72 resultados para Complex Project Management


Relevância:

90.00% 90.00%

Publicador:

Resumo:

Personalized health (p-health) systems can contribute significantly to the sustainability of healthcare systems, though their feasibility is yet to be proven. One of the problems related to their development is the lack of well-established development tools for this domain. As the p-health paradigm is focused on patient self-management, big challenges arise around the design and implementation of patient systems. This paper presents a reference platform created for the development of these applications, and shows the advantages of its adoption in a complex project dealing with cardio-vascular diseases.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

In this work, the power management techniques implemented in a high-performance node for Wireless Sensor Networks (WSN) based on a RAM-based FPGA are presented. This new node custom architecture is intended for high-end WSN applications that include complex sensor management like video cameras, high compute demanding tasks such as image encoding or robust encryption, and/or higher data bandwidth needs. In the case of these complex processing tasks, yet maintaining low power design requirements, it can be shown that the combination of different techniques such as extensive HW algorithm mapping, smart management of power islands to selectively switch on and off components, smart and low-energy partial reconfiguration, an adequate set of save energy modes and wake up options, all combined, may yield energy results that may compete and improve energy usage of typical low power microcontrollers used in many WSN node architectures. Actually, results show that higher complexity tasks are in favor of HW based platforms, while the flexibility achieved by dynamic and partial reconfiguration techniques could be comparable to SW based solutions.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

En los últimos años hemos sido testigos de la creciente demanda de software para resolver problemas cada vez más complejos y de mayor valor agregado. Bajo estas circunstancias, nos podemos hacer la siguiente pregunta: ¿Está preparada la industria de software para entregar el software que se necesita en los próximos años, de acuerdo con las demandas del cliente? Hoy en día, muchos expertos creen que el éxito de esta industria dependerá de su capacidad para gestionar los proyectos, las personas y los recursos. En este sentido, la gestión de proyectos es un factor clave para el éxito de los proyectos software en todo el mundo. Además, considerando que las Pequeñas y Medianas Empresas de software (PYMEs) representan el 99,87% de las empresas españolas, es vital para este tipo de empresas la implementación de los procesos involucrados con la gestión de proyectos. Es cierto que existen muchos modelos que mejoran la eficacia de la gestión de proyectos, pero la mayoría de ellos se centra únicamente en dos procesos: la planificación del proyecto y la monitorización y control del proyecto, ninguno de los cuales a menudo es asequible para las PYMEs. Estos modelos se basan en el consenso de un grupo de trabajo designado para establecer cómo debe ser gestionado el proceso software. Los modelos son bastante útiles ya que proporcionan lineamientos generales sobre dónde empezar a mejorar la gestión de los proyectos, y en qué orden, a personas que no saben cómo hacerlo. Sin embargo, como se ha dicho anteriormente, la mayoría de estos modelos solamente funcionan en escenarios dentro de las grandes empresas. Por lo tanto, es necesario adaptar los modelos y herramientas para el contexto de PYMEs. Esta tesis doctoral presenta una solución complementaria basada en la aplicación de un metamodelo. Este metamodelo es creado para mejorar la calidad de los procesos de la gestión de proyectos a través de la incorporación de prácticas eficaces identificadas a través del análisis y estudio de los modelos y normas existentes relacionadas con la gestión de proyectos. viii ProMEP – Metamodelo para la gestión de proyectos Por lo tanto, el metamodelo PROMEP (Gestión de Proyectos basada en Prácticas Efectivas) permitirá establecer un proceso estándar de gestión de proyectos que puede adaptarse a los proyectos de cada empresa a través de dos pasos: En primer lugar, para obtener una fotografía instantánea (o base) de los procesos de gestión de proyectos de las PYMEs se creó un cuestionario de dos fases para identificar tanto las prácticas realizadas y como las no realizadas. El cuestionario propuesto se basa en el Modelo de Madurez y Capacidad Integrado para el Desarrollo v1.2 (CMMI-DEV v1.2). Como resultado adicional, se espera que la aplicación de este cuestionario ayude a las PYMEs a identificar aquellas prácticas que se llevan a cabo, pero no son documentadas, aquellas que necesitan más atención, y aquellas que no se realizan debido a la mala gestión o al desconocimiento. En segundo lugar, para apoyar fácilmente y eficazmente las tareas de gestión de proyectos software del metamodelo PROMEP, se diseñó una biblioteca de activos de proceso (PAL) para apoyar la definición de los procesos de gestión de proyectos y realizar una gestión cuantitativa de cada proyecto de las PYMEs. Ambos pasos se han implementado como una herramienta computacional que apoya nuestro enfoque de metamodelo. En concreto, la presente investigación propone la construcción del metamodelo PROMEP para aquellas PYMEs que desarrollan productos software de tal forma que les permita planificar, monitorizar y controlar sus proyectos software, identificar los riesgos y tomar las medidas correctivas necesarias, establecer y mantener un conjunto de activos de proceso, definir un mecanismo cuantitativo para predecir el rendimiento de los procesos, y obtener información de mejora. Por lo tanto, nuestro estudio sugiere un metamodelo alternativo para lograr mayores niveles de rendimiento en los entornos de PYMEs. Así, el objetivo principal de esta tesis es ayudar a reducir los excesos de trabajo y el tiempo de entrega, y aumentar así la calidad del software producido en este tipo de organizaciones. Abstract In recent years we have been witnessing the increasing demand for software to solve more and more complex tasks and greater added value. Under these circumstances, we can ourselves the following question: Is the software industry prepared to deliver the software that is needed in the coming years, according to client demands? Nowadays, many experts believe that the industry’ success will depend on its capacity to manage the projects, people and resources. In this sense, project management is a key factor for software project success around the world. Moreover, taking into account that small and medium-sized software enterprises (SMSe) are the 99.87% of the Spanish enterprises, it is vital for this type of enterprises to implement the processes involved in project management. It is true that there are many models that improve the project management effectiveness, but most of them are focused only on two processes: project planning and project monitoring and control, neither of which is affordable for SMSe. Such models are based on the consensus of a designated working group on how software process should be managed. They are very useful in that they provide general guidelines on where to start improving the project management, and in which order, to people who do not know how to do it. However, as we said, the majority of these models have only worked in scenarios within large companies. So, it is necessary to adapt these models and tools to the context of SMSe. A complementary solution based on the implementation of a metamodel is presented in this thesis. This metamodel is created to improve the quality of project management processes through the incorporation of effective practices identified through the analysis and study of relevant models and standards related to project management. Thus, the PROMEP (PROject Management based on Effective Practices) metamodel will allow establishing a project management standard process to be tailored to each enterprise’s project through two steps: Firstly, to obtain a baseline snapshot of project management processes in SMSe a two-phase questionnaire was created to identify both performed and nonperformed practices. The x ProMEP – Metamodelo para la gestión de proyectos proposed questionnaire is based on Capability Maturity Model Integration for Development v1.2. As additional result, it is expected that the application of the questionnaire to the processes will help SMSe to identify those practices which are performed but not documented, which practices need more attention, and which are not implemented due to bad management or unawareness. Secondly, to easily an effectively support the software project management tasks in the PROMEP metamodel, a Process Asset Library (PAL) is designed to support the definition of project management processes and to achieve quantitative project management in SMSe. Both steps have been implemented as a computational tool that supports our metamodel approach. Concretely, the present research proposes the accomplishment of the PROMEP metamodel for those SMSe which develop software products and enable them to plan, supervise and control their software projects, identify risks and take corrective actions, establish and maintain a set of process assets, define quantitative models that predict the process performance, and provide improvement information. So, our study suggests an alternative metamodel to achieve higher performance levels in the SMSe environments. The main objective of this thesis is help to reduce software overruns and delivery time, and increase software quality in these types of organizations.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

La complejidad en los proyectos y la complejidad de la dirección de proyectos son conceptos cuyo interés va en aumento. En el ámbito de los proyectos, dado que la gestión de recursos y las actividades suceden en interacción con las personas, la complejidad en dirección de proyectos resulta ser una práctica inherentemente social. Esto ha hecho que en la actualidad se haya convertido en una necesidad profundizar en el concepto. En el primer capítulo de esta investigación, se hace una revisión del estado del arte del concepto y se construye un marco teórico que permite establecer y justificar las dimensiones de la complejidad en esta disciplina. De igual manera, con una revisión similar de los estándares internacionales existentes, se descubren las herramientas y modelos para el análisis de la complejidad en dirección de proyectos, con la que se pretende, a través de la práctica profesional desde organismos y alianzas internacionales, ayudar a contrastar la utilidad e interés de los conceptos propuestos. En el segundo capítulo, se presenta un marco conceptual sobre la certificación de competencias, se analizan y comparan los principales sistemas de certificación de competencias vigentes en el ámbito de la dirección de proyectos. En el tercer capítulo, se presenta un proceso metodológico novedoso para valorar, desde la integración del conocimiento experto y experimentado, dos aspectos complementarios de la complejidad de la dirección de proyectos: (a) la valoración del nivel de complejidad del proyecto; y (b), la valoración de los efectos en el desarrollo de las competencias de comportamiento de las partes implicadas. La metodología propuesta se aplica a la Comunidad de Regantes LASESA en Huesca (España), proceso que se presenta en el cuarto capítulo. LASESA es un proyecto complejo que gestiona los recursos hídricos de 10.000 hectáreas y con más de 600 propietarios implicados. Los resultados evidencian como la gestión de un proyecto complejo genera efectos positivos en el desarrollo de las competencias de comportamiento de las personas que se implican y participan en los trabajos….. ABSTRACT The complexity of the projects and the complexity of project management are concepts whose interest is increasing. In terms of projects, since the management of resources and activities occur in interaction with people, the project management complexity makes an inherently social practice. This has now has become a necessity to deepen the concept. In the first chapter of this study, we review the state of art of the concept and builds a theoretical framework that allows to establish and justify the dimensions of the complexity in this discipline. Likewise, a similar review of existing international standards, we discover the tools and models for the analysis of complexity in project management, with which it is intended, through professional practice from agencies and international alliances, help to compare the usefulness and interest of the proposed concepts. In the second chapter, we present a conceptual framework for the certification of competences, are analyzed and compared the main skills certification systems in force in the field of project management. In the third chapter, we present a novel methodological process to assess, since the integration of expert knowledge and experienced, complementary aspects of the complexity of project management: (a) the assessment of the level of complexity of the project, and (b ), the assessment of the effects on the development of behavioral competencies of the parties involved. The proposed methodology is applied to the Community Irrigation LASESA in Huesca (Spain), a process that is presented in the fourth chapter. LASESA is a complex project that manages the water resources of 10,000 acres and more than 600 landowners involved. The results show as managing a complex project generates positive effects on the development of behavioral competencies of people who are involved and participate in the work.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

La construcción es una de las actividades más valiosas para la sociedad debido a la naturaleza de los servicios que ofrece y por el volumen de empleos y movimiento económico que genera. Por ello es un elemento fundamental para el desarrollo sustentable. Es una industria compleja, cada vez más dependiente del conocimiento. Debido a su naturaleza fragmentaria y temporal y la alta rotación de personal presenta grandes retos y complicaciones particulares. Estas dificultades en oportunidades pueden transformarse en problemas por la complejidad, localización geográfica o los requisitos técnicos, financieros e innovaciones de los proyectos. Debido a sus características, las construcciones sufren cambios en las condiciones planificadas. Con frecuencia estos cambios conducen a retrasos en la ejecución de los proyectos, costes superiores a los presupuestados y conflictos entre los clientes y los ejecutores. Esto genera problemas de competitividad que afectan tanto a países desarrollados como países en vías de desarrollo. Los problemas de la construcción tienen perniciosos efectos para la sociedad, que pierde recursos que deberían permitir mejores resultados en términos de calidad de vida y beneficios sociales y económicos. Debido a la importancia del sector y los ingentes recursos que se invierten en cada proyecto se justifican los máximos esfuerzos para lograr los mejores desempeños de esta industria. Éste interés ha orientado el desarrollo de investigaciones, para apoyar el logro de los objetivos de mejoramiento continuo y construcción sustentable. Los estudios desarrollados han permitido demostrar el valor añadido del conocimiento en todos los sectores productivos. Para la construcción, los conocimientos ofrecen indicadores de desempeño, datos y lecciones aprendidas provenientes de aciertos y errores. Estos deben conducir a aprendizajes fundamentales para sustentar su competitividad. Sin embargo, a pesar de los conocimientos disponibles y los avances en las técnicas de control gerencial y de proyectos, es alarmante la recurrencia de los problemas de construcción. Esta problemática se manifiesta con severidad en los proyectos de construcción industrial que se desarrollan para el sector petrolero, petroquímico y energético venezolano. El sector presenta evidentes necesidades para un mejor desempeño competitivo por la alta incidencia de retrasos de los proyectos, que implican pérdidas de gran parte de los recursos humanos, financieros, técnicos y conocimientos invertidos. Esta investigación plantea como objetivos analizar la importancia de la construcción y su sustentabilidad, los principales problemas que afectan el sector, la gestión del conocimiento y algunos modelos disponibles para gestionarlos. Igualmente examina las lecciones aprendidas y la productividad y competitividad, con particular atención a los problemas de competitividad venezolanos. Adicionalmente se evalúan las implicaciones del conocimiento como activo estratégico y se caracterizan las empresas de construcción industrial venezolanas. Para ello se identifican las dimensiones que sustentan la gestión del conocimiento en estas empresas, para finalmente determinar las que resultan más idóneas para el nuevo modelo a ser propuesto. Con estos objetivos se desarrolló el estudio empírico. Para ello fueron invitados a participar representantes de 105 empresas y expertos de construcción distintos, todos con experiencias de construcción al sector industrial venezolano. Se obtuvieron 112 respuestas en representación de 41 organizaciones y expertos diferentes. El trabajo de campo inició en Junio de 2012 y culminó en Noviembre de 2012. Los datos obtenidos fueron analizados con apoyo de técnicas estadísticas descriptivas y multivariables. Los objetivos de la investigación se alcanzaron ya que se logró caracterizar el sector de las construcciones industriales y se propuso un nuevo modelo de gestión del conocimiento adecuado a sus características. El nuevo modelo fue formulado atendiendo a criterios de sencillez, bajos costes y facilidad de adaptación para motivar su utilización en organizaciones de construcción industrial variadas. Con ello se busca que resulte de utilidad aún para las organizaciones más pequeñas, con menores recursos o aquellas que enfrentan entornos constructivos complicados. Por último se presentan algunas sugerencias para motivar la comprensión de los fenómenos estudiados en los grupos de interés de la construcción. Se propone analizar estos problemas desde las etapas iniciales de los estudios de ingeniería, de arquitectura, de construcción, de economía y administración. Igualmente se propone desarrollar acciones conjuntas de parte de los sectores académicos, gubernamentales, industriales y asociaciones para el mejoramiento competitivo y desarrollo sustentable global. La propuesta aporta datos sobre el sector constructivo venezolano en un área que presenta grandes carencias y propone un modelo innovador por su sencillez y orientación hacia el uso diario e intuitivo de los conocimientos como recursos fundamentales para la competitividad. Esta orientación puede tener trascendencia más allá del sector descrito, para apoyar la solución de problemas de otras industrias en entornos globales. ABSTRACT Construction is one of the most valuable activities for society due to the nature of the services offered and the number of jobs and revenues generated. Therefore it is a key element for sustainable development. Construction is a complex industry increasingly dependent on knowledge. Its temporary and fragmentary nature and the high staff turnover present great challenges and particular complications to construction. In some cases these conditions may evolve to serious problems because of the complexity, geographic location or even technical, financial and innovative requirements of each project. Due to their characteristics, constructions frequently undergo changes in planned conditions. Often these changes lead to delays in project completion, costs higher than budgeted and conflicts between clients and performers. This creates problems of competitiveness affecting both developed and developing countries. The construction problems have harmful effects on society, since it loses resources that would otherwise allow better results in terms of quality of life and social and economic benefits. The importance and the enormous resources invested in each project justify the efforts to achieve the best performance of this industry. This interest has guided the development of multiple research efforts to support the achievement of construction performance improvements and sustainable construction. The studies carried out have demonstrated the added value of knowledge in all productive sectors. For construction, knowledge offers performance indicators, data and lessons learned from successes and failures. These should lead to fundamental learning to sustain sector competitiveness. However, despite the available knowledge and advances in techniques and project management control, the recurrence of construction problems is alarming. This problem shows itself severely in industrial construction projects that are developed for the Venezuelan oil, petrochemical and energy sectors. These sectors have evident needs for better competitive performance because of the high incidence of project delays, involving loss of much of the human, financial, technical and knowledge resources invested. This research analyzes the importance of construction and sustainability, the main problems affecting the sector, knowledge and some models available to manage them. It also examines the lessons learned and the productivity and competitiveness, with particular attention to the problems of Venezuelan competitiveness. Additionally, the Venezuelan industrial construction companies are characterized evaluating the implications of knowledge as an strategic asset for construction. Moreover, the research evaluates the dimensions that support knowledge management in these companies, to finally identify those that are the most suitable for the new model to be proposed. With these objectives in mind the empirical study was developed. 105 different companies and experts with Venezuelan industrial construction experiences were invited to participate on the survey. 112 responses were obtained representing 41 different organizations and experts. Fieldwork started in June 2012 and ended in November 2012. The data obtained was analyzed with descriptive and multivariate statistical techniques. The research objectives were achieved since the industrial construction sector was characterized and a new management model was proposed based on the particular characteristics of these companies. The new model was formulated according to the criteria of simplicity, low cost and ease of adaptation. This was performed to motivate the use of the new model in various industrial construction organizations, even in smaller companies, with limited resources or those facing complex construction environments. Finally some suggestions to encourage understanding of the phenomena studied among construction stakeholders were proposed. The importance of studying these problems at an early stage of the engineering, architectural, construction, economic and administration studies is highlighted. Additionally, academic, government, industrial organizations and associations are invited to join efforts to improve the competitive and sustainable global development. The proposal provides data on the Venezuelan construction sector in an area that has large gaps and proposes a model which is innovative for its simplicity and suggests the daily and intuitive use of knowledge resources as a key issue to competitiveness. This orientation may have implications beyond the described sector to support the solution of problems of other industries in a global environment.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Nowadays, it has become evident the need to seek sustainable development models that address challenges arising in a variety of contexts. The resilience concept appears connected to the ability of people to cope with adversities that inevitably arise due to context dynamics, at different spatial and temporal scales. This concept is related to the model known as Working With People (WWP), focused on rural development projects planning, management and evaluation, from the integration of three dimensions: technical-entrepreneurial, ethical-social and political-contextual. The research reported is part of the RETHINK European Project, whose overall aim is farm modernization and rural resilience. The resilience concept has been analyzed, in the scope of rural development projects management, and a relationship with the WWP model has been established. To this end, a thorough review of the scientific literature concerning this topic has been addressed, in order to develop the state of the art of the different concepts and models involved. A conceptual proposal for the integration of resilience in rural development projects sustainable management, through the three-dimensional WWP model is presented.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

IThis paper analyses communication for development from a new perspective: the project in its broader and most genuine sense, as an instrument for changing current reality. This is examined from both its theoretical and practical implementation side. Knowledge/action binomial as a two-way relationship is one of the basis of the project cycle. It allows for better knowing the reality that the project itself (what constitutes the action) is intended to improve. Besides that, this knowledge/action binomial also offers new knowledge that nourishes future actions (projects). From a project based communication perspective, the project nourishes the knowledge, which leads to a transformative action. Reflecting about the action is a new knowledge source whose adoption by the community is eased by the communication process. Radio Mensaje project among the indigenous Andean communities in Cayambe (Ecuador) was born and also developed within this approach, supporting the collaborative participation in project management. This leads to the development process which is described in this case study.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

In Chile, during the last three decades there has been a strong decentralization process whose main objective has been to improve the management of schools through the transfer of responsibilities and resources of education and thus improve the outcome of learning, reducing equity gaps between schools and territories. This is how, there has been an evolution of school principals¿ professional profile from an administrative to a management approach, in which principals have become project managers of educational projects. From a competence model for school leaders, based on IPMA guidelines, the present article presents an analysis of best practices for school management, allowing to generate a link between competencies and school management, from the perspective of project management. Results showed that the different competence elements, have relative weights according to the different practice fields, and that this analysis can be considered as a strategic element in educational project planning and development.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

In Chile, during the last three decades there has been a strong decentralization process whose main objective has been to improve the management of schools through the transfer of responsibilities and resources of education and thus improve the outcome of learning, reducing equity gaps between schools and territories. This is how, there has been an evolution of school principals¿ professional profile from an administrative to a management approach, in which principals have become project managers of educational projects. From a competence model for school leaders, based on IPMA guidelines, the present article presents an analysis of best practices for school management, allowing to generate a link between competencies and school management, from the perspective of project management. Results showed that the different competence elements, have relative weights according to the different practice fields, and that this analysis can be considered as a strategic element in educational project planning and development.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

En el año 2014 se publicó, bajo mandato de la Comisión Europea, la Norma Europea EN 301 549, titulada “Requisitos de accesibilidad de productos y servicios TIC aplicables a la contratación pública en Europa”. El objetivo de dicha norma es que los productos o servicios TIC (Tecnologías de la Información y la Comunicación) adquiridos por cualquier administración pública europea puedan ser utilizados por personas con diversas características y capacidades, incluyendo a personas con discapacidad. La norma EN 301 549 es compleja, ya que contiene más de 200 requisitos y recomendaciones, que se aplican o no a un producto o servicio TIC en función de las características de dicho producto o servicio. Por ello se ha planteado, desde el Grupo de Investigación en Tecnología Informática y de las Comunicaciones (CETTICO), el desarrollo de una herramienta de soporte a la evaluación del cumplimiento de la norma. La herramienta permitirá a grupos de trabajo anotar los resultados de la evaluación de accesibilidad de un producto o servicio TIC siguiendo los requisitos de la norma Europea EN 301 549. Este trabajo de Fin de Grado se centra en el diseño y codificación del cliente web de la herramienta. Se parte de los resultados de un TFG y un practicum anteriores. En el TFG realizado por Laura Elorrieta [Elorrieta, 2014], se diseñó la interacción del sistema y se evaluó su grado de usabilidad. En el practicum [Montero, 2015], posterior al TFG de Laura Elorrieta, se eligieron las tecnologías web que se iban a utilizar y se realizó el diseño y la implementación mediante prototipos iterativos de la gestión de proyectos de evaluación. El trabajo que se ha realizado en el TFG ha consistido en el diseño de la interfaz de usuario analizando los cambios a realizar en el diseño, debido a los errores de usabilidad conocidos, y la implementación del prototipo funcional de la herramienta. Junto con la parte servidor del TFG de mi compañero Rubén Ortiz Burgos y la interfaz de usuario de este TFG se ha obtenido una aplicación web para realizar evaluaciones de accesibilidad de productos o servicios TIC siguiendo los requisitos de la norma EN 301 549. El prototipo funcional contiene diez páginas web que recogen las diferentes acciones y tareas que pueden realizar los usuarios en función del rol que desempeñen. EL diseño y la implementación se han llevado a cabo empleando las tecnologías web HTML5, CSS3, JavaScript, jQuery y las librerías de Foundation frontend framework.---ABSTRACT---In 2014, under the European Commission mandate, the European standard EN 301 549 has been published under the title “Accessibility requirements applicable to ICT products and procurement services in Europe”. The goal of this standard is that the products or services ICT (Information Communication Technology) acquires by every European public administration can be used by every person with different characteristics and capacities, including those with disability. The rule EN 301549 is very complex, since it has more than 200 requirements and recommendations that can be or not applied to an ICT product or service based on its characteristics of the given product or service. That’s why a development of a support tool has been proposed to the rating of the compliance of the rule, by the Research Group of Informatics Technology and Communication. This tool will allow working groups to record the results of the compliance of accessibility of a product or service following the requirements of the European Standard EN 301549. This Final Degree Work focuses in the design and the coding of the web customer of this tool. The results of a TFG and previous practicums have been used for this. The TFG performed by Laura Elorrieta [Elorrieta, 2014], the interaction of the system was designed and degree of usability was evaluated. In the practicum [Montero, 2015], after the TFG Laura Elorrieta, web technologies used were chosen and the design and implementation were performed using iterative prototyping project management evaluation. The work done on the TFG was to design the users interface to perform analyzing changes in design due to errors known usability and working prototype implementation of the tool. Together with the server part of the TFG my partner Rubén Ortiz Burgos and the user interface done of this TFG it has obtained a web application for the conduct of evaluations accessibility of products or services ICT following the requirements of the EN 301 549. The functional prototype contains ten web sites that collect the various activities and tasks that users can perform based on the role they perform. The design and implementation have been carried out using the technologies web HTML5, CSS3, Java Script, jQuery and the libraries of Foundation fronted framework.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Las desviaciones de tiempo y coste constituyen un fenómeno muy frecuente en la industria de la construcción. Existe un gran número de proyectos que no se terminan en el plazo y el tiempo estipulados, y esto parece que se ha convertido más en la norma que en la excepción. Los proyectos de construcción son heterogéneos por naturaleza y pueden llegar a ser muy complejos, involucrando numerosos procesos y expuestos a infinidad de variables y factores que pueden afectar el cumplimiento de los objetivos de tiempo y coste. Las desviaciones de tiempo y coste no favorecen ni al promotor ni al resto de equipos participantes del proyecto, dando lugar además la mayoría de las veces a situaciones de conflictos y relaciones adversas entre participantes del proyecto. Es por todo ello que surge la necesidad de atender a una estrategia de gestión de riesgos eficaz, como herramienta esencial de la gestión de proyectos para contribuir al éxito de los mismos. Es preciso considerar también que los proyectos de construcción pueden presentar distintas características específicas según el tipo de proyecto de que se traten. El presente trabajo de investigación estudia concretamente los proyectos de edificios de uso hotelero, los cuales pueden presentar estructuras organizativas muy diversas, incluyendo numerosos agentes participantes y procesos que a su vez se desarrollan en un entorno que ya es muy dinámico por su propia naturaleza. En el sector hotelero el cumplimiento de los objetivos de tiempo y coste del proyecto son especialmente importantes ya que cualquier retraso en la fecha de apertura estimada del hotel se traducirá en pérdidas importantes de negocio y cuota de mercado y podrá llevar asociadas también repercusiones importantes en otros aspectos relacionados con la operativa hotelera. Si se conocen las causas que originan tales desviaciones de tiempo y coste, se podrán establecer las correspondientes medidas de actuación para anticiparnos a ellas y que no se produzcan, siendo ésta la base del propósito de esta tesis. Así, la identificación de riesgos supone el primer paso para una gestión de riesgos eficaz, fundamental para contribuir al éxito de un proyecto. El contexto de la investigación delimita como lugar geográfico de estudio España, donde el sector turístico constituye un motor importante de la economía y en el que la eficiencia y competitividad debe estar reflejada también en el proceso del proyecto edificatorio, minimizándose los retrasos y sobrecostes. El presente estudio investiga por tanto los factores de riesgo más críticos que dan lugar a desviaciones de tiempo y coste en proyectos de edificios de uso hotelero en España. A partir del análisis de la literatura existente se genera una propuesta de identificación de factores de riesgo, que se analiza mediante un análisis cualitativo basado en la opinión de expertos y estudio de casos específicos. De los resultados de este análisis se determinan los niveles críticos para cada factor de riesgo, se comparan además las percepciones de niveles de riesgo según distintos tipos de grupos profesionales, y se establece un procedimiento en cuanto a prioridad de acción de respuesta. Así, se desarrolla una propuesta final de identificación y matriz de factores de riesgo con el objetivo de que pueda servir de base a propietarios, empresas gestoras y otros participantes de proyectos hoteleros para diseñar un plan de gestión de riesgos eficaz, contribuyendo de este modo al éxito del proyecto en cuanto a cumplimiento de objetivos de tiempo y coste programados. ABSTRACT Cost and schedule overruns constitute a very frequent phenomenon in the construction industry. A large number of construction projects do not finish on the estimated time and cost, and this scenario seems to be becoming the norm rather than the exception. Construction projects are heterogeneous by nature and they can become very complex as they involve a large number of processes which are subject to many variables and factors that may give rise to time and cost overruns. Time and cost overruns cause dissatisfaction not only to owners but all stakeholders involved in the project, leading most of the times to undesirable situations of conflicts and adversarial relationships between project participants. Hence, it becomes necessary to adopt an effective risk management strategy as an essential part of project management in order to achieve project success. Construction projects may have different characteristics depending on the type of project. This research specifically focuses on hotel construction projects. Hotel projects usually involve complex organizational structures, including many project participants and processes which develop in an environment that is already dynamic by nature. In this type of projects, the achievement of time and cost objectives is particularly important, as any delay of the hotel opening date will result in significant loss of business and market share and may also involve key important implications related to hotel operations. If the risk factors that lead to time and cost overrun are known in advance, preventive actions could be established in order to avoid them, so that time and cost overruns are minimized. This constitutes the aim of this research, being risk identification the first step of any effective risk management strategy for project success. The context of this research is focused on a particular geographical area, being this Spain. Tourism in Spain is a major contributor to the Spanish economy, and efficiency and competiveness should also be reflected in the building processes of the hotel industry, where delays and cost overruns should be kept to the minimum. The aim of this study is to explore the most critical risk factors leading to time and cost overruns in hotel construction projects in Spain. From the analysis of the literature review, a proposal of a risk identification framework is developed, which will be further analyzed by a qualitative assessment based on expert opinions and the study of specific case studies. From the results of this assessment, the levels of risk criticality are determined for the identified factors, a comparison of the perceptions of risk levels among different groups of respondents is also carried out, and a procedure for prioritization of factors in terms of needs of response is established. A final proposal of a risk register matrix framework is then developed in order to assist hotel owners, project management companies or other hotel project stakeholders, and provide them with a base to design their own specific risk management plans, contributing in this way to project success with regards to the achievement of cost and time objectives.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

In this work, a comparison between the competences codes in the CDIÓs* curriculum, the ones defined for the Tunning Project and the International Project Management Association (IPMA) is made. The goal is to define the most appropriate competences codes for the engineering education in Latin America. The CDIO code is obtained from the engineering practice, and responds to the Accreditation Board for Engineering and Technology (ABET) standards of accreditation. The Tuning competences are the ones defined for Latin America and the IPMÁs are international competences for project management. It is the first time that the competences defined in ABET accreditation standards in the engineering field are compared with the international competences according to IPMÁs model. The results give evidence that, in first place, there is a need to apply holistic models in the definition of an engineering curriculum. Second, the pertinence of these models in the definition of engineering programs in Latin America.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Una de las maneras de garantizar ante terceros un producto o servicio de calidad es mediante los Certificados de Producto o de Servicio que se pueden obtener por la implantación de Sistemas de Gestión de la Calidad en base a las Normas ISO 9000. En la actualidad continúa abierto, desde antes de la entrada en vigor de la Ley de Ordenación de la Edificación, el debate entre el colectivo de Aparejadores, Arquitectos Técnicos e Ingenieros de Edificación españoles, sobre la manera de aplicar estos sistemas para regular, procedimentar y garantizar los servicios del Director de Ejecución de Obra. El consejo General de la Arquitectura Técnica en España ha editado varias guías que intentan animar al colectivo a agruparse en Sociedades Profesionales y a implantar en ellas Sistemas de Gestión de la Calidad de acuerdo a la Norma ISO 9001, la última en 2008. Se ha realizado un estudio mediante el análisis de una encuesta a una muestra de la población de Constructores, Promotores, Directores de Obra y Directores de Ejecución de Obra, que pone de manifiesto que los intentos de promover estas prácticas no han dado resultado en el colectivo.Por otra parte, el sector de la Construcción tiene unas características muy especiales que le hacen diferente al resto de Industrias y una de las que más dificultades entraña a la hora de que los Sistemas de Gestión de la Calidad puedan ser efectivos es la falta de coordinación entre los diferentes intervinientes en la fase de construcción: Promotor, Constructor, Director de Obra y Director de Ejecución de Obra. Esta labor de integración la desarrollan en muchas ocasiones las empresas de Project Management. Sin embargo no todas las obras pueden asumir el coste adicional que supone este servicio, pudiendo en estos casos ser el Director de Ejecución de Obra el que lidere el proceso edificatorio. Por estas razones, en esta ponencia se defiende el desarrollo de un Modelo Integrador de Sistema de Gestión de la Calidad que facilite estas relaciones, que integre los esfuerzos de todos y que además pueda servir de base para establecer los requisitos para la certificación de los Servicios de Dirección de Ejecución de Obra, bien sea a través de una Empresa de Servicios Profesionales o como Profesional Liberal.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

En este trabajo se comparan las codificaciones de competencias del Plan de estudios de CDIO (Conceive, Desing, Implement and Operate systems in the enterprise and societal context) con las definidas por el Proyecto Tuning y las de IPMA (International Project Management Asociation). También se determina el tipo de aprendizaje más apropiado para lograr la adquisición de competencias en la formación de los ingenieros y se revisa la evolución de los programas de ingeniería industrial en Perú, España y EE.UU para definir las competencias específicas aplicables al caso peruano. La codificación de CDIO responde a los estándares de acreditación de ABET (Accreditation Board for Engineering and Technology) y las competencias del Proyecto Tuning son las definidas para Latinoamérica. Se comparan las competencias definidas en los estándares de acreditación ABET en el ámbito de las ingenierías, con las competencias internacionales según el modelo IPMA. Los resultados evidencian la necesidad de aplicar modelos holísticos que abarquen competencias técnicas, contextuales y de comportamiento en los planes de estudio de ingeniería, su pertinencia para la definición de programas de ingeniería en Latinoamérica y la posibilidad de definir un plan de estudios de ingeniería industrial con una estrategia de aprendizaje apropiada.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

A high productivity rate in Engineering is related to an efficient management of the flow of the large quantities of information and associated decision making activities that are consubstantial to the Engineering processes both in design and production contexts. Dealing with such problems from an integrated point of view and mimicking real scenarios is not given much attention in Engineering degrees. In the context of Engineering Education, there are a number of courses designed for developing specific competencies, as required by the academic curricula, but not that many in which integration competencies are the main target. In this paper, a course devoted to that aim is discussed. The course is taught in a Marine Engineering degree but the philosophy could be used in any Engineering field. All the lessons are given in a computer room in which every student can use each all the treated software applications. The first part of the course is dedicated to Project Management: the students acquire skills in defining, using Ms-PROJECT, the work breakdown structure (WBS), and the organization breakdown structure (OBS) in Engineering projects, through a series of examples of increasing complexity, ending up with the case of vessel construction. The second part of the course is dedicated to the use of a database manager, Ms-ACCESS, for managing production related information. A series of increasing complexity examples is treated ending up with the management of the pipe database of a real vessel. This database consists of a few thousand of pipes, for which a production timing frame is defined, which connects this part of the course with the first one. Finally, the third part of the course is devoted to the work with FORAN, an Engineering Production package of widespread use in the shipbuilding industry. With this package, the frames and plates where all the outfitting will be carried out are defined through cooperative work by the studens, working simultaneously in the same 3D model. In the paper, specific details about the learning process are given. Surveys have been posed to the students in order to get feed-back from their experience as well as to assess their satisfaction with the learning process. Results from these surveys are discussed in the paper