53 resultados para Underground
Resumo:
Underground coal mines explosions generally arise from the inflammation of a methane/air mixture. This explosion can also generate a subsequent coal dust explosion. Traditionally such explosions have being fought eliminating one or several of the factors needed by the explosion to take place. Although several preventive measures are taken to prevent explosions, other measures should be considered to reduce the effects or even to extinguish the flame front. Unlike other protection methods that remove one or two of the explosion triangle elements, namely; the ignition source, the oxidizing agent and the fuel, explosion barriers removes all of them: reduces the quantity of coal in suspension, cools the flame front and the steam generated by vaporization removes the oxygen present in the flame. Passive water barriers are autonomous protection systems against explosions that reduce to a satisfactory safety level the effects of methane and/or flammable dust explosions. The barriers are activated by the pressure wave provoked in the explosion destroying the barrier troughs and producing a uniform dispersion of the extinguishing agent throughout the gallery section in quantity enough to extinguish the explosion flame. Full scale tests have been carried out in Polish Barbara experimental mine at GIG Central Mining Institute in order to determine the requirements and the optimal installation conditions of these devices for small sections galleries which are very frequent in the Spanish coal mines. Full scale tests results have been analyzed to understand the explosion timing and development, in order to assess on the use of water barriers in the typical small crosssection Spanish galleries. Several arrangements of water barriers have been designed and tested to verify the effectiveness of the explosion suppression in each case. The results obtained demonstrate the efficiency of the water barriers in stopping the flame front even with smaller amounts of water than those established by the European standard. According to the tests realized, water barriers activation times are between 0.52 s and 0.78 s and the flame propagation speed are between 75 m/s and 80 m/s. The maximum pressures (Pmax) obtained in the full scale tests have varied between 0.2 bar and 1.8 bar. Passive barriers protect effectively against the spread of the flame but cannot be used as a safeguard of the gallery between the ignition source and the first row of water troughs or bags, or even after them, as the pressure could remain high after them even if the flame front has been extinguished.
Resumo:
Communications Based Train Control Systems require high quality radio data communications for train signaling and control. Actually most of these systems use 2.4GHz band with proprietary radio transceivers and leaky feeder as distribution system. All them demand a high QoS radio network to improve the efficiency of railway networks. We present narrow band, broad band and data correlated measurements taken in Madrid underground with a transmission system at 2.4 GHz in a test network of 2 km length in subway tunnels. The architecture proposed has a strong overlap in between cells to improve reliability and QoS. The radio planning of the network is carefully described and modeled with narrow band and broadband measurements and statistics. The result is a network with 99.7% of packets transmitted correctly and average propagation delay of 20ms. These results fulfill the specifications QoS of CBTC systems.
Resumo:
A Probabilistic Safety Assessment (PSA) is being developed for a steam-methane reforming hydrogen production plant linked to a High-Temperature Gas Cooled Nuclear Reactor (HTGR). This work is based on the Japan Atomic Energy Research Institute’s (JAERI) High Temperature Test Reactor (HTTR) prototype in Japan. This study has two major objectives: calculate the risk to onsite and offsite individuals, and calculate the frequency of different types of damage to the complex. A simplified HAZOP study was performed to identify initiating events, based on existing studies. The initiating events presented here are methane pipe break, helium pipe break, and PPWC heat exchanger pipe break. Generic data was used for the fault tree analysis and the initiating event frequency. Saphire was used for the PSA analysis. The results show that the average frequency of an accident at this complex is 2.5E-06, which is divided into the various end states. The dominant sequences result in graphite oxidation which does not pose a health risk to the population. The dominant sequences that could affect the population are those that result in a methane explosion and occur 6.6E-8/year, while the other sequences are much less frequent. The health risk presents itself if there are people in the vicinity who could be affected by the explosion. This analysis also demonstrates that an accident in one of the plants has little effect on the other. This is true given the design base distance between the plants, the fact that the reactor is underground, as well as other safety characteristics of the HTGR. Sensitivity studies are being performed in order to determine where additional and improved data is needed.
Resumo:
Se realiza el diseño de un gasoducto requerido para la conexión del nuevo almacenamiento subterráneo de Yela con la red de gasoductos existentes. Se plantea un trazado alternativo al original, debido a circunstancias legales y administrativas que han provocado su variación. En el proyecto se muestran los datos básicos de diseño, criterios de cálculo, planos y pliegos de condiciones y el correspondiente presupuesto de las instalaciones. ABSTRACT This project analyzes the design of a pipeline required to connect the new underground storage Yela with existing pipeline network. An alternative route is proposed to the original, due to legal and administrative circumstances . The project shows the basic design data, calculation criteria, plans and specifications and the corresponding budget installations.
Resumo:
La finalidad de este proyecto consiste en realizar un estudio de la gestión del agua del complejo minero de carbón que SAMCA tiene en Ariño, así como recoger distintas iniciativas de mejora para su optimización en la actualidad. Por otro lado, también se pretende analizar la problemática de la posible clausura de la mina de interior “Sierra de Arcos”, una de las principales aportadoras de agua al sistema, y se presentan las posibles opciones para el aprovechamiento óptimo de las aguas superficiales y subterráneas de cara al futuro de la explotación para garantizar un balance hídrico en el que los aportes y los consumos de agua estén equilibrados. Después de este exhaustivo análisis, se deciden cuáles son las mejores opciones desde un punto de vista tanto técnico como económico. ABSTRACT The purpose of this Project is to carry out a study about the management of SAMCA´s coalmine complex in Ariño, as well as gathering a range of initiatives to help optimizing the present system. Additionally, the study sets out to analyze the possible problems arising from the closing of “Sierra de Arcos” underground mine, contributor of one of the main sources of water into the system. Based on the analysis, a series of possible options are presented to reach the ideal utilization of the superficial and underground water. These proposals aim to ensure an optimal water balance sheet between the water contributions and the water consumptions. The results obtained from this exhaustive analysis are used to reach a conclusion for the project by presenting what are considered the best options from both, a technical and an economic point of view.
Resumo:
El objetivo de este proyecto es estudiar la recuperación secundaria de petróleo de la capa sureste Ayoluengo del campo Ayoluengo, Burgos (España), y su conversión en un almacenamiento subterráneo de gas. La capa Ayoluengo se ha considerado como una capa inclinada de 60 km por 10 km de superficie por 30 m de espesor en el que se han perforado 20 pozos, y en donde la recuperación primaria ha sido de un 19%. Se ha realizado el ajuste histórico de la recuperación primaria de gas, petróleo y agua de la capa desde el año 1965 al 2011. La conversión a almacenamiento subterráneo de gas se ha realizado mediante ciclos de inyección de gas, de marzo a octubre, y extracción de gas, de noviembre a febrero, de forma que se incrementa la presión del campo hasta alcanzar la presión inicial. El gas se ha inyectado y extraído por 5 pozos situados en la zona superior de la capa. Al mismo tiempo, se ha realizado una recuperación secundaria debido a la inyección de gas natural de 20 años de duración en donde la producción de petróleo se realiza por 14 pozos situados en la parte inferior de la capa. Para proceder a la simulación del ajuste histórico, conversión en almacenamiento y recuperación secundaria se utilizó el simulador Eclipse100. Los resultados obtenidos fueron una recuperación secundaria de petróleo de un 9% más comparada con la primaria. En cuanto al almacenamiento de gas natural, se alcanzó la presión inicial consiguiendo un gas útil de 300 Mm3 y un gas colchón de 217,3 Mm3. ABSTRACT The aim of this project is to study the secondary recovery of oil from the southeast Ayoluengo layer at the oil field Ayoluengo, Burgos (Spain), and its conversion into an underground gas storage. The Ayoluengo layer is an inclined layer of 60 km by 10km of area by 30 m gross and with 20 wells, which its primary recovery is of 19%. The history matching of the production of oil, gas and water has been carried out from the year 1965 until 2011. The conversion into an underground gas storage has been done in cycles of gas injection from March to October, and gas extraction from November to February, so that the reservoir pressure increases until it gets to the initial pressure. The gas has been injected and extracted through five well situated in the top part of the layer. At the same time, the secondary recovery has occurred due to de injection of natural gas during 20 years where the production of oil has been done through 14 wells situated in the lowest part of the layer. To proceed to the simulation of the history match, the conversion into an underground gas storage and its secondary recovery, the simulator used was Eclipse100. The results were a secondary recovery of oil of 9% more, compared to the primary recovery and concerning the underground gas storage, the initial reservoir pressure was achieved with a working gas of 300 Mm3 and a cushion gas of 217,3 Mm3.
Resumo:
Enriquecer el conocimiento sobre la Radiación Solar (RS) a nivel del suelo es de gran interés para diferentes aplicaciones meteorológicas entre ellas el área de las energías renovables como la energía solar. La interpolación de observaciones de RS por estaciones en tierra, los sensores remotos y la ejecución de distintos modelos son algunas de las formas que existen para obtener valores de RS con continuidad espacial en el terreno. Aunque se sabe que los mejores valores de RS en la superficie son los observados por estaciones terrestres, este tipo de observaciones presentan como desventaja una baja distribución geográfica. En este trabajo se propone el uso de estaciones meteorológicas de voluntarios no oficiales (Meteoclimatic, Weather, Underground, Weather, Link, CWOP) las cuales son fuentes de Información Geográfica por Voluntarios (Volunteered Geographic Information - VGI) que proporcionan sus observaciones RS en tiempo real a través de Internet como una alternativa para densificar la disponibilidad y distribución espacial de las observaciones por RS a nivel superficial. En este trabajo se desarrolla una metodología que contempla tanto la recolección de las observaciones, como su alineación temporal para finalizar con el análisis de los datos indicando sus valores de incertidumbre a medida que se integra en una Base de Datos que integra las distintas fuentes de datos utilizadas. Los resultados indican que el error RS relativo entre las estimaciones por satélite y las observaciones en superficie no es constante a lo largo del día y por tanto debe analizarse mediante agrupaciones. También se ha observado que dicho error puede verse afectado por la localización de la estación meteorológica, en concreto se ha apreciado una relación directa entre el error relativo y la diferencia entre las longitudes de la ubicación de las estaciones superficiales en tierra y el satélite. Ésta misma comparación siguiere que es correcto considerar el uso de Meteoclimatic (la red Voluntaria tomada como piloto) como una fuente de observaciones de la RS importante al presentar un error esperado y aportar aproximadamente 10 veces más estaciones meteorológicas RS que la red oficial en España aportando un buen precedente para la integración de más redes voluntarias en la densificación de observaciones de la RS con estaciones en tierra.
Resumo:
Ya en el informe acerca del estado de la tecnología en la excavación profunda y en la construcción de túneles en terreno duro presentado en la 7ª Conferencia en Mecánica de Suelos e Ingeniería de la Cimentación, Peck (1969) introdujo los tres temas a ser tenidos en cuenta para el diseño de túneles en terrenos blandos: o Estabilidad de la cavidad durante la construcción, con particular atención a la estabilidad del frente del túnel; o Evaluación de los movimientos del terreno inducidos por la construcción del túnel y de la incidencia de los trabajos subterráneos a poca profundidad sobre los asentamientos en superficie; o Diseño del sistema de sostenimiento del túnel a instalar para asegurar la estabilidad de la estructura a corto y largo plazo. Esta Tesis se centra en los problemas señalados en el segundo de los puntos, analizando distintas soluciones habitualmente proyectadas para reducir los movimientos inducidos por la excavación de los túneles. El objeto de la Tesis es el análisis de la influencia de distintos diseños de paraguas de micropilotes, pantalla de micropilotes, paraguas de jet grouting y pantallas de jet grouting en los asientos en superficie durante la ejecución de túneles ejecutados a poca profundidad, con objeto de buscar el diseño que optimice los medios empleados para una determinada reducción de asientos. Para ello se establecen unas premisas para los proyectistas con objeto de conocer a priori cuales son los tratamientos más eficientes (de los propuestos en la Tesis) para la reducción de asientos en superficie cuando se ha de proyectar un túnel, de tal manera que pueda tener datos cualitativos y algunos cuantitativos sobre los diseños más óptimos, utilizando para ello un programa de elementos finitos de última generación que permite realizara la simulación tensodeformación del terreno mediante el modelo de suelo con endurecimiento (Hardening Soil Small model), que es una variante elastoplástica del modelo hiperbólico, similar al Hardening Soil Model. Además, este modelo incorpora una relación entre deformación y el modulo de rigidez, simulando el diferente comportamiento del suelo para pequeñas deformaciones (por ejemplo vibraciones con deformaciones por debajo de 10-5 y grandes deformaciones (deformaciones > 10-3). Para la realización de la Tesis se han elegido cinco secciones de túnel, dos correspondiente a secciones tipo de túnel ejecutado con tuneladora y tres secciones ejecutados mediante convencionales (dos correspondientes a secciones que han utilizado el método Belga y una que ha utilizado el NATM). Para conseguir los objetivos marcados, primeramente se ha analizado mediante una correlación entre modelos tridimensionales y bidimensionales el valor de relajación usado en estos últimos, y ver su variación al cambio de parámetros como la sección del túnel, la cobertera, el procedimiento constructivo, longitud de pase (métodos convencionales) o presión del frente (tuneladora) y las características geotécnicas de los materiales donde se ejecuta el túnel. Posteriormente se ha analizado que diseño de pantalla de protección tiene mejor eficacia respecto a la reducción de asientos, variando distintos parámetros de las características de la misma, como son el empotramiento, el tipo de micropilotes o pilote, la influencia del arriostramiento de las pantallas de protección en cabeza, la inclinación de la pantalla, la separación de la pantalla al eje del túnel y la disposición en doble fila de la pantalla de pantalla proyectada. Para finalizar el estudio de la efectividad de pantalla de protección para la reducción de asiento, se estudiará la influencia de la sobrecarga cercanas (simulación de edificios) tiene en la efectividad de la pantalla proyectada (desde el punto de vista de reducción de movimientos en superficie). Con objeto de poder comparar la efectividad de la pantalla de micropilotes respecto a la ejecución de un paraguas de micropilotes se ha analizado distintos diseños de paraguas, comparando el movimiento obtenido con el obtenido para el caso de pantalla de micropilotes, comparando ambos resultados con los medidos en obras ya ejecutadas. En otro apartado se ha realizado una comparación entre tratamientos similar, comparándolos en este caso con un paraguas de jet grouting y pantallas de jet grouting. Los resultados obtenidos se han con valores de asientos medidos en distintas obras ya ejecutadas y cuyas secciones se corresponden a los empleados en los modelos numéricos. Since the report on the state of technology in deep excavation and tunnelling in hard ground presented at the 7th Conference on Soil Mechanics and Foundation Engineering, Peck (1969) introduced the three issues to be taken into account for the design of tunnels in soft ground: o Cavity Stability during construction, with particular attention to the stability of the tunnel face; o Evaluation of ground movements induced by tunnelling and the effect of shallow underground workings on surface settlement; o Design of the tunnel support system to be installed to ensure short and long term stability of the structure. This thesis focuses on the issues identified in the second point, usually analysing different solutions designed to reduce the movements induced by tunnelling. The aim of the thesis is to analyse the influence of different micropile forepole umbrellas, micropile walls, jet grouting umbrellas and jet grouting wall designs on surface settlements during near surface tunnelling in order to use the most optimal technique to achieve a determined reduction in settlement. This will establish some criteria for designers to know a priori which methods are most effective (of those proposed in the thesis) to reduce surface settlements in tunnel design, so that it is possible to have qualitative and some quantitative data on the optimal designs, using the latest finite element modelling software that allows simulation of the ground’s infinitesimal strain behaviour using the Hardening Soil Small Model, which is a variation on the elasto-plastic hyperbolic model, similar to Hardening Soil model. In addition, this model incorporates a relationship between strain and the rigidity modulus, simulating different soil behaviour for small deformations (eg deformation vibrations below 10-5 and large deformations (deformations > 10-3). For the purpose of this thesis five tunnel sections have been chosen, two sections corresponding to TBM tunnels and three sections undertaken by conventional means (two sections corresponding to the Belgian method and one corresponding to the NATM). To achieve the objectives outlined, a correlation analysis of the relaxation values used in the 2D and 3D models was undertaken to verify them against parameters such as the tunnel cross-section, the depth of the tunnel, the construction method, the length of step (conventional method) or face pressure (TBM) and the geotechnical characteristics of the ground where the tunnel is constructed. Following this, the diaphragm wall design with the greatest efficiency regarding settlement reduction was analysed, varying parameters such as the toe depth, type of micropiles or piles, the influence of bracing of the head protection diaphragm walls, the inclination of the diaphragm wall, the separation between the diaphragm wall and the tunnel axis and the double diaphragm wall design arrangement. In order to complete the study into the effectiveness of protective diaphragm walls ofn the reduction of settlements, the influence of nearby imposed loads (simulating buildings) on the effectiveness of the designed diaphragm walls (from the point of view of reducing surface movements) will be studied. In order to compare the effectiveness of micropile diaphragm walls regarding the installation of micropile forepole umbrellas, different designs of these forepole umbrellas have been analysed comparing the movement obtained with that obtained for micropiled diaphragm walls, comparing both results with those measured from similar completed projects. In another section, a comparison between similar treatments has been completed, comparing the treatments with a forepole umbrella by jet grouting and jet grouting walls. The results obtained compared with settlement values measured in various projects already completed and whose sections correspond to those used in the numerical models.
Resumo:
The decision to build the Secondary Lining in Route Tunnels which are perforated using the New Austrian Tunnelling Method does not generally depend on reasons of structural strength. The paper discusses the implications of the issue as well as the pros and cons of the current alternative courses of action.
Resumo:
Se describe el comportamiento de los rellenos de pasta de las cámaras primarias de la mina de Aguas Teñidas y se calcula la resistencia que deben tener dichos rellenos para que no se desmoronen las paredes de los mismos que quedan expuestas al extraer las cámaras secundarias.Abstract:This article presents the study carried out at an underground mine to understand the stress distribution in the paste fills and to calculate the stability of the paste walls. The mine is operated using sublevel stopes. Three-dimensional numerical models designed with the FLAC 3D software are used to study the distribution of the vertical stresses in the paste. The numerical models have demonstrated that an arc-like effect is produced in the paste fills of the primary stopes. This effect relieves the vertical stresses and increases the stability of the exposed paste wall fill. Based on the results of the numerical models, in the 30m high secondary stopes, the arc effect starts to be evident only in paste walls with a width/height ratio lower than 0.8. 3-D calculations show that the use of Mitchell, R. J. et al. (1982) formula may be risky when estimating the fill stability in secondary stopes.
Resumo:
The engineer must have sufficient theoretical knowledge to be applied to solve specific problems, with the necessary capacity to simplify these approaches, and taking into account factors such as speed, simplicity, quality and economy. In Geology, its ultimate goal is the exploration of the history of the geological events through observation, deduction, reasoning and, in exceptional cases by the direct underground exploration or experimentation. Experimentation is very limited in Geology. Reproduction laboratory of certain phenomena or geological processes is difficult because both time and space become a large scale. For this reason, some Earth Sciences are in a nearly descriptive stage whereas others closest to the experimental, Geophysics and Geochemistry, have assimilated progress experienced by the physics and chemistry. Thus, Anglo-Saxon countries clearly separate Engineering Geology from Geological Engineering, i.e. Applied Geology to the Geological Engineering concepts. Although there is a big professional overlap, the first one corresponds to scientific approach, while the last one corresponds to a technological one. Applied Geology to Engineering could be defined as the Science and Applied Geology to the design, construction and performance of engineering infrastructures in and field geology discipline. There has been much discussion on the primacy of theory over practice. Today prevails the exaggeration of practice, but you get good workers and routine and mediocre teachers. This idea forgets too that teaching problem is a problem of right balance. The approach of the action lines on the European Higher Education Area (EHEA) framework provides for such balance. Applied Geology subject represents the first real contact with the physical environment with the practice profession and works. Besides, the situation of the topic in the first trace of Study Plans for many students implies the link to other subjects and topics of the career (tunnels, dams, groundwater, roads, etc). This work analyses in depth the justification of such practical trips. It shows the criteria and methods of planning and the result which manifests itself in pupils. Once practical trips experience developed, the objective work tries to know about results and changes on student’s motivation in learning perspective. This is done regardless of the outcome of their knowledge achievements assessed properly and they are not subject to such work. For this objective, it has been designed a survey about their motivation before and after trip. Survey was made by the Unidad Docente de Geología Aplicada of the Departamento de Ingeniería y Morfología del Terreno (Escuela Técnica Superior de Ingenieros de Caminos, Canales y Puertos, Universidad Politécnica de Madrid). It was completely anonymous. Its objective was to collect the opinion of the student as a key agent of learning and teaching of the subject. All the work takes place under new teaching/learning criteria approach at the European framework in Higher Education. The results are exceptionally good with 90% of student’s participation and with very high scores in a number of questions as the itineraries, teachers and visited places (range of 4.5 to 4.2 in a 5 points scale). The majority of students are very satisfied (average of 4.5 in a 5 points scale).
Resumo:
En los últimos años ha aumentado el interés en el desarrollo de proyectos en el ámbito de las centrales hidroeléctricas y en concreto en las centrales reversibles. Estas centrales están diseñadas para grandes caudales y saltos, lo cual conlleva túneles de gran diámetro y alta presión y a menudo son esquemas subterráneos. Por ello, los estudios relativos a revestimientos de túneles en presión y los referentes a los blindajes de acero han cobrado una mayor relevancia. En las décadas de los 60 y 70 se realizó una importante labor de investigación coincidiendo con el desarrollo hidroeléctrico en Europa y Norteamérica, que sin embargo ha quedado sin continuidad hasta esta década, en la que se ha experimentado un impulso debido al desarrollo de nuevos proyectos hidroeléctricos de gran magnitud. La adecuación de los métodos de cálculo de blindajes supone una herramienta imprescindible en el correcto desarrollo técnico de los nuevos proyectos hidroeléctricos, así como para la evaluación de la seguridad de los saltos hidroeléctricos existentes en operación. En la presente Tesis se realiza un análisis del comportamiento estructural de las galerías en presión de saltos hidroeléctricos, así como una discusión y revisión de los métodos de cálculo existentes. En concreto se analizan los siguientes aspectos: •Descripción y comparación de las formulaciones existentes para el cálculo de blindajes tanto a presión exterior como interior. •Aplicación del Método de Elementos Finitos para la modelización y cálculo resistente y frente a inestabilidad de blindajes sometidos a presión exterior. •Análisis de un caso real, en el que se ha producido un fallo estructural en un blindaje sometido a presión exterior. Discusión sobre el comportamiento de blindajes con rigidizadores. Estudio paramétrico de la capacidad resistente y de la estabilidad de los blindajes con rigidizadores. •Estudio del comportamiento diferenciado entre un rigidizador y un conector. •Detalles constructivos y de durabilidad de las galerías en presión. •Desarrollo de una metodología para el cálculo de blindajes y tuberías forzadas a fatiga derivada de las variaciones de presión de la conducción. •Análisis de un caso real de una tubería forzada sometida a procesos de variación de carga, evaluando su seguridad frente a la fatiga. El cálculo de blindajes en galerías forzadas presenta una serie de aspectos complejos, y que no permiten la definición del problema con exactitud, tales como las características del macizo rocoso y su permeabilidad, la determinación del nivel freático, la holgura existente entre el blindaje y el revestimiento del trasdós y sus posibles defectos geométricos. Por estas incertidumbres, el cálculo de blindajes supone una materia compleja y que debe ser abordada desde la cautela y el análisis de otros trabajos y/o análisis realizados con anterioridad. En cualquier caso, debe realizarse un análisis de sensibilidad de los diversos parámetros que intervienen en el cálculo. En esta tesis se han descrito las principales formulaciones de cálculo de blindajes de galerías forzadas sometidas a presión interior y exterior; se ha constatado que existe una gran diversidad y que de su aplicación no se llega a resultados concluyentes. Las formulaciones clásicas utilizadas en el cálculo de blindajes lisos y con rigidizadores sometidos a presión exterior (Amstutz y Jacobsen) no resultan del todo adecuadas ni son de aplicación general. Además, pueden arrojar resultados no conservadores o conducir a un sobredimensionamiento del blindaje en otros casos. En las formulaciones tradicionales de diseño se han tenido en cuenta como imperfecciones la holgura del blindaje y la ovalidad del mismo. En la presente tesis, se han analizado imperfecciones de tipo ondulatorio derivadas de los procesos de soldadura y la existencia de espesores reducidos en zonas de corrosión. En el caso práctico analizado sometido a presión exterior, se ha comprobado el funcionamiento real del blindaje mediante los modelos realizados con elementos finitos. Se desprende que los rigidizadores no han funcionado como tales, puesto que para blindajes lisos se obtienen presiones más bajas de pandeo y para el caso de funcionamiento correcto de los rigidizadores se habría obtenido un coeficiente de seguridad suficiente. Por este motivo, se ha analizado el posible funcionamiento de los rigidizadores, que en determinados casos pueden actuar como conectores. En estos casos deben dimensionarse de forma adecuada las soldaduras para soportar las tensiones entre chapa y conector. Por otra parte, tradicionalmente no se han tenido en cuenta los efectos de fatiga que pueden ocasionar los golpes de ariete y las pulsaciones de presión debidas a la regulación secundaria de la red. En esta tesis se ha establecido un procedimiento de comprobación de tuberías forzadas y blindajes sometidos a procesos de fatiga. Adicionalmente, se ha estudiado el caso real de las tuberías forzadas de una central reversible real (Bolarque II) en funcionamiento de regulación secundaria. Se ha concluido, como en otros casos analizados en la bibliografía, que las pulsaciones derivadas de la regulación secundaria no son significativas como para tener en cuenta la fatiga del acero. Por otra parte, las maniobras de arranque y parada (golpe de ariete) suponen una variación importante de la presión en la conducción. Sin embargo, el moderado número de ciclos permite asegurar la integridad de la tubería frente a fenómenos de fatiga. Nowadays, there is a significant concern in the development of projects in the field of hydroelectric power plants, particularly in the pump-storage projects. These plants are designed for high flow rates and heads, which entails large-diameter tunnels and high pressure ratios), and often as underground schemes. Therefore, this concern has reactivated studies about penstocks and in particular those related to steel liners. During the 1960s and 1970s due to hydropower-engineering development in Europe and North America, a major research effort was done. However, the increasing development of new large-scale hydropower projects has involved a renewed research effort during this decade. The adequacy of steel liner calculation methods is a very important issue in the proper technical development of new hydroelectric projects, and for the safety assessment of existing hydroelectric power plants in operation. In this work, an analysis of the structural behavior of pressure galleries in hydroelectric schemes was carried out. Also, a discussion and a review of existing calculation methods are included. In particular, the following issues have been considered: •Description and comparison of existing formulations for calculating the liner response to both external and internal pressure. •Analysis of an actual case study of a steel liner which failed due to external pressure. •Application of the Finite Element Method to liner modeling and analysis subjected to external pressure. •A parametric study of the shielding with stiffeners and discussion about the behavior of liner with stiffeners. •Constructive aspects and durability of pressure galleries. •Development of a methodology for estimating fatigue effects on penstocks and liners sue to pressure changes. •Analysis of an actual case study of a penstock under varying load and assessment of its safety against fatigue. The project of a hydropower penstock is a complex issue, due to the uncertainties in the definition of the problem data, such as the characteristics of the rock mass and its permeability, the determination of the water table, the existing gap between the steel liner and the concrete of the backfill, the geometric imperfections... Hence, the design and analysis of a steel liner must be addressed cautiously and take into account a review of previous studies performed. Ever, a sensitivity analysis of the various parameters involved in the calculation should be performed. In this work, some of the most relevant formulations for liner design subjected to inside and outside pressure have been studied. As a whole, there is a wide variety and its application does not lead to conclusive results. The classical formulations used in the steel liner calculation either with or without stiffeners under external pressure (Amstutz and Jacobsen) are not entirely adequate Also, those can yield both conservative and non-conservative results in large ranges of application. Traditionally design approaches only considered initial gap and ovality as the most relevant geometric imperfections. Thus, little attention was paid to those caused either by welding or by thickness loss in corroded areas. In the case study analyzed in this thesis, the actual working of the liner under external pressure has been simulated by the Finite Element Method. Results show that the stiffeners have not performed as such, since for unstiffened liner lower buckling pressures are obtained and for proper performance of the stiffeners would give a sufficient safety factor. Hence, it must be pointed out that stiffeners may perform either as such or as connectors. For the latter, welding must be designed to properly withstand stresses between the shell and the stiffener. Likewise, the potential fatigue effects due to both water hammer and pressure pulsations due to secondary regulation of the network have not been considered in many studies. It has been included in this work a procedure for checking penstocks and liners under fatigue processes. Additionally, the penstock fatigue response of an actual pump storage project (Bolarque II, Spain) subjected to secondary control operation has been assessed. As in other cases discussed in the literature, pulsations derived from the secondary control are not significant to account for fatigue of steel. Moreover, the start and stop manoeuvres (water hammer) cause a significant change in penstock pressure. However, the moderate number of cycles ensures the integrity of the penstock against fatigue phenomena.
Resumo:
The use of probabilistic methods to analyse reliability of structures is being applied to a variety of engineering problems due to the possibility of establishing the failure probability on rational grounds. In this paper we present the application of classical reliability theory to analyse the safety of underground tunnels.
Resumo:
RESUMEN Este proyecto ha tenido por objetivo el estudio de la viabilidad de instalar un nuevo almacenamiento subterráneo de gas natural en España. Dentro de las diferentes posibilidades para emplazar el almacenamiento de gas natural se escogió el domo salino por ser la estructura geológica más favorable desde el punto de vista técnico y económico. Una vez escogido el domo salino, el estudio se centró en localizar una ubicación lo más favorable posible siendo el domo salino de Salinas de Añana el elegido. Una vez elegido el domo se procedió al estudio de la viabilidad técnica de la instalación; para ello se utilizaron estudios geológicos, gavimétricos y sondeos. Tras estos estudios se concluyó que en el domo salino de Salinas de Añana es posible la instalación de un almacenamiento subterráneo de gas natural y se procedió a la caracterización del almacenamiento. ABSTRACT This project has considered of installing a new underground natural gas storage in Spain. Among the different possibilities to place a natural gas storage, the salt dome was chosen because it was the geological strucutrure where the project was easier and more interesting economically. After that the study focused on looking for the location as favorable as possible. The best place was the salt dome of Salinas de Añana. Before the salt dome of Salinas de Añana was chosen this project tried to know if the setting-up of a natural gas storage is technical feasibility. For that were used geological studies, gravity studies and drillings. These studies concluded that is possible the setting-up and the study tried to describe technically this storage.
Resumo:
Este proyecto consiste en la fase de desmantelamiento de un experimento que se ha ido desarrollando por la empresa AITEMIN en colaboración con multitud de empresas internacionales del ámbito de la eliminación de residuos radioactivos de alta actividad y se desarrolla en el laboratorio subterráneo de Mont Terri en Suiza. En el proyecto se describirán todas las partes del experimento y se procederá a establecer el procedimiento a utilizar para su desmantelamiento, explicando exhaustivamente los pasos a realizar por las personas responsables de la desmantelamiento. ABSTRACT This project involves the dismantling phase of an experiment that has been developed by the company AITEMIN in collaboration with many international companies in the field of radioactive waste disposal and develops high activity in the Mont Terri underground laboratory in Switzerland. The project will describe all parts of the experiment and proceed to establish the procedure to be used for dismantling, thoroughly explaining the steps to be performed by the persons responsible for the dismantling