21 resultados para service level deviation


Relevância:

30.00% 30.00%

Publicador:

Resumo:

IP Multimedia Subsystem (IMS) is considered to provide multimedia services to users through an IP-based control plane. The current IMS service invocation mechanism, however, requires the Serving-Call Session Control Function (S-CSCF) invokes each Application Server (AS) sequentially to perform service subscription pro?le, which results in the heavy load of the S-CSCF and the long session set-up delay. To solve this issue, this paper proposes a linear chained service invocation mechanism to invoke each AS consecutively. By checking all the initial Filter Criteria (iFC) one-time and adding the addresses of all involved ASs to the ?Route? header, this new approach enables multiple services to be invoked as a linear chain during a session. We model the service invocation mechanisms through Jackson networks, which are validated through simulations. The analytic results verify that the linear chained service invocation mechanism can effectively reduce session set-up delay of the service layer and decrease the load level of the S-CSCF

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Como en todos los medios de transporte, la seguridad en los viajes en avión es de primordial importancia. Con los aumentos de tráfico aéreo previstos en Europa para la próxima década, es evidente que el riesgo de accidentes necesita ser evaluado y monitorizado cuidadosamente de forma continúa. La Tesis presente tiene como objetivo el desarrollo de un modelo de riesgo de colisión exhaustivo como método para evaluar el nivel de seguridad en ruta del espacio aéreo europeo, considerando todos los factores de influencia. La mayor limitación en el desarrollo de metodologías y herramientas de monitorización adecuadas para evaluar el nivel de seguridad en espacios de ruta europeos, donde los controladores aéreos monitorizan el tráfico aéreo mediante la vigilancia radar y proporcionan instrucciones tácticas a las aeronaves, reside en la estimación del riesgo operacional. Hoy en día, la estimación del riesgo operacional está basada normalmente en reportes de incidentes proporcionados por el proveedor de servicios de navegación aérea (ANSP). Esta Tesis propone un nuevo e innovador enfoque para evaluar el nivel de seguridad basado exclusivamente en el procesamiento y análisis trazas radar. La metodología propuesta ha sido diseñada para complementar la información recogida en las bases de datos de accidentes e incidentes, mediante la provisión de información robusta de los factores de tráfico aéreo y métricas de seguridad inferidas del análisis automático en profundidad de todos los eventos de proximidad. La metodología 3-D CRM se ha implementado en un prototipo desarrollado en MATLAB © para analizar automáticamente las trazas radar y planes de vuelo registrados por los Sistemas de Procesamiento de Datos Radar (RDP) e identificar y analizar todos los eventos de proximidad (conflictos, conflictos potenciales y colisiones potenciales) en un periodo de tiempo y volumen del espacio aéreo. Actualmente, el prototipo 3-D CRM está siendo adaptado e integrado en la herramienta de monitorización de prestaciones de Aena (PERSEO) para complementar las bases de accidentes e incidentes ATM y mejorar la monitorización y proporcionar evidencias de los niveles de seguridad. ABSTRACT As with all forms of transport, the safety of air travel is of paramount importance. With the projected increases in European air traffic in the next decade and beyond, it is clear that the risk of accidents needs to be assessed and carefully monitored on a continuing basis. The present thesis is aimed at the development of a comprehensive collision risk model as a method of assessing the European en-route risk, due to all causes and across all dimensions within the airspace. The major constraint in developing appropriate monitoring methodologies and tools to assess the level of safety in en-route airspaces where controllers monitor air traffic by means of radar surveillance and provide aircraft with tactical instructions lies in the estimation of the operational risk. The operational risk estimate normally relies on incident reports provided by the air navigation service providers (ANSPs). This thesis proposes a new and innovative approach to assessing aircraft safety level based exclusively upon the process and analysis of radar tracks. The proposed methodology has been designed to complement the information collected in the accident and incident databases, thereby providing robust information on air traffic factors and safety metrics inferred from the in depth assessment of proximate events. The 3-D CRM methodology is implemented in a prototype tool in MATLAB © in order to automatically analyze recorded aircraft tracks and flight plan data from the Radar Data Processing systems (RDP) and identify and analyze all proximate events (conflicts, potential conflicts and potential collisions) within a time span and a given volume of airspace. Currently, the 3D-CRM prototype is been adapted and integrated in AENA’S Performance Monitoring Tool (PERSEO) to complement the information provided by the ATM accident and incident databases and to enhance monitoring and providing evidence of levels of safety.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Este trabajo de Tesis se desarrolla en el marco de los escenarios de ejecución distribuida de servicios móviles y contribuye a la definición y desarrollo del concepto de usuario prosumer. El usuario prosumer se caracteriza por utilizar su teléfono móvil para crear, proveer y ejecutar servicios. Este nuevo modelo de usuario contribuye al avance de la sociedad de la información, ya que el usuario prosumer se transforma de creador de contenidos a creador de servicios (estos últimos formados por contenidos y la lógica para acceder a ellos, procesarlos y representarlos). El objetivo general de este trabajo de Tesis es la provisión de un modelo de creación, distribución y ejecución de servicios para entorno móvil que permita a los usuarios no programadores (usuarios prosumer), pero expertos en un determinado dominio, crear y ejecutar sus propias aplicaciones y servicios. Para ello se definen, desarrollan e implementan metodologías, procesos, algoritmos y mecanismos adaptables a dominios específicos, para construir entornos de ejecución distribuida de servicios móviles para usuarios prosumer. La provisión de herramientas de creación adaptadas a usuarios no expertos es una tendencia actual que está siendo desarrollada en distintos trabajos de investigación. Sin embargo, no se ha propuesto una metodología de desarrollo de servicios que involucre al usuario prosumer en el proceso de diseño, desarrollo, implementación y validación de servicios. Este trabajo de Tesis realiza un estudio de las metodologías y tecnologías más innovadoras relacionadas con la co‐creación y utiliza este análisis para definir y validar una metodología que habilita al usuario para ser el responsable de la creación de servicios finales. Siendo los entornos móviles prosumer (mobile prosumer environments) una particularización de los entornos de ejecución distribuida de servicios móviles, en este trabajo se tesis se investiga en técnicas de adaptación, distribución, coordinación de servicios y acceso a recursos identificando como requisitos las problemáticas de este tipo de entornos y las características de los usuarios que participan en los mismos. Se contribuye a la adaptación de servicios definiendo un modelo de variabilidad que soporte la interdependencia entre las decisiones de personalización de los usuarios, incorporando mecanismos de guiado y detección de errores. La distribución de servicios se implementa utilizando técnicas de descomposición en árbol SPQR, cuantificando el impacto de separar cualquier servicio en distintos dominios. Considerando el plano de comunicaciones para la coordinación en la ejecución de servicios distribuidos hemos identificado varias problemáticas, como las pérdidas de enlace, conexiones, desconexiones y descubrimiento de participantes, que resolvemos utilizando técnicas de diseminación basadas en publicación subscripción y algoritmos Gossip. Para lograr una ejecución flexible de servicios distribuidos en entorno móvil, soportamos la adaptación a cambios en la disponibilidad de los recursos, proporcionando una infraestructura de comunicaciones para el acceso uniforme y eficiente a recursos. Se han realizado validaciones experimentales para evaluar la viabilidad de las soluciones propuestas, definiendo escenarios de aplicación relevantes (el nuevo universo inteligente, prosumerización de servicios en entornos hospitalarios y emergencias en la web de la cosas). Abstract This Thesis work is developed in the framework of distributed execution of mobile services and contributes to the definition and development of the concept of prosumer user. The prosumer user is characterized by using his mobile phone to create, provide and execute services. This new user model contributes to the advancement of the information society, as the prosumer is transformed from producer of content, to producer of services (consisting of content and logic to access them, process them and represent them). The overall goal of this Thesis work is to provide a model for creation, distribution and execution of services for the mobile environment that enables non‐programmers (prosumer users), but experts in a given domain, to create and execute their own applications and services. For this purpose I define, develop and implement methodologies, processes, algorithms and mechanisms, adapted to specific domains, to build distributed environments for the execution of mobile services for prosumer users. The provision of creation tools adapted to non‐expert users is a current trend that is being developed in different research works. However, it has not been proposed a service development methodology involving the prosumer user in the process of design, development, implementation and validation of services. This thesis work studies innovative methodologies and technologies related to the co‐creation and relies on this analysis to define and validate a methodological approach that enables the user to be responsible for creating final services. Being mobile prosumer environments a specific case of environments for distributed execution of mobile services, this Thesis work researches in service adaptation, distribution, coordination and resource access techniques, and identifies as requirements the challenges of such environments and characteristics of the participating users. I contribute to service adaptation by defining a variability model that supports the dependency of user personalization decisions, incorporating guiding and error detection mechanisms. Service distribution is implemented by using decomposition techniques based on SPQR trees, quantifying the impact of separating any service in different domains. Considering the communication level for the coordination of distributed service executions I have identified several problems, such as link losses, connections, disconnections and discovery of participants, which I solve using dissemination techniques based on publish‐subscribe communication models and Gossip algorithms. To achieve a flexible distributed service execution in mobile environments, I support adaptation to changes in the availability of resources, while providing a communication infrastructure for the uniform and efficient access to resources. Experimental validations have been conducted to assess the feasibility of the proposed solutions, defining relevant application scenarios (the new intelligent universe, service prosumerization in hospitals and emergency situations in the web of things).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

El objetivo final de las investigaciones recogidas en esta tesis doctoral es la estimación del volumen de hielo total de los ms de 1600 glaciares de Svalbard, en el Ártico, y, con ello, su contribución potencial a la subida del nivel medio del mar en un escenario de calentamiento global. Los cálculos más exactos del volumen de un glaciar se efectúan a partir de medidas del espesor de hielo obtenidas con georradar. Sin embargo, estas medidas no son viables para conjuntos grandes de glaciares, debido al coste, dificultades logísticas y tiempo requerido por ellas, especialmente en las regiones polares o de montaña. Frente a ello, la determinación de áreas de glaciares a partir de imágenes de satélite sí es viable a escalas global y regional, por lo que las relaciones de escala volumen-área constituyen el mecanismo más adecuado para las estimaciones de volúmenes globales y regionales, como las realizadas para Svalbard en esta tesis. Como parte del trabajo de tesis, hemos elaborado un inventario de los glaciares de Svalbard en los que se han efectuado radioecosondeos, y hemos realizado los cálculos del volumen de hielo de más de 80 cuencas glaciares de Svalbard a partir de datos de georradar. Estos volúmenes han sido utilizados para calibrar las relaciones volumen-área desarrolladas en la tesis. Los datos de georradar han sido obtenidos en diversas campañas llevadas a cabo por grupos de investigación internacionales, gran parte de ellas lideradas por el Grupo de Simulación Numérica en Ciencias e Ingeniería de la Universidad Politécnica de Madrid, del que forman parte la doctoranda y los directores de tesis. Además, se ha desarrollado una metodología para la estimación del error en el cálculo de volumen, que aporta una novedosa técnica de cálculo del error de interpolación para conjuntos de datos del tipo de los obtenidos con perfiles de georradar, que presentan distribuciones espaciales con unos patrones muy característicos pero con una densidad de datos muy irregular. Hemos obtenido en este trabajo de tesis relaciones de escala específicas para los glaciares de Svalbard, explorando la sensibilidad de los parámetros a diferentes morfologías glaciares, e incorporando nuevas variables. En particular, hemos efectuado experimentos orientados a verificar si las relaciones de escala obtenidas caracterizando los glaciares individuales por su tamaño, pendiente o forma implican diferencias significativas en el volumen total estimado para los glaciares de Svalbard, y si esta partición implica algún patrón significativo en los parámetros de las relaciones de escala. Nuestros resultados indican que, para un valor constante del factor multiplicativo de la relacin de escala, el exponente que afecta al área en la relación volumen-área decrece según aumentan la pendiente y el factor de forma, mientras que las clasificaciones basadas en tamaño no muestran un patrón significativo. Esto significa que los glaciares con mayores pendientes y de tipo circo son menos sensibles a los cambios de área. Además, los volúmenes de la población total de los glaciares de Svalbard calculados con fraccionamiento en grupos por tamaño y pendiente son un 1-4% menores que los obtenidas usando la totalidad de glaciares sin fraccionamiento en grupos, mientras que los volúmenes calculados fraccionando por forma son un 3-5% mayores. También realizamos experimentos multivariable para obtener estimaciones óptimas del volumen total mediante una combinación de distintos predictores. Nuestros resultados muestran que un modelo potencial simple volumen-área explica el 98.6% de la varianza. Sólo el predictor longitud del glaciar proporciona significación estadística cuando se usa además del área del glaciar, aunque el coeficiente de determinación disminuye en comparación con el modelo más simple V-A. El predictor intervalo de altitud no proporciona información adicional cuando se usa además del área del glaciar. Nuestras estimaciones del volumen de la totalidad de glaciares de Svalbard usando las diferentes relaciones de escala obtenidas en esta tesis oscilan entre 6890 y 8106 km3, con errores relativos del orden de 6.6-8.1%. El valor medio de nuestras estimaciones, que puede ser considerado como nuestra mejor estimación del volumen, es de 7.504 km3. En términos de equivalente en nivel del mar (SLE), nuestras estimaciones corresponden a una subida potencial del nivel del mar de 17-20 mm SLE, promediando 19_2 mm SLE, donde el error corresponde al error en volumen antes indicado. En comparación, las estimaciones usando las relaciones V-A de otros autores son de 13-26 mm SLE, promediando 20 _ 2 mm SLE, donde el error representa la desviación estándar de las distintas estimaciones. ABSTRACT The final aim of the research involved in this doctoral thesis is the estimation of the total ice volume of the more than 1600 glaciers of Svalbard, in the Arctic region, and thus their potential contribution to sea-level rise under a global warming scenario. The most accurate calculations of glacier volumes are those based on ice-thicknesses measured by groundpenetrating radar (GPR). However, such measurements are not viable for very large sets of glaciers, due to their cost, logistic difficulties and time requirements, especially in polar or mountain regions. On the contrary, the calculation of glacier areas from satellite images is perfectly viable at global and regional scales, so the volume-area scaling relationships are the most useful tool to determine glacier volumes at global and regional scales, as done for Svalbard in this PhD thesis. As part of the PhD work, we have compiled an inventory of the radio-echo sounded glaciers in Svalbard, and we have performed the volume calculations for more than 80 glacier basins in Svalbard from GPR data. These volumes have been used to calibrate the volume-area relationships derived in this dissertation. Such GPR data have been obtained during fieldwork campaigns carried out by international teams, often lead by the Group of Numerical Simulation in Science and Engineering of the Technical University of Madrid, to which the PhD candidate and her supervisors belong. Furthermore, we have developed a methodology to estimate the error in the volume calculation, which includes a novel technique to calculate the interpolation error for data sets of the type produced by GPR profiling, which show very characteristic data distribution patterns but with very irregular data density. We have derived in this dissertation scaling relationships specific for Svalbard glaciers, exploring the sensitivity of the scaling parameters to different glacier morphologies and adding new variables. In particular, we did experiments aimed to verify whether scaling relationships obtained through characterization of individual glacier shape, slope and size imply significant differences in the estimated volume of the total population of Svalbard glaciers, and whether this partitioning implies any noticeable pattern in the scaling relationship parameters. Our results indicate that, for a fixed value of the factor in the scaling relationship, the exponent of the area in the volume-area relationship decreases as slope and shape increase, whereas size-based classifications do not reveal any clear trend. This means that steep slopes and cirque-type glaciers are less sensitive to changes in glacier area. Moreover, the volumes of the total population of Svalbard glaciers calculated according to partitioning in subgroups by size and slope are smaller (by 1-4%) than that obtained considering all glaciers without partitioning into subgroups, whereas the volumes calculated according to partitioning in subgroups by shape are 3-5% larger. We also did multivariate experiments attempting to optimally predict the volume of Svalbard glaciers from a combination of different predictors. Our results show that a simple power-type V-A model explains 98.6% of the variance. Only the predictor glacier length provides statistical significance when used in addition to the predictor glacier area, though the coefficient of determination decreases as compared with the simpler V-A model. The predictor elevation range did not provide any additional information when used in addition to glacier area. Our estimates of the volume of the entire population of Svalbard glaciers using the different scaling relationships that we have derived along this thesis range within 6890-8106 km3, with estimated relative errors in total volume of the order of 6.6-8.1% The average value of all of our estimates, which could be used as a best estimate for the volume, is 7,504 km3. In terms of sea-level equivalent (SLE), our volume estimates correspond to a potential contribution to sea-level rise within 17-20 mm SLE, averaging 19 _ 2 mm SLE, where the quoted error corresponds to our estimated relative error in volume. For comparison, the estimates using the V-A scaling relations found in the literature range within 13-26 mm SLE, averaging 20 _ 2 mm SLE, where the quoted error represents the standard deviation of the different estimates.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

El objetivo de la presente investigación es el desarrollo de un modelo de cálculo rápido, eficiente y preciso, para la estimación de los costes finales de construcción, en las fases preliminares del proyecto arquitectónico. Se trata de una herramienta a utilizar durante el proceso de elaboración de estudios previos, anteproyecto y proyecto básico, no siendo por tanto preciso para calcular el “predimensionado de costes” disponer de la total definición grafica y literal del proyecto. Se parte de la hipótesis de que en la aplicación práctica del modelo no se producirán desviaciones superiores al 10 % sobre el coste final de la obra proyectada. Para ello se formulan en el modelo de predimensionado cinco niveles de estimación de costes, de menor a mayor definición conceptual y gráfica del proyecto arquitectónico. Los cinco niveles de cálculo son: dos que toman como referencia los valores “exógenos” de venta de las viviendas (promoción inicial y promoción básica) y tres basados en cálculos de costes “endógenos” de la obra proyectada (estudios previos, anteproyecto y proyecto básico). El primer nivel de estimación de carácter “exógeno” (nivel .1), se calcula en base a la valoración de mercado de la promoción inmobiliaria y a su porcentaje de repercusión de suelo sobre el valor de venta de las viviendas. El quinto nivel de valoración, también de carácter “exógeno” (nivel .5), se calcula a partir del contraste entre el valor externo básico de mercado, los costes de construcción y los gastos de promoción estimados de la obra proyectada. Este contraste entre la “repercusión del coste de construcción” y el valor de mercado, supone una innovación respecto a los modelos de predimensionado de costes existentes, como proceso metodológico de verificación y validación extrínseca, de la precisión y validez de las estimaciones resultantes de la aplicación práctica del modelo, que se denomina Pcr.5n (Predimensionado costes de referencia con .5niveles de cálculo según fase de definición proyectual / ideación arquitectónica). Los otros tres niveles de predimensionado de costes de construcción “endógenos”, se estiman mediante cálculos analíticos internos por unidades de obra y cálculos sintéticos por sistemas constructivos y espacios funcionales, lo que se lleva a cabo en las etapas iniciales del proyecto correspondientes a estudios previos (nivel .2), anteproyecto (nivel .3) y proyecto básico (nivel .4). Estos cálculos teóricos internos son finalmente evaluados y validados mediante la aplicación práctica del modelo en obras de edificación residencial, de las que se conocen sus costes reales de liquidación final de obra. Según va evolucionando y se incrementa el nivel de definición y desarrollo del proyecto, desde los estudios previos hasta el proyecto básico, el cálculo se va perfeccionando en su nivel de eficiencia y precisión de la estimación, según la metodología aplicada: [aproximaciones sucesivas en intervalos finitos], siendo la hipótesis básica como anteriormente se ha avanzado, lograr una desviación máxima de una décima parte en el cálculo estimativo del predimensionado del coste real de obra. El cálculo del coste de ejecución material de la obra, se desarrolla en base a parámetros cúbicos funcionales “tridimensionales” del espacio proyectado y parámetros métricos constructivos “bidimensionales” de la envolvente exterior de cubierta/fachada y de la huella del edificio sobre el terreno. Los costes funcionales y constructivos se ponderan en cada fase del proceso de cálculo con sus parámetros “temáticos/específicos” de gestión (Pg), proyecto (Pp) y ejecución (Pe) de la concreta obra presupuestada, para finalmente estimar el coste de construcción por contrata, como resultado de incrementar al coste de ejecución material el porcentaje correspondiente al parámetro temático/especifico de la obra proyectada. El modelo de predimensionado de costes de construcción Pcr.5n, será una herramienta de gran interés y utilidad en el ámbito profesional, para la estimación del coste correspondiente al Proyecto Básico previsto en el marco técnico y legal de aplicación. Según el Anejo I del Código Técnico de la Edificación (CTE), es de obligado cumplimiento que el proyecto básico contenga una “Valoración aproximada de la ejecución material de la obra proyectada por capítulos”, es decir , que el Proyecto Básico ha de contener al menos un “presupuesto aproximado”, por capítulos, oficios ó tecnologías. El referido cálculo aproximado del presupuesto en el Proyecto Básico, necesariamente se ha de realizar mediante la técnica del predimensionado de costes, dado que en esta fase del proyecto arquitectónico aún no se dispone de cálculos de estructura, planos de acondicionamiento e instalaciones, ni de la resolución constructiva de la envolvente, por cuanto no se han desarrollado las especificaciones propias del posterior proyecto de ejecución. Esta estimación aproximada del coste de la obra, es sencilla de calcular mediante la aplicación práctica del modelo desarrollado, y ello tanto para estudiantes como para profesionales del sector de la construcción. Como se contiene y justifica en el presente trabajo, la aplicación práctica del modelo para el cálculo de costes en las fases preliminares del proyecto, es rápida y certera, siendo de sencilla aplicación tanto en vivienda unifamiliar (aisladas y pareadas), como en viviendas colectivas (bloques y manzanas). También, el modelo es de aplicación en el ámbito de la valoración inmobiliaria, tasaciones, análisis de viabilidad económica de promociones inmobiliarias, estimación de costes de obras terminadas y en general, cuando no se dispone del proyecto de ejecución y sea preciso calcular los costes de construcción de las obras proyectadas. Además, el modelo puede ser de aplicación para el chequeo de presupuestos calculados por el método analítico tradicional (estado de mediciones pormenorizadas por sus precios unitarios y costes descompuestos), tanto en obras de iniciativa privada como en obras promovidas por las Administraciones Públicas. Por último, como líneas abiertas a futuras investigaciones, el modelo de “predimensionado costes de referencia 5 niveles de cálculo”, se podría adaptar y aplicar para otros usos y tipologías diferentes a la residencial, como edificios de equipamientos y dotaciones públicas, valoración de edificios históricos, obras de urbanización interior y exterior de parcela, proyectos de parques y jardines, etc….. Estas lineas de investigación suponen trabajos paralelos al aquí desarrollado, y que a modo de avance parcial se recogen en las comunicaciones presentadas en los Congresos internacionales Scieconf/Junio 2013, Rics‐Cobra/Septiembre 2013 y en el IV Congreso nacional de patología en la edificación‐Ucam/Abril 2014. ABSTRACT The aim of this research is to develop a fast, efficient and accurate calculation model to estimate the final costs of construction, during the preliminary stages of the architectural project. It is a tool to be used during the preliminary study process, drafting and basic project. It is not therefore necessary to have the exact, graphic definition of the project in order to be able to calculate the cost‐scaling. It is assumed that no deviation 10% higher than the final cost of the projected work will occur during the implementation. To that purpose five levels of cost estimation are formulated in the scaling model, from a lower to a higher conceptual and graphic definition of the architectural project. The five calculation levels are: two that take as point of reference the ”exogenous” values of house sales (initial development and basic development), and three based on calculation of endogenous costs (preliminary study, drafting and basic project). The first ”exogenous” estimation level (level.1) is calculated over the market valuation of real estate development and the proportion the cost of land has over the value of the houses. The fifth level of valuation, also an ”exogenous” one (level.5) is calculated from the contrast between the basic external market value, the construction costs, and the estimated development costs of the projected work. This contrast between the ”repercussions of construction costs” and the market value is an innovation regarding the existing cost‐scaling models, as a methodological process of extrinsic verification and validation, of the accuracy and validity of the estimations obtained from the implementation of the model, which is called Pcr.5n (reference cost‐scaling with .5calculation levels according to the stage of project definition/ architectural conceptualization) The other three levels of “endogenous” construction cost‐scaling are estimated from internal analytical calculations by project units and synthetic calculations by construction systems and functional spaces. This is performed during the initial stages of the project corresponding to preliminary study process (level.2), drafting (level.3) and basic project (level.4). These theoretical internal calculations are finally evaluated and validated via implementation of the model in residential buildings, whose real costs on final payment of the works are known. As the level of definition and development of the project evolves, from preliminary study to basic project, the calculation improves in its level of efficiency and estimation accuracy, following the applied methodology: [successive approximations at finite intervals]. The basic hypothesis as above has been made, achieving a maximum deviation of one tenth, in the estimated calculation of the true cost of predimensioning work. The cost calculation for material execution of the works is developed from functional “three‐dimensional” cubic parameters for the planned space and constructive “two dimensional” metric parameters for the surface that envelopes around the facade and the building’s footprint on the plot. The functional and building costs are analyzed at every stage of the process of calculation with “thematic/specific” parameters of management (Pg), project (Pp) and execution (Pe) of the estimated work in question, and finally the cost of contractual construction is estimated, as a consequence of increasing the cost of material execution with the percentage pertaining to the thematic/specific parameter of the projected work. The construction cost‐scaling Pcr.5n model will be a useful tool of great interest in the professional field to estimate the cost of the Basic Project as prescribed in the technical and legal framework of application. According to the appendix of the Technical Building Code (CTE), it is compulsory that the basic project contains an “approximate valuation of the material execution of the work, projected by chapters”, that is, that the basic project must contain at least an “approximate estimate” by chapter, trade or technology. This approximate estimate in the Basic Project is to be performed through the cost‐scaling technique, given that structural calculations, reconditioning plans and definitive contruction details of the envelope are still not available at this stage of the architectural project, insofar as specifications pertaining to the later project have not yet been developed. This approximate estimate of the cost of the works is easy to calculate through the implementation of the given model, both for students and professionals of the building sector. As explained and justified in this work, the implementation of the model for cost‐scaling during the preliminary stage is fast and accurate, as well as easy to apply both in single‐family houses (detached and semi‐detached) and collective housing (blocks). The model can also be applied in the field of the real‐estate valuation, official appraisal, analysis of the economic viability of real estate developments, estimate of the cost of finished projects and, generally, when an implementation project is not available and it is necessary to calculate the building costs of the projected works. The model can also be applied to check estimates calculated by the traditional analytical method (state of measurements broken down into price per unit cost details), both in private works and those promoted by Public Authorities. Finally, as potential lines for future research, the “five levels of calculation cost‐scaling model”, could be adapted and applied to purposes and typologies other than the residential one, such as service buildings and public facilities, valuation of historical buildings, interior and exterior development works, park and garden planning, etc… These lines of investigation are parallel to this one and, by way of a preview, can be found in the dissertations given in the International Congresses Scieconf/June 2013, Rics‐Cobra/September 2013 and in the IV Congress on building pathology ‐Ucam/April 2014.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Data-related properties of the activities involved in a service composition can be used to facilitate several design-time and run-time adaptation tasks, such as service evolution, distributed enactment, and instance-level adaptation. A number of these properties can be expressed using a notion of sharing. We present an approach for automated inference of data properties based on sharing analysis, which is able to handle service compositions with complex control structures, involving loops and sub-workflows. The properties inferred can include data dependencies, information content, domain-defined attributes, privacy or confidentiality levels, among others. The analysis produces characterizations of the data and the activities in the composition in terms of minimal and maximal sharing, which can then be used to verify compliance of potential adaptation actions, or as supporting information in their generation. This sharing analysis approach can be used both at design time and at run time. In the latter case, the results of analysis can be refined using the composition traces (execution logs) at the point of execution, in order to support run-time adaptation.