24 resultados para exploitation of the testing
Resumo:
Building-integrated Photovoltaics (BIPV) is one of the most promising technologies enabling buildings to generate on-site part of their electricity needs while performing architectural functionalities. A clear example of BIPV products consists of semi-transparent photovoltaic modules (STPV), designed to replace the conventional glazing solutions in building façades. Accordingly, the active building envelope is required to perform multiple requirements such as provide solar shading to avoid overheating, supply solar gains and thermal insulation to reduce heat loads and improve daylight utilization. To date, various studies into STPV systems have focused on their energy performance based on existing simulation programs, or on the modelling, normally validated by limited experimental data, of the STPV modules thermal behaviour. Taking into account that very limited experimental research has been conducted on the energy performance of STPV elements and that the characterization in real operation conditions is necessary to promote an energetically efficient integration of this technology in the building envelope, an outdoor testing facility has been designed, developed and built at the Solar Energy Institute of the Technical University of Madrid. In this work, the methodology used in the definition of the testing facility, its capability and limitations are presented and discussed.
Resumo:
El principal objetivo de este trabajo es aportar conocimiento para contestar la pregunta: ¿hasta que punto los ensayos en túnel aerodinámico pueden contribuir a determinar las características que afectan la respuesta dinámica de los aerogeneradores operando en terreno complejo?. Esta pregunta no es nueva, de hecho, el debate en la comunidad científica comenzó en el primer tercio del siglo pasado y aún está intensamente vivo. El método generalmente aceptado para enfrentar el mencionado problema consiste en analizar un caso de estudio determinado en el cual se aplican tanto ensayos a escala real como análisis computacionales y ensayos en túnel aerodinámico. Esto no es ni fácil ni barato. Esta es la razón por la cual desde el experimento de Askervein en 1988, los modelizadores del flujo atmosférico tuvieron que esperar hasta 2007 a que el experimento de Bolund fuese puesto en marcha con un despliegue de medios técnicos equivalentes (teniendo en cuenta la evolución de las tecnologías de sensores y computación). El problema contempla tantos aspectos que ambas experiencias fueron restringidas a condiciones de atmósfera neutra con efectos de Coriolis despreciables con objeto de reducir la complejidad. Este es el contexto en el que se ha desarrollado la presente tesis doctoral. La topología del flujo sobre la isla de Bolund ha sido estudiada mediante la reproducción del experimento de Bolund en los túneles aerodinámicos A9 y ACLA16 del IDR. Dos modelos de la isla de Bolund fueron fabricados a dos escalas, 1:230 y 1:115. El flujo de entrada en el túnel aerodinámico simulando la capa límite sin perturbar correspondía a régimen de transición (transitionally rough regime) y fue usado como situación de referencia. El modelo a escala 1:230 fue ensayado en el túnel A9 para determinar la presión sobre su superficie. La distribución del coeficiente de presión sobre la isla proporcionó una visualización y estimación de una región de desprendimiento sobre el pequeño acantilado situado al frente de la misma. Las medidas de presión instantánea con suficiente grado de resolución temporal pusieron de manifiesto la no estacionariedad en la región de desprendimiento. El modelo a escala 1:115 fue ensayado utilizando hilo caliente de tres componentes y un sistema de velocimetría por imágenes de partículas de dos componentes. El flujo fue caracterizado por el ratio de aceleración, el incremento normalizado de energía cinética turbulenta y los ángulos de inclinación y desviación horizontal. Los resultados a lo largo de la dirección 270°y alturas de 2 m y 5 m presentaron una gran similitud con los resultados a escala real del experimento de Bolund. Los perfiles verticales en las localizaciones de las torres meteorológicas mostraron un acuerdo significativo con los resultados a escala real. El análisis de los esfuerzos de Reynolds y el análisis espectral en las localizaciones de los mástiles meteorológicos presentaron niveles de acuerdo variados en ciertas posiciones, mientras que en otras presentaron claras diferencias. El mapeo horizontal del flujo, para una dirección de viento de 270°, permitió caracterizar el comportamiento de la burbuja intermitente de recirculación sobre el pequeño acantilado existente al frente de la isla así como de la región de relajación y de la capa de cortadura en la región corriente abajo de Bolund. Se realizaron medidas de velocidad con alta resolución espacial en planos perpendiculares a la dirección del flujo sin perturbar. Estas medidas permitieron detectar y caracterizar una estructura de flujo similar a un torbellino longitudinal con regiones con altos gradientes de velocidad y alta intensidad de turbulencia. Esta estructura de flujo es, sin duda, un reto para los modelos computacionales y puede considerarse un factor de riesgo para la operación de los aerogeneradores. Se obtuvieron y analizaron distribuciones espaciales de los esfuerzos de Reynolds mediante 3CHW y PIV. Este tipo de parámetros no constituyen parte de los resultados habituales en los ensayos en túnel sobre topografías y son muy útiles para los modelizadores que utilizan simulación de grades torbellinos (LES). Se proporciona una interpretación de los resultados obtenidos en el túnel aerodinámico en términos de utilidad para los diseñadores de parques eólicos. La evolución y variación de los parámetros del flujo a lo largo de líneas, planos y superficies han permitido identificar como estas propiedades del flujo podrían afectar la localización de los aerogeneradores y a la clasificación de emplazamientos. Los resultados presentados sugieren, bajo ciertas condiciones, la robustez de los ensayos en túnel para estudiar la topología sobre terreno complejo y su comparabilidad con otras técnicas de simulación, especialmente considerando el nivel de acuerdo del conjunto de resultados presentados con los resultados a escala real. De forma adicional, algunos de los parámetros del flujo obtenidos de las medidas en túnel son difícilmente determinables en ensayos a escala real o por medios computacionales, considerado el estado del arte. Este trabajo fue realizado como parte de las actividades subvencionadas por la Comisión Europea como dentro del proyecto FP7-PEOPLE-ITN-2008WAUDIT (Wind Resource Assessment Audit and Standardization) dentro de la FP7 Marie-Curie Initial Training Network y por el Ministerio Español de Economía y Competitividad dentro del proyecto ENE2012-36473, TURCO (Determinación en túnel aerodinámico de la distribución espacial de parámetros estadísticos de la turbulencia atmosférica sobre topografías complejas) del Plan Nacional de Investigación (Subprograma de investigación fundamental no orientada 2012). El informe se ha organizado en siete capítulos y un conjunto de anexos. En el primer capítulo se introduce el problema. En el capítulo dos se describen los medios experimentales utilizados. Seguidamente, en el capítulo tres, se analizan en detalle las condiciones de referencia del principal túnel aerodinámico utilizado en esta investigación. En el capítulo tres se presentan resultados de ensayos de presión superficial sobre un modelo de la isla. Los principales resultados del experimento de Bolund se reproducen en el capítulo cinco. En el capítulo seis se identifican diferentes estructuras del flujo sobre la isla y, finalmente, en el capitulo siete, se recogen las conclusiones y una propuesta de lineas de trabajo futuras. ABSTRACT The main objective of this work is to contribute to answer the question: to which extend can the wind tunnel testing contribute to determine the flow characteristics that affect the dynamic response of wind turbines operating in highly complex terrains?. This question is not new, indeed, the debate in the scientific community was opened in the first third of the past century and it is still intensely alive. The accepted approach to face this problem consists in analysing a given case study where full-scale tests, computational modelling and wind tunnel testing are applied to the same topography. This is neither easy nor cheap. This is is the reason why since the Askervein experience in 1988, the atmospheric flow modellers community had to wait till 2007 when the Bolund experiment was setup with a deployment of technical means equivalent (considering the evolution of the sensor and computing techniques). The problem is so manifold that both experiences were restricted to neutral conditions without Coriolis effects in order to reduce the complexity. This is the framework in which this PhD has been carried out. The flow topology over the Bolund Island has been studied by replicating the Bolund experiment in the IDR A9 and ACLA16 wind tunnels. Two mock-ups of the Bolund island were manufactured at two scales of 1:230 and 1:115. The in-flow in the empty wind tunnel simulating the incoming atmospheric boundary layer was in the transitionally rough regime and used as a reference case. The 1:230 model was tested in the A9 wind tunnel to measure surface pressure. The mapping of the pressure coefficient across the island gave a visualisation and estimation of a detachment region on the top of the escarpment in front of the island. Time resolved instantaneous pressure measurements illustrated the non-steadiness in the detachment region. The 1:115 model was tested using 3C hot-wires(HW) and 2C Particle Image Velocimetry(PIV). Measurements at met masts M3, M6, M7 and M8 and along Line 270°were taken to replicate the result of the Bolund experiment. The flow was characterised by the speed-up ratio, normalised increment of the turbulent kinetic energy, inclination angle and turning angle. Results along line 270°at heights of 2 m and 5 m compared very well with the full-scale results of the Bolund experiment. Vertical profiles at the met masts showed a significant agreement with the full-scale results. The analysis of the Reynolds stresses and the spectral analysis at the met mast locations gave a varied level of agreement at some locations while clear mismatch at others. The horizontal mapping of the flow field, for a 270°wind direction, allowed to characterise the behaviour of the intermittent recirculation bubble on top of the front escarpment followed by a relaxation region and the presence of a shear layer in the lee side of the island. Further detailed velocity measurements were taken at cross-flow planes over the island to study the flow structures on the island. A longitudinal vortex-like structure with high mean velocity gradients and high turbulent kinetic energy was characterised on the escarpment and evolving downstream. This flow structure is a challenge to the numerical models while posing a threat to wind farm designers when siting wind turbines. Spatial distribution of Reynold stresses were presented from 3C HW and PIV measurements. These values are not common results from usual wind tunnel measurements and very useful for modellers using large eddy simulation (LES). An interpretation of the wind tunnel results in terms of usefulness to wind farm designers is given. Evolution and variation of the flow parameters along measurement lines, planes and surfaces indicated how the flow field could affect wind turbine siting. Different flow properties were presented so compare the level of agreement to full-scale results and how this affected when characterising the site wind classes. The results presented suggest, under certain conditions, the robustness of the wind tunnel testing for studying flow topology over complex terrain and its capability to compare to other modelling techniques especially from the level of agreement between the different data sets presented. Additionally, some flow parameters obtained from wind tunnel measurements would have been quite difficult to be measured at full-scale or by computational means considering the state of the art. This work was carried out as a part of the activities supported by the EC as part of the FP7- PEOPLE-ITN-2008 WAUDIT project (Wind Resource Assessment Audit and Standardization) within the FP7 Marie-Curie Initial Training Network and by the Spanish Ministerio de Economía y Competitividad, within the framework of the ENE2012-36473, TURCO project (Determination of the Spatial Distribution of Statistic Parameters of Flow Turbulence over Complex Topographies in Wind Tunnel) belonging to the Spanish National Program of Research (Subprograma de investigación fundamental no orientada 2012). The report is organised in seven chapters and a collection of annexes. In chapter one, the problem is introduced. In chapter two the experimental setup is described. Following, in chapter three, the inflow conditions of the main wind tunnel used in this piece of research are analysed in detail. In chapter three, preliminary pressure tests results on a model of the island are presented. The main results from the Bolund experiment are replicated in chapter five. In chapter six, an identification of specific flow strutures over the island is presented and, finally, in chapter seven, conclusions and lines for future works related to the presented one are included.
Resumo:
The main contribution of this research paper is to display a range of figures and values which could help urban planners to quantify the urban phenomenon of sprawl. In this way, after a rigorous analysis and comparison between a scattered urban fabric (Majadahonda) and a compact urban fabric (Alcorcón), several possible indexes are established and characterized in order to verify the main hypothesis: in what extent land consumption and exploitation of energy resources are higher in a scattered urban fabric than in a compact one.
Resumo:
While static fracture toughness is a widely studied and standardised parameter, its dynamic counterpart has not been exhaustively examined. Therefore, in this research a series of quasi-static and different loading-rate dynamic tests were carried out to determine the evolution of fracture toughness with the velocity of the application of the load on aluminium 7017-T73 alloy. Three-point bending tests of pre-fatigued standard specimens (ASTM E399) at four loading-rates were carried out. The experiments were conducted by employing the subsequent apparatus ordered from lowest to highest load application velocity: a servo-hydraulic universal testing machine, a free-drop tower, a modified Split Hopkinson Pressure Bar and an explosive load testing device. In order to perform the dynamic fracture toughness tests, it was necessary to design and develop some experimental devices. The fracture-initiation toughness of the aluminium 7017-T73 alloy did not exhibit a significant variation for the studied cases. As a conclusion, the research showed that fracture-initiation toughness remained constant regardless of the velocity at which the load was applied.
Resumo:
This document contains detailed description of the design and the implementation of a multi-agent application controlling traffic lights in a city together with a system for simulating traffic and testing. The goal of this thesis is to design and build a simplified intelligent and distributed solution to the problem with the traffic in the big cities following different good practices in order to allow future refining of the model of the real world. The problem of the traffic in the big cities is still a problem that cannot be solved. Not only is the increasing number of cars a reason for the traffic jams, but also the way the traffic is organized. Usually, the intersections with traffic lights are replaced by roundabouts or interchanges to increase the number of cars that can cross the intersection in certain time. But still there are places where the infrastructure cannot be changed and the traffic light semaphores are the only way to control the car flows. In real life, the traffic lights have a predefined plan for change or they receive information from a centralized system when and how they have to change. But what if the traffic lights can cooperate and decide on their own when and how to change? Using this problem, the purpose of the thesis is to explore different agent-based software engineering approaches to design and build a non-conventional distributed system. From the software engineering point of view, the goal of the thesis is to apply the knowledge and use the skills, acquired during the various courses of the master program in Software Engineering, while solving a practical and complex problem such as the traffic in the cities.
Resumo:
Amblyseius swirskii (Athias-Henriot) is a polyphagous predatory mite which feeds on pollen and small arthropod preys like whiteflies, thrips and mites. This species is widely used in IPM programs in greenhouses, being essential for its success, to obtain information about the non target effects of the pesticides currently used in those crops where the mite is artificially released. This work describes a laboratory contact residual test for evaluating lethal (mortality after 72 hour exposure to fresh residues) and sublethal effects (fecundity and fertility of the surviving mites) of eleven modern pesticides to adults of A. swirskii. Spiromesifen is lipogenesis inhibitor; flonicamid a selective feeding inhibitor with a mode of action not totally known; flubendiamide a modulator of the rhyanodin receptor, sulfoxaflor has a complex mode of action not totally ascertained; metaflumizone is a voltage dependent sodium channel blocker; methoxyfenozide is an IGR, spirotetramat inhibits lipids; abamectin and emamectin activate the Cl- channel; spinosad is a neurotix naturalyte and deltamethrin a pyrethroid used as positive standard. Selected pesticides are effective against different key pests present in horticultural crop areas and were always applied at the maximum field recommended concentration in Spain if registered, or at the concentration recommended by the supplier. Out of the tested pesticides, spiromesifen, flonicamid, flubendiamide, sulfoxaflor, metaflumizone, methoxyfenozide and spirotetramat were harmless to adults of the predatory mite (IOBC toxicity class 1). The rest of pesticides exhibited some negative effects: emamectin was slightly harmful (IOBC 2), deltamethrin moderately harmful (IOBC 3) and spinosad and abamectin harmful (IOBC 4). Further testing under more realistic conditions is needed for those pesticides having some harmful effect on the mite prior deciding their joint use or not. Key words: Amblyseius swirskii, adults, laboratory, residual test, spiromesifen, flonicamid, flubendiamide, sulfoxaflor, metaflumizone, methoxyfenozide, spirotetramat, emamectin, deltamethrin, abamectin, spinosad.
Resumo:
In this work the thermal analysis of a small satellite orbiting around the Earth has been approached by direct integration of the heat balance equations of a two-node reduced model, obtaining a linearized second order ODE problem, similar in form to the classical case of the forced vibration of a damped system. As the thermal loads (solar radiation, albedo, etc.) are harmonic, the problem is solved by means of Fourier analysis methods. Research on that field can be directly applied to the analysis of thermal problems and the results obtained are satisfactory. Working on the frequency domain streamlines the analysis, simplifies the study and facilitates the experimental testing. The transfer functions are obtained for the two-node case but the study can be extended to an n-node model.
Resumo:
PURPOSE The decision-making process plays a key role in organizations. Every decision-making process produces a final choice that may or may not prompt action. Recurrently, decision makers find themselves in the dichotomous question of following a traditional sequence decision-making process where the output of a decision is used as the input of the next stage of the decision, or following a joint decision-making approach where several decisions are taken simultaneously. The implication of the decision-making process will impact different players of the organization. The choice of the decision- making approach becomes difficult to find, even with the current literature and practitioners’ knowledge. The pursuit of better ways for making decisions has been a common goal for academics and practitioners. Management scientists use different techniques and approaches to improve different types of decisions. The purpose of this decision is to use the available resources as well as possible (data and techniques) to achieve the objectives of the organization. The developing and applying of models and concepts may be helpful to solve managerial problems faced every day in different companies. As a result of this research different decision models are presented to contribute to the body of knowledge of management science. The first models are focused on the manufacturing industry and the second part of the models on the health care industry. Despite these models being case specific, they serve the purpose of exemplifying that different approaches to the problems and could provide interesting results. Unfortunately, there is no universal recipe that could be applied to all the problems. Furthermore, the same model could deliver good results with certain data and bad results for other data. A framework to analyse the data before selecting the model to be used is presented and tested in the models developed to exemplify the ideas. METHODOLOGY As the first step of the research a systematic literature review on the joint decision is presented, as are the different opinions and suggestions of different scholars. For the next stage of the thesis, the decision-making process of more than 50 companies was analysed in companies from different sectors in the production planning area at the Job Shop level. The data was obtained using surveys and face-to-face interviews. The following part of the research into the decision-making process was held in two application fields that are highly relevant for our society; manufacturing and health care. The first step was to study the interactions and develop a mathematical model for the replenishment of the car assembly where the problem of “Vehicle routing problem and Inventory” were combined. The next step was to add the scheduling or car production (car sequencing) decision and use some metaheuristics such as ant colony and genetic algorithms to measure if the behaviour is kept up with different case size problems. A similar approach is presented in a production of semiconductors and aviation parts, where a hoist has to change from one station to another to deal with the work, and a jobs schedule has to be done. However, for this problem simulation was used for experimentation. In parallel, the scheduling of operating rooms was studied. Surgeries were allocated to surgeons and the scheduling of operating rooms was analysed. The first part of the research was done in a Teaching hospital, and for the second part the interaction of uncertainty was added. Once the previous problem had been analysed a general framework to characterize the instance was built. In the final chapter a general conclusion is presented. FINDINGS AND PRACTICAL IMPLICATIONS The first part of the contributions is an update of the decision-making literature review. Also an analysis of the possible savings resulting from a change in the decision process is made. Then, the results of the survey, which present a lack of consistency between what the managers believe and the reality of the integration of their decisions. In the next stage of the thesis, a contribution to the body of knowledge of the operation research, with the joint solution of the replenishment, sequencing and inventory problem in the assembly line is made, together with a parallel work with the operating rooms scheduling where different solutions approaches are presented. In addition to the contribution of the solving methods, with the use of different techniques, the main contribution is the framework that is proposed to pre-evaluate the problem before thinking of the techniques to solve it. However, there is no straightforward answer as to whether it is better to have joint or sequential solutions. Following the proposed framework with the evaluation of factors such as the flexibility of the answer, the number of actors, and the tightness of the data, give us important hints as to the most suitable direction to take to tackle the problem. RESEARCH LIMITATIONS AND AVENUES FOR FUTURE RESEARCH In the first part of the work it was really complicated to calculate the possible savings of different projects, since in many papers these quantities are not reported or the impact is based on non-quantifiable benefits. The other issue is the confidentiality of many projects where the data cannot be presented. For the car assembly line problem more computational power would allow us to solve bigger instances. For the operation research problem there was a lack of historical data to perform a parallel analysis in the teaching hospital. In order to keep testing the decision framework it is necessary to keep applying more case studies in order to generalize the results and make them more evident and less ambiguous. The health care field offers great opportunities since despite the recent awareness of the need to improve the decision-making process there are many opportunities to improve. Another big difference with the automotive industry is that the last improvements are not spread among all the actors. Therefore, in the future this research will focus more on the collaboration between academia and the health care sector.
Resumo:
According to cognitive linguistics, language has an experiential origin based on perception, sensory motor activities and our knowledge of the world. Our thought operates by establishing similarities, links and associations that enable us to talk about one thing in terms of another as shown in the example of love as a journey (Lakoff and Johnson, 1980). Metaphor and metonymy are conceptual and linguistic tools that make possible most of these cognitive operations. Since metaphor is an essential element of human communication, the discourse of specialised disciplines includes metaphorical mappings and numerous examples of metaphorical expressions, for example in economics, where business is mapped in terms of war (White, 2004; Herrera & White, 2000), electrotechnics with electrical components understood as couples (Roldán- Riejos in preparation) or in civil engineering where a bridge is conceptualized as a person (Roldán-Riejos, 2013). In this paper, the metaphors: WORKING WITH METALS IS COOKING/ TRABAJAR CON METALES ES COCINAR and METALS ARE CULINARY OBJECTS/ LOS METALES SON OBJETOS CULINARIOS are explored. The main aim is to show that the cooking metaphor is widely spread in the metallurgical domain in English and Spanish, although with different nuances in each language due to socio-cultural factors. The method adopted consists of analysing examples taken from the: Bilingual Dictionary of Scientific and Technical Metaphors and Metonymies Spanish- English/English-Spanish, a forthcoming and rigorously documented bilingual dictionary that sums up research on conceptual, linguistic and visual metaphor and metonymy in different areas of engineering (Roldán-Riejos and Molina, 2013). The present paper studies in detail English and Spanish cross-linguistic correspondences related to types of metals and processes. It is suggested that they reflect synesthetic metaphoric mappings. The exploitation of cognitive conceptual metaphor in the ESP classroom is lastly recommended.