70 resultados para railway communications
Resumo:
Achieving reliable communication over HF channels is known to be challenging due to the particularly hostile propagation medium. To address this problem, diversity techniques were shown to be promising. In this paper, we demonstrate through experimental results the benefits of different diversity strategies when applied to multi-input-multi-output (MIMO) multicarrier systems. The performance gains of polarisation, space and frequency diversities are quantified using different measurement campaigns.
Resumo:
Revisión y puesta al día de la publicaciones relacionadas con el diseño de puentes de ferrocarril de alta velocidad y nuevas investigaciones sobre dinámica lateral.
Resumo:
The study of lateral dynamics of running trains on bridges is of importance mainly for the safety of the traffic, and may be relevant for laterally compliant bridges. These studies require 3D coupled vehicle-bridge models, and consideration of wheel to rail contact, a phenomenon which is complex and costly to model in detail. We describe here a fully nonlinear coupled model, described in absolute coordinates and incorporated into a commercial finite element framework. Two applications are presented, firstly to a vehicle subject to a strong wind gust traversing a br idge, showing the relevance of the nonlinear wheel-rail contact model as well as the interaction between bridge and vehicle. The second application is to a real viaduct in a high-speed line, with a long continuous deck and tall piers with high lateral compliance. The results show the safety of the traffic as well as the relevance of considering the wind action and the nonlinear response.
Resumo:
Cognitive Radio principles can be applied to HF communications to make a more efficient use of the extremely scarce spectrum. In this contribution we focus on analyzing the usage of the available channels done by the legacy users, which are regarded as primary users since they are allowed to transmit without resorting any smart procedure, and consider the possibilities for our stations -over the HFDVL (HF Data+Voice Link) architecture- to participate as secondary users. Our goal is to enhance an efficient use of the HF band by detecting the presence of uncoordinated primary users and avoiding collisions with them while transmitting in different HF channels using our broad-band HF transceiver. A model of the primary user activity dynamics in the HF band is developed in this work. It is based on Hidden Markov Models (HMM) which are a powerful tool for modelling stochastic random processes, and is trained with real measurements from the 14 MHz band.
Resumo:
This paper introduces novel calibration processes applied to antenna arrays with new architectures and technologies designed to improve the performance of traditional earth stations for satellite communications due to the increasing requirement of data capacity during last decades. Besides, the Radiation Group from the Technical University of Madrid has been working on the development of new antenna arrays based on novel architecture and technologies along many projects as a solution for the ground segment in the early future. Nowadays, the calibration process is an interesting and cutting edge research field in a period of expansion with a lot of work to do for calibration in transmission and also for reception of these novel antennas under development.
Resumo:
The achievement of higher frequencies (HF) and the reduction of energy consumption, to improve sensing, communication and computation, involve the continued scaling down to the nanometer level. This scaling is enabled by of innovative device designs, improved processing technologies and assessment tools, and new material structures. In this work, we have used all these factors to demonstrate state-of-the-art HF devices in two materials with quite different electronic properties: wide semiconductor bandgap III-nitrides for resonators and power amplifiers; and graphene, a zero bandgap material expected to revolutionize low noise and HF flexible electronics. Some issues faced during their development will be discussed during the talk.
Resumo:
Structural Health Monitoring (SHM) requires integrated "all in one" electronic devices capable of performing analysis of structural integrity and on-board damage detection in aircraft?s structures. PAMELA III (Phased Array Monitoring for Enhanced Life Assessment, version III) SHM embedded system is an example of this device type. This equipment is capable of generating excitation signals to be applied to an array of integrated piezoelectric Phased Array (PhA) transducers stuck to aircraft structure, acquiring the response signals, and carrying out the advanced signal processing to obtain SHM maps. PAMELA III is connected with a host computer in order to receive the configuration parameters and sending the obtained SHM maps, alarms and so on. This host can communicate with PAMELA III through an Ethernet interface. To avoid the use of wires where necessary, it is possible to add Wi-Fi capabilities to PAMELA III, connecting a Wi-Fi node working as a bridge, and to establish a wireless communication between PAMELA III and the host. However, in a real aircraft scenario, several PAMELA III devices must work together inside closed structures. In this situation, it is not possible for all PAMELA III devices to establish a wireless communication directly with the host, due to the signal attenuation caused by the different obstacles of the aircraft structure. To provide communication among all PAMELA III devices and the host, a wireless mesh network (WMN) system has been implemented inside a closed aluminum wingbox. In a WMN, as long as a node is connected to at least one other node, it will have full connectivity to the entire network because each mesh node forwards packets to other nodes in the network as required. Mesh protocols automatically determine the best route through the network and can dynamically reconfigure the network if a link drops out. The advantages and disadvantages on the use of a wireless mesh network system inside closed aerospace structures are discussed.
Resumo:
The commercial centre VIALIA and the new railway station of the AVE (high speed train) in Malaga was inaugurated in November 2006, just on the place of the former railway station. The new railway station with an investment of 134,7 million Euros occupies a surface of 51.377 m2, five times the surface of the former station. The enclosure is the biggest intermodal and commercial centre of Spain which comprises a parking of 21.000 m2 for 1300 parking places, one commercial area and a hotel with a total extension constructed of approximately 100.000 m2. The spaces of leisure contain cinemas, shops, restaurants, bowling, gymnasium, swimming pool and zones of passenger's traffic.
Resumo:
The physical model based on moving constant loads is widely used for the analysis of railway bridges. Nevertheless, this model is not well-suited for the study of short span bridges (L<=15-20 m), and the results it produces (displacements and accelerations) are much greater than those obtained experimentally. In this paper two factors are analysed which are believed to have an influence in the dynamic behaviour of short bridges. These two factors are not accounted for by the moving loads model and are the following: the distribution of the loads due to the presence of the sleepers and ballast layer, and the train-bridge interaction. Several numerical simulations have been performed in order to decide on their influence, and the results are presented and discussed herein.
Resumo:
Underpasses are common in modern railway lines. Wildlife corridors and drainage conduits often fall into this category of partially buried structures. Their dynamic behaviour has received far less attention than that of other structures such as bridges, but their large number makes their study an interesting challenge in order to achieve safe and cost-effective structures. As ballast operations are a key life cycle cost, and excessive vibrations increase the need of ballast regulation in order to ensure track geometry, special attention is paid to accelerations, the values of which should be limited to avoid track instability according to Eurocode. In this paper, the data obtained during on site measurements on culverts belonging to a Spanish high-speed train line are presented. A set of six rectangular-shaped, closed-frame underpasses were monitored under traffic loading. Acceleration records at different points of the structures are presented and discussed. They reveal a non-uniform dynamic response of the roof-slab, with the highest observed values below the occupied track. Also, they indicate that the dynamic response is important up to frequencies higher than those usually observed for standard simply supported bridges. Finally, they are used to obtain a heuristic rule to estimate acceleration levels on the roof-slab.
Resumo:
This Master Final Project is intended to show the process developed to the functional and electrical characterization between different devices that use the SpaceWire space communications standard integrated into an evaluation board designed for this purpose. In order to carry out this characterization, firstly, a study to understand the SpaceWire standard is done. After that, another study for the understanding of the demonstration board with its different interfaces and IPs of SpW is done. According to this, it is expected to find out how the SpW devices are structured, especially at FPGA level, and how is the communication between them. Based on the knowledge obtained about SpaceWire and the SpW devices integrated into the evaluation board, the set of measurements and the strategy to validate electrical interoperability between the different devices are defined, as well as to perform functional checks required to ensure its proper understanding. Furthermore, it will let check whether the standard is met and search the limit of operation within a communication system representative of existing equipment in a satellite. Once finished the test plan and implemented on the representative hardware, the board will be considered characterized at SpW level and a report with the conclusions reached about the operation of the SpW interfaces in the board and constraints found will be done. RESUMEN. El presente Trabajo Fin de Máster pretende mostrar el proceso realizado para la caracterización eléctrica y funcional entre distintos dispositivos que utilizan el estándar de comunicaciones espaciales SpaceWire integrados en una tarjeta de evaluación diseñada para tal efecto. Para poder llevar a cabo dicha caracterización, en primer lugar, se realiza un estudio para el conocimiento del estándar SpaceWire. A continuación, se lleva a cabo otro estudio para el conocimiento de la tarjeta de demostración en la que se encuentran los distintos interfaces e IPs de SpW. Con esto último, se pretende conocer como están estructurados los dispositivos SpW, sobre todo a nivel de FPGA, y como se realiza la comunicación entre ellos. En base a los conocimientos adquiridos acerca de SpaceWire y los dispositivos SpW de la tarjeta de evaluación, se definen el conjunto de medidas y la estrategia a seguir para validar eléctricamente la interoperabilidad entre los distintos dispositivos, así como para realizar las comprobaciones funcionales necesarias para asegurar su correcto entendimiento. Además, con ello se podrá comprobar si se cumple el estándar y se podrá también buscar el límite de operación dentro de un sistema de comunicaciones representativo de los equipos existentes en un satélite. Realizado el plan de pruebas y aplicado sobre el hardware representativo se podrá dar por caracterizada la tarjeta a nivel SpW y realizar un informe con las conclusiones alcanzadas acerca del funcionamiento de los interfaces SpW de la tarjeta y las limitaciones encontradas.
Resumo:
This paper presents the results of part of the research carried out by a committee in charge of the elaboration of the new Spanish Code of Actions in Railway Bridges. Following the work developed by the European Rail Research Institute (ERRI), the dynamic effects caused by the Spanish high-speed train TALGO have been studied and compared with other European trains. A simplified envelope of the impact coefficient is also presented. Finally, the train-bridge interactions has been analysed and the results compared with those obtained from simple models based on moving loads.
Resumo:
An actual case of an underground railway in the neighbourhood of habitation buildings has been analyzed. The study has been based on a twodimensional BEM model including a tunnel and a typical building. The soil properties were obtained using geophysical techniques. After a sensitivity study, the model has been simplyfied and validated by comparison with "in situ" measurements. Using this simplyfied model, a parametric study has been done including trenches and walls of different materials and different depths at two different distances from the tunnel. The reductions obtained with the different solutions can then be compared.
Resumo:
Implantación de la Red de Alta velocidad Ferroviaria en California. Tramo San Francisco-Sacramento. Este artículo de la serie “Alta velocidad Ferroviaria en California (CHSRS), se ocupa de la línea San Francisco– Sacramento “Bay Crossing Alternative”, que cierra la red de alta velocidad ferroviaria del Estado de California, permitiendo en la terminal HSR de Sacramento, conectar con la línea Fresno–Sacramento, en coincidencia de trazados para en el futuro prolongar la red californiana de alta velocidad ferroviaria hasta su entronque con la del Estado de Nevada, vía Tahoe Lake–Reno. La línea San Francisco–Sacramento “Bay Crossing Alternative”, consta de tres trayectos: El primero de ellos “San Francisco urbano” va desde la terminal HSR “San Francisco Airport”, donde termina la alternativa “Golden Gate” de la línea Fresno–San Francisco, hasta el viaducto de acceso al Paso de la Bahía, que constituye el segundo trayecto “San Francisco–Richmond”, trayecto estrella de la red, de 15,48 Km de longitud sobre la Bahía de San Francisco, con desarrollo a través de 11,28 Km en puente colgante múltiple, con vanos de 800 m de luz y 67 m de altura libre bajo el tablero que permite la navegación en la Bahía. El tercer trayecto “Richmond–Sacramento” cruza la Bahía de San Pablo con un puente colgante de 1,6 Km de longitud y tipología similar a los múltiples de la Bahía de San Francisco, pasa por Vallejo (la por plazo breve de tiempo, antigua capital del Estado de California) y por la universitaria Davis, antes de finalmente llegar a la HSR Terminal Station de Sacramento Roseville. This article of the series “California High Speed Railway System”(CHSRS) treats on Line San Francisco–Sacramento “Bay Crossing Alternative” (BCA). This line closes the system of California high speed state railway, and connects with the line Fresno–Sacramento “Stockton Arch Alternative”, joining its alignments in the HSR Terminal of Sacramento Roseville. From this station it will be possible, in the future, to extend the Californian railway system till the Nevada railway system, vía Tahoe Lake and Reno. The BCA consists of three sections: The first one passing through San Francisco city, goes from HSR San Francisco Airport Terminal Station (where the line Fresno–San Francisco “Golden Gate Alternative” ends), up to the Viaduct access at the Bay Crossing. The second section San Francisco–Richmond, constitutes the star section of the system, with 15,48 Km length on the San Francisco Bay, where 11,28 Km in multi suspension bridge, 800 m span and 67 m gauge under panel, to allow navigation through the Bay. The third section Richmond–Sacramento crosses the San Pablo Bay through another suspension bridge of similar typology to that of San Francisco Bay crossing; pass through Vallejo (the ancient and for a short time Head of the State of California) and through Davis, university city, to arrive to the HSR Terminal Station of Sacramento Roseville.
Resumo:
Implantación de la Red de Alta velocidad Ferroviaria en California. Tramo Fresno-Sacramento. El presente articúlo es la cuarta parte de la serie "Alta Velocidad Ferroviaria en California (CHSRS)". Recoge la Alternativa "Stockton Arch", que el Proyecto FARWEST presenta a la prevista por la Authority (CHSRA), para la Línea HSR Fresno-Sacramento, en programación y en trazado. Éste discurre, desde la gran Terminal de Fresno (implantada en las afueras al suroeste de la ciudad) por el segmento sur del "mar interior" (que en el Terciario Superior ocupaba el actual Valle Central), hasta Stockton, y por el segmento norte, hasta Sacramento. El Paet de Ripperdan (~ pK 40) queda conectado por carretera con el PAET de Oroloma de la Línea HSR Fresno-San Francisco (Golden Gate Alternative). La última parte del trazado de la Línea HSR Fresno-Sacramento (Stockton Arch Alternative), coincide en alineación y rasante con la Línea HSR San Francisco-Sacramento (Crossing Bay Alternative) a la altura de Roseville, donde se emplaza la gran terminal norte de la red de California, desde la que se unirá ésta con la de Nevada, por Reno. This article forras the fourth part of the series entitled "High Speed Railway in California (CHSRS)". It addresses the "Stockton Arch" alternative, which the FARWESTProjectpresents in scheduling and in alignment as to that provided for by the Authority (CHSRA) for the Fresno-Sacramento HSR Line. The latter runs from the grand Fresno Terminal (located in the outskirts to the southwest ofthe city) through the south segment ofthe "inland sea" (which oceupied the current Central Valley in the Upper Tertiary) to Stockton and through the north segment to Sacramento. The Ripperdan TSAP (post ofpassing and stabling trains), — kilometer point 40, conneets with the Oroloma TSAP ofthe Fresno-San Francisco HSR Line (Golden Gate Alternative) by road. The last part of the Fresno-Sacramento HSR Line alignment (Stockton Arch Alternative), coincides in alignment and grade with the San Francisco-Sacramento HSR Line (Crossing Bay Alternative) at Roseville, where the great north terminal ofthe California network is located, from which the latter will be linked with Nevada s network through Reno.