21 resultados para Nathec events, lightning, risk assessment, chemical plant


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Geologic storage of carbon dioxide (CO2) has been proposed as a viable means for reducing anthropogenic CO2 emissions. Once injection begins, a program for measurement, monitoring, and verification (MMV) of CO2 distribution is required in order to: a) research key features, effects and processes needed for risk assessment; b) manage the injection process; c) delineate and identify leakage risk and surface escape; d) provide early warnings of failure near the reservoir; and f) verify storage for accounting and crediting. The selection of the methodology of monitoring (characterization of site and control and verification in the post-injection phase) is influenced by economic and technological variables. Multiple Criteria Decision Making (MCDM) refers to a methodology developed for making decisions in the presence of multiple criteria. MCDM as a discipline has only a relatively short history of 40 years, and it has been closely related to advancements on computer technology. Evaluation methods and multicriteria decisions include the selection of a set of feasible alternatives, the simultaneous optimization of several objective functions, and a decision-making process and evaluation procedures that must be rational and consistent. The application of a mathematical model of decision-making will help to find the best solution, establishing the mechanisms to facilitate the management of information generated by number of disciplines of knowledge. Those problems in which decision alternatives are finite are called Discrete Multicriteria Decision problems. Such problems are most common in reality and this case scenario will be applied in solving the problem of site selection for storing CO2. Discrete MCDM is used to assess and decide on issues that by nature or design support a finite number of alternative solutions. Recently, Multicriteria Decision Analysis has been applied to hierarchy policy incentives for CCS, to assess the role of CCS, and to select potential areas which could be suitable to store. For those reasons, MCDM have been considered in the monitoring phase of CO2 storage, in order to select suitable technologies which could be techno-economical viable. In this paper, we identify techniques of gas measurements in subsurface which are currently applying in the phase of characterization (pre-injection); MCDM will help decision-makers to hierarchy the most suitable technique which fit the purpose to monitor the specific physic-chemical parameter.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Colombia is one of the largest per capita mercury polluters in the world as a consequence of its artisanal gold mining activities. The severity of this problem in terms of potential health effects was evaluated by means of a probabilistic risk assessment carried out in the twelve departments (or provinces) in Colombia with the largest gold production. The two exposure pathways included in the risk assessment were inhalation of elemental Hg vapors and ingestion of fish contaminated with methyl mercury. Exposure parameters for the adult population (especially rates of fish consumption) were obtained from nation-wide surveys and concentrations of Hg in air and of methyl-mercury in fish were gathered from previous scientific studies. Fish consumption varied between departments and ranged from 0 to 0.3 kg d?1. Average concentrations of total mercury in fish (70 data) ranged from 0.026 to 3.3 lg g?1. A total of 550 individual measurements of Hg in workshop air (ranging from menor queDL to 1 mg m?3) and 261 measurements of Hg in outdoor air (ranging from menor queDL to 0.652 mg m?3) were used to generate the probability distributions used as concentration terms in the calculation of risk. All but two of the distributions of Hazard Quotients (HQ) associated with ingestion of Hg-contaminated fish for the twelve regions evaluated presented median values higher than the threshold value of 1 and the 95th percentiles ranged from 4 to 90. In the case of exposure to Hg vapors, minimum values of HQ for the general population exceeded 1 in all the towns included in this study, and the HQs for miner-smelters burning the amalgam is two orders of magnitude higher, reaching values of 200 for the 95th percentile. Even acknowledging the conservative assumptions included in the risk assessment and the uncertainties associated with it, its results clearly reveal the exorbitant levels of risk endured not only by miner-smelters but also by the general population of artisanal gold mining communities in Colombia.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents an assessment analysis of damage domains of the 30 MWth prototype High-Temperature Engineering Test Reactor (HTTR) operated by the Japan Atomic Energy Agency (JAEA). For this purpose, an in-house deterministic risk assessment computational tool was developed based on the Theory of Stimulated Dynamics (TSD). To illustrate the methodology and applicability of the developed modelling approach, assessment results of a control rod (CR) withdrawal accident during subcritical conditions are presented and compared with those obtained by the JAEA.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Esta tesis aborda metodologías para el cálculo de riesgo de colisión de satélites. La minimización del riesgo de colisión se debe abordar desde dos puntos de vista distintos. Desde el punto de vista operacional, es necesario filtrar los objetos que pueden presentar un encuentro entre todos los objetos que comparten el espacio con un satélite operacional. Puesto que las órbitas, del objeto operacional y del objeto envuelto en la colisión, no se conocen perfectamente, la geometría del encuentro y el riesgo de colisión deben ser evaluados. De acuerdo con dicha geometría o riesgo, una maniobra evasiva puede ser necesaria para evitar la colisión. Dichas maniobras implican un consumo de combustible que impacta en la capacidad de mantenimiento orbital y por tanto de la visa útil del satélite. Por tanto, el combustible necesario a lo largo de la vida útil de un satélite debe ser estimado en fase de diseño de la misión para una correcta definición de su vida útil, especialmente para satélites orbitando en regímenes orbitales muy poblados. Los dos aspectos, diseño de misión y aspectos operacionales en relación con el riesgo de colisión están abordados en esta tesis y se resumen en la Figura 3. En relación con los aspectos relacionados con el diseño de misión (parte inferior de la figura), es necesario evaluar estadísticamente las características de de la población espacial y las teorías que permiten calcular el número medio de eventos encontrados por una misión y su capacidad de reducir riesgo de colisión. Estos dos aspectos definen los procedimientos más apropiados para reducir el riesgo de colisión en fase operacional. Este aspecto es abordado, comenzando por la teoría descrita en [Sánchez-Ortiz, 2006]T.14 e implementada por el autor de esta tesis en la herramienta ARES [Sánchez-Ortiz, 2004b]T.15 proporcionada por ESA para la evaluación de estrategias de evitación de colisión. Esta teoría es extendida en esta tesis para considerar las características de los datos orbitales disponibles en las fases operacionales de un satélite (sección 4.3.3). Además, esta teoría se ha extendido para considerar riesgo máximo de colisión cuando la incertidumbre de las órbitas de objetos catalogados no es conocida (como se da el caso para los TLE), y en el caso de querer sólo considerar riesgo de colisión catastrófico (sección 4.3.2.3). Dichas mejoras se han incluido en la nueva versión de ARES [Domínguez-González and Sánchez-Ortiz, 2012b]T.12 puesta a disposición a través de [SDUP,2014]R.60. En fase operacional, los catálogos que proporcionan datos orbitales de los objetos espaciales, son procesados rutinariamente, para identificar posibles encuentros que se analizan en base a algoritmos de cálculo de riesgo de colisión para proponer maniobras de evasión. Actualmente existe una única fuente de datos públicos, el catálogo TLE (de sus siglas en inglés, Two Line Elements). Además, el Joint Space Operation Center (JSpOC) Americano proporciona mensajes con alertas de colisión (CSM) cuando el sistema de vigilancia americano identifica un posible encuentro. En función de los datos usados en fase operacional (TLE o CSM), la estrategia de evitación puede ser diferente debido a las características de dicha información. Es preciso conocer las principales características de los datos disponibles (respecto a la precisión de los datos orbitales) para estimar los posibles eventos de colisión encontrados por un satélite a lo largo de su vida útil. En caso de los TLE, cuya precisión orbital no es proporcionada, la información de precisión orbital derivada de un análisis estadístico se puede usar también en el proceso operacional así como en el diseño de la misión. En caso de utilizar CSM como base de las operaciones de evitación de colisiones, se conoce la precisión orbital de los dos objetos involucrados. Estas características se han analizado en detalle, evaluando estadísticamente las características de ambos tipos de datos. Una vez concluido dicho análisis, se ha analizado el impacto de utilizar TLE o CSM en las operaciones del satélite (sección 5.1). Este análisis se ha publicado en una revista especializada [Sánchez-Ortiz, 2015b]T.3. En dicho análisis, se proporcionan recomendaciones para distintas misiones (tamaño del satélite y régimen orbital) en relación con las estrategias de evitación de colisión para reducir el riesgo de colisión de manera significativa. Por ejemplo, en el caso de un satélite en órbita heliosíncrona en régimen orbital LEO, el valor típico del ACPL que se usa de manera extendida es 10-4. Este valor no es adecuado cuando los esquemas de evitación de colisión se realizan sobre datos TLE. En este caso, la capacidad de reducción de riesgo es prácticamente nula (debido a las grandes incertidumbres de los datos TLE) incluso para tiempos cortos de predicción. Para conseguir una reducción significativa del riesgo, sería necesario usar un ACPL en torno a 10-6 o inferior, produciendo unas 10 alarmas al año por satélite (considerando predicciones a un día) o 100 alarmas al año (con predicciones a tres días). Por tanto, la principal conclusión es la falta de idoneidad de los datos TLE para el cálculo de eventos de colisión. Al contrario, usando los datos CSM, debido a su mejor precisión orbital, se puede obtener una reducción significativa del riesgo con ACPL en torno a 10-4 (considerando 3 días de predicción). Incluso 5 días de predicción pueden ser considerados con ACPL en torno a 10-5. Incluso tiempos de predicción más largos se pueden usar (7 días) con reducción del 90% del riesgo y unas 5 alarmas al año (en caso de predicciones de 5 días, el número de maniobras se mantiene en unas 2 al año). La dinámica en GEO es diferente al caso LEO y hace que el crecimiento de las incertidumbres orbitales con el tiempo de propagación sea menor. Por el contrario, las incertidumbres derivadas de la determinación orbital son peores que en LEO por las diferencias en las capacidades de observación de uno y otro régimen orbital. Además, se debe considerar que los tiempos de predicción considerados para LEO pueden no ser apropiados para el caso de un satélite GEO (puesto que tiene un periodo orbital mayor). En este caso usando datos TLE, una reducción significativa del riesgo sólo se consigue con valores pequeños de ACPL, produciendo una alarma por año cuando los eventos de colisión se predicen a un día vista (tiempo muy corto para implementar maniobras de evitación de colisión).Valores más adecuados de ACPL se encuentran entre 5•10-8 y 10-7, muy por debajo de los valores usados en las operaciones actuales de la mayoría de las misiones GEO (de nuevo, no se recomienda en este régimen orbital basar las estrategias de evitación de colisión en TLE). Los datos CSM permiten una reducción de riesgo apropiada con ACPL entre 10-5 y 10-4 con tiempos de predicción cortos y medios (10-5 se recomienda para predicciones a 5 o 7 días). El número de maniobras realizadas sería una en 10 años de misión. Se debe notar que estos cálculos están realizados para un satélite de unos 2 metros de radio. En el futuro, otros sistemas de vigilancia espacial (como el programa SSA de la ESA), proporcionarán catálogos adicionales de objetos espaciales con el objetivo de reducir el riesgo de colisión de los satélites. Para definir dichos sistemas de vigilancia, es necesario identificar las prestaciones del catalogo en función de la reducción de riesgo que se pretende conseguir. Las características del catálogo que afectan principalmente a dicha capacidad son la cobertura (número de objetos incluidos en el catalogo, limitado principalmente por el tamaño mínimo de los objetos en función de las limitaciones de los sensores utilizados) y la precisión de los datos orbitales (derivada de las prestaciones de los sensores en relación con la precisión de las medidas y la capacidad de re-observación de los objetos). El resultado de dicho análisis (sección 5.2) se ha publicado en una revista especializada [Sánchez-Ortiz, 2015a]T.2. Este análisis no estaba inicialmente previsto durante la tesis, y permite mostrar como la teoría descrita en esta tesis, inicialmente definida para facilitar el diseño de misiones (parte superior de la figura 1) se ha extendido y se puede aplicar para otros propósitos como el dimensionado de un sistema de vigilancia espacial (parte inferior de la figura 1). La principal diferencia de los dos análisis se basa en considerar las capacidades de catalogación (precisión y tamaño de objetos observados) como una variable a modificar en el caso de un diseño de un sistema de vigilancia), siendo fijas en el caso de un diseño de misión. En el caso de las salidas generadas en el análisis, todos los aspectos calculados en un análisis estadístico de riesgo de colisión son importantes para diseño de misión (con el objetivo de calcular la estrategia de evitación y la cantidad de combustible a utilizar), mientras que en el caso de un diseño de un sistema de vigilancia, los aspectos más importantes son el número de maniobras y falsas alarmas (fiabilidad del sistema) y la capacidad de reducción de riesgo (efectividad del sistema). Adicionalmente, un sistema de vigilancia espacial debe ser caracterizado por su capacidad de evitar colisiones catastróficas (evitando así in incremento dramático de la población de basura espacial), mientras que el diseño de una misión debe considerar todo tipo de encuentros, puesto que un operador está interesado en evitar tanto las colisiones catastróficas como las letales. Del análisis de las prestaciones (tamaño de objetos a catalogar y precisión orbital) requeridas a un sistema de vigilancia espacial se concluye que ambos aspectos han de ser fijados de manera diferente para los distintos regímenes orbitales. En el caso de LEO se hace necesario observar objetos de hasta 5cm de radio, mientras que en GEO se rebaja este requisito hasta los 100 cm para cubrir las colisiones catastróficas. La razón principal para esta diferencia viene de las diferentes velocidades relativas entre los objetos en ambos regímenes orbitales. En relación con la precisión orbital, ésta ha de ser muy buena en LEO para poder reducir el número de falsas alarmas, mientras que en regímenes orbitales más altos se pueden considerar precisiones medias. En relación con los aspectos operaciones de la determinación de riesgo de colisión, existen varios algoritmos de cálculo de riesgo entre dos objetos espaciales. La Figura 2 proporciona un resumen de los casos en cuanto a algoritmos de cálculo de riesgo de colisión y como se abordan en esta tesis. Normalmente se consideran objetos esféricos para simplificar el cálculo de riesgo (caso A). Este caso está ampliamente abordado en la literatura y no se analiza en detalle en esta tesis. Un caso de ejemplo se proporciona en la sección 4.2. Considerar la forma real de los objetos (caso B) permite calcular el riesgo de una manera más precisa. Un nuevo algoritmo es definido en esta tesis para calcular el riesgo de colisión cuando al menos uno de los objetos se considera complejo (sección 4.4.2). Dicho algoritmo permite calcular el riesgo de colisión para objetos formados por un conjunto de cajas, y se ha presentado en varias conferencias internacionales. Para evaluar las prestaciones de dicho algoritmo, sus resultados se han comparado con un análisis de Monte Carlo que se ha definido para considerar colisiones entre cajas de manera adecuada (sección 4.1.2.3), pues la búsqueda de colisiones simples aplicables para objetos esféricos no es aplicable a este caso. Este análisis de Monte Carlo se considera la verdad a la hora de calcular los resultados del algoritmos, dicha comparativa se presenta en la sección 4.4.4. En el caso de satélites que no se pueden considerar esféricos, el uso de un modelo de la geometría del satélite permite descartar eventos que no son colisiones reales o estimar con mayor precisión el riesgo asociado a un evento. El uso de estos algoritmos con geometrías complejas es más relevante para objetos de dimensiones grandes debido a las prestaciones de precisión orbital actuales. En el futuro, si los sistemas de vigilancia mejoran y las órbitas son conocidas con mayor precisión, la importancia de considerar la geometría real de los satélites será cada vez más relevante. La sección 5.4 presenta un ejemplo para un sistema de grandes dimensiones (satélite con un tether). Adicionalmente, si los dos objetos involucrados en la colisión tienen velocidad relativa baja (y geometría simple, Caso C en la Figura 2), la mayor parte de los algoritmos no son aplicables requiriendo implementaciones dedicadas para este caso particular. En esta tesis, uno de estos algoritmos presentado en la literatura [Patera, 2001]R.26 se ha analizado para determinar su idoneidad en distintos tipos de eventos (sección 4.5). La evaluación frete a un análisis de Monte Carlo se proporciona en la sección 4.5.2. Tras este análisis, se ha considerado adecuado para abordar las colisiones de baja velocidad. En particular, se ha concluido que el uso de algoritmos dedicados para baja velocidad son necesarios en función del tamaño del volumen de colisión proyectado en el plano de encuentro (B-plane) y del tamaño de la incertidumbre asociada al vector posición entre los dos objetos. Para incertidumbres grandes, estos algoritmos se hacen más necesarios pues la duración del intervalo en que los elipsoides de error de los dos objetos pueden intersecar es mayor. Dicho algoritmo se ha probado integrando el algoritmo de colisión para objetos con geometrías complejas. El resultado de dicho análisis muestra que este algoritmo puede ser extendido fácilmente para considerar diferentes tipos de algoritmos de cálculo de riesgo de colisión (sección 4.5.3). Ambos algoritmos, junto con el método Monte Carlo para geometrías complejas, se han implementado en la herramienta operacional de la ESA CORAM, que es utilizada para evaluar el riesgo de colisión en las actividades rutinarias de los satélites operados por ESA [Sánchez-Ortiz, 2013a]T.11. Este hecho muestra el interés y relevancia de los algoritmos desarrollados para la mejora de las operaciones de los satélites. Dichos algoritmos han sido presentados en varias conferencias internacionales [Sánchez-Ortiz, 2013b]T.9, [Pulido, 2014]T.7,[Grande-Olalla, 2013]T.10, [Pulido, 2014]T.5, [Sánchez-Ortiz, 2015c]T.1. ABSTRACT This document addresses methodologies for computation of the collision risk of a satellite. Two different approaches need to be considered for collision risk minimisation. On an operational basis, it is needed to perform a sieve of possible objects approaching the satellite, among all objects sharing the space with an operational satellite. As the orbits of both, satellite and the eventual collider, are not perfectly known but only estimated, the miss-encounter geometry and the actual risk of collision shall be evaluated. In the basis of the encounter geometry or the risk, an eventual manoeuvre may be required to avoid the conjunction. Those manoeuvres will be associated to a reduction in the fuel for the mission orbit maintenance, and thus, may reduce the satellite operational lifetime. Thus, avoidance manoeuvre fuel budget shall be estimated, at mission design phase, for a better estimation of mission lifetime, especially for those satellites orbiting in very populated orbital regimes. These two aspects, mission design and operational collision risk aspects, are summarised in Figure 3, and covered along this thesis. Bottom part of the figure identifies the aspects to be consider for the mission design phase (statistical characterisation of the space object population data and theory computing the mean number of events and risk reduction capability) which will define the most appropriate collision avoidance approach at mission operational phase. This part is covered in this work by starting from the theory described in [Sánchez-Ortiz, 2006]T.14 and implemented by this author in ARES tool [Sánchez-Ortiz, 2004b]T.15 provided by ESA for evaluation of collision avoidance approaches. This methodology has been now extended to account for the particular features of the available data sets in operational environment (section 4.3.3). Additionally, the formulation has been extended to allow evaluating risk computation approached when orbital uncertainty is not available (like the TLE case) and when only catastrophic collisions are subject to study (section 4.3.2.3). These improvements to the theory have been included in the new version of ESA ARES tool [Domínguez-González and Sánchez-Ortiz, 2012b]T.12 and available through [SDUP,2014]R.60. At the operation phase, the real catalogue data will be processed on a routine basis, with adequate collision risk computation algorithms to propose conjunction avoidance manoeuvre optimised for every event. The optimisation of manoeuvres in an operational basis is not approached along this document. Currently, American Two Line Element (TLE) catalogue is the only public source of data providing orbits of objects in space to identify eventual conjunction events. Additionally, Conjunction Summary Message (CSM) is provided by Joint Space Operation Center (JSpOC) when the American system identifies a possible collision among satellites and debris. Depending on the data used for collision avoidance evaluation, the conjunction avoidance approach may be different. The main features of currently available data need to be analysed (in regards to accuracy) in order to perform estimation of eventual encounters to be found along the mission lifetime. In the case of TLE, as these data is not provided with accuracy information, operational collision avoidance may be also based on statistical accuracy information as the one used in the mission design approach. This is not the case for CSM data, which includes the state vector and orbital accuracy of the two involved objects. This aspect has been analysed in detail and is depicted in the document, evaluating in statistical way the characteristics of both data sets in regards to the main aspects related to collision avoidance. Once the analysis of data set was completed, investigations on the impact of those features in the most convenient avoidance approaches have been addressed (section 5.1). This analysis is published in a peer-reviewed journal [Sánchez-Ortiz, 2015b]T.3. The analysis provides recommendations for different mission types (satellite size and orbital regime) in regards to the most appropriate collision avoidance approach for relevant risk reduction. The risk reduction capability is very much dependent on the accuracy of the catalogue utilized to identify eventual collisions. Approaches based on CSM data are recommended against the TLE based approach. Some approaches based on the maximum risk associated to envisaged encounters are demonstrated to report a very large number of events, which makes the approach not suitable for operational activities. Accepted Collision Probability Levels are recommended for the definition of the avoidance strategies for different mission types. For example for the case of a LEO satellite in the Sun-synchronous regime, the typically used ACPL value of 10-4 is not a suitable value for collision avoidance schemes based on TLE data. In this case the risk reduction capacity is almost null (due to the large uncertainties associated to TLE data sets, even for short time-to-event values). For significant reduction of risk when using TLE data, ACPL on the order of 10-6 (or lower) seems to be required, producing about 10 warnings per year and mission (if one-day ahead events are considered) or 100 warnings per year (for three-days ahead estimations). Thus, the main conclusion from these results is the lack of feasibility of TLE for a proper collision avoidance approach. On the contrary, for CSM data, and due to the better accuracy of the orbital information when compared with TLE, ACPL on the order of 10-4 allows to significantly reduce the risk. This is true for events estimated up to 3 days ahead. Even 5 days ahead events can be considered, but ACPL values down to 10-5 should be considered in such case. Even larger prediction times can be considered (7 days) for risk reduction about 90%, at the cost of larger number of warnings up to 5 events per year, when 5 days prediction allows to keep the manoeuvre rate in 2 manoeuvres per year. Dynamics of the GEO orbits is different to that in LEO, impacting on a lower increase of orbits uncertainty along time. On the contrary, uncertainties at short prediction times at this orbital regime are larger than those at LEO due to the differences in observation capabilities. Additionally, it has to be accounted that short prediction times feasible at LEO may not be appropriate for a GEO mission due to the orbital period being much larger at this regime. In the case of TLE data sets, significant reduction of risk is only achieved for small ACPL values, producing about a warning event per year if warnings are raised one day in advance to the event (too short for any reaction to be considered). Suitable ACPL values would lay in between 5•10-8 and 10-7, well below the normal values used in current operations for most of the GEO missions (TLE-based strategies for collision avoidance at this regime are not recommended). On the contrary, CSM data allows a good reduction of risk with ACPL in between 10-5 and 10-4 for short and medium prediction times. 10-5 is recommended for prediction times of five or seven days. The number of events raised for a suitable warning time of seven days would be about one in a 10-year mission. It must be noted, that these results are associated to a 2 m radius spacecraft, impact of the satellite size are also analysed within the thesis. In the future, other Space Situational Awareness Systems (SSA, ESA program) may provide additional catalogues of objects in space with the aim of reducing the risk. It is needed to investigate which are the required performances of those catalogues for allowing such risk reduction. The main performance aspects are coverage (objects included in the catalogue, mainly limited by a minimum object size derived from sensor performances) and the accuracy of the orbital data to accurately evaluate the conjunctions (derived from sensor performance in regards to object observation frequency and accuracy). The results of these investigations (section 5.2) are published in a peer-reviewed journal [Sánchez-Ortiz, 2015a]T.2. This aspect was not initially foreseen as objective of the thesis, but it shows how the theory described in the thesis, initially defined for mission design in regards to avoidance manoeuvre fuel allocation (upper part of figure 1), is extended and serves for additional purposes as dimensioning a Space Surveillance and Tracking (SST) system (bottom part of figure below). The main difference between the two approaches is the consideration of the catalogue features as part of the theory which are not modified (for the satellite mission design case) instead of being an input for the analysis (in the case of the SST design). In regards to the outputs, all the features computed by the statistical conjunction analysis are of importance for mission design (with the objective of proper global avoidance strategy definition and fuel allocation), whereas for the case of SST design, the most relevant aspects are the manoeuvre and false alarm rates (defining a reliable system) and the Risk Reduction capability (driving the effectiveness of the system). In regards to the methodology for computing the risk, the SST system shall be driven by the capacity of providing the means to avoid catastrophic conjunction events (avoiding the dramatic increase of the population), whereas the satellite mission design should consider all type of encounters, as the operator is interested on avoiding both lethal and catastrophic collisions. From the analysis of the SST features (object coverage and orbital uncertainty) for a reliable system, it is concluded that those two characteristics are to be imposed differently for the different orbital regimes, as the population level is different depending on the orbit type. Coverage values range from 5 cm for very populated LEO regime up to 100 cm in the case of GEO region. The difference on this requirement derives mainly from the relative velocity of the encounters at those regimes. Regarding the orbital knowledge of the catalogues, very accurate information is required for objects in the LEO region in order to limit the number of false alarms, whereas intermediate orbital accuracy can be considered for higher orbital regimes. In regards to the operational collision avoidance approaches, several collision risk algorithms are used for evaluation of collision risk of two pair of objects. Figure 2 provides a summary of the different collision risk algorithm cases and indicates how they are covered along this document. The typical case with high relative velocity is well covered in literature for the case of spherical objects (case A), with a large number of available algorithms, that are not analysed in detailed in this work. Only a sample case is provided in section 4.2. If complex geometries are considered (Case B), a more realistic risk evaluation can be computed. New approach for the evaluation of risk in the case of complex geometries is presented in this thesis (section 4.4.2), and it has been presented in several international conferences. The developed algorithm allows evaluating the risk for complex objects formed by a set of boxes. A dedicated Monte Carlo method has also been described (section 4.1.2.3) and implemented to allow the evaluation of the actual collisions among a large number of simulation shots. This Monte Carlo runs are considered the truth for comparison of the algorithm results (section 4.4.4). For spacecrafts that cannot be considered as spheres, the consideration of the real geometry of the objects may allow to discard events which are not real conjunctions, or estimate with larger reliability the risk associated to the event. This is of particular importance for the case of large spacecrafts as the uncertainty in positions of actual catalogues does not reach small values to make a difference for the case of objects below meter size. As the tracking systems improve and the orbits of catalogued objects are known more precisely, the importance of considering actual shapes of the objects will become more relevant. The particular case of a very large system (as a tethered satellite) is analysed in section 5.4. Additionally, if the two colliding objects have low relative velocity (and simple geometries, case C in figure above), the most common collision risk algorithms fail and adequate theories need to be applied. In this document, a low relative velocity algorithm presented in the literature [Patera, 2001]R.26 is described and evaluated (section 4.5). Evaluation through comparison with Monte Carlo approach is provided in section 4.5.2. The main conclusion of this analysis is the suitability of this algorithm for the most common encounter characteristics, and thus it is selected as adequate for collision risk estimation. Its performances are evaluated in order to characterise when it can be safely used for a large variety of encounter characteristics. In particular, it is found that the need of using dedicated algorithms depend on both the size of collision volume in the B-plane and the miss-distance uncertainty. For large uncertainties, the need of such algorithms is more relevant since for small uncertainties the encounter duration where the covariance ellipsoids intersect is smaller. Additionally, its application for the case of complex satellite geometries is assessed (case D in figure above) by integrating the developed algorithm in this thesis with Patera’s formulation for low relative velocity encounters. The results of this analysis show that the algorithm can be easily extended for collision risk estimation process suitable for complex geometry objects (section 4.5.3). The two algorithms, together with the Monte Carlo method, have been implemented in the operational tool CORAM for ESA which is used for the evaluation of collision risk of ESA operated missions, [Sánchez-Ortiz, 2013a]T.11. This fact shows the interest and relevance of the developed algorithms for improvement of satellite operations. The algorithms have been presented in several international conferences, [Sánchez-Ortiz, 2013b]T.9, [Pulido, 2014]T.7,[Grande-Olalla, 2013]T.10, [Pulido, 2014]T.5, [Sánchez-Ortiz, 2015c]T.1.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Hazard and risk assessment of landslides with potentially long run-out is becoming more and more important. Numerical tools exploiting different constitutive models, initial data and numerical solution techniques are important for making the expert’s assessment more objective, even though they cannot substitute for the expert’s understanding of the site-specific conditions and the involved processes. This paper presents a depth-integrated model accounting for pore water pressure dissipation and applications both to real events and problems for which analytical solutions exist. The main ingredients are: (i) The mathematical model, which includes pore pressure dissipation as an additional equation. This makes possible to model flowslide problems with a high mobility at the beginning, the landslide mass coming to rest once pore water pressures dissipate. (ii) The rheological models describing basal friction: Bingham, frictional, Voellmy and cohesive-frictional viscous models. (iii) We have implemented simple erosion laws, providing a comparison between the approaches of Egashira, Hungr and Blanc. (iv) We propose a Lagrangian SPH model to discretize the equations, including pore water pressure information associated to the moving SPH nodes

Relevância:

100.00% 100.00%

Publicador:

Resumo:

La reutilización de efluentes depurados siempre ha sido una opción en lugares con déficit coyuntural o estructural de recursos hídricos, se haya o no procedido a la regulación y planificación de esta práctica. La necesidad se crea a partir de las demandas de una zona, normalmente riego agrícola, que ven un mejor desarrollo de su actividad por contar con este recurso. España es el país de la UE que más caudal reutiliza, y está dentro de los diez primeros a nivel mundial. La regulación de esta práctica por el RD 1620/2007, ayudó a incorporar la reutilización de efluentes depurados a la planificación hidrológica como parte de los programas de medidas, con objeto de mitigar presiones, como son las extracciones de agua superficial y subterránea, o mejoras medioambientales evitando un vertido. El objeto de este trabajo es conocer la situación de la reutilización de efluentes depurados en España, los diferentes escenarios y planteamientos de esta actividad, el desarrollo del marco normativo y su aplicabilidad, junto a los tratamientos que permiten alcanzar los límites de calidad establecidos en la normativa vigente, en función de los distintos usos. Además, se aporta un análisis de costes de las distintas unidades de tratamiento y tipologías de líneas de regeneración, tanto de las utilizadas después de un tratamiento secundario como de otras opciones de depuración, como son los biorreactores de membrana (MBRs). Para el desarrollo de estos objetivos, en primer lugar, se aborda el conocimiento de la situación de la reutilización en España a través de una base de datos diseñada para cubrir todos los aspectos de esta actividad: datos de la estación depuradora de aguas residuales (EDAR), de la estación regeneradora (ERA), caudales depurados, reutilizados, volúmenes utilizados y ubicación de los distintos usos, tipos de líneas de tratamiento, calidades del agua reutilizada, etc. Las principales fuentes de información son las Confederaciones Hidrográficas (CCHH) a través de las concesiones de uso del agua depurada, las entidades de saneamiento y depuración de las distintas comunidades autónomas (CCAA), ayuntamientos, Planes Hidrológicos de Cuenca (PHC) y visitas a las zonas más emblemáticas. Además, se revisan planes y programas con el fin de realizar una retrospectiva de cómo se ha ido consolidando y desarrollando esta práctica en las distintas zonas de la geografía española. Se han inventariado 322 sistemas de reutilización y 216 tratamientos de regeneración siendo el más extendido la filtración mediante filtro arena seguido de una desinfección mediante hipoclorito, aunque este tratamiento se ha ido sustituyendo por un físico-químico con decantación lamelar, filtro de arena y radiación ultravioleta, tratamiento de regeneración convencional (TRC), y otros tratamientos que pueden incluir membranas, tratamientos de regeneración avanzados (TRA), con dosificación de hipoclorito como desinfección residual, para adaptarse al actual marco normativo. El uso más extendido es el agrícola con el 70% del caudal total reutilizado, estimado en 408 hm3, aunque la capacidad de los tratamientos de regeneración esperada para 2015, tras el Plan Nacional de Reutilización de Aguas (PNRA), es tres veces superior. Respecto al desarrollo normativo, en las zonas donde la reutilización ha sido pionera, las administraciones competentes han ido desarrollando diferentes recomendaciones de calidad y manejo de este tipo de agua. El uso agrícola, y en zonas turísticas, el riego de campos de golf, fueron los dos primeros usos que tuvieron algún tipo de recomendación incluso reglamentación. Esta situación inicial, sin una normativa a nivel estatal ni recomendaciones europeas, creó cierta incertidumbre en el avance de la reutilización tanto a nivel de concesiones como de planificación. En la actualidad sigue sin existir una normativa internacional para la reutilización y regeneración de efluentes depurados. Las recomendaciones de referencia a nivel mundial, y en concreto para el uso agrícola, son las de la OMS (Organización Mundial de la Salud) publicadas 1989, con sus posteriores revisiones y ampliaciones (OMS, 2006). Esta norma combina tratamientos básicos de depuración y unas buenas prácticas basadas en diferentes niveles de protección para evitar problemas sanitarios. Otra normativa que ha sido referencia en el desarrollo del marco normativo en países donde se realiza esta práctica, son las recomendaciones dadas por la Agencia Medioambiente Estadunidense (USEPA, 2012) o las publicadas por el Estado de California (Título 22, 2001). Estas normas establecen unos indicadores y valores máximos dónde el tratamiento de regeneración es el responsable de la calidad final en función del uso. Durante 2015, la ISO trabajaba en un documento para el uso urbano donde se muestra tanto los posibles parámetros que habría que controlar como la manera de actuar para evitar posibles riesgos. Por otro lado, la Comisión Europea (CE) viene impulsando desde el 2014 la reutilización de aguas depuradas dentro del marco de la Estrategia Común de Implantación de la Directiva Marco del Agua, y fundamentalmente a través del grupo de trabajo de “Programas de medidas”. Para el desarrollo de esta iniciativa se está planteando sacar para 2016 una guía de recomendaciones que podría venir a completar el marco normativo de los distintos Estados Miembros (EM). El Real Decreto 1620/2007, donde se establece el marco jurídico de la reutilización de efluentes depurados, tiende más a la filosofía implantada por la USEPA, aunque la UE parece más partidaria de una gestión del riesgo, donde se establecen unos niveles de tolerancia y unos puntos de control en función de las condiciones socioeconómicas de los distintos Estados, sin entrar a concretar indicadores, valores máximos o tratamientos. Sin embargo, en la normativa estadounidense se indican una serie de tratamientos de regeneración, mientras que, en la española, se hacen recomendaciones a este respecto en una Guía sin validez legal. Por tanto, queda sin regular los procesos para alcanzar estos estándares de calidad, pudiendo ser éstos no apropiados para esta práctica. Es el caso de la desinfección donde el uso de hipoclorito puede generar subproductos indeseables. En la Guía de recomendaciones para la aplicación del RD, publicada por el Ministerio de Agricultura y Medioambiente (MAGRAMA) en 2010, se aclaran cuestiones frecuentes sobre la aplicación del RD, prescripciones técnicas básicas para los sistemas de reutilización, y buenas prácticas en función del uso. Aun así, el RD sigue teniendo deficiencias en su aplicación siendo necesaria una revisión de la misma, como en las frecuencias de muestreo incluso la omisión de algunos parámetros como huevos de nematodos que se ha demostrado ser inexistentes tras un tratamiento de regeneración convencional. En este sentido, existe una tendencia a nivel mundial a reutilizar las aguas con fines de abastecimiento, incluir indicadores de presencia de virus o protozoos, o incluir ciertas tecnologías como las membranas u oxidaciones avanzadas para afrontar temas como los contaminantes emergentes. Otro de los objetivos de este trabajo es el estudio de tipologías de tratamiento en función de los usos establecidos en el RD 1620/2007 y sus costes asociados, siendo base de lo establecido a este respecto en la Guía y PNRA anteriormente indicados. Las tipologías de tratamiento propuestas se dividen en líneas con capacidad de desalar y las que no cuentan con una unidad de desalación de aguas salobres de ósmosis inversa o electrodiálisis reversible. Se realiza esta división al tener actuaciones en zonas costeras donde el agua de mar entra en los colectores, adquiriendo el agua residual un contenido en sales que es limitante en algunos usos. Para desarrollar este objetivo se han estudiado las unidades de tratamiento más implantadas en ERAs españolas en cuanto a fiabilidad para conseguir determinada calidad y coste, tanto de implantación como de explotación. El TRC, tiene un coste de implantación de 28 a 48 €.m-3.d y de explotación de 0,06 a 0,09 €. m-3, mientras que, si se precisara desalar, este coste se multiplica por diez en la implantación y por cinco en la explotación. En caso de los usos que requieren de TRA, como los domiciliarios o algunos industriales, los costes serían de 185 a 398 €.m-3.d en implantación y de 0,14 a 0,20 €.m-3 en explotación. En la selección de tecnologías de regeneración, la capacidad del tratamiento en relación al coste es un indicador fundamental. Este trabajo aporta curvas de tendencia coste-capacidad que sirven de herramienta de selección frente a otros tratamientos de regeneración de reciente implantación como son los MBR, u otros como la desalación de agua de mar o los trasvases entre cuencas dentro de la planificación hidrológica. En España, el aumento de las necesidades de agua de alta calidad en zonas con recursos escasos, aumento de zonas sensibles como puntos de captación para potables, zonas de baño o zonas de producción piscícola, y en ocasiones, el escaso terreno disponible para la implantación de nuevas plantas depuradoras (EDARs), han convertido a los MBRs, en una opción dentro del marco de la reutilización de aguas depuradas. En este trabajo, se estudia esta tecnología frente a los TRC y TRA, aportando igualmente curvas de tendencia coste-capacidad, e identificando cuando esta opción tecnológica puede ser más competitiva frente a los otros tratamientos de regeneración. Un MBR es un tratamiento de depuración de fangos activos donde el decantador secundario es sustituido por un sistema de membranas de UF o MF. La calidad del efluente, por tanto, es la misma que el de una EDAR seguida de un TRA. Los MBRs aseguran una calidad del efluente para todos los usos establecidos en el RD, incluso dan un efluente que permite ser directamente tratado por las unidades de desalación de OI o EDR. La implantación de esta tecnología en España ha tenido un crecimiento exponencial, pasando de 13 instalaciones de menos de 5.000 m3. d-1 en el 2006, a más de 55 instalaciones en operación o construcción a finales del 2014, seis de ellas con capacidades por encima de los 15.000 m3. d-1. Los sistemas de filtración en los MBR son los que marcan la operación y diseño de este tipo de instalaciones. El sistema más implantado en España es de membrana de fibra hueca (MFH), sobre todo para instalaciones de gran capacidad, destacando Zenon que cuenta con el 57% de la capacidad total instalada. La segunda casa comercial con mayor número de plantas es Kubota, con membranas de configuración placa plana (MPP), que cuenta con el 30 % de la capacidad total instalada. Existen otras casas comerciales implantadas en MBR españoles como son Toray, Huber, Koch o Microdym. En este documento se realiza la descripción de los sistemas de filtración de todas estas casas comerciales, aportando información de sus características, parámetros de diseño y operación más relevantes. El estudio de 14 MBRs ha posibilitado realizar otro de los objetivos de este trabajo, la estimación de los costes de explotación e implantación de este tipo de sistemas frente a otras alternativas de tratamiento de regeneración. En este estudio han participado activamente ACA y ESAMUR, entidades públicas de saneamiento y depuración de Cataluña y Murcia respectivamente, que cuentan con una amplia experiencia en la explotación de este tipo de sistemas. Este documento expone los problemas de operación encontrados y sus posibles soluciones, tanto en la explotación como en los futuros diseños de este tipo de plantas. El trabajo concluye que los MBRs son una opción más para la reutilización de efluentes depurados, siendo ventajosos en costes, tanto de implantación como de explotación, respecto a EDARs seguidas de TRA en capacidades por encima de los 10.000 m3.d-1. ABSTRACT The reuse of treated effluent has always been an option in places where a situational or structural water deficit exists, whether regulatory and/or planning efforts are completed or not. The need arises from the demand of a sector, commonly agricultural irrigation, which benefits of this new resource. Within the EU, Spain is ahead in the annual volume of reclaimed water, and is among the top ten countries at a global scale. The regulation of this practice through the Royal Decree 1620/2007 has helped to incorporate the water reuse to the hydrological plans as a part of the programme of measures to mitigate pressures such as surface or ground water extraction, or environmental improvements preventing discharges. The object of this study is to gain an overview of the state of the water reuse in Spain, the different scenarios and approaches to this activity, the development of the legal framework and its enforceability, together with the treatments that achieve the quality levels according to the current law, broken down by applications. Additionally, a cost analysis of technologies and regeneration treatment lines for water reclamation is performed, whereas the regeneration treatment is located after a wastewater treatment or other options such as membrane bioreactors (MBR). To develop the abovementioned objectives, the state of water reuse in Spain is studied by means of a database designed to encompass all aspects of the activity: data from the wastewater treatment plants (WWTP), from the water reclamation plants (WRP), the use of reclaimed water, treated water and reclaimed water annual volumes and qualities, facilities and applications, geographic references, technologies, regeneration treatment lines, etc. The main data providers are the River Basin authorities, through the concession or authorization for water reuse, (sanitary and wastewater treatment managers from the territorial governments, local governments, Hydrological Plans of the River Basins and field visits to the main water reuse systems. Additionally, a review of different plans and programmes on wastewater treatment or water reuse is done, aiming to put the development and consolidation process of this activity in the different regions of Spain in perspective. An inventory of 322 reuse systems and 216 regeneration treatments has been gathered on the database, where the most extended regeneration treatment line was sand filtration followed by hypochlorite disinfection, even though recently it is being replaced by physical–chemical treatment with a lamella settling system, depth sand filtration, and a disinfection with ultraviolet radiation and hypochlorite as residual disinfectant, named conventional regeneration treatment (CRT), and another treatment that may include a membrane process, named advanced regeneration treatment (ART), to adapt to legal requirements. Agricultural use is the most extended, accumulating 70% of the reclaimed demand, estimated at 408 hm3, even though the expected total capacity of WRPs for 2015, after the implementation of the National Water Reuse Plan (NWRP) is three times higher. According to the development of the water reuse legal framework, there were pioneer areas where competent authorities developed different quality and use recommendations for this new resource. Agricultural use and golf course irrigation in touristic areas were the first two uses with recommendations and even legislation. The initial lack of common legislation for water reuse at a national or European level created some doubts which affected the implementation of water reuse, both from a planning and a licensing point of view. Currently there is still a lack of common international legislation regarding water reuse, technologies and applications. Regarding agricultural use, the model recommendations at a global scale are those set by the World Health Organization published in 1989, and subsequent reviews and extensions about risk prevention (WHO, 2006). These documents combine wastewater treatments with basic regeneration treatments reinforced by good practices based on different levels of protection to avoid deleterious health effects. Another relevant legal reference for this practices has been the Environmental Protection Agency of the US (USEPA, 2012), or those published by the State of California (Title 22, 2001). These establish indicator targets and maximum thresholds where regeneration treatment lines are responsible for the final quality according to the different uses. During 2015, the ISO has worked on a document aimed at urban use, where the possible parameters to be monitored together with risk prevention have been studied. On the other hand, the European Commission has been promoting the reuse of treated effluents within the Common Implementation Strategy of the Water Framework Directive, mainly through the work of the Programme of Measures Working Group. Within this context, the publication of a recommendation guide during 2016 is intended, as a useful tool to fill in the legal gaps of different Member States on the matter. The Royal Decree 1620/2007, where the water reuse regulation is set, resembles the principles of the USEPA more closely, even though the EU shows a tendency to prioritize risk assessment by establishing tolerance levels and thresholds according to socioeconomic conditions of the different countries, without going into details of indicators, maximum thresholds or treatments. In contrast, in the US law, regeneration treatments are indicated, while in the Spanish legislation, the only recommendations to this respect are compiled in a non-compulsory guide. Therefore, there is no regulation on the different treatment lines used to achieve the required quality standards, giving room for inappropriate practices in this respect. This is the case of disinfection, where the use of hypochlorite may produce harmful byproducts. In the recommendation Guide for the application of the Royal Decree (RD), published by the Ministry of Agriculture and Environment (MAGRAMA) in 2010, clarifications of typical issues that may arise from the application of the RD are given, as well as basic technical parameters to consider in reuse setups, or good practices according to final use. Even so, the RD still presents difficulties in its application and requires a review on issues such as the sampling frequency of current quality parameters or even the omission of nematode eggs indicator, which have been shown to be absent after CRT. In this regard, there is a global tendency to employ water reuse for drinking water, including indicators for the presence of viruses and protozoans, or to include certain technologies such as membranes or advanced oxidation processes to tackle problems like emerging pollutants. Another of the objectives of this study is to provide different regeneration treatment lines to meet the quality requirements established in the RD 1620/2007 broken down by applications, and to estimate establishment and operational costs. This proposal has been based on what is established in the above mentioned Guide and NWRP. The proposed treatment typologies are divided in treatment trains with desalination, like reverse osmosis or reversible electrodialisis, and those that lack this treatment for brackish water. This separation is done due to coastal facilities, where sea water may permeate the collecting pipes, rising salt contents in the wastewater, hence limiting certain uses. To develop this objective a study of the most common treatment units set up in Spanish WRPs is conducted in terms of treatment train reliability to obtain an acceptable relationship between the required quality and the capital and operational costs. The CRT has an establishment cost of 28 to 48 €.m-3.d and an operation cost of 0.06 to 0.09 €.m-3, while, if desalination was required, these costs would increase tenfold for implementation and fivefold for operation. In the cases of uses that require ART, such as residential or certain industrial uses, the costs would be of 185 to 398 €.m-3.d for implementation and of 0.14 to 0.20 €.m-3 for operation. When selecting regeneration treatment lines, the relation between treatment capacity and cost is a paramount indicator. This project provides cost-capacity models for regeneration treatment trains. These may serve as a tool when selecting between different options to fulfill water demands with MBR facilities, or others such as sea water desalination plants or inter-basin water transfer into a water planning framework. In Spain, the requirement for high quality water in areas with low resource availability, the increasing number of sensitive zones, such as drinking water extraction, recreational bathing areas, fish protected areas and the lack of available land to set up new WWTPs, have turned MBRs into a suitable option for water reuse. In this work this technology is analyzed in contrast to CRT and ART, providing cost-capacity models, and identifying when and where this treatment option may outcompete other regeneration treatments. An MBR is an activated sludge treatment where the secondary settling is substituted by a membrane system of UF or MF. The quality of the effluent is, therefore, comparable to that of a WWTP followed by an ART. MBRs ensure a sufficient quality level for the requirements of the different uses established in the RD, even producing an effluent that can be directly treated in OI or EDR processes. The implementation of this technology in Spain has grown exponentially, growing from 13 facilities with less than 5000 m3.d-1 in 2006 to above 55 facilities operating by the end of 2014, 6 of them with capacities over 15000 m3.d-1. The membrane filtration systems for MBR are the ones that set the pace of operation and design of this type of facilities. The most widespread system in Spain is the hollow fiber membrane configuration, especially on high flow capacities, being Zenon commercial technology, which mounts up to 57% of the total installed capacity, the main contributor. The next commercial technology according to plant number is Kubota, which uses flat sheet membrane configuration, which mounts up to 30% of the total installed capacity. Other commercial technologies exist within the Spanish MBR context, such as Toray, Huber, Koch or Microdym. In this document an analysis of all of these membrane filtration systems is done, providing information about their characteristics and relevant design and operation parameters. The study of 14 full scale running MBRs has enabled to pursue another of the objectives of this work: the estimation of the implementation and operation costs of this type of systems in contrast to other regeneration alternatives. Active participation of ACA and ESAMUR, public wastewater treatment and reuse entities of Cataluña and Murcia respectively, has helped attaining this objective. A number of typical operative problems and their possible solutions are discussed, both for operation and plant design purposes. The conclusion of this study is that MBRs are another option to consider for water reuse, being advantageous in terms of both implementation and operational costs, when compared with WWTPs followed by ART, when considering flow capacities above 10000 m3.d-1.