental effect. Fifth chapter discusses experimental and theoretical results focused to the analysis of the active glazing behavior, associated with a specific volume and water flow temperature. The efficiency on harvesting incident solar radiation is calculated, and, by comparison with a conventional glazing, the reduction of solar gains and energy losses are determined. The experimental performance of fluid flow glazing against the one offered by photothermal solar panels available on the market are compared. By translating the experimental and theoretical results to cases of full-size cells, the reduction in cooling and heating consumption achieved by active fluid glazing is quantified. The reduction of energy costs to achieve comfort conditions is calculated, differentiating each case by its whole construction composition and orientation. Subsequently, the saving of the implementation of the system on an existing lightweight construction enclosure, located in the School of Architecture at the Polytechnic University of Madrid (UPM), is then calculated. The compatibility between the active fluid flow glazing and a heat pump with geothermal heat supply system is estimated through the approach of different energy renovation scenarios. The overall system operation is described, from the perspective of active glazing and geothermal heat exchange combined operation, in our climate. By parameterization of its functions, the added benefit of its integration it is discussed, particularly from the improvement of the heat pump performance COP (Coefficient of Performance) in heating and efficiency EER (Energy Efficiency Ratio) in cooling. In the case study of the enclosure in the School of Architecture, the contribution of the active glazing façade in qualifying the enclosure as nearly Zero Energy Building has been analyzed, and the feasibility and profitability of the system are studied. The sixth chapter sets the conclusions of the investigation. To date, the system may require high initial investment; however, high efficiency with low architectural impact is generated. Operational costs are highly reduced as well as the size and complexity of the energy production systems, which normally have huge visual impact on buildings. By the active façade with geothermal supply, the deck area it is not condemned. Useful volume is not consumed by the presence of air-conditioning equipment. Useful surface and room height are not reduced by insulation reinforcement. After discussion, water flow glazing is considered a potential value alternative in nZEB design and construction processes. Finally, this chapter proposes future research lines aiming to increase the knowledge of active water flow glazing technology. The last chapter presents research dissemination activities. Additionally, a technological improvement to existing active facades has been developed, which has resulted in a patent application, currently in handling process.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Los procesos de diseño y construcción en Arquitectura han mostrado un desarrollo de optimización históricamente muy deficiente cuando se compara con las restantes actividades típicamente industriales. La aspiración constante a una industrialización efectiva, tanto en aras de alcanzar mayores cotas de calidad así como de ahorro de recursos, recibe hoy una oportunidad inmejorable desde el ámbito informático: el Building Information Modelling o BIM. Lo que en un inicio puede parecer meramente un determinado tipo de programa informático, en realidad supone un concepto de “proceso” que subvierte muchas rutinas hoy habituales en el desarrollo de proyectos y construcciones arquitectónicas. La inclusión y desarrollo de datos ligados al proyecto, desde su inicio hasta el fin de su ciclo de vida, conlleva la oportunidad de crear una realidad virtual dinámica y actualizable, que por añadidura posibilita su ensayo y optimización en todos sus aspectos: antes y durante su ejecución, así como vida útil. A ello se suma la oportunidad de transmitir eficientemente los datos completos de proyecto, sin apenas pérdidas o reelaboración, a la cadena de fabricación, lo que facilita el paso a una industrialización verdaderamente significativa en edificación. Ante una llamada mundial a la optimización de recursos y el interés indudable de aumentar beneficios económicos por medio de la reducción del factor de incertidumbre de los procesos, BIM supone un opción de mejora indudable, y así ha sido reconocido a través de la inminente implantación obligatoria por parte de los gobiernos (p. ej. Gran Bretaña en 2016 y España en 2018). La modificación de procesos y roles profesionales que conlleva la incorporación de BIM resulta muy significativa y marcará el ejercicio profesional de los futuros graduados en las disciplinas de Arquitectura, Ingeniería y Construcción (AEC por sus siglas en inglés). La universidad debe responder ágilmente a estas nuevas necesidades incorporando esta metodología en la enseñanza reglada y aportando una visión sinérgica que permita extraer los beneficios formativos subyacentes en el propio marco BIM. En este sentido BIM, al aglutinar el conjunto de datos sobre un único modelo virtual, ofrece un potencial singularmente interesante. La realidad tridimensional del modelo, desarrollada y actualizada continuamente, ofrece al estudiante una gestión radicalmente distinta de la representación gráfica, en la que las vistas parciales de secciones y plantas, tan complejas de asimilar en los inicios de la formación universitaria, resultan en una mera petición a posteriori, para ser extraída según necesidad del modelo virtual. El diseño se realiza siempre sobre el propio modelo único, independientemente de la vista de trabajo elegida en cada momento, permaneciendo los datos y sus relaciones constructivas siempre actualizados y plenamente coherentes. Esta descripción condensada de características de BIM preconfiguran gran parte de las beneficios formativos que ofrecen los procesos BIM, en especial, en referencia al desarrollo del diseño integrado y la gestión de la información (incluyendo TIC). Destacan a su vez las facilidades en comprensión visual de elementos arquitectónicos, sistemas técnicos, sus relaciones intrínsecas así como procesos constructivos. A ello se une el desarrollo experimental que la plataforma BIM ofrece a través de sus software colaborativos: la simulación del comportamiento estructural, energético, económico, entre otros muchos, del modelo virtual en base a los datos inherentes del proyecto. En la presente tesis se describe un estudio de conjunto para explicitar tanto las cualidades como posibles reservas en el uso de procesos BIM, en el marco de una disciplina concreta: la docencia de la Arquitectura. Para ello se ha realizado una revisión bibliográfica general sobre BIM y específica sobre docencia en Arquitectura, así como analizado las experiencias de distintos grupos de interés en el marco concreto de la enseñanza de la en Arquitectura en la Universidad Europea de Madrid. El análisis de beneficios o reservas respecto al uso de BIM se ha enfocado a través de la encuesta a estudiantes y la entrevista a profesionales AEC relacionados o no con BIM. Las conclusiones del estudio permiten sintetizar una implantación de metodología BIM que para mayor claridad y facilidad de comunicación y manejo, se ha volcado en un Marco de Implantación eminentemente gráfico. En él se orienta sobre las acciones docentes para el desarrollo de competencias concretas, valiéndose de la flexibilidad conceptual de los Planes de Estudio en el contexto del Espacio Europeo de Educación Superior (Declaración de Bolonia) para incorporar con naturalidad la nueva herramienta docente al servicio de los objetivos formativo legalmente establecidos. El enfoque global del Marco de Implementación propuesto facilita la planificación de acciones formativas con perspectiva de conjunto: combinar los formatos puntuales o vehiculares BIM, establecer sinergias transversales y armonizar recursos, de modo que la metodología pueda beneficiar tanto la asimilación de conocimientos y habilidades establecidas para el título, como el propio flujo de aprendizaje o learn flow BIM. Del mismo modo reserva, incluso visualmente, aquellas áreas de conocimiento en las que, al menos en la planificación actual, la inclusión de procesos BIM no se considera ventajosa respecto a otras metodologías, o incluso inadecuadas para los objetivos docentes establecidos. Y es esta última categorización la que caracteriza el conjunto de conclusiones de esta investigación, centrada en: 1. la incuestionable necesidad de formar en conceptos y procesos BIM desde etapas muy iniciales de la formación universitaria en Arquitectura, 2. los beneficios formativos adicionales que aporta BIM en el desarrollo de competencias muy diversas contempladas en el currículum académico y 3. la especificidad del rol profesional del arquitecto que exigirá una implantación cuidadosa y ponderada de BIM que respete las metodologías de desarrollo creativo tradicionalmente efectivas, y aporte valor en una reorientación simbiótica con el diseño paramétrico y fabricación digital que permita un diseño finalmente generativo. ABSTRACT The traditional architectural design and construction procedures have proven to be deficient where process optimization is concerned, particularly when compared to other common industrial activities. The ever‐growing strife to achieve effective industrialization, both in favor of reaching greater quality levels as well as sustainable management of resources, has a better chance today than ever through a mean out of the realm of information technology, the Building Information Modelling o BIM. What may initially seem to be merely another computer program, in reality turns out to be a “process” concept that subverts many of today’s routines in architectural design and construction. Including and working with project data from the very beginning to the end of its full life cycle allows for creating a dynamic and updatable virtual reality, enabling data testing and optimizing throughout: before and during execution, all the way to the end of its lifespan. In addition, there is an opportunity to transmit complete project data efficiently, with hardly any loss or redeveloping of the manufacture chain required, which facilitates attaining a truly significant industrialization within the construction industry. In the presence of a world‐wide call for optimizing resources, along with an undeniable interest in increasing economic benefits through reducing uncertainty factors in its processes, BIM undoubtedly offers a chance for improvement as acknowledged by its imminent and mandatory implementation on the part of governments (for example United Kingdom in 2016 and Spain in 2018). The changes involved in professional roles and procedures upon incorporating BIM are highly significant and will set the course for future graduates of Architecture, Engineering and Construction disciplines (AEC) within their professions. Higher Education must respond to such needs with swiftness by incorporating this methodology into their educational standards and providing a synergetic vision that focuses on the underlying educational benefits inherent in the BIM framework. In this respect, BIM, in gathering data set under one single virtual model, offers a uniquely interesting potential. The three‐dimensional reality of the model, under continuous development and updating, provides students with a radically different graphic environment, in which partial views of elevation, section or plan that tend characteristically to be difficult to assimilate at the beginning of their studies, become mere post hoc requests to be ordered when needed directly out the virtual model. The design is always carried out on the sole model itself, independently of the working view chosen at any particular moment, with all data and data relations within construction permanently updated and fully coherent. This condensed description of the features of BIM begin to shape an important part of the educational benefits posed by BIM processes, particularly in reference to integrated design development and information management (including ITC). At the same time, it highlights the ease with which visual understanding is achieved regarding architectural elements, technology systems, their intrinsic relationships, and construction processes. In addition to this, there is the experimental development the BIM platform grants through its collaborative software: simulation of structural, energetic, and economic behavior, among others, of the virtual model according to the data inherent to the project. This doctoral dissertation presents a broad study including a wide array of research methods and issues in order to specify both the virtues and possible reservations in the use of BIM processes within the framework of a specific discipline: teaching Architecture. To do so, a literature review on BIM has been carried out, specifically concerning teaching in the discipline of Architecture, as well as an analysis of the experience of different groups of interest delimited to Universidad Europea de Madrid. The analysis of the benefits and/or limitations of using BIM has been approached through student surveys and interviews with professionals from the AEC sector, associated or not, with BIM. Various diverse educational experiences are described and academic management for experimental implementation has been analyzed. The conclusions of this study offer a synthesis for a Framework of Implementation of BIM methodology, which in order to reach greater clarity, communication ease and user‐friendliness, have been posed in an eminently graphic manner. The proposed framework proffers guidance on teaching methods conducive to the development of specific skills, taking advantage of the conceptual flexibility of the European Higher Education Area guidelines based on competencies, which naturally facilitate for the incorporation of this new teaching tool to achieve the educational objectives established by law. The global approach of the Implementation Framework put forth in this study facilitates the planning of educational actions within a common perspective: combining exceptional or vehicular BIM formats, establishing cross‐disciplinary synergies, and sharing resources, so as to purport a methodology that contributes to the assimilation of knowledge and pre‐defined competencies within the degree program, and to the flow of learning itself. At the same time, it reserves, even visually, those areas of knowledge in which the use of BIM processes is not considered necessarily an advantage over other methodologies, or even inadequate for the learning outcomes established, at least where current planning is concerned. It is this last category which characterizes the research conclusions as a whole, centering on: 1. The unquestionable need for teaching BIM concepts and processes in Architecture very early on, in the initial stages of higher education; 2. The additional educational benefits that BIM offers in a varied array of competency development within the academic curriculum; and 3. The specific nature of the professional role of the Architect, which demands a careful and balanced implementation of BIM that respects the traditional teaching methodologies that have proven effective and creative, and adds value by a symbiotic reorientation merged with parametric design and digital manufacturing so to enable for a finally generative design.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Offshore wind farms are beginning to form part of coastal and marine landscapes located in dynamic surroundings. An integral management model must therefore be applied to achieve not only technical and economic viability of the project but also respect for the environment. Amongst other aspects, the latter calls for an analysis of the possible impact these facilities may have on littoral processes and this requires the differences between littoral processes prior and subsequent to the facility’s construction to be known. The maritime climate, the composition of the coast, lay-out distribution and characteristics of the facility’s components need to be known, particularly foundations as they are the main obstacles waves and currents meet. This article first addresses different aspects related to an offshore wind farm’s influence on the analysis of how it affects littoral dynamics and, because of their importance in this study, pays special attention to foundations. Coastal erosion due to this type of facility is then examined. The main conclusion of this article is that, whilst there are certain opinions claiming the coast is not affected by the presence of this kind of facility since the distance from location to coast and between wind turbine generators themselves is long, the impact must be analysed in each specific case, at least until experience proves otherwise and criteria are adopted in this respect.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The developments in materials over the last decade have been considerable within the automotive industry, being one of the leaders in innovative product applications. Sustainable product development of an automotive structure requires a balanced approach towards technological, economical and ecological aspects. The introduction of new materials and processes is dependent on satisfying different factors. Competitive and legislative pressures, creating the need for change, affect these factors considerably. The process, direction and speed of change are often reactive. Current paper shows the application of aluminium alloys, for the use in the bottom structure of a car to face the problem for the weight of the entire bottom structure under static load conditions, including stiffness, strength and buckling constraints. In addition to minimized mass and materials' price, the assessment of an environmental impact of materials-candidates during the entire life cycle of the structure is considered.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Digital atlases of animal development provide a quantitative description of morphogenesis, opening the path toward processes modeling. Prototypic atlases offer a data integration framework where to gather information from cohorts of individuals with phenotypic variability. Relevant information for further theoretical reconstruction includes measurements in time and space for cell behaviors and gene expression. The latter as well as data integration in a prototypic model, rely on image processing strategies. Developing the tools to integrate and analyze biological multidimensional data are highly relevant for assessing chemical toxicity or performing drugs preclinical testing. This article surveys some of the most prominent efforts to assemble these prototypes, categorizes them according to salient criteria and discusses the key questions in the field and the future challenges toward the reconstruction of multiscale dynamics in model organisms.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The relevance of renewable energy has grown significantly in our global society. Important efforts are oriented to sustain it. Renewable energy depends on different technical, financial environmental and social complex processes. From the point of view of industrial construction sector this research evaluates some of the current trends in energy generation and use in Venezuela as well as environmental consequences and risks that derive from these. Additionally, authors highlight the importance of infrastructure as key issue to sustain renewable energy generation and use. The study present references of some energy renewable projects in process in Venezuela and the main problems that constrain their performance. Conclusions evidence the complex nature of industrial construction and suggest the need to improve industrial construction competitivenes as a strategy oriented to enhance renewable energy offer in the country. Additionally it is proposed to all stakeholders to work toghether to correct the conditions that currently limit industrial construction development. This is part of ongoing research.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The recognition of the relevance of energy, especially of the renewable energies generated by the sun, water, wind, tides, modern biomass or thermal is growing significantly in the global society based on the possibility it has to improve societies′ quality of life, to support poverty reduction and sustainable development. Renewable energy, and mainly the energy generated by large hydropower generation projects that supply most of the renewable energy consumed by developing countries, requires many technical, legal, financial and social complex processes sustained by innovations and valuable knowledge. Besides these efforts, renewable energy requires a solid infrastructure to generate and distribute the energy resources needed to solve the basic needs of society. This demands a proper construction performance to deliver the energy projects planned according to specifications and respecting environmental and social concerns, which implies the observance of sustainable construction guidelines. But construction projects are complex and demanding and frequently face time and cost overruns that may cause negative impacts on the initial planning and thus on society. The renewable energy issue and the large renewable energy power generation and distribution projects are particularly significant for developing countries and for Latin America in particular, as this region concentrates an important hydropower potential and installed capacity. Using as references the performance of Venezuelan large hydropower generation projects and the Guri dam construction, this research evaluates the tight relationship existing between sustainable construction and knowledge management and their impact to achieve sustainability goals. The knowledge management processes are proposed as a basic strategy to allow learning from successes and failures obtained in previous projects and transform the enhancement opportunites into actions to improve the performance of the renewable energy power generation and distribution projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

El presente trabajo se basa en la filosofía de la Construcción sin Pérdidas (“Lean Construction”), analizando la situación de esta filosofía en el sector de la edificación en el contexto internacional y español, respondiendo las siguientes preguntas: 1. ¿Cómo surge el “Lean Construction”? 2. ¿Cuáles son sus actividades, funciones y cometidos? 3. ¿Existe regulación del ¨Lean Construction” en otros países? 4. ¿Existe demanda del ¨Lean Construction” en España? 5. ¿Existe regulación del ¨Lean Construction” en España? 6. ¿Cómo debería ser la regulación ¨Lean Construction” en España? 7. ¿Cuál es la relación del “Lean Construction” con el “Project & Construction Management”? 8. ¿Cómo debería ser la regulación de “Lean Construction” en España considerando su relación con el “Project & Construction Management”? Las preguntas indicadas las hemos respondido detalladamente en el presente trabajo, a continuación se resume las respuestas a dichas preguntas: 1. El “Lean Construction” surge en agosto de 1992, cuando el investigador finlandés Lauri Koskela publicó en la Universidad de Stanford el reporte TECHNICAL REPORT N° 72 titulado “Application of the New Production Philosophy to Construction”. Un año más tarde el Dr. Koskela invitó a un grupo de especialistas en construcción al primer workshop de esta materia en Finlandia, dando origen al International Group for Lean Construction (IGLC) lo que ha permitido extender la filosofía a EEUU, Europa, América, Asia, Oceanía y África. “Lean Construction” es un sistema basado en el enfoque “Lean Production” desarrollado en Japón por Toyota Motors a partir de los años cincuenta, sistema que permitió a sus fábricas producir unidades con mayor eficiencia que las industrias americanas, con menores recursos, en menor tiempo, y con un número menor de errores de fabricación. 2. El sistema “Lean Construction” busca maximizar el valor y disminuir las pérdidas de los proyectos generando una coordinación eficiente entre los involucrados, manejando un proyecto como un sistema de producción, estrechando la colaboración entre los participantes de los proyectos, capacitándoles y empoderándoles, fomentando una cultura de cambio. Su propósito es desarrollar un proceso de construcción en el que no hayan accidentes, ni daños a equipos, instalaciones, entorno y comunidad, que se realice en conformidad con los requerimientos contractuales, sin defectos, en el plazo requerido, respetando los costes presupuestados y con un claro enfoque en la eliminación o reducción de las pérdidas, es decir, las actividades que no generen beneficios. El “Last Planner System”, o “Sistema del Último Planificador”, es un sistema del “Lean Construction” que por su propia naturaleza protege a la planificación y, por ende, ayuda a maximizar el valor y minimizar las pérdidas, optimizando de manera sustancial los sistemas de seguridad y salud. El “Lean Construction” se inició como un concepto enfocado a la ejecución de las obras, posteriormente se aplicó la filosofía a todas las etapas del proyecto. Actualmente considera el desarrollo total de un proyecto, desde que nace la idea hasta la culminación de la obra y puesta en marcha, considerando el ciclo de vida completo del proyecto. Es una filosofía de gestión, metodologías de trabajo y una cultura empresarial orientada a la eficiencia de los procesos y flujos. La filosofía “Lean Construction” se está expandiendo en todo el mundo, además está creciendo en su alcance, influyendo en la gestión contractual de los proyectos. Su primera evolución consistió en la creación del sistema “Lean Project Delivery System”, que es el concepto global de desarrollo de proyectos. Posteriormente, se proponen el “Target Value Design”, que consiste en diseñar de forma colaborativa para alcanzar los costes y el valor requerido, y el “Integrated Project Delivery”, en relación con sistemas de contratos relacionales (colaborativos) integrados, distintos a los contratos convencionales. 3. Se verificó que no existe regulación específica del ¨Lean Construction” en otros países, en otras palabras, no existe el agente con el nombre específico de “Especialista en Lean Construction” o similar, en consecuencia, es un agente adicional en el proyecto de la edificación, cuyas funciones y cometidos se pueden solapar con los del “Project Manager”, “Construction Manager”, “Contract Manager”, “Safety Manager”, entre otros. Sin embargo, se comprobó la existencia de formatos privados de contratos colaborativos de Integrated Project Delivery, los cuales podrían ser tomados como unas primeras referencias para futuras regulaciones. 4. Se verificó que sí existe demanda del ¨Lean Construction” en el desarrollo del presente trabajo, aunque aún su uso es incipiente, cada día existe más interesados en el tema. 5. No existe regulación del ¨Lean Construction” en España. 6. Uno de los objetivos fundamentales de esta tesis es el de regular esta figura cuando actúe en un proyecto, definir y realizar una estructura de Agente de la Edificación, según la Ley de Ordenación de la Edificación (LOE), y de esta manera poder introducirla dentro de la Legislación Española, protegiéndola de eventuales responsabilidades civiles. En España existe jurisprudencia (sentencias de los tribunales de justicia españoles) con jurisdicción civil basada en la LOE para absolver o condenar a agentes de la edificación que son definidos en los tribunales como “gestores constructivos” o similares. Por este motivo, en un futuro los tribunales podrían dictaminar responsabilidades solidarias entre el especialista “Lean Construction” y otros agentes del proyecto, dependiendo de sus actuaciones, y según se implemente el “Lean Project Delivery System”, el “Target Value Design” y el “Integrated Project Delivery”. Por otro lado, es posible que el nivel de actuación del especialista “Lean Construcción” pueda abarcar la gestión del diseño, la gestión de la ejecución material (construcción), la gestión de contratos, o la gestión integral de todo el proyecto de edificación, esto último, en concordancia con la última Norma ISO 21500:2012 o UNE-ISO 21500:2013 Directrices para la dirección y gestión de proyectos. En consecuencia, se debería incorporar adecuadamente a uno o más agentes de la edificación en la LOE de acuerdo a sus funciones y responsabilidades según los niveles de actuación del “Especialista en Lean Construction”. Se propone la creación de los siguientes agentes: Gestor del Diseño, Gestor Constructivo y Gestor de Contratos, cuyas definiciones están desarrolladas en este trabajo. Estas figuras son definidas de manera general, puesto que cualquier “Project Manager” o “DIPE”, gestor BIM (Building Information Modeling), o similar, puede actuar como uno o varios de ellos. También se propone la creación del agente “Gestor de la Construcción sin Pérdidas”, como aquel agente que asume las actuaciones del “gestor de diseño”, “gestor constructivo” y “gestor de contratos” con un enfoque en los principios del Lean Production. 7. En la tesis se demuestra, por medio del uso de la ISO 21500, que ambos sistemas son complementarios, de manera que los proyectos pueden tener ambos enfoques y ser compatibilizados. Un proyecto que use el “Project & Construction Management” puede perfectamente apoyarse en las herramientas y técnicas del “Lean Construction” para asegurar la eliminación o reducción de las pérdidas, es decir, las actividades que no generen valor, diseñando el sistema de producción, el sistema de diseño o el sistema de contratos. 8. Se debería incorporar adecuadamente al agente de la edificación “Especialista en Lean Construction” o similar y al agente ¨Especialista en Project & Construction Management” o DIPE en la Ley de Ordenación de la Edificación (LOE) de acuerdo a sus funciones y responsabilidades, puesto que la jurisprudencia se ha basado para absolver o condenar en la referida Ley. Uno de los objetivos fundamentales de esta tesis es el de regular la figura del “Especialista en Lean Construction” cuando actúa simultáneamente con el DIPE, y realizar una estructura de Agente de la Edificación según la LOE, y de esta manera protegerlo de eventuales responsabilidades solidarias. Esta investigación comprueba que la propuesta de definición del agente de edificación DIPE, según la LOE, presentada en la tesis doctoral del Doctor Manuel Soler Severino es compatible con las nuevas definiciones propuestas. El agente DIPE puede asumir los roles de los diferentes gestores propuestos en esta tesis si es que se especializa en dichas materias, o, si lo estima pertinente, recomendar sus contrataciones. ABSTRACT This work is based on the Lean Construction philosophy; an analysis is made herein with regard to the situation of this philosophy in the building sector within the international and Spanish context, replying to the following questions: 1. How did the concept of Lean Construction emerge? 2. Which are the activities, functions and objectives of Lean Construction? 3. Are there regulations on Lean Construction in other countries? 4. Is there a demand for Lean Construction in Spain? 5. Are there regulations on Lean Construction in Spain? 6. How should regulations on Lean Construction be developed in Spain? 7. What is the relationship between Lean Construction and the Project & Construction Management? 8. How should regulations on Lean Construction be developed in Spain considering its relationship with the Project & Construction Management? We have answered these questions in detail here and the replies are summarized as follows: 1. The concept of Lean Construction emerged in august of 1992, when Finnish researcher Lauri Koskela published in Stanford University TECHNICAL REPORT N° 72 entitled “Application of the New Production Philosophy to Construction”. A year later, Professor Koskela invited a group of construction specialists to Finland to the first workshop conducted on this matter; thus, the International Group for Lean Construction (IGLC) was established, which has contributed to extending the philosophy to the United States, Europe, the Americas, Asia, Oceania, and Africa. Lean Construction is a system based on the Lean Production approach, which was developed in Japan by Toyota Motors in the 1950s. Thanks to this system, the Toyota plants were able to produce more units, with greater efficiency than the American industry, less resources, in less time, and with fewer manufacturing errors. 2. The Lean Construction system aims at maximizing the value of projects while reducing waste, producing an effective coordination among those involved; it manages projects as a production system, enhancing collaboration between the parties that participate in the projects while building their capacities, empowering them, and promoting a culture of change. Its purpose is to develop a construction process free of accidents, without damages to the equipment, facilities, environment and community, flawless, in accordance with contractual requirements, within the terms established, respecting budgeted costs, and with a clear approach to eliminating or reducing waste, that is, activities that do not generate benefits. The Last Planner System is a Lean Construction system, which by its own nature protects planning and, therefore, helps to maximize the value and minimize waste, optimizing substantially the safety and health systems. Lean Construction started as a concept focused on the execution of works, and subsequently the philosophy was applied to all the stages of the project. At present it considers the project’s total development, since the time ideas are born until the completion and start-up of the work, taking into account the entire life cycle of the project. It is a philosophy of management, work methodologies, and entrepreneurial culture aimed at the effectiveness of processes and flows. The Lean Construction philosophy is extending all over the world and its scope is becoming broader, having greater influence on the contractual management of projects. It evolved initially through the creation of the Lean Project Delivery System, a global project development concept. Later on, the Target Value Design was developed, based on collaborative design to achieve the costs and value required, as well as the Integrated Project Delivery, in connection with integrated relational (collaborative) contract systems, as opposed to conventional contracts. 3. It was verified that no specific regulations on Lean Construction exist in other countries, in other words, there are no agents with the specific name of “Lean Construction Specialist” or other similar names; therefore, it is an additional agent in building projects, which functions and objectives can overlap those of the Project Manager, Construction Manager, Contract Manager, or Safety Manager, among others. However, the existence of private collaborative contracts of Integrated Project Delivery was confirmed, which could be considered as first references for future regulations. 4. There is a demand for Lean Construction in the development of this work; even though it is still emerging, there is a growing interest in this topic. 5. There are no regulations on Lean Construction in Spain. 6. One of the main objectives of this thesis is to regulate this role when acting in a project, and to define and develop a Building Agent structure, according to the Building Standards Law (LOE by its acronym in Spanish), in order to be able to incorporate it into the Spanish law, protecting it from civil liabilities. In Spain there is jurisprudence in civil jurisdiction based on the LOE to acquit or convict building agents, which are defined in the courts as “construction managers” or similar. For this reason, courts could establish in the future joint and several liabilities between the Lean Construction Specialist and other agents of the project, depending on their actions and based on the implementation of the Lean Project Delivery System, the Target Value Design, and the Integrated Project Delivery. On the other hand, it is possible that the level of action of the Lean Construction Specialist may comprise design management, construction management and contract management, or the integral management of the entire building project in accordance with the last ISO 21500:2012 or UNE-ISO 21500:2013, guidelines for the management of projects. Accordingly, one or more building agents should be appropriately incorporated into the LOE according to their functions and responsibilities and based on the levels of action of the Lean Construction Specialist. The creation of the following agents is proposed: Design Manager, Construction Manager, and Contract Manager, which definitions are developed in this work. These agents are defined in general, since any Project Manager or DIPE, Building Information Modeling (BIM) Manager or similar, may act as one or as many of them. The creation of the Lean Construction Manager is also proposed, as the agent that takes on the role of the Design Manager, Construction Manager and Contract Manager with a focus on the Lean Production principles. 7. In the thesis it is demonstrated that through the implementation of the ISO 21500, both systems are supplementary, so projects may have both approaches and be compatible. A project that applies the Project & Construction Management may perfectly have the support of the tools, techniques and practices of Lean Construction to ensure the elimination or reduction of losses, that is, those activities that do not generate value, thus designing the production system, the design system, or the contract system. 8. The Lean Construction Specialist or similar and the Specialist in Project & Construction Management should be incorporated appropriately into the LOE according to their functions and responsibilities, since jurisprudence has been based on such Law to acquit or convict. One of the main objectives of this thesis is the regulate the role of the Lean Construction Specialist when acting simultaneously with the DIPE, and to develop a structure of the building agent, according to the LOE, and in this way protect such agent from joint and several liabilities. This research proves that the proposal to define the DIPE building agent, according to the LOE, and presented in the doctoral dissertation of Manuel Soler Severino, Ph.D. is compatible with the new definitions proposed. The DIPE agent may assume the roles of the different managers proposed in this thesis if he specializes in those topics or, if deemed pertinent, recommends that they be engaged.