60 resultados para Photography, High-speed
Resumo:
The dynamic effects of high-speed trains on viaducts are important issues for the design of the structures, as well as for the consideration of safe running conditions for the trains. In this work we start by reviewing the relevance of some basic design aspects. The significance of impact factor envelopes for moving loads is considered first. Resonance which may be achieved for high-speed trains requires dynamic analysis, for which some key aspects are discussed. The relevance of performing a longitudinal distribution of axle loads, the number of modes taken in analysis, and the consideration of vehicle-structure interaction are discussed with representative examples. The lateral dynamic effects of running trains on bridges is of importance for laterally compliant viaducts, such as some very tall structures erected in new high-speed lines. The relevance of this study is mainly for the safety of the traffic, considering both internal actions such as the hunting motion as well as external actions such as wind or earthquakes [1]. These studies require three-dimensional dynamic coupled vehicle-bridge models, and consideration of wheel to rail contact, a phenomenon which is complex and costly to model in detail. We describe here a fully nonlinear coupled model, described in absolute coordinates and incorporated into a commercial finite element framework [2]. The wheel-rail contact has been considered using a FastSim algorithm which provides a compromise between accuracy and computational cost, and captures the main nonlinear response of the contact interface. Two applications are presented, firstly to a vehicle subject to a strong wind gust traversing a bridge, showing the relevance of the nonlinear wheel-rail contact model as well as the dynamic interaction between bridge and vehicle. The second application is to a real HS viaduct with a long continuous deck and tall piers and high lateral compliance [3]. The results show the safety of the traffic as well as the importance of considering features such as track alignment irregularities.
Resumo:
A pressure wave is generated when a high speed train enters a tunnel. This wave travels along the tunnel back and forth, and is reflected at the irregularities of the tunnel duct (section changes, chimneys and tunnel ends). The pressure changes are associated to these waves can have an effect on passengers if the trains are not suitably sealed or pressurized. The intensity of the waves depends mainly on the train speed, and on the blockage ratio (train-section-to- tunnel-section area ratio). As the intensity of the waves is limited by regulations, and also by the effects on passengers and infrastructures, the sizing of the tunnel section area is largely influenced by the maximum train speed allowed in the tunnel. The aim of this study is to analyse the increase in cost in a tunnel due to the existence of this difference in ground level, and evaluate the increase of construction costs that this elevation might involve.
Resumo:
An aerodynamic optimization of the ICE 2 high-speed train nose in term of front wind action sensitivity is carried out in this paper. The nose is parametrically defined by Be?zier Curves, and a three-dimensional representation of the nose is obtained using thirty one design variables. This implies a more complete parametrization, allowing the representation of a real model. In order to perform this study a genetic algorithm (GA) is used. Using a GA involves a large number of evaluations before finding such optimal. Hence it is proposed the use of metamodels or surrogate models to replace Navier-Stokes solver and speed up the optimization process. Adaptive sampling is considered to optimize surrogate model fitting and minimize computational cost when dealing with a very large number of design parameters. The paper introduces the feasi- bility of using GA in combination with metamodels for real high-speed train geometry optimization.
Resumo:
The response of high-speed bridges at resonance, particularly under flexural vibrations, constitutes a subject of research for many scientists and engineers at the moment. The topic is of great interest because, as a matter of fact, such kind of behaviour is not unlikely to happen due to the elevated operating speeds of modern rains, which in many cases are equal to or even exceed 300 km/h ( [1,2]). The present paper addresses the subject of the evolution of the wheel-rail contact forces during resonance situations in simply supported bridges. Based on a dimensionless formulation of the equations of motion presented in [4], very similar to the one introduced by Klasztorny and Langer in [3], a parametric study is conducted and the contact forces in realistic situations analysed in detail. The effects of rail and wheel irregularities are not included in the model. The bridge is idealised as an Euler-Bernoulli beam, while the train is simulated by a system consisting of rigid bodies, springs and dampers. The situations such that a severe reduction of the contact force could take place are identified and compared with typical situations in actual bridges. To this end, the simply supported bridge is excited at resonace by means of a theoretical train consisting of 15 equidistant axles. The mechanical characteristics of all axles (unsprung mass, semi-sprung mass, and primary suspension system) are identical. This theoretical train permits the identification of the key parameters having an influence on the wheel-rail contact forces. In addition, a real case of a 17.5 m bridges traversed by the Eurostar train is analysed and checked against the theoretical results. The influence of three fundamental parameters is investigated in great detail: a) the ratio of the fundamental frequency of the bridge and natural frequency of the primary suspension of the vehicle; b) the ratio of the total mass of the bridge and the semi-sprung mass of the vehicle and c) the ratio between the length of the bridge and the characteristic distance between consecutive axles. The main conclusions derived from the investigation are: The wheel-rail contact forces undergo oscillations during the passage of the axles over the bridge. During resonance, these oscillations are more severe for the rear wheels than for the front ones. If denotes the span of a simply supported bridge, and the characteristic distance between consecutive groups of loads, the lower the value of , the greater the oscillations of the contact forces at resonance. For or greater, no likelihood of loss of wheel-rail contact has been detected. The ratio between the frequency of the primary suspension of the vehicle and the fundamental frequency of the bridge is denoted by (frequency ratio), and the ratio of the semi-sprung mass of the vehicle (mass of the bogie) and the total mass of the bridge is denoted by (mass ratio). For any given frequency ratio, the greater the mass ratio, the greater the oscillations of the contact forces at resonance. The oscillations of the contact forces at resonance, and therefore the likelihood of loss of wheel-rail contact, present a minimum for approximately between 0.5 and 1. For lower or higher values of the frequency ratio the oscillations of the contact forces increase. Neglecting the possible effects of torsional vibrations, the metal or composite bridges with a low linear mass have been found to be the ones where the contact forces may suffer the most severe oscillations. If single-track, simply supported, composite or metal bridges were used in high-speed lines, and damping ratios below 1% were expected, the minimum contact forces at resonance could drop to dangerous values. Nevertheless, this kind of structures is very unusual in modern high-speed railway lines.
Resumo:
One of the phenomena that limit the velocity of trains in high speed lines is the so- called “ballast pick-up”. It is a ballast train-induced-wind erosion (or BATIWE) that can produce damage to the train under body and the infrastructure surrounding the tracks. The analysis of the measurements taken during several passes of the train allows for a criterion of ballast flight initiation to be obtained. The first rotation of a ballast stone occurs when the impulse given to the stone (arising from the aerodynamic loading produced by the wind gust genera ted by the passing train) overpasses a critical impulse. This impulse depends on the physical properties of the stone (mass, shape, moment of inertia, etc. ...) and its posture on the track bed. The aim of this paper is to report on the experimental results obtained in the ADIF’S Brihuega (Guadalajara) test station, in the Madrid to Barcelona high speed line, and the way they can be used to support the feasibility of the definition of a criterion to evaluate the BA TIWE capability of trains. The results obtained show the feasibility of the proposed method, and contribute to a method of BATIWE characterization, which can be relevant for the development of train interoperability standardization.
Resumo:
This paper deals with the assessment of the contribution of the second flexural mode to the dynamic behaviour of simply supported railway bridges. Alluding to the works of other authors, it is suggested in some references that the dynamic behaviour of simply supported bridges could be adequately represented taking into account only the contribution of the fundamental flexural mode. On the other hand, the European Rail Research Institute (ERRI) proposes that the second mode should also be included whenever the associated natural frequency is lower than 30 Hz]. This investigation endeavours to clarify the question as much as possible by establishing whether the maximum response of the bridge, in terms of displacements, accelerations and bending moments, can be computed accurately not taking account of the contribution of the second mode. To this end, a dimensionless formulation of the equations of motion of a simply supported beam traversed by a series of equally spaced moving loads is presented. This formulation brings to light the fundamental parameters governing the behaviour of the beam: damping ratio, dimensionless speed $ \alpha$=VT/L, and L/d ratio (L stands for the span of the beam, V for the speed of the train, T represents the fundamental period of the bridge and d symbolises the distance between consecutive loads). Assuming a damping ratio equal to 1%, which is a usual value for prestressed high-speed bridges, a parametric analysis is conducted over realistic ranges of values of $ \alpha$ and L/d. The results can be extended to any simply supported bridge subjected to a train of equally spaced loads in virtue of the so-called Similarity Formulae. The validity of these formulae can be derived from the dimensionless formulation mentioned above. In the parametric analysis the maximum response of the bridge is obtained for one thousand values of speed that cover the range from the fourth resonance of the first mode to the first resonance of the second mode. The response at twenty-one different locations along the span of the beam is compared in order to decide if the maximum can be accurately computed with the sole contribution of the fundamental mode.
Resumo:
Revisión y puesta al día de la publicaciones relacionadas con el diseño de puentes de ferrocarril de alta velocidad y nuevas investigaciones sobre dinámica lateral.
Resumo:
The dynamic effects of high-speed trains on viaducts are important issues for the design of the structures, as well as for determining safe running conditions of trains. In this work we start by reviewing the relevance of some basic moving load models for the dynamic action of vertical traffic loads. The study of lateral dynamics of running trains on bridges is of importance mainly for the safety of the traffic, and may be relevant for laterally compliant bridges. These studies require 3D coupled vehicle-bridge models and consideration of wheel to rail contact. We describe here a fully nonlinear coupled model, formulated in absolute coordinates and incorporated into a commercial finite element framework. An application example is presented for a vehicle subject to a strong wind gust traversing a bridge, showing the relevance of the nonlinear wheel-rail contact model as well as the interaction between bridge and vehicle.
Resumo:
The commercial centre VIALIA and the new railway station of the AVE (high speed train) in Malaga was inaugurated in November 2006, just on the place of the former railway station. The new railway station with an investment of 134,7 million Euros occupies a surface of 51.377 m2, five times the surface of the former station. The enclosure is the biggest intermodal and commercial centre of Spain which comprises a parking of 21.000 m2 for 1300 parking places, one commercial area and a hotel with a total extension constructed of approximately 100.000 m2. The spaces of leisure contain cinemas, shops, restaurants, bowling, gymnasium, swimming pool and zones of passenger's traffic.
Resumo:
The physical model based on moving constant loads is widely used for the analysis of railway bridges. Nevertheless, this model is not well-suited for the study of short span bridges (L<=15-20 m), and the results it produces (displacements and accelerations) are much greater than those obtained experimentally. In this paper two factors are analysed which are believed to have an influence in the dynamic behaviour of short bridges. These two factors are not accounted for by the moving loads model and are the following: the distribution of the loads due to the presence of the sleepers and ballast layer, and the train-bridge interaction. Several numerical simulations have been performed in order to decide on their influence, and the results are presented and discussed herein.
Resumo:
Underpasses are common in modern railway lines. Wildlife corridors and drainage conduits often fall into this category of partially buried structures. Their dynamic behaviour has received far less attention than that of other structures such as bridges, but their large number makes their study an interesting challenge in order to achieve safe and cost-effective structures. As ballast operations are a key life cycle cost, and excessive vibrations increase the need of ballast regulation in order to ensure track geometry, special attention is paid to accelerations, the values of which should be limited to avoid track instability according to Eurocode. In this paper, the data obtained during on site measurements on culverts belonging to a Spanish high-speed train line are presented. A set of six rectangular-shaped, closed-frame underpasses were monitored under traffic loading. Acceleration records at different points of the structures are presented and discussed. They reveal a non-uniform dynamic response of the roof-slab, with the highest observed values below the occupied track. Also, they indicate that the dynamic response is important up to frequencies higher than those usually observed for standard simply supported bridges. Finally, they are used to obtain a heuristic rule to estimate acceleration levels on the roof-slab.
Resumo:
Implantación de la Red de Alta velocidad Ferroviaria en California. Tramo San Francisco-Sacramento. Este artículo de la serie “Alta velocidad Ferroviaria en California (CHSRS), se ocupa de la línea San Francisco– Sacramento “Bay Crossing Alternative”, que cierra la red de alta velocidad ferroviaria del Estado de California, permitiendo en la terminal HSR de Sacramento, conectar con la línea Fresno–Sacramento, en coincidencia de trazados para en el futuro prolongar la red californiana de alta velocidad ferroviaria hasta su entronque con la del Estado de Nevada, vía Tahoe Lake–Reno. La línea San Francisco–Sacramento “Bay Crossing Alternative”, consta de tres trayectos: El primero de ellos “San Francisco urbano” va desde la terminal HSR “San Francisco Airport”, donde termina la alternativa “Golden Gate” de la línea Fresno–San Francisco, hasta el viaducto de acceso al Paso de la Bahía, que constituye el segundo trayecto “San Francisco–Richmond”, trayecto estrella de la red, de 15,48 Km de longitud sobre la Bahía de San Francisco, con desarrollo a través de 11,28 Km en puente colgante múltiple, con vanos de 800 m de luz y 67 m de altura libre bajo el tablero que permite la navegación en la Bahía. El tercer trayecto “Richmond–Sacramento” cruza la Bahía de San Pablo con un puente colgante de 1,6 Km de longitud y tipología similar a los múltiples de la Bahía de San Francisco, pasa por Vallejo (la por plazo breve de tiempo, antigua capital del Estado de California) y por la universitaria Davis, antes de finalmente llegar a la HSR Terminal Station de Sacramento Roseville. This article of the series “California High Speed Railway System”(CHSRS) treats on Line San Francisco–Sacramento “Bay Crossing Alternative” (BCA). This line closes the system of California high speed state railway, and connects with the line Fresno–Sacramento “Stockton Arch Alternative”, joining its alignments in the HSR Terminal of Sacramento Roseville. From this station it will be possible, in the future, to extend the Californian railway system till the Nevada railway system, vía Tahoe Lake and Reno. The BCA consists of three sections: The first one passing through San Francisco city, goes from HSR San Francisco Airport Terminal Station (where the line Fresno–San Francisco “Golden Gate Alternative” ends), up to the Viaduct access at the Bay Crossing. The second section San Francisco–Richmond, constitutes the star section of the system, with 15,48 Km length on the San Francisco Bay, where 11,28 Km in multi suspension bridge, 800 m span and 67 m gauge under panel, to allow navigation through the Bay. The third section Richmond–Sacramento crosses the San Pablo Bay through another suspension bridge of similar typology to that of San Francisco Bay crossing; pass through Vallejo (the ancient and for a short time Head of the State of California) and through Davis, university city, to arrive to the HSR Terminal Station of Sacramento Roseville.
Resumo:
Implantación de la Red de Alta velocidad Ferroviaria en California. Tramo Fresno-Sacramento. El presente articúlo es la cuarta parte de la serie "Alta Velocidad Ferroviaria en California (CHSRS)". Recoge la Alternativa "Stockton Arch", que el Proyecto FARWEST presenta a la prevista por la Authority (CHSRA), para la Línea HSR Fresno-Sacramento, en programación y en trazado. Éste discurre, desde la gran Terminal de Fresno (implantada en las afueras al suroeste de la ciudad) por el segmento sur del "mar interior" (que en el Terciario Superior ocupaba el actual Valle Central), hasta Stockton, y por el segmento norte, hasta Sacramento. El Paet de Ripperdan (~ pK 40) queda conectado por carretera con el PAET de Oroloma de la Línea HSR Fresno-San Francisco (Golden Gate Alternative). La última parte del trazado de la Línea HSR Fresno-Sacramento (Stockton Arch Alternative), coincide en alineación y rasante con la Línea HSR San Francisco-Sacramento (Crossing Bay Alternative) a la altura de Roseville, donde se emplaza la gran terminal norte de la red de California, desde la que se unirá ésta con la de Nevada, por Reno. This article forras the fourth part of the series entitled "High Speed Railway in California (CHSRS)". It addresses the "Stockton Arch" alternative, which the FARWESTProjectpresents in scheduling and in alignment as to that provided for by the Authority (CHSRA) for the Fresno-Sacramento HSR Line. The latter runs from the grand Fresno Terminal (located in the outskirts to the southwest ofthe city) through the south segment ofthe "inland sea" (which oceupied the current Central Valley in the Upper Tertiary) to Stockton and through the north segment to Sacramento. The Ripperdan TSAP (post ofpassing and stabling trains), — kilometer point 40, conneets with the Oroloma TSAP ofthe Fresno-San Francisco HSR Line (Golden Gate Alternative) by road. The last part of the Fresno-Sacramento HSR Line alignment (Stockton Arch Alternative), coincides in alignment and grade with the San Francisco-Sacramento HSR Line (Crossing Bay Alternative) at Roseville, where the great north terminal ofthe California network is located, from which the latter will be linked with Nevada s network through Reno.
Resumo:
Implantación de la Red de Alta velocidad Ferroviaria en California. Tramo Fresno-Los Angeles-San Diego. Este artículo, tercera parte de la serie que describe la red de Alta Velocidad Ferroviaria de California (CHSRS), se ocupa de la línea Fresno-Los Angeles Airport-San Diego Airport, con el trazado propuesto en la Alternativa Missions Trail del Proyecto FARWEST, caracterizada por el paso directo de las montañas de Tehachapi, mediante dos grandes túneles de 27,5 Km (17 mile) y 25,6 Km (15,9 mile) de longitud. También por el emplazamiento de la estación terminal de Los Angeles, junto al Aeropuerto Internacional de Los Angeles y la sustitución de la circunvalación ferroviaria de la aglomeración urbana de Los Angeles, a través de Inland Empire, por el ramal Anaheim-Riverside, que da acceso a esa región, y que es cabecera de la futura Dessert Express a Las Vegas. The third of a series describing the California High Speed Railway (CHSRS), this article refers to the Fresno-Los Angeles Airport-San Diego Airport line, with the alignment as proposed in the Missions Trail Alternative of the FARWEST Project, characterized by the direct Tehachapi mountain pass through two large tunnels 27.5 Km (17 miles) and 25.6 Km (15.9 miles) long and also to the siting of the Los Angeles terminal station next to the Los Angeles International Airport and the replacement of the Los Angeles urban conglomeration railway by-pass through Inland Empire, by the Anaheim-Riverside branch providing access to that region and which is the head of the future Desert Express to Las Vegas.
Resumo:
The new railway station of María Zambrano for AVE (Spanish high-speed trains) located in Malaga, has been inaugurated in November 2006, just on the site of the former railway station. The new railway station with an investment of 134.7 million Euros occupies a surface of 51.377 m2, five times the surface of the former station. The enclosure is the biggest intermodal transport and commercial center of Spain which comprises a parking of 21,000 m2 for 1,300 parking places, one commercial area and a hotel of 35 m height, with a total extension constructed of approximately 100,000 m2.