Resumo:
At present, engineering problems required quite a sophisticated calculation means. However, analytical models still can prove to be a useful tool for engineers and scientists when dealing with complex physical phenomena. The mathematical models developed to analyze three different engineering problems: photovoltaic devices analysis; cup anemometer performance; and high-speed train pressure wave effects in tunnels are described. In all cases, the results are quite accurate when compared to testing measurements.
Resumo:
RESUMEN La realización de túneles de gran longitud para ferrocarriles ha adquirido un gran auge en los últimos años. En España se han abordado proyectos de estas características, no existiendo para su ejecución una metodología completa y contrastada de actuación. Las características geométricas, de observación y de trabajo en túneles hace que las metodologías que se aplican en otros proyectos de ingeniería no sean aplicables por las siguientes causas: separación de las redes exteriores e interiores de los túneles debido a la diferente naturaleza de los observables, geometría en el interior siempre desfavorable a los requerimientos de observación clásica, mala visibilidad dentro del túnel, aumento de errores conforme avanza la perforación, y movimientos propios del túnel durante su ejecución por la propia geodinámica activa. Los patrones de observación geodésica usados deben revisarse cuando se ejecutan túneles de gran longitud. Este trabajo establece una metodología para el diseño de redes exteriores. ABSTRACT: The realization of long railway tunnels has acquired a great interest in recent years. In Spain it is necessary to address projects of this nature, but ther is no corresponding methodological framework supporting them. The tunnel observational and working geometrical properties, make that former methodologies used may be unuseful in this case: the observation of the exterior and interior geodetical networks of the tunnel is different in nature. Conditions of visibility in the interior of the tunnels, regardless of the geometry, are not the most advantageous for observation due to the production system and the natural conditions of the tunnels. Errors increase as the drilling of the tunnel progresses, as it becomes problematical to perform continuous verifications along the itinerary itself. Moreover, inherent tunnel movements due to active geodynamics must also be considered. Therefore patterns for geodetic and topographic observations have to be reviewed when very long tunnels are constructed.
Resumo:
In overhead conductor rail lines, aluminium beams are usually mounted with support spacing between 8 and 12 meters, to limit the maximum vertical deflection in the center of the span. This small support spacing limits the use of overhead conductor rail to tunnels, therefore it has been used almost exclusively in metropolitan networks, with operation speeds below 110 km/h. Nevertheless, due to the lower cost of maintenance required for this electrification system, some railway administrations are beginning to install it in some tunnels on long-distance lines, requesting higher operation speeds [1]. Some examples are the Barcelona and Madrid suburban networks (Spain), and recent lines in Turkey and Malaysia. In order to adapt the design of the overhead conductor for higher speeds (V > 160 km/h), particular attention must be paid to the geometry of the conductor rail in critical zones as overlaps, crossings and, especially, transitions between conductor rail and conventional catenary, since the use of overhead conductor rail is limited to tunnels, as already mentioned. This paper describes simulation techniques developed in order to take into account these critical zones. Furthermore, some specific simulations results are presented that have been used to analyze and optimizes the geometry of this special zones to get a better current collection quality, in a real suburban network. This paper presents the work undertaken by the Railways Technology Research Centre (CITEF), having over 10 years of experience in railways research [1-4].
Resumo:
The main objective of ventilation systems in case of fire is the reduction of the possible consequences by achieving the best possible conditions for the evacuation of the users and the intervention of the emergency services. In the last years, the required quick response of the ventilation system, from normal to emergency mode, has been improved by the use of automatic and semi-automatic control systems, what reduces the response times through the support to the operators decision taking, and the use of pre-defined strategies. A further step consists on the use of closedloop algorithms, which takes into account not only the initial conditions but their development (air velocity, traffic situation, etc), optimizing the quality of the smoke control process
Resumo:
Components of a Wind Tunnel Balance: Design and Calibration
Resumo:
Accurate characterization of the radio channel in tunnels is of great importance for new signaling and train control communications systems. To model this environment, measurements have been taken at 2.4 GHz in a real environment in Madrid subway. The measurements were carried out with four base station transmitters installed in a 2-km tunnel and using a mobile receiver installed on a standard train. First, with an optimum antenna configuration, all the propagation characteristics of a complex subway environment, including near shadowing, path loss,shadow fading, fast fading, level crossing rate (LCR), and average fade duration (AFD), have been measured and computed. Thereafter, comparisons of propagation characteristics in a double-track tunnel (9.8-m width) and a single-track tunnel (4.8-m width) have been made. Finally, all the measurement results have been shown in a complete table for accurate statistical modeling.
Resumo:
Ya en el informe acerca del estado de la tecnología en la excavación profunda y en la construcción de túneles en terreno duro presentado en la 7ª Conferencia en Mecánica de Suelos e Ingeniería de la Cimentación, Peck (1969) introdujo los tres temas a ser tenidos en cuenta para el diseño de túneles en terrenos blandos: o Estabilidad de la cavidad durante la construcción, con particular atención a la estabilidad del frente del túnel; o Evaluación de los movimientos del terreno inducidos por la construcción del túnel y de la incidencia de los trabajos subterráneos a poca profundidad sobre los asentamientos en superficie; o Diseño del sistema de sostenimiento del túnel a instalar para asegurar la estabilidad de la estructura a corto y largo plazo. Esta Tesis se centra en los problemas señalados en el segundo de los puntos, analizando distintas soluciones habitualmente proyectadas para reducir los movimientos inducidos por la excavación de los túneles. El objeto de la Tesis es el análisis de la influencia de distintos diseños de paraguas de micropilotes, pantalla de micropilotes, paraguas de jet grouting y pantallas de jet grouting en los asientos en superficie durante la ejecución de túneles ejecutados a poca profundidad, con objeto de buscar el diseño que optimice los medios empleados para una determinada reducción de asientos. Para ello se establecen unas premisas para los proyectistas con objeto de conocer a priori cuales son los tratamientos más eficientes (de los propuestos en la Tesis) para la reducción de asientos en superficie cuando se ha de proyectar un túnel, de tal manera que pueda tener datos cualitativos y algunos cuantitativos sobre los diseños más óptimos, utilizando para ello un programa de elementos finitos de última generación que permite realizara la simulación tensodeformación del terreno mediante el modelo de suelo con endurecimiento (Hardening Soil Small model), que es una variante elastoplástica del modelo hiperbólico, similar al Hardening Soil Model. Además, este modelo incorpora una relación entre deformación y el modulo de rigidez, simulando el diferente comportamiento del suelo para pequeñas deformaciones (por ejemplo vibraciones con deformaciones por debajo de 10-5 y grandes deformaciones (deformaciones > 10-3). Para la realización de la Tesis se han elegido cinco secciones de túnel, dos correspondiente a secciones tipo de túnel ejecutado con tuneladora y tres secciones ejecutados mediante convencionales (dos correspondientes a secciones que han utilizado el método Belga y una que ha utilizado el NATM). Para conseguir los objetivos marcados, primeramente se ha analizado mediante una correlación entre modelos tridimensionales y bidimensionales el valor de relajación usado en estos últimos, y ver su variación al cambio de parámetros como la sección del túnel, la cobertera, el procedimiento constructivo, longitud de pase (métodos convencionales) o presión del frente (tuneladora) y las características geotécnicas de los materiales donde se ejecuta el túnel. Posteriormente se ha analizado que diseño de pantalla de protección tiene mejor eficacia respecto a la reducción de asientos, variando distintos parámetros de las características de la misma, como son el empotramiento, el tipo de micropilotes o pilote, la influencia del arriostramiento de las pantallas de protección en cabeza, la inclinación de la pantalla, la separación de la pantalla al eje del túnel y la disposición en doble fila de la pantalla de pantalla proyectada. Para finalizar el estudio de la efectividad de pantalla de protección para la reducción de asiento, se estudiará la influencia de la sobrecarga cercanas (simulación de edificios) tiene en la efectividad de la pantalla proyectada (desde el punto de vista de reducción de movimientos en superficie). Con objeto de poder comparar la efectividad de la pantalla de micropilotes respecto a la ejecución de un paraguas de micropilotes se ha analizado distintos diseños de paraguas, comparando el movimiento obtenido con el obtenido para el caso de pantalla de micropilotes, comparando ambos resultados con los medidos en obras ya ejecutadas. En otro apartado se ha realizado una comparación entre tratamientos similar, comparándolos en este caso con un paraguas de jet grouting y pantallas de jet grouting. Los resultados obtenidos se han con valores de asientos medidos en distintas obras ya ejecutadas y cuyas secciones se corresponden a los empleados en los modelos numéricos. Since the report on the state of technology in deep excavation and tunnelling in hard ground presented at the 7th Conference on Soil Mechanics and Foundation Engineering, Peck (1969) introduced the three issues to be taken into account for the design of tunnels in soft ground: o Cavity Stability during construction, with particular attention to the stability of the tunnel face; o Evaluation of ground movements induced by tunnelling and the effect of shallow underground workings on surface settlement; o Design of the tunnel support system to be installed to ensure short and long term stability of the structure. This thesis focuses on the issues identified in the second point, usually analysing different solutions designed to reduce the movements induced by tunnelling. The aim of the thesis is to analyse the influence of different micropile forepole umbrellas, micropile walls, jet grouting umbrellas and jet grouting wall designs on surface settlements during near surface tunnelling in order to use the most optimal technique to achieve a determined reduction in settlement. This will establish some criteria for designers to know a priori which methods are most effective (of those proposed in the thesis) to reduce surface settlements in tunnel design, so that it is possible to have qualitative and some quantitative data on the optimal designs, using the latest finite element modelling software that allows simulation of the ground’s infinitesimal strain behaviour using the Hardening Soil Small Model, which is a variation on the elasto-plastic hyperbolic model, similar to Hardening Soil model. In addition, this model incorporates a relationship between strain and the rigidity modulus, simulating different soil behaviour for small deformations (eg deformation vibrations below 10-5 and large deformations (deformations > 10-3). For the purpose of this thesis five tunnel sections have been chosen, two sections corresponding to TBM tunnels and three sections undertaken by conventional means (two sections corresponding to the Belgian method and one corresponding to the NATM). To achieve the objectives outlined, a correlation analysis of the relaxation values used in the 2D and 3D models was undertaken to verify them against parameters such as the tunnel cross-section, the depth of the tunnel, the construction method, the length of step (conventional method) or face pressure (TBM) and the geotechnical characteristics of the ground where the tunnel is constructed. Following this, the diaphragm wall design with the greatest efficiency regarding settlement reduction was analysed, varying parameters such as the toe depth, type of micropiles or piles, the influence of bracing of the head protection diaphragm walls, the inclination of the diaphragm wall, the separation between the diaphragm wall and the tunnel axis and the double diaphragm wall design arrangement. In order to complete the study into the effectiveness of protective diaphragm walls ofn the reduction of settlements, the influence of nearby imposed loads (simulating buildings) on the effectiveness of the designed diaphragm walls (from the point of view of reducing surface movements) will be studied. In order to compare the effectiveness of micropile diaphragm walls regarding the installation of micropile forepole umbrellas, different designs of these forepole umbrellas have been analysed comparing the movement obtained with that obtained for micropiled diaphragm walls, comparing both results with those measured from similar completed projects. In another section, a comparison between similar treatments has been completed, comparing the treatments with a forepole umbrella by jet grouting and jet grouting walls. The results obtained compared with settlement values measured in various projects already completed and whose sections correspond to those used in the numerical models.
Resumo:
UV-absorbing covers reduce the incidence of injurious insect pests and viruses in protected crops. In the present study, the effect of a UV-absorbing net (Bionet) on the spatio-temporal dynamics of the potato aphid on lettuce plants was evaluated. A field experiment was conducted during three seasons in two identical tunnels divided in four plots. A set of lettuce plants were artificially infested with Macrosiphum euphorbiae adults and the population was estimated by counting aphids on every plant over 7 to 9 weeks. Insect population grew exponentially but a significantly lower aphid density was present on plants grown under the UV-absorbing cover compared to a standard 50 mesh net. Similarly, in laboratory conditions, life table parameters were significantly reduced under the Bionet. Moreover, SADIE analysis showed that the spatial distribution of aphids was effectively limited under the UV-absorbing nets. Our results indicate that UV-absorbing nets should be considered as an important component of lettuce indoor cropping systems preventing pesticide applications and reducing the risk of spread of aphid-borne virus diseases.
Resumo:
The decision to build the Secondary Lining in Route Tunnels which are perforated using the New Austrian Tunnelling Method does not generally depend on reasons of structural strength. The paper discusses the implications of the issue as well as the pros and cons of the current alternative courses of action.
Resumo:
Field studies were conducted in walk-in tunnels to determine the flying capacity in the presence and absence of crop, of the parasitoid Psyttalia concolor and the predator Chrysoperla carnea under a UV-absorbent net (Bionet®). Yellow sticky cards were used for insect recovery but neither P. concolor nor C. carnea were very attracted to them, thus captures were too low to permit any meaningful comparisons. Bionet® did not seem to affect the mobility of any natural enemy irrespective of the trap location and monitoring hour. Climatic conditions inside nets were very extreme (average temperatures very high and relative humidity very low) threatening insect survival. New experiments are being developed, trying to find new attractants that permit a significant capture of both natural enemies.
Resumo:
When non linear physical systems of infinite extent are modelled, such as tunnels and perforations, it is necessary to simulate suitably the solution in the infinite as well as the non linearity. The finite element method (FEM) is a well known procedure for simulating the non linear behavior. However, the treatment of the infinite field with domain truncations is often questionable. On the other hand, the boundary element method (BEM) is suitable to simulate the infinite behavior without truncations. Because of this, by the combination of both methods, suitable use of the advantages of each one may be obtained. Several possibilities of FEM-BEM coupling and their performance in some practical cases are discussed in this paper. Parallelizable coupling algorithms based on domain decomposition are developed and compared with the most traditional coupling methods.
Resumo:
The design, construction and operation of the tunnels of M-30, the major ring road in the city of Madrid (Spain), represent a very interesting project in wich a wide variety of situations -geometrical, topographical, etc.- had to be covered, in variable conditions of traffic. For that reasons, the M-30 project is a remarkable technical challenge, which, after its completion, turned into an international reference. From the "design for safety" perspective, a holistic approach has been used to deal with new technologies, integration of systems and development of the procedures to reach the maximum level. However, one of the primary goals has been to achieve reasonable homogeneity characteristics which can permit operate a netword of tunels as one only infraestructure. In the case of the ventilation system the mentioned goals have implied innovative solutions and coordination efforts of great interest. Consequently, this paper describes the principal ideas underlying the conceptual solution developed focusing on the principal peculiarities of the project.
Resumo:
The possibility of application of structural reliability theory to the computation of the safety margins of excavated tunnels is presented. After a brief description of the existing procedures the limitations of the safety coefficients such as they usually defined, the proposed limit states are precised as well as the random variables and the applied methodology. Also presented are simple examples, some of them based in actual cases, and to end, some conclusions are established the most important one being the probability of using the method to solve the inverse problem of identification.
Resumo:
La entrada en vigor del R.D. 635 del año 2006, sobre los requisitos mínimos de seguridad en túneles de carreteras establece la necesidad de profundizar en las características y prestaciones a exigir para los sistemas informáticos de control de ventilación en túneles tanto para las situaciones de servicio como de incendio. En general, este tipo de sistemas tienen como objetivo fundamental lograr la reducción de los tiempos de respuesta por parte de los sistemas y del personal de explotación, a la vez que aportar la mayor flexibilidad posible en las pautas de actuación manuales y automáticas. Sin embargo, las aplicaciones informáticas a implementar precisan tener en cuenta las diferencias en las tipologías de los sistemas de ventilación y las condiciones distintas que se pueden dar en la explotación del túnel, como por ejemplo, el tráfico denso o fluido en el interior del túnel en caso de incidente. Esto requiere estrategias de ventilación complejas que en algunos casos pueden ser predefinidas en el sistema de control. Con el objetivo de optimizar el funcionamiento de la ventilación es posible desarrollar algoritmos de control que establecen actuaciones sobre los distintos equipos en función de las condiciones previas al inicio del incidente pero también la evolución de las mismas durante el mismo. En consecuencia, el presente artículo intenta reflejar las tendencias y alternativas que puedan contemplarse para el control de los humos en caso de túneles planteados desde un punto de vista tanto teórico, en función de las recomendaciones internacionales, como práctico al incorporar resultados de medida in situ obtenidas en la verificación de sistemas de este tipo implementados sistemas de control de túneles en explotación.
Resumo:
The engineer must have sufficient theoretical knowledge to be applied to solve specific problems, with the necessary capacity to simplify these approaches, and taking into account factors such as speed, simplicity, quality and economy. In Geology, its ultimate goal is the exploration of the history of the geological events through observation, deduction, reasoning and, in exceptional cases by the direct underground exploration or experimentation. Experimentation is very limited in Geology. Reproduction laboratory of certain phenomena or geological processes is difficult because both time and space become a large scale. For this reason, some Earth Sciences are in a nearly descriptive stage whereas others closest to the experimental, Geophysics and Geochemistry, have assimilated progress experienced by the physics and chemistry. Thus, Anglo-Saxon countries clearly separate Engineering Geology from Geological Engineering, i.e. Applied Geology to the Geological Engineering concepts. Although there is a big professional overlap, the first one corresponds to scientific approach, while the last one corresponds to a technological one. Applied Geology to Engineering could be defined as the Science and Applied Geology to the design, construction and performance of engineering infrastructures in and field geology discipline. There has been much discussion on the primacy of theory over practice. Today prevails the exaggeration of practice, but you get good workers and routine and mediocre teachers. This idea forgets too that teaching problem is a problem of right balance. The approach of the action lines on the European Higher Education Area (EHEA) framework provides for such balance. Applied Geology subject represents the first real contact with the physical environment with the practice profession and works. Besides, the situation of the topic in the first trace of Study Plans for many students implies the link to other subjects and topics of the career (tunnels, dams, groundwater, roads, etc). This work analyses in depth the justification of such practical trips. It shows the criteria and methods of planning and the result which manifests itself in pupils. Once practical trips experience developed, the objective work tries to know about results and changes on student’s motivation in learning perspective. This is done regardless of the outcome of their knowledge achievements assessed properly and they are not subject to such work. For this objective, it has been designed a survey about their motivation before and after trip. Survey was made by the Unidad Docente de Geología Aplicada of the Departamento de Ingeniería y Morfología del Terreno (Escuela Técnica Superior de Ingenieros de Caminos, Canales y Puertos, Universidad Politécnica de Madrid). It was completely anonymous. Its objective was to collect the opinion of the student as a key agent of learning and teaching of the subject. All the work takes place under new teaching/learning criteria approach at the European framework in Higher Education. The results are exceptionally good with 90% of student’s participation and with very high scores in a number of questions as the itineraries, teachers and visited places (range of 4.5 to 4.2 in a 5 points scale). The majority of students are very satisfied (average of 4.5 in a 5 points scale).