29 resultados para center
Resumo:
Proyecto para un centro cultural en Villaviciosa de Odón, Madrid
Resumo:
Sport Center C.A.R.D., Las Rozas, Madrid (1987)
Resumo:
Collaborator: Javier Esteban Martín
Resumo:
Collaborator: Javier Esteban Martín.
Resumo:
Collaborator: Javier Esteban Martín.
Resumo:
An enclosure to house Picasso’s “Guernica” was to be created in the town of the same name. = Había que crear un recinto para colocar el “Guernica” de Picasso en la villa del mismo nombre.
Resumo:
In collaboration with Julio Cano Lasso.
Resumo:
In collaboration with Julio Cano Lasso.
Resumo:
In collaboration with Julio Cano Lasso.
Resumo:
The Shopping centre is a long term investment in which Greenfield development decisions are often taken based on risks analysis regarding construction costs, location, competition, market and an expected DCF. Furthermore, integration between the building design, project planning, operational costs and investment analysis is not entirely considered by the investor at the decision making stage. The absence of such information tends to produce certain negative impacts on the future running costs and annual maintenance of the building, especially on energy demand and other occupancy expenses paid by the tenants to the landlord. From the investor´s point of view, this blind spot in strategy development will possibly decrease their profit margin as changes in the occupancy expenses[ ] have a direct outcome on the profit margin. In order to try to reduce some higher operating cost components such as energy use and other utility savings as well as their CO2 emissions, quite a few income properties worldwide have some type of environmental label such as BREEAM and LEED. The drawback identified in this labelling is that usually the investments required to get an ecolabel are high and the investor finds no direct evidence that it increases market value. However there is research on certified commercial properties (especially offices) that shows better performance in terms of occupancy rate and rental cost (Warren-Myers, 2012). Additionally, Sayce (2013) says that the certification only provides a quick reference point i.e. the lack of a certificate does not indicate that a building is not sustainable or efficient. Based on the issues described above, this research compares important components of the development stages such as investments costs, concept/ strategy development as well as the current investor income and property value. The subjects for this analysis are a shopping centre designed with passive cooling/bioclimatic strategies evaluated at the decision making stage, a certified regional shopping centre and a non-certified standard regional shopping centre. Moreover, the proposal intends to provide decision makers with some tools for linking green design features to the investment analysis in order to optimize the decision making process when looking into cost savings and design quality.
Resumo:
Evaluar la asociación entre los niveles físicos de la aptitud, de calidad relacionada con la salud de la vida (CVRS) y la obesidad sarcopénica
Resumo:
The pararotor is a biology-inspired decelerator device based on the autorotation of a rotary wing whose main purpose is to guide a load descent into a certain atmosphere. This paper focuses on a practical approach to the general dynamic stability of a pararotor whose center of mass is displaced from the blade plane. The analytical study departs from the motion equations of pararotor flight, considering the center of mass displacement from the blade plane, studied over a number of simplifying hypotheses that allows determining the most important influences to flight behavior near equilibrium. Two practical indexes are developed to characterize the stability of a pararotor in terms of geometry, inertia, and the aerodynamic characteristics of the device. Based on these two parameters, a stability diagram can be defined upon which stability regions can be identified. It was concluded that the ability to reach stability conditions depends mainly on a limited number of parameters associated with the pararotor configuration: the relationship between moments of inertia, the position of the blades, the planform shape (associated with the blade aerodynamic coefficients and blade area), and the vertical distance between the center of mass and the blade plane. These parameters can be evaluated by computing practical indexes to determine stability behavior.
Resumo:
Este proyecto muestra una solución de red para una empresa que presta servicios de Contact Center desde distintas sedes distribuidas geográficamente, utilizando la tecnología de telefonía sobre IP. El objetivo de este proyecto es el de convertirse en una guía de diseño para el despliegue de soluciones de red utilizando los actuales equipos de comunicaciones desarrollados por el fabricante Cisco Systems, Inc., los equipos de seguridad desarrollados por el fabricante Fortinet y los sistemas de telefonía desarrollados por Avaya Inc. y Oracle Corporation, debido a su gran penetración en el mercado y a las aportaciones que cada uno ha realizado en el sector de Contact Center. Para poder proveer interconexión entre las sedes de un Contact Center se procede a la contratación de un acceso a la red MPLS perteneciente a un operador de telecomunicaciones, quien provee conectividad entre las sedes utilizando la tecnología VPN MPLS con dos accesos diversificados entre sí desde cada una de las sedes del Contact Center. El resultado de esta contratación es el aprovechamiento de las ventajas que un operador de telecomunicaciones puede ofrecer a sus clientes, en relación a calidad de servicio, disponibilidad y expansión geográfica. De la misma manera, se definen una serie de criterios o niveles de servicio que aseguran a un Contact Center una comunicación de calidad entre sus sedes, entendiéndose por comunicación de calidad aquella que sea capaz de transmitirse con unos valores mínimos de pérdida de paquetes así como retraso en la transmisión, y una velocidad acorde a la demanda de los servicios de voz y datos. Como parte de la solución, se diseña una conexión redundante a Internet que proporciona acceso a todas las sedes del Contact Center. La solución de conectividad local en cada una de las sedes de un Contact Center se ha diseñado de manera general acorde al volumen de puestos de usuarios y escalabilidad que pueda tener cada una de las sedes. De esta manera se muestran varias opciones asociadas al equipamiento actual que ofrece el fabricante Cisco Systems, Inc.. Como parte de la solución se han definido los criterios de calidad para la elección de los Centros de Datos (Data Center). Un Contact Center tiene conexiones hacia o desde las empresas cliente a las que da servicio y provee de acceso a la red a sus tele-trabajadores. Este requerimiento junto con el acceso y servicios publicados en Internet necesita una infraestructura de seguridad. Este hecho da lugar al diseño de una solución que unifica todas las conexiones bajo una única infraestructura, dividiendo de manera lógica o virtual cada uno de los servicios. De la misma manera, se ha definido la utilización de protocolos como 802.1X para evitar accesos no autorizados a la red del Contact Center. La solución de voz elegida es heterogénea y capaz de soportar los protocolos de señalización más conocidos (SIP y H.323). De esta manera se busca tener la máxima flexibilidad para establecer enlaces de voz sobre IP (Trunk IP) con proveedores y clientes. Esto se logra gracias a la utilización de SBCs y a una infraestructura interna de voz basada en el fabricante Avaya Inc. Los sistemas de VoIP en un Contact Center son los elementos clave para poder realizar la prestación del servicio; por esta razón se elige una solución redundada bajo un entorno virtual. Esta solución permite desplegar el sistema de VoIP desde cualquiera de los Data Center del Contact Center. La solución llevada a cabo en este proyecto está principalmente basada en mi experiencia laboral adquirida durante los últimos siete años en el departamento de comunicaciones de una empresa de Contact Center. He tenido en cuenta los principales requerimientos que exigen hoy en día la mayor parte de empresas que desean contratar un servicio de Contact Center. Este proyecto está dividido en cuatro capítulos. El primer capítulo es una introducción donde se explican los principales escenarios de negocio y áreas técnicas necesarias para la prestación de servicios de Contact Center. El segundo capítulo describe de manera resumida, las principales tecnologías y protocolos que serán utilizados para llevar a cabo el diseño de la solución técnica de creación de una red de comunicaciones para una empresa de Contact Center. En el tercer capítulo se expone la solución técnica necesaria para permitir que una empresa de Contact Center preste sus servicios desde distintas ubicaciones distribuidas geográficamente, utilizando dos Data Centers donde se centralizan las aplicaciones de voz y datos. Finalmente, en el cuarto capítulo se presentan las conclusiones obtenidas tras la elaboración de la presente memoria, así como una propuesta de trabajos futuros, que permitirían junto con el proyecto actual, realizar una solución técnica completa incluyendo otras áreas tecnológicas necesarias en una empresa de Contact Center. Todas las ilustraciones y tablas de este proyecto son de elaboración propia a partir de mi experiencia profesional y de la información obtenida en diversos formatos de la bibliografía consultada, excepto en los casos en los que la fuente es mencionada. ABSTRACT This project shows a network solution for a company that provides Contact Center services from different locations geographically distributed, using the Telephone over Internet Protocol (ToIP) technology. The goal of this project is to become a design guide for performing network solutions using current communications equipment developed by the manufacturer Cisco Systems, Inc., firewalls developed by the manufacturer Fortinet and telephone systems developed by Avaya Inc. and Oracle Corporation, due to their great market reputation and their contributions that each one has made in the field of Contact Center. In order to provide interconnection between its different sites, the Contact Center needs to hire the services of a telecommunications’ operator, who will use the VPN MPLS technology, with two diversified access from each Contact Center’s site. The result of this hiring is the advantage of the benefits that a telecommunications operator can offer to its customers, regarding quality of service, availability and geographical expansion. Likewise, Service Level Agreement (SLA) has to be defined to ensure the Contact Center quality communication between their sites. A quality communication is understood as a communication that is capable of being transmitted with minimum values of packet loss and transmission delays, and a speed according to the demand for its voice and data services. As part of the solution, a redundant Internet connection has to be designed to provide access to every Contact Center’s site. The local connectivity solution in each of the Contact Center’s sites has to be designed according to its volume of users and scalability that each one may have. Thereby, the manufacturer Cisco Systems, Inc. offers several options associated with the current equipment. As part of the solution, quality criteria are being defined for the choice of the Data Centers. A Contact Center has connections to/from the client companies that provide network access to teleworkers. This requires along the access and services published on the Internet, needs a security infrastructure. Therefore is been created a solution design that unifies all connections under a single infrastructure, dividing each services in a virtual way. Likewise, is been defined the use of protocols, such as 802.1X, to prevent unauthorized access to the Contact Center’s network. The voice solution chosen is heterogeneous and capable of supporting best-known signaling protocols (SIP and H.323) in order to have maximum flexibility to establish links of Voice over IP (IP Trunk) with suppliers and clients. This can be achieved through the use of SBC and an internal voice infrastructure based on Avaya Inc. The VoIP systems in a Contact Center are the key elements to be able to provide the service; for this reason a redundant solution under virtual environment is been chosen. This solution allows any of the Data Centers to deploy the VoIP system. The solution carried out in this project is mainly based on my own experience acquired during the past seven years in the communications department of a Contact Center company. I have taken into account the main requirements that most companies request nowadays when they hire a Contact Center service. This project is divided into four chapters. The first chapter is an introduction that explains the main business scenarios and technical areas required to provide Contact Center services. The second chapter describes briefly the key technologies and protocols that will be used to carry out the design of the technical solution for the creation of a communications network in a Contact Center company. The third chapter shows a technical solution required that allows a Contact Center company to provide services from across geographically distributed locations, using two Data Centers where data and voice applications are centralized. Lastly, the fourth chapter includes the conclusions gained after making this project, as well as a future projects proposal, which would allow along the current project, to perform a whole technical solution including other necessary technologic areas in a Contact Center company All illustrations and tables of this project have been made by myself from my professional experience and the information obtained in various formats of the bibliography, except in the cases where the source is indicated.
Luz industrial e imagen tecnificada: de Moholy Nagy al C.A.V.S. (Center for Advanced Visual Studies)
Resumo:
El desarrollo de la tecnología de la luz implicará la transformación de la vida social, cultural y económica. Tanto las consideraciones espaciales del Movimiento Moderno, como los efectos producidos por la segunda Guerra Mundial, tendrán efectos visibles en las nuevas configuraciones espaciales y en la relación simbiótica y recíproca que se dará entre ideología y tecnología. La transformación en la comprensión de la articulación espacial, asociada al desarrollo tecnológico, afectará al modo en que este espacio es experimentado y percibido. El espacio expositivo y el espacio escénico se convertirán en laboratorio práctico donde desarrollar y hacer comprensible todo el potencial ilusorio de la luz, la proyección y la imagen, como parámetros modificadores y dinamizadores del espacio arquitectónico. Esta experimentación espacial estará precedida por la investigación y creación conceptual en el mundo plástico, donde los nuevos medios mecánicos serán responsables de la construcción de una nueva mirada moderna mediatizada por los elementos técnicos. La experimentación óptica, a través de la fotografía, el cine, o el movimiento de la luz y su percepción, vinculada a nuevos modos de representación y comunicación, se convertirá en elemento fundamental en la configuración espacial. Este ámbito de experimentación se hará patente en la Escuela de la Bauhaus, de la mano de Gropius, Schlemmer o Moholy Nagy entre otros; tanto en reflexiones teóricas como en el desarrollo de proyectos expositivos, arquitectónicos o teatrales, que evolucionarán en base a la tecnología y la modificación de la relación con el espectador. El espacio expositivo y el espacio escénico se tomarán como oportunidad de investigación espacial y de análisis de los modos de percepción, convirtiéndose en lugares de experimentación básicos para el aprendizaje. El teatro se postula como punto de encuentro entre el arte y la técnica, cobrando especial importancia la intersección con otras disciplinas en la definición espacial. Las múltiples innovaciones técnicas ligadas a los nuevos fundamentos teatrales en la modificación de la relación con la escena, que se producen a principios del siglo XX, tendrán como consecuencia la transformación del espacio en un espacio dinámico, tanto física como perceptivamente, que dará lugar a nuevas concepciones espaciales, muchas de ellas utópicas. La luz, la proyección y la creación de ilusión en base a estímulos visuales y sonoros, aparecen como elementos proyectuales efímeros e inmateriales, que tendrán una gran incidencia en el espacio y su modo de ser experimentado. La implicación de la tecnología en el arte conllevará modificaciones en la visualización, así como en la configuración espacial de los espacios destinados a esta. Destacaremos como propuesta el Teatro Total de Walter Gropius, en cuyo desarrollo se recogen de algún modo las experiencias espaciales y las investigaciones desarrolladas sobre la estructura formal de la percepción realizadas por Moholy Nagy, además de los conceptos acerca del espacio escénico desarrollados en el taller de Teatro de la Bauhaus por Oskar Schlemmer. En el Teatro Total, Gropius incorporará su propia visión de cuestiones que pertenecen a la tradición de la arquitectura teatral y las innovaciones conceptuales que estaban teniendo lugar desde finales del s.XIX, tales como la participación activa del público o la superación entre escena y auditorio, estableciendo en el proyecto una nueva relación perceptual entre sala, espectáculo y espectador; aumentando la sensación de inmersión, a través del uso de la física, la óptica, y la acústica, creando una energía concéntrica capaz de extenderse en todas direcciones. El Teatro Total será uno de los primeros ejemplos en los que desde el punto de partida del proyecto, se conjuga la imagen como elemento comunicativo con la configuración espacial. Las nuevas configuraciones escénicas tendrán como premisa de desarrollo la capacidad de transformación tanto perceptiva, como física. En la segunda mitad del s.XX, la creación de centros de investigación como el CAVS (The Center for Advanced Visual Studies,1967), o el EAT (Experiments in Art and Technology, 1966), favorecerán la colaboración interdisciplinar entre arte y ciencia, implicando a empresas de carácter tecnológico, como Siemens, HP, IBM o Philips, facilitando soporte técnico y económico para el desarrollo de nuevos sistemas. Esta colaboración interdisciplinar dará lugar a una serie de intervenciones espaciales que tendrán su mayor visibilidad en algunas Exposiciones Universales. El resultado será, en la mayoría de los casos, la creación de espacios de carácter inmersivo, donde se establecerá una relación simbiótica entre espacio, imagen, sonido, y espectador. La colocación del espectador en el centro de la escena y la disposición dinámica de imagen y sonido, crearán una particular narrativa espacial no lineal, concebida para la experiencia. Desde las primeras proyecciones de cine a la pantalla múltiple de los Eames, las técnicas espaciales de difusión del sonido en Stockhausen, o los experimentos con el movimiento físico interactivo, la imagen, la luz en movimiento y el sonido, quedan inevitablemente convertidos en material arquitectónico. ABSTRACT. Light technology development would lead to a social, cultural and economic transformation. Both spatial consideration of “Modern Movement” and Second World War effects on technology, would have a visible aftereffect on spatial configuration and on the symbiotic and mutual relationship between ideology & technology. Comprehension adjustment on the articulation of space together with technology development, would impact on how space is perceived and felt. Exhibition space and scenic space would turn into a laboratory where developing and making comprehensive all illusory potential of light, projection and image. These new parameters would modify and revitalize the architectonic space. as modifying and revitalizing parameters of architectonic space. Spatial experimentation would be preceded by conceptual creation and investigation on the sculptural field, where new mechanic media would be responsible for a fresh and modern look influenced by technical elements. Optical experimentation, through photography, cinema or light movement and its perception, would turn into essential components for spatial arrangement linked to new ways of performance and communication. This experimentation sphere would be clear at The Bauhaus School, by the hand of Gropius, Schlemmer or Moholy Nag among others; in theoretical, theatrical or architectural performance’s projects, that would evolve based on technology and also based on the transformation of the relationship with the observer. Exhibition and perfor-mance areas would be taken as opportunities of spatial investigation and for the analysis of the different ways of perception, thus becoming key places for learning. Theater is postulated as a meeting point between art and technique, taking on a new significance at its intersection with other disciplines working with spatial definition too. The multiple innovation techniques linked to the new foundations for the theater regarding stage relation, would have as a consequence the regeneration of the space. Space would turn dynamic, both physically and perceptibly, bringing innovative spatial conceptions, many of them unrealistic. Light, projection and illusory creation based on sound and visual stimulus would appear as intangible and momentary design components, which would have a great impact on the space and on the way it is experienced. Implication of technology in art would bring changes on the observer as well as on the spatial configuration of the art spaces2. It would stand out as a proposal Walter Groupis Total Theater, whose development would include somehow the spatial experiments and studies about formal structure of perception accomplished by Moholy Nagy besides the concepts regarding stage space enhanced at the Bauhaus Theater Studio by Oskar Schlemmer. Within Total Theater, Groupis would incorporate his own view about traditional theatric architecture and conceptual innovations that were taking place since the end of the nineteenth century, such as active audience participation or the diffusing limits between scene and audience, establishing a new perception relationship between auditorium, performance and audience, improving the feeling of immersion through the use of physics, optics and acoustics, creating a concentric energy capable of spreading in all directions. Total Theater would be one of the first example in which, from the beginning of the Project, image is combined as a communicating element with the spatial configuration. As a premise of development, new stage arrangement would have the capacity of transformation, both perceptive and physically. During the second half or the twentieth century, the creation of investigation centers such as CAVS (Center for Advanced Visual Studies, 1967) or EAT (Experiments in Art and Technology, 1966), would help to the interdisciplinary collaboration between art and science, involving technology companies like Siemens, HP, IBM or Philips, providing technical and economic support to the development of new systems. This interdisciplinary collaboration would give room to a series of spatial interventions which would have visibility in some Universal Exhibitions. The result would be, in most cases, the creation of immersive character spaces, where a symbiotic relationship would be stablished between space, image, sound and audience. The new location of the audience in the middle of the display, together with the dynamic arrangement of sound and image would create a particular, no lineal narrative conceived to be experienced. Since the first cinema projections, the multiple screen of Eames, the spatial techniques for sound dissemination at Stockhausen or the interactive physical movement experimentation, image, motion light and sound would turn inevitably into architectural material.