83 resultados para road tunnel
Resumo:
Road infrastructure has a remarkable economic and social impact on society. This is why road financing has always drawn the attention of policymakers, especially when resources available for government spending become scarce. Nations exhibit differing approaches to dealing with road transportation financing. In the United States, the current system of road funding has been called into question because some regard it as insufficient to meet the amounts now required for road expenditures. By contrast, in most European countries, road charges are very high, but these revenues are not allocated for the funding of roads. This paper analyzes the balance between charging for the use of and expenditure on the road sector in the United States and compares the American policy with those of several European countries (Germany, United Kingdom, France, Spain, and Switzerland). To that end, a methodology is defined to calculate the annual amount of fee charges levied on light and heavy vehicles in the selected countries in order to compare those charges with annual road expenditures. The results show that road charges in America are noticeably lower than those paid in Europe. Additionally, the research concludes that in Europe, road-generated revenues exceed road expenditures in all the countries studied, so road charges actually subsidize other policies. By contrast, in the United States, the public sector subsidizes the road system in order to maintain the current level of expenditure.
Resumo:
Considerable evidence from different countries has revealed important shortcomings in most road public-private partnership (PPP) models. In this paper a new PPP model is presented that overcomes some of the problems found in PPP road contracts. The new model is based on separating user tolls from the fees paid to PPP contractors and setting up new institutional arrangements to oversee PPPs.
Resumo:
Between 2003 and 2007 an urban network of road tunnels with a total constructed tubes length of 45 km was built in the city of Madrid. This amazing engineering work, known as “Calle30 Project” counted with different kinds of tunnel typologies and ventilation systems. Due to the length of the tunnels and the impact of the work itself, the tunnels were endowed with a great variety of installations to provide the maximum levels of safety both for users and the infrastructure including,in some parts of the tunnel, fixed fire fighting system based on water mist. Within this framework a large-scale campaign of fire tests were planned to study different aspects related to fire safety in the tunnels including the phenomena of the interaction between ventilation and extinction system. In addition, this large scale fire tests allowed fire brigades of the city of Madrid an opportunity to define operational procedures for specific fire fighting in tunnels and evaluate the possibilities of fixed fire fighting systems. The tests were carried out in the Center of Experimentation "San Pedro of Anes" which counts with a 600 m tunnel with a removable false ceiling for reproducing different ceiling heights and ventilation conditions (transverse and longitudinal ones). Interesting conclusions on the interaction of ventilation and water mist systems were obtained but also on other aspects including performance of water mist system in terms of reduction of gas temperatures or visibility conditions. This paper presents a description of the test’s campaign carried out and some previous results obtained.
Resumo:
Road traffic is the greatest contributor to the carbon footprint of the transport sector and reducing it has become one of the main targets of sustainable transport policies. An analysis of the main factors influencing greenhouse gas (GHG) emissions is essential for designing new energy- and environmentally efficient strategies for the road transport. This paper addresses this need by (i) identifying factors which influence the carbon footprint, including traffic activity, fuel economy and socioeconomic development; and (ii) proposing a methodological framework which uses Modified Laspeyres Index decomposition to analyze the effect of important drivers on the changes in emissions of road transport in Spain during the period from 1990 to 2010. The results demonstrate that the country׳s economic growth has been closely linked to the rise in GHG emissions. The innovative contribution of this paper is the special analysis of the changes in mobility patterns and GHG emissions during the economic crisis, when, for the first time, Spanish road traffic emissions decreased. The reduction of road transport and improved energy efficiency has been powerful contributors to this decrease, demonstrating the effectiveness of energy-saving measures. On the basis of this analysis, several tailored policy recommendations have been suggested for future implementation.
Resumo:
Este proyecto trata de diseñar el sistema eléctrico y de control de potencia de una maqueta del túnel aerodinámico ACLA-16 de la Universidad Politécnica de Madrid (UPM). Dicha maqueta se utiliza para estudiar el efecto de la capa límite atmosférica, debido a su importancia en el impacto sobre estructuras civiles. Primero se desarrolla una parte teórica sobre qué son los túneles aerodinámicos, las aplicaciones que tienen y conceptos básicos acerca de la capa límite atmosférica. Luego se analiza el diseño geométrico de la maqueta del túnel y se detallan los elementos que debe tener el sistema eléctrico. Además, se realiza una simulación por ordenador con un programa de CFD (Fluent) para comparar los resultados experimentales reales con los resultados numéricos de la simulación para comprobar si se pueden extraer resultados aceptables por ordenador y así ahorrar costes y tiempo en el estudio de ensayos.
Resumo:
Wind-flow pattern over embankments involves an overexposure of the rolling stock travelling on them to wind loads. Windbreaks are a common solution for changing the flow characteristic in order to decrease unwanted effects induced by the presence of crosswind. The shelter effectiveness of a set of windbreaks placed over a railway twin-track embankment is experimentally analysed. A set of two-dimensional wind tunnel tests are undertaken and results corresponding to pressure tap measurements over a section of a typical high-speed train are herein presented.The results indicate that even small-height windbreaks provide sheltering effects to the vehicles. Also, eaves located at the windbreak tips seem to improve their sheltering effect.
Resumo:
El principal objetivo de este trabajo es aportar conocimiento para contestar la pregunta: ¿hasta que punto los ensayos en túnel aerodinámico pueden contribuir a determinar las características que afectan la respuesta dinámica de los aerogeneradores operando en terreno complejo?. Esta pregunta no es nueva, de hecho, el debate en la comunidad científica comenzó en el primer tercio del siglo pasado y aún está intensamente vivo. El método generalmente aceptado para enfrentar el mencionado problema consiste en analizar un caso de estudio determinado en el cual se aplican tanto ensayos a escala real como análisis computacionales y ensayos en túnel aerodinámico. Esto no es ni fácil ni barato. Esta es la razón por la cual desde el experimento de Askervein en 1988, los modelizadores del flujo atmosférico tuvieron que esperar hasta 2007 a que el experimento de Bolund fuese puesto en marcha con un despliegue de medios técnicos equivalentes (teniendo en cuenta la evolución de las tecnologías de sensores y computación). El problema contempla tantos aspectos que ambas experiencias fueron restringidas a condiciones de atmósfera neutra con efectos de Coriolis despreciables con objeto de reducir la complejidad. Este es el contexto en el que se ha desarrollado la presente tesis doctoral. La topología del flujo sobre la isla de Bolund ha sido estudiada mediante la reproducción del experimento de Bolund en los túneles aerodinámicos A9 y ACLA16 del IDR. Dos modelos de la isla de Bolund fueron fabricados a dos escalas, 1:230 y 1:115. El flujo de entrada en el túnel aerodinámico simulando la capa límite sin perturbar correspondía a régimen de transición (transitionally rough regime) y fue usado como situación de referencia. El modelo a escala 1:230 fue ensayado en el túnel A9 para determinar la presión sobre su superficie. La distribución del coeficiente de presión sobre la isla proporcionó una visualización y estimación de una región de desprendimiento sobre el pequeño acantilado situado al frente de la misma. Las medidas de presión instantánea con suficiente grado de resolución temporal pusieron de manifiesto la no estacionariedad en la región de desprendimiento. El modelo a escala 1:115 fue ensayado utilizando hilo caliente de tres componentes y un sistema de velocimetría por imágenes de partículas de dos componentes. El flujo fue caracterizado por el ratio de aceleración, el incremento normalizado de energía cinética turbulenta y los ángulos de inclinación y desviación horizontal. Los resultados a lo largo de la dirección 270°y alturas de 2 m y 5 m presentaron una gran similitud con los resultados a escala real del experimento de Bolund. Los perfiles verticales en las localizaciones de las torres meteorológicas mostraron un acuerdo significativo con los resultados a escala real. El análisis de los esfuerzos de Reynolds y el análisis espectral en las localizaciones de los mástiles meteorológicos presentaron niveles de acuerdo variados en ciertas posiciones, mientras que en otras presentaron claras diferencias. El mapeo horizontal del flujo, para una dirección de viento de 270°, permitió caracterizar el comportamiento de la burbuja intermitente de recirculación sobre el pequeño acantilado existente al frente de la isla así como de la región de relajación y de la capa de cortadura en la región corriente abajo de Bolund. Se realizaron medidas de velocidad con alta resolución espacial en planos perpendiculares a la dirección del flujo sin perturbar. Estas medidas permitieron detectar y caracterizar una estructura de flujo similar a un torbellino longitudinal con regiones con altos gradientes de velocidad y alta intensidad de turbulencia. Esta estructura de flujo es, sin duda, un reto para los modelos computacionales y puede considerarse un factor de riesgo para la operación de los aerogeneradores. Se obtuvieron y analizaron distribuciones espaciales de los esfuerzos de Reynolds mediante 3CHW y PIV. Este tipo de parámetros no constituyen parte de los resultados habituales en los ensayos en túnel sobre topografías y son muy útiles para los modelizadores que utilizan simulación de grades torbellinos (LES). Se proporciona una interpretación de los resultados obtenidos en el túnel aerodinámico en términos de utilidad para los diseñadores de parques eólicos. La evolución y variación de los parámetros del flujo a lo largo de líneas, planos y superficies han permitido identificar como estas propiedades del flujo podrían afectar la localización de los aerogeneradores y a la clasificación de emplazamientos. Los resultados presentados sugieren, bajo ciertas condiciones, la robustez de los ensayos en túnel para estudiar la topología sobre terreno complejo y su comparabilidad con otras técnicas de simulación, especialmente considerando el nivel de acuerdo del conjunto de resultados presentados con los resultados a escala real. De forma adicional, algunos de los parámetros del flujo obtenidos de las medidas en túnel son difícilmente determinables en ensayos a escala real o por medios computacionales, considerado el estado del arte. Este trabajo fue realizado como parte de las actividades subvencionadas por la Comisión Europea como dentro del proyecto FP7-PEOPLE-ITN-2008WAUDIT (Wind Resource Assessment Audit and Standardization) dentro de la FP7 Marie-Curie Initial Training Network y por el Ministerio Español de Economía y Competitividad dentro del proyecto ENE2012-36473, TURCO (Determinación en túnel aerodinámico de la distribución espacial de parámetros estadísticos de la turbulencia atmosférica sobre topografías complejas) del Plan Nacional de Investigación (Subprograma de investigación fundamental no orientada 2012). El informe se ha organizado en siete capítulos y un conjunto de anexos. En el primer capítulo se introduce el problema. En el capítulo dos se describen los medios experimentales utilizados. Seguidamente, en el capítulo tres, se analizan en detalle las condiciones de referencia del principal túnel aerodinámico utilizado en esta investigación. En el capítulo tres se presentan resultados de ensayos de presión superficial sobre un modelo de la isla. Los principales resultados del experimento de Bolund se reproducen en el capítulo cinco. En el capítulo seis se identifican diferentes estructuras del flujo sobre la isla y, finalmente, en el capitulo siete, se recogen las conclusiones y una propuesta de lineas de trabajo futuras. ABSTRACT The main objective of this work is to contribute to answer the question: to which extend can the wind tunnel testing contribute to determine the flow characteristics that affect the dynamic response of wind turbines operating in highly complex terrains?. This question is not new, indeed, the debate in the scientific community was opened in the first third of the past century and it is still intensely alive. The accepted approach to face this problem consists in analysing a given case study where full-scale tests, computational modelling and wind tunnel testing are applied to the same topography. This is neither easy nor cheap. This is is the reason why since the Askervein experience in 1988, the atmospheric flow modellers community had to wait till 2007 when the Bolund experiment was setup with a deployment of technical means equivalent (considering the evolution of the sensor and computing techniques). The problem is so manifold that both experiences were restricted to neutral conditions without Coriolis effects in order to reduce the complexity. This is the framework in which this PhD has been carried out. The flow topology over the Bolund Island has been studied by replicating the Bolund experiment in the IDR A9 and ACLA16 wind tunnels. Two mock-ups of the Bolund island were manufactured at two scales of 1:230 and 1:115. The in-flow in the empty wind tunnel simulating the incoming atmospheric boundary layer was in the transitionally rough regime and used as a reference case. The 1:230 model was tested in the A9 wind tunnel to measure surface pressure. The mapping of the pressure coefficient across the island gave a visualisation and estimation of a detachment region on the top of the escarpment in front of the island. Time resolved instantaneous pressure measurements illustrated the non-steadiness in the detachment region. The 1:115 model was tested using 3C hot-wires(HW) and 2C Particle Image Velocimetry(PIV). Measurements at met masts M3, M6, M7 and M8 and along Line 270°were taken to replicate the result of the Bolund experiment. The flow was characterised by the speed-up ratio, normalised increment of the turbulent kinetic energy, inclination angle and turning angle. Results along line 270°at heights of 2 m and 5 m compared very well with the full-scale results of the Bolund experiment. Vertical profiles at the met masts showed a significant agreement with the full-scale results. The analysis of the Reynolds stresses and the spectral analysis at the met mast locations gave a varied level of agreement at some locations while clear mismatch at others. The horizontal mapping of the flow field, for a 270°wind direction, allowed to characterise the behaviour of the intermittent recirculation bubble on top of the front escarpment followed by a relaxation region and the presence of a shear layer in the lee side of the island. Further detailed velocity measurements were taken at cross-flow planes over the island to study the flow structures on the island. A longitudinal vortex-like structure with high mean velocity gradients and high turbulent kinetic energy was characterised on the escarpment and evolving downstream. This flow structure is a challenge to the numerical models while posing a threat to wind farm designers when siting wind turbines. Spatial distribution of Reynold stresses were presented from 3C HW and PIV measurements. These values are not common results from usual wind tunnel measurements and very useful for modellers using large eddy simulation (LES). An interpretation of the wind tunnel results in terms of usefulness to wind farm designers is given. Evolution and variation of the flow parameters along measurement lines, planes and surfaces indicated how the flow field could affect wind turbine siting. Different flow properties were presented so compare the level of agreement to full-scale results and how this affected when characterising the site wind classes. The results presented suggest, under certain conditions, the robustness of the wind tunnel testing for studying flow topology over complex terrain and its capability to compare to other modelling techniques especially from the level of agreement between the different data sets presented. Additionally, some flow parameters obtained from wind tunnel measurements would have been quite difficult to be measured at full-scale or by computational means considering the state of the art. This work was carried out as a part of the activities supported by the EC as part of the FP7- PEOPLE-ITN-2008 WAUDIT project (Wind Resource Assessment Audit and Standardization) within the FP7 Marie-Curie Initial Training Network and by the Spanish Ministerio de Economía y Competitividad, within the framework of the ENE2012-36473, TURCO project (Determination of the Spatial Distribution of Statistic Parameters of Flow Turbulence over Complex Topographies in Wind Tunnel) belonging to the Spanish National Program of Research (Subprograma de investigación fundamental no orientada 2012). The report is organised in seven chapters and a collection of annexes. In chapter one, the problem is introduced. In chapter two the experimental setup is described. Following, in chapter three, the inflow conditions of the main wind tunnel used in this piece of research are analysed in detail. In chapter three, preliminary pressure tests results on a model of the island are presented. The main results from the Bolund experiment are replicated in chapter five. In chapter six, an identification of specific flow strutures over the island is presented and, finally, in chapter seven, conclusions and lines for future works related to the presented one are included.
Resumo:
Road accidents are a very relevant issue in many countries and macroeconomic models are very frequently applied by academia and administrations to reduce their frequency and consequences. The selection of explanatory variables and response transformation parameter within the Bayesian framework for the selection of the set of explanatory variables a TIM and 3IM (two input and three input models) procedures are proposed. The procedure also uses the DIC and pseudo -R2 goodness of fit criteria. The model to which the methodology is applied is a dynamic regression model with Box-Cox transformation (BCT) for the explanatory variables and autorgressive (AR) structure for the response. The initial set of 22 explanatory variables are identified. The effects of these factors on the fatal accident frequency in Spain, during 2000-2012, are estimated. The dependent variable is constructed considering the stochastic trend component.
Resumo:
Using the Bayesian approach as the model selection criteria, the main purpose in this study is to establish a practical road accident model that can provide a better interpretation and prediction performance. For this purpose we are using a structural explanatory model with autoregressive error term. The model estimation is carried out through Bayesian inference and the best model is selected based on the goodness of fit measures. To cross validate the model estimation further prediction analysis were done. As the road safety measures the number of fatal accidents in Spain, during 2000-2011 were employed. The results of the variable selection process show that the factors explaining fatal road accidents are mainly exposure, economic factors, and surveillance and legislative measures. The model selection shows that the impact of economic factors on fatal accidents during the period under study has been higher compared to surveillance and legislative measures.
Resumo:
El proyecto está basado en el estudio de la planta de potencia de un túnel aerodinámico. Para ello se ha realizado una breve introducción definiendo qué es un túnel aerodinámico, cuál es su propósito, qué tipos hay, etc. Posteriormente se ha escogido un tipo concreto de túnel entre todas las posibilidades y se ha procedido a su estudio. Se ha definido una forma y unas dimensiones y tras calcular las pérdidas de carga, se ha seleccionado la planta de potencia necesaria para compensar dichas pérdidas, dimensionándose también las conexiones de esta desde la acometida de potencia eléctrica. Por último se han dimensionado las conexiones correspondientes a la iluminación y los servicios que competen al túnel aerodinámico.
Resumo:
La utilización de túneles aerodinámicos en ingeniería civil está cada vez más demandada debido al actual desarrollo urbanístico, esto es, la necesidad de edificios cada vez más altos en los que concentrar mayor cantidad de población, puentes y estructuras que faciliten el paso de medios de transporte alternativos, la importancia de los aspectos artísticos en la construcción (además de los funcionales), etc. Son muchos los factores que pueden hacer necesario el ensayo de alguna de esas estructuras en un túnel aerodinámico, y no existe un criterio universal a la hora de decidir si conviene o no hacerlo.
Resumo:
This paper presents an experimental and systematic investigation about how geometric parameters on a biplane configuration have an influence on aerodynamic parameters. This experimental investigation has been developed in a two-dimensional approach. Theoretical studies about biplanes configurations have been developed in the past, but there is not enough information about experimental wind tunnel data at low Reynolds number. This two-dimensional study is a first step to further tridimensional investigations about the box wing configuration. The main objective of the study is to find the relationships between the geometrical parameters which present the best aerodynamic behavior: the highest lift, the lowest drag and the lowest slope of the pitching moment. A tridimensional wing-box model will be designed following the pattern of the two dimensional study conclusions. It will respond to the geometrical relationships that have been considered to show the better aerodynamic behavior. This box-wing model will be studied in the aim of comparing the advantages and disadvantages between this biplane configuration and the plane configuration, looking for implementing the box-wing in the UAV?s field. Although the box wing configuration has been used in a small number of existing UAV, prestigious researchers have found it as a field of high aerodynamic and structural potential.
Resumo:
This paper presents the experimental three-year learning activity developed by a group of teachers in a wind tunnel facility. The authors, leading a team of students, carried out a project consisting of the design, assembly and testing of a wind tunnel. The project included all stages of the process from its initial specifications to its final quality flow assessments, going through the calculation of each element, and the building of the whole wind tunnel. The group of (final year) students was responsible for the whole wind tunnel project as a part of their bachelor degree project. The paper focuses on the development of wind tunnel data acquisition software. This automatic tool is essential to improve the automation of the data acquisition of the wind tunnel facility systems, in particular for a 6DOF multi-axis force/torque sensor. This work can be considered as a typical example of real engineering practice: a set of specifications that has to be modified due to the constraints imposed throughout the project, in order to obtain the final result
Resumo:
El sector del transporte por carretera es uno de los principales contribuyentes de consumo de combustible y emisiones de España. Por lo tanto, la evaluación de los impactos ambientales del tráfico rodado es esencial para los programas de mitigación del cambio climático y la eficiencia energética. Sin embargo, uno de los retos en la planificación del transporte y el diseño de políticas consiste en la aplicación de metodologías de evaluación de emisiones consistentes, el diseño de estrategias y la evaluación de su eficacia. Las metodologías existentes de evaluación de las emisiones del transporte por carretera, utilizan diferentes niveles de análisis y períodos. Sin embargo, estos análisis son puntuales y no existe una continuidad en el análisis de diferentes estrategias o políticas. Esta tesis doctoral proporciona conocimientos y herramientas para el análisis de las políticas destinadas a reducir las emisiones de tráfico, tomando España como caso de estudio. La investigación se estructura en dos partes: i) el desarrollo y aplicación de metodologías para el análisis de factores y políticas que contribuyen en la evolución de las emisiones GEI del transporte por carretera en España; desde una perspectiva nacional; y ii) el desarrollo y aplicación de un marco metodológico para estimar las emisiones del tráfico interurbano y de evaluar estrategias centradas en la operación del tráfico y en la infraestructura. En resumen, esta tesis demuestra la idoneidad de utilizar diferentes herramientas para analizar las emisiones de tráfico desde diferentes puntos de vista. Desde el diseño de políticas de mitigación y eficiencia energética a nivel nacional, a estrategias centradas en la operación del tráfico interurbano y la infraestructura. Road transport is one of the major contributors to fuel consumption and emissions in Spain. Consequently, assessing the environmental impacts of road traffic is essential for climate change mitigation and energy efficiency programs. However, one of the key challenges of policy makers and transport planners consists of implementing consistent assessment emissions methodologies, applying mitigation strategies, and knowing their effectiveness. Current state-of-the-art emissions assessment methodologies estimate emissions from different levels and periods, using different approaches. Nevertheless, these studies are timely and they usually take different methodologies for analysing different strategies or policies, regardless of the assessment as a whole. This doctoral thesis provides knowledge and methodologies for analysing policies designed to reduce road traffic emissions, using the case study of Spain. The research procedure consists of two main scopes: i) the development and application of methodologies for analysing key factors and policies driving the GHG emissions of road transport in Spain; from a national perspective; and ii) the development and application of a road traffic emissions model for assessing operational and infrastructure strategies of the interurban road network at segment level. In summary, this thesis demonstrates the appropriateness to use different tools to analyse road traffic emissions at different levels: from appropriate nationwide mitigation and energy efficiency policies, to strategies focused on the operation of interurban traffic and infrastructure.
Resumo:
En este artículo se recoge cómo se ha regulado este aspecto tradicionalmente en concesiones y cómo se viene haciendo más recientemente, comparando para tres concesiones europeas puestas en servicio en los últimos años, las bonificaciones con el beneficio social que corresponden a cada nivel de reducción de la accidentalidad en la carretera. Los resultados arrojan que los incentivos aplicados, tanto antiguamente como los más recientes, son anodinos por dos motivos: porque son muy inferiores al beneficio social derivado de ellos y porque aparentemente son muy inferiores al coste de las actuaciones de mejora de la seguridad vial. Road safety is one of the most important issues in PPP roads. At this respect, to achieve a property regulation it is necessary to introduce objective and explicit incentives in the contracts. Besides, these incentives must be focused at the net social benefit. This paper explains how road safety has been introduced traditionally in PPP road contracts and how it is been doing it nowadays, comparing for three recent concessions of Europe, the bonuses and the social benefit associated to each reduction of accidents in the roads. As a result, it can be affirmed that the incentives applied, both traditional and the most ones, are unremarkable for two reasons: because they are much lower than the social benefit derived from them and because they apparently are well below the cost of measures to improve road safety.