25 resultados para Life cycle stages


Relevância:

90.00% 90.00%

Publicador:

Resumo:

Insulating materials in buildings are one of the main factors that should be taken into account when talking about sustainability since with a correct application it could imply important savings for the citizens. In the course of its life, a building requires a series of supplies to perform the duties it has been built for, generating an impact on the environment. The selection of one material or another will establish partly the global environmental impact of the building. Choosing the right insulating material will determine the building's general degree of sustainability, both in its heating savings (energy consumption) and in the environmental impacts caused by its LCA (greenhouse gas emissions). Therefore, we propose to establish guidelines to characterize the insulating material with a better environmental performance in all the stages of its life cycle, taking into account the construction system, the use of the building and its location.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

La producción y el transporte a obra de los productos cerámicos de carácter estructural suponen un importante consumo energético, que conlleva la emisión de gases de efecto invernadero a la atmósfera. El objetivo de la presente Tesis es demostrar la existencia de importantes diferencias en el valor del impacto ambiental asociado a los productos de cerámica estructural fabricados en España, y que estas diferencias podrían quedar cuantificadas y reflejadas mediante un análisis de Huella de Carbono y de la Energía Embebida. Se parte de la inexistencia en España, de base de datos contrastada y consensuada, que establezca las cargas medioambientales en función del tipo de producto cerámico a utilizar. Se realiza en la primera parte del estudio una revisión del estado actual de la Huella de Carbono y la Energía Embebida en el campo de los materiales de construcción, y más concretamente en el sector de la cerámica estructural, que sirve para acotar los límites del estudio y justificar el objeto de la Tesis. La investigación se acota a las etapas de producción y transporte a obra de los productos (estudio cuna a puerta con opciones), al considerar que son éstas, a priori, las que tienen una mayor incidencia en el comportamiento ambiental del producto. Siguiendo los pasos definidos en la normativa aplicable (definición del mapa de procesos – límites y alcance – inventario – cálculo y evaluación), se establece un método específico de identificación y cuantificación de las variables que determinan la Huella de Carbono y Energía Embebida de los productos cerámicos, en función de la tipología de producto. La información necesaria (inventario) se obtiene principalmente con recogida de datos “in situ” de fábricas de productos cerámicos, lo que garantiza que la información tratada en este estudio es de primer nivel. La información se complementa/contrasta con fuentes bibliográficas. Se determinan 6 variables con influencia global en el impacto ambiental, 44 variables principales y 39 secundarias, estableciendo las fórmulas de cálculo a partir de dichas variables. Los resultados de cálculo y evaluación determinan que, para unas mismas condiciones de fabricación, las diferencias entre productos cerámicos llegan hasta un 27% para la Huella de Carbono y un 35% para Energía Embebida. La relevancia que alcanza el impacto asociado al transporte del producto a obra puede llegar hasta un 40% del total. El método de cálculo y las fórmulas desarrolladas se integran en una hoja de cálculo, para el cálculo de Huella de Carbono y Energía Embebida de los productos cerámicos, que permite, a su vez, conocer la repercusión medioambiental que tiene la introducción de modificaciones o innovaciones en el proceso de producción o transporte a obra. Así mismo, el trabajo desarrollado ha servido para poner en relieve una serie de problemas y falta de información en el campo de la cerámica estructural y el medioambiente que pueden ser objeto de futuras líneas de investigación, tanto para el sector de la edificación como para la comunidad científica, pudiendo implementar la metodología desarrollada en otras investigaciones. Se considera que la investigación realizada y sus resultados suponen una aportación importante para conocer y reducir el impacto ambiental de los edificios, desde la perspectiva del ciclo de vida y considerando que el impacto ambiental de un edificio comienza desde el momento en que se extraen las materias primas para la fabricación de los materiales con los que se construyen los edificios. ABSTRACT The production and transport of structural ceramic products involves an important energy consumption, which leads to the emission of greenhouse gases into the atmosphere. The objective of the research is to demonstrate the existence of significant differences in the value of the environmental impact of structural ceramic products manufactured in Spain, and these differences could be quantified by the Carbon Footprint and Embodied Energy. It starts from the absence in Spain, of contrasted and agreed databases that establish the environmental loads depending on the type of ceramic product. In the first part of the study reviews the current state of the Carbon Footprint and Embedded Energy in the field of building materials, and more specifically in the field of structural ceramics, which serves to limit the scope of the study and justify the purpose of this Thesis. The Research is bounded to production and transportation stages of (cradle to gate with options), considering they are the stages that have a greater impact on the environmental performance of the product. Following the steps defined in applicable rules (definition of process map - boundaries and scope – inventory analysis- calculation and impact assessment), it sets a specific method for the identification and quantification of the variables that determine the Carbon Footprint and Embedded Energy of structural ceramic products, depending on the type of product. The information (inventory) is given mainly with a data collection in ceramic factories (and in a consultation with the manufactures of the products), ensuring that the information handled in this Thesis is a first rate data. It is established 6 variables with a global influence in the environmental impact, 44 primary and 39 secondary variables, establishing calculation formula from these variables. The results of calculation and assessment determined that, for same manufacturing conditions, the differences between ceramic products reach 27% for Carbon Footprint and 35% for Embodied Energy. The relevance that reaches the impact of transport can reach 40% of the total. The method of calculation and formulas developed are integrated into a simple calculation tool, excel base, to calculate the Carbon Footprint and Embodied Energy of structural ceramic products, which allows, know the environmental impact of changes or innovations in the production process or transport to work. The work also has served to find a problems and gaps in the field of structural ceramics and the environment that may well be the subject of future research, both for the building sector to the scientific community, implementing the methodology developed in other research. It is considered that the research and its results represent an important contribution to understand and reduce the environmental impact of buildings from the perspective of the life cycle, considering that the environmental impact of a building starts from the time that the raw materials are extracted for the manufacture of building materials.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

El mercado de outsourcing ha estado creciendo en los últimos años y se prevé que lo siga haciendo en los próximos, pero este crecimiento ha estado limitado por el fracaso de muchos proyectos que, en algunos casos, han llevado a las organizaciones a asumir de nuevo esos servicios (insourcing). Estos fracasos se han debido en gran parte a los problemas con los proveedores: falta de experiencia, de capacidades para asumir los proyectos, dificultad en la comunicación,… A diferencia de lo que ocurre en otras disciplinas, no existe una metodología que ayude, tanto a los clientes como a los proveedores de servicios de outsourcing de TI, a gobernar y gestionar sus proyectos y conseguir los resultados buscados. En los últimos años han aparecido, al mismo tiempo que la expansión del outsourcing, algunos modelos y marcos de buenas prácticas para la gestión de los proyectos de outsourcing, pero generalmente sólo cubren algunos aspectos de la gestión. No se los puede considerar metodologías, porque no definen roles, responsabilidades ni entregables. Por lo general, son el resultado de la experiencia en la gestión de otros tipos de proyectos. Hay que considerar también que, excepto eSCM-SP, que es un modelo de buenas prácticas para mejorar la capacidad en la provisión de servicios, están todos orientados al cliente. El objetivo de esta tesis es, por un lado, demostrar la necesidad de contar con una metodología que guíe a los proveedores durante todo el ciclo de vida un proyecto de outsourcing y, por otro, proponer una metodología que contemple desde la fase inicial de la búsqueda de oportunidades de negocio, evaluación de las propuestas RFP, la decisión de hacer una oferta o no para la prestación de servicios, la participación en la due diligence, la firma del contrato, la transición y la entrega de servicios, hasta la finalización del contrato. La metodología se ha organizado en base a un ciclo de vida del outsourcing de cinco etapas, definiendo para cada una de ellas los roles que participan y las responsabilidades que deberán asumir, las actividades a realizar y los entregables que se deberán generar, y que servirán de elementos de control tanto para la gestión del proyecto como para la provisión del servicio. La validación de la metodología se ha realizado aplicándola en proyectos de provisión de servicios de TI de una mediana empresa española y comparando los resultados obtenidos con los conseguidos en proyectos anteriores. ABSTRACT The outsourcing market has been growing in recent years and it is expected to keep doing so in the coming years, but this growth has been limited by the failure of many projects that, in some cases, has led organizations to take back those services (insourcing). These failures have been due to a major degree to problems with providers: lack of experience and capacity to take on the projects, and difficulties of communication. Unlike what happens in other disciplines, there is no methodology for helping both customers and providers of outsourcing services. In recent years, some good practice frameworks have also appeared at the same time as the expansion of outsourcing. They are not methodologies because they have not defined any roles, responsibilities and deliverables. These frameworks aim to help organizations to be successful at managing and governing outsourcing projects. They are usually the result of their experience in managing other kinds of projects. In consequence, it is not appropriate to name them "methodologies" for managing outsourcing projects and much less "standards". It is also important to note that all existing good practice frameworks, except eSCM-SP, are client-oriented. The aim of this thesis is to state the need to propose a methodology that guides providers throughout the whole outsourcing life cycle and facilitates the provision of quality services and their management, and the proposal of a methodology in which the stages, activities, deliverables, roles and responsibilities are clearly defined. The proposed methodology cover all the stages of the outsourcing life cycle, from the early stage of searching for business opportunities, evaluation of the RFP proposals, the decision to bid or not to bid for the service provision, participation in the due diligence if necessary, the signing of the contract, the transition and delivery of service to the termination of the contract. For each activity, roles, responsibilities and deliverables have been defined. The validation of the methodology has been done by applying it in the provision of some outsourcing projects carried out by a Spanish IT medium company and comparing the results with those obtained in previous projects.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Four European fuel cycle scenarios involving transmutation options (in coherence with PATEROS and CPESFR EU projects) have been addressed from a point of view of resources utilization and economic estimates. Scenarios include: (i) the current fleet using Light Water Reactor (LWR) technology and open fuel cycle, (ii) full replacement of the initial fleet with Fast Reactors (FR) burning U?Pu MOX fuel, (iii) closed fuel cycle with Minor Actinide (MA) transmutation in a fraction of the FR fleet, and (iv) closed fuel cycle with MA transmutation in dedicated Accelerator Driven Systems (ADS). All scenarios consider an intermediate period of GEN-III+ LWR deployment and they extend for 200 years, looking for long term equilibrium mass flow achievement. The simulations were made using the TR_EVOL code, capable to assess the management of the nuclear mass streams in the scenario as well as economics for the estimation of the levelized cost of electricity (LCOE) and other costs. Results reveal that all scenarios are feasible according to nuclear resources demand (natural and depleted U, and Pu). Additionally, we have found as expected that the FR scenario reduces considerably the Pu inventory in repositories compared to the reference scenario. The elimination of the LWR MA legacy requires a maximum of 55% fraction (i.e., a peak value of 44 FR units) of the FR fleet dedicated to transmutation (MA in MOX fuel, homogeneous transmutation) or an average of 28 units of ADS plants (i.e., a peak value of 51 ADS units). Regarding the economic analysis, the main usefulness of the provided economic results is for relative comparison of scenarios and breakdown of LCOE contributors rather than provision of absolute values, as technological readiness levels are low for most of the advanced fuel cycle stages. The obtained estimations show an increase of LCOE ? averaged over the whole period ? with respect to the reference open cycle scenario of 20% for Pu management scenario and around 35% for both transmutation scenarios. The main contribution to LCOE is the capital costs of new facilities, quantified between 60% and 69% depending on the scenario. An uncertainty analysis is provided around assumed low and high values of processes and technologies.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

La fotosíntesis es el proceso biológico que permite la producción primaria y, por tanto, la vida en nuestro planeta. La tasa fotosintética viene determinada por la ‘maquinaria’ bioquímica y las resistencias difusivas al paso del CO2 desde la atmósfera hasta su fijación en el interior de los cloroplastos. Históricamente la mayor resistencia difusiva se ha atribuido al cierre estomático, sin embargo ahora sabemos, debido a las mejoras en las técnicas experimentales, que existe también una resistencia grande que se opone a la difusión del CO2 desde los espacios intercelulares a los lugares de carboxilación. Esta resistencia, llamada normalmente por su inversa: la conductancia del mesófilo (gm), puede ser igual o incluso superior a la resistencia debida por el cierre estomático. En la presente tesis doctoral he caracterizado la limitación que ejerce la resistencia del mesófilo a la fijación de CO2 en diversas especies forestales y en distintos momentos de su ciclo biológico. En la fase de regenerado, hemos estudiado tres situaciones ambientales relevantes en el mayor éxito de su supervivencia, que son: el déficit hídrico, su interacción con la irradiancia y el paso del crecimiento en la sombra a mayor irradiancia, como puede suceder tras la apertura de un hueco en el dosel forestal. En la fase de arbolado adulto se ha caracterizado el estado hídrico y el intercambio gaseoso en hojas desarrolladas a distinta irradiancia dentro del dosel vegetal durante tres años contrastados en pluviometría. Para cada tipo de estudio se han empleado las técnicas ecofisiológicas más pertinentes para evaluar el estado hídrico y el intercambio gaseoso. Por su complejidad y la falta de un método que permita su cuantificación directa, la gm ha sido evaluada por los métodos más usados, que son: la discriminación isotópica del carbono 13, el método de la J variable, el método de la J constante y el método de la curvatura. Los resultados más significativos permiten concluir que la limitación relativa a la fotosíntesis por la conductancia estomática, del mesófilo y bioquímica es dependiente de la localización de la hoja en el dosel forestal. Por primera vez se ha documentado que bajo estrés hídrico las hojas desarrolladas a la sombra estuvieron más limitadas por una reducción en la gm, mientras que las hojas desarrolladas a pleno sol estuvieron más limitadas por reducción mayor de la conductancia estomática (gsw). Encontramos buena conexión entre el aparato fotosintético foliar y el sistema hídrico debido al alto grado de correlación entre la conductancia hidráulica foliar aparente y la concentración de CO2 en los cloroplastos en distintas especies forestales. Además, hemos mostrado diferentes pautas de regulación del intercambio gaseoso según las particularidades ecológicas de las especies estudiadas. Tanto en brinzales crecidos de forma natural y en el arbolado adulto como en plántulas cultivadas en el invernadero la ontogenia afectó a las limitaciones de la fotosíntesis producidas por estrés hídrico, resultando que las limitaciones estomáticas fueron dominantes en hojas más jóvenes mientras que las no estomáticas en hojas más maduras. La puesta en luz supuso un gran descenso en la gm durante los días siguientes a la transferencia, siendo este efecto mayor según el grado de sombreo previo en el que se han desarrollado las hojas. La aclimatación de las hojas a la alta irradiancia estuvo ligada a las modificaciones anatómicas foliares y al estado de desarrollo de la hoja. El ratio entre la gm/gsw determinó la mayor eficiencia en el uso del agua y un menor estado oxidativo durante la fase de estrés hídrico y su posterior rehidratación, lo cual sugiere el uso de este ratio en los programas de mejora genética frente al estrés hídrico. Debido a que la mayoría de modelos de estimación de la producción primaria bruta (GPP) de un ecosistema no incluye la gm, los mismos están incurriendo en una sobreestimación del GPP particularmente bajo condiciones de estrés hídrico, porque más de la mitad de la reducción en fotosíntesis en hojas desarrolladas a la sombra se debe a la reducción en gm. Finalmente se presenta un análisis de la importancia en las estimas de la gm bajo estrés hídrico de la refijación del CO2 emitido en la mitocondria a consecuencia de la fotorrespiración y la respiración mitocondrial en luz. ABSTRACT Photosynthesis is the biological process that supports primary production and, therefore, life on our planet. Rates of photosynthesis are determined by biochemical “machinery” and the diffusive resistance to the transfer of CO2 from the atmosphere to the place of fixation within the chloroplasts. Historically the largest diffusive resistance was attributed to the stomata, although we now know via improvements in experimental techniques that there is also a large resistance from sub-stomatal cavities to sites of carboxylation. This resistance, commonly quantified as mesophyll conductance (gm), can be as large or even larger than that due to stomatal resistance. In the present PhD I have characterized the limitation exerted by the mesophyll resistance to CO2 fixation in different forest species at different stages of their life cycle. In seedlings, we studied three environmental conditions that affect plant fitness, namely, water deficit, the interaction of water deficit with irradiance, and the transfer of plants grown in the shade to higher irradiance as can occur when a gap opens in the forest canopy. At the stage of mature trees we characterized water status and gas exchange in leaves developed at different irradiance within the canopy over the course of three years that had contrasting rainfall. For each study we used the most relevant ecophysiological techniques to quantify water relations and gas exchange. Due to its complexity and the lack of a method that allows direct quantification, gm was estimated by the most commonly used methods which are: carbon isotope discrimination, the J-variable, constant J and the curvature method The most significant results suggest that the relative limitation of photosynthesis by stomata, mesophyll and biochemistry depending on the position of the leaf within the canopy. For the first time it was documented that under water stress shaded leaves were more limited by a reduction in gm, while the sun-adapted leaves were more limited by stomatal conductance (gsw). The connection between leaf photosynthetic apparatus and the hydraulic system was shown by the good correlations found between the apparent leaf hydraulic conductance and the CO2 concentration in the chloroplasts in shade- and sun-adapted leaves of several tree species. In addition, we have revealed different patterns of gas exchange regulation according to the functional ecology of the species studied. In field grown trees and greenhouse-grown seedlings ontogeny affected limitations of photosynthesis due to water stress with stomatal limitations dominating in young leaves and nonstomatal limitations in older leaves. The transfer to high light resulted in major decrease of gm during the days following the transfer and this effect was greater as higher was the shade which leaves were developed. Acclimation to high light was linked to the leaf anatomical changes and the state of leaf development. The ratio between the gm/gsw determined the greater efficiency in water use and reduced the oxidative stress during the water stress and subsequent rehydration, suggesting the use of this ratio in breeding programs aiming to increase avoidance of water stress. Because most models to estimate gross primary production (GPP) of an ecosystem do not include gm, they are incurring an overestimation of GPP particularly under conditions of water stress because more than half of An decrease in shade-developed leaves may be due to reduction in gm. Finally, we present an analysis of the importance of how estimates of gm under water stress are affected by the refixation of CO2 that is emitted from mitochondria via photorespiration and mitochondrial respiration in light.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

habilidades de comprensión y resolución de problemas. Tanto es así que se puede afirmar con rotundidad que no existe el método perfecto para cada una de las etapas de desarrollo y tampoco existe el modelo de ciclo de vida perfecto: cada nuevo problema que se plantea es diferente a los anteriores en algún aspecto y esto hace que técnicas que funcionaron en proyectos anteriores fracasen en los proyectos nuevos. Por ello actualmente se realiza un planteamiento integrador que pretende utilizar en cada caso las técnicas, métodos y herramientas más acordes con las características del problema planteado al ingeniero. Bajo este punto de vista se plantean nuevos problemas. En primer lugar está la selección de enfoques de desarrollo. Si no existe el mejor enfoque, ¿cómo se hace para elegir el más adecuado de entre el conjunto de los existentes? Un segundo problema estriba en la relación entre las etapas de análisis y diseño. En este sentido existen dos grandes riesgos. Por un lado, se puede hacer un análisis del problema demasiado superficial, con lo que se produce una excesiva distancia entre el análisis y el diseño que muchas veces imposibilita el paso de uno a otro. Por otro lado, se puede optar por un análisis en términos del diseño que provoca que no cumpla su objetivo de centrarse en el problema, sino que se convierte en una primera versión de la solución, lo que se conoce como diseño preliminar. Como consecuencia de lo anterior surge el dilema del análisis, que puede plantearse como sigue: para cada problema planteado hay que elegir las técnicas más adecuadas, lo que requiere que se conozcan las características del problema. Para ello, a su vez, se debe analizar el problema, eligiendo una técnica antes de conocerlo. Si la técnica utiliza términos de diseño entonces se ha precondicionado el paradigma de solución y es posible que no sea el más adecuado para resolver el problema. En último lugar están las barreras pragmáticas que frenan la expansión del uso de métodos con base formal, dificultando su aplicación en la práctica cotidiana. Teniendo en cuenta todos los problemas planteados, se requieren métodos de análisis del problema que cumplan una serie de objetivos, el primero de los cuales es la necesidad de una base formal, con el fin de evitar la ambigüedad y permitir verificar la corrección de los modelos generados. Un segundo objetivo es la independencia de diseño: se deben utilizar términos que no tengan reflejo directo en el diseño, para que permitan centrarse en las características del problema. Además los métodos deben permitir analizar problemas de cualquier tipo: algorítmicos, de soporte a la decisión o basados en el conocimiento, entre otros. En siguiente lugar están los objetivos relacionados con aspectos pragmáticos. Por un lado deben incorporar una notación textual formal pero no matemática, de forma que se facilite su validación y comprensión por personas sin conocimientos matemáticos profundos pero al mismo tiempo sea lo suficientemente rigurosa para facilitar su verificación. Por otro lado, se requiere una notación gráfica complementaria para representar los modelos, de forma que puedan ser comprendidos y validados cómodamente por parte de los clientes y usuarios. Esta tesis doctoral presenta SETCM, un método de análisis que cumple estos objetivos. Para ello se han definido todos los elementos que forman los modelos de análisis usando una terminología independiente de paradigmas de diseño y se han formalizado dichas definiciones usando los elementos fundamentales de la teoría de conjuntos: elementos, conjuntos y relaciones entre conjuntos. Por otro lado se ha definido un lenguaje formal para representar los elementos de los modelos de análisis – evitando en lo posible el uso de notaciones matemáticas – complementado con una notación gráfica que permite representar de forma visual las partes más relevantes de los modelos. El método propuesto ha sido sometido a una intensa fase de experimentación, durante la que fue aplicado a 13 casos de estudio, todos ellos proyectos reales que han concluido en productos transferidos a entidades públicas o privadas. Durante la experimentación se ha evaluado la adecuación de SETCM para el análisis de problemas de distinto tamaño y en sistemas cuyo diseño final usaba paradigmas diferentes e incluso paradigmas mixtos. También se ha evaluado su uso por analistas con distinto nivel de experiencia – noveles, intermedios o expertos – analizando en todos los casos la curva de aprendizaje, con el fin de averiguar si es fácil de aprender su uso, independientemente de si se conoce o no alguna otra técnica de análisis. Por otro lado se ha estudiado la capacidad de ampliación de modelos generados con SETCM, para comprobar si permite abordar proyectos realizados en varias fases, en los que el análisis de una fase consista en ampliar el análisis de la fase anterior. En resumidas cuentas, se ha tratado de evaluar la capacidad de integración de SETCM en una organización como la técnica de análisis preferida para el desarrollo de software. Los resultados obtenidos tras esta experimentación han sido muy positivos, habiéndose alcanzado un alto grado de cumplimiento de todos los objetivos planteados al definir el método.---ABSTRACT---Software development is an inherently complex activity, which requires specific abilities of problem comprehension and solving. It is so difficult that it can even be said that there is no perfect method for each of the development stages and that there is no perfect life cycle model: each new problem is different to the precedent ones in some respect and the techniques that worked in other problems can fail in the new ones. Given that situation, the current trend is to integrate different methods, tools and techniques, using the best suited for each situation. This trend, however, raises some new problems. The first one is the selection of development approaches. If there is no a manifestly single best approach, how does one go about choosing an approach from the array of available options? The second problem has to do with the relationship between the analysis and design phases. This relation can lead to two major risks. On one hand, the analysis could be too shallow and far away from the design, making it very difficult to perform the transition between them. On the other hand, the analysis could be expressed using design terminology, thus becoming more a kind of preliminary design than a model of the problem to be solved. In third place there is the analysis dilemma, which can be expressed as follows. The developer has to choose the most adequate techniques for each problem, and to make this decision it is necessary to know the most relevant properties of the problem. This implies that the developer has to analyse the problem, choosing an analysis method before really knowing the problem. If the chosen technique uses design terminology then the solution paradigm has been preconditioned and it is possible that, once the problem is well known, that paradigm wouldn’t be the chosen one. The last problem consists of some pragmatic barriers that limit the applicability of formal based methods, making it difficult to use them in current practice. In order to solve these problems there is a need for analysis methods that fulfil several goals. The first one is the need of a formal base, which prevents ambiguity and allows the verification of the analysis models. The second goal is design-independence: the analysis should use a terminology different from the design, to facilitate a real comprehension of the problem under study. In third place the analysis method should allow the developer to study different kinds of problems: algorithmic, decision-support, knowledge based, etc. Next there are two goals related to pragmatic aspects. Firstly, the methods should have a non mathematical but formal textual notation. This notation will allow people without deep mathematical knowledge to understand and validate the resulting models, without losing the needed rigour for verification. Secondly, the methods should have a complementary graphical notation to make more natural the understanding and validation of the relevant parts of the analysis. This Thesis proposes such a method, called SETCM. The elements conforming the analysis models have been defined using a terminology that is independent from design paradigms. Those terms have been then formalised using the main concepts of the set theory: elements, sets and correspondences between sets. In addition, a formal language has been created, which avoids the use of mathematical notations. Finally, a graphical notation has been defined, which can visually represent the most relevant elements of the models. The proposed method has been thoroughly tested during the experimentation phase. It has been used to perform the analysis of 13 actual projects, all of them resulting in transferred products. This experimentation allowed evaluating the adequacy of SETCM for the analysis of problems of varying size, whose final design used different paradigms and even mixed ones. The use of the method by people with different levels of expertise was also evaluated, along with the corresponding learning curve, in order to assess if the method is easy to learn, independently of previous knowledge on other analysis techniques. In addition, the expandability of the analysis models was evaluated, assessing if the technique was adequate for projects organised in incremental steps, in which the analysis of one step grows from the precedent models. The final goal was to assess if SETCM can be used inside an organisation as the preferred analysis method for software development. The obtained results have been very positive, as SETCM has obtained a high degree of fulfilment of the goals stated for the method.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

En el presente proyecto se propone la definición e implementación de un subsistema de monitorización para un sistema de tiempo real distribuido. Este monitor supervisará el estado de todos los componentes software y hardware del sistema original, y permitirá el arranque y parada de cada componente individualmente o del subsistema completo. Constará de dos componentes básicos: un supervisor local para cada subsistema, y un supervisor central con interfaz gráfica. El supervisor local es un componente software asociado a cada subsistema que realizará las funciones de monitorización, arranque/parada de los componentes y envío de informes al supervisor central. Atenderá además a los comandos de arranque y parada provenientes del supervisor central. El supervisor central recibirá los informes de estado de cada uno de los supervisores locales y permitirá el arranque y parada de los subsistemas. Contará con un interfaz gráfico a modo de posición de control. El sistema será desarrollado íntegramente (salvo la posición gráfica) en ADA95, y podrá ejecutarse en cualquiera de las distribuciones Linux más extendidas. En el contexto de Ingeniería de Software, se seguirá un desarrollo en cascada, aportándose los requisitos, el diseño, la codificación y un plan de pruebas. Abstract In this project, the definition and implementation of a monitoring system is proposed for a previously defined real-time distributed system. This supervisory system will monitor the status of each subsystem and its software and hardware components. This new system will also be able to start and stop each individual component and start or stop the entire system. It will consist of two basic components: a local supervisor for each subsystem, and a central supervisor with a graphical unit interface (GUI). The local supervisor will be a software component attached to each original subsystem, which will perform functions such as components monitoring, start and stop the associated subsystem, and sending reports to the central supervisor. It also will attend the start and stop commands from the central supervisor. The central supervisor will receive status reports from each of the local supervisors and will allow starting and stopping the subsystems. It will offer a graphical interface to be used as a main control panel. The system will be developed in ADA 95 (except the graphical position), and should work on any of the most common Linux distributions. In the context of Software Engineering, the project will be developed following a waterfall life cycle. Reports on the stages of requirements, design, coding and testing plan shall be provided.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

El presente trabajo se basa en la filosofía de la Construcción sin Pérdidas (“Lean Construction”), analizando la situación de esta filosofía en el sector de la edificación en el contexto internacional y español, respondiendo las siguientes preguntas: 1. ¿Cómo surge el “Lean Construction”? 2. ¿Cuáles son sus actividades, funciones y cometidos? 3. ¿Existe regulación del ¨Lean Construction” en otros países? 4. ¿Existe demanda del ¨Lean Construction” en España? 5. ¿Existe regulación del ¨Lean Construction” en España? 6. ¿Cómo debería ser la regulación ¨Lean Construction” en España? 7. ¿Cuál es la relación del “Lean Construction” con el “Project & Construction Management”? 8. ¿Cómo debería ser la regulación de “Lean Construction” en España considerando su relación con el “Project & Construction Management”? Las preguntas indicadas las hemos respondido detalladamente en el presente trabajo, a continuación se resume las respuestas a dichas preguntas: 1. El “Lean Construction” surge en agosto de 1992, cuando el investigador finlandés Lauri Koskela publicó en la Universidad de Stanford el reporte TECHNICAL REPORT N° 72 titulado “Application of the New Production Philosophy to Construction”. Un año más tarde el Dr. Koskela invitó a un grupo de especialistas en construcción al primer workshop de esta materia en Finlandia, dando origen al International Group for Lean Construction (IGLC) lo que ha permitido extender la filosofía a EEUU, Europa, América, Asia, Oceanía y África. “Lean Construction” es un sistema basado en el enfoque “Lean Production” desarrollado en Japón por Toyota Motors a partir de los años cincuenta, sistema que permitió a sus fábricas producir unidades con mayor eficiencia que las industrias americanas, con menores recursos, en menor tiempo, y con un número menor de errores de fabricación. 2. El sistema “Lean Construction” busca maximizar el valor y disminuir las pérdidas de los proyectos generando una coordinación eficiente entre los involucrados, manejando un proyecto como un sistema de producción, estrechando la colaboración entre los participantes de los proyectos, capacitándoles y empoderándoles, fomentando una cultura de cambio. Su propósito es desarrollar un proceso de construcción en el que no hayan accidentes, ni daños a equipos, instalaciones, entorno y comunidad, que se realice en conformidad con los requerimientos contractuales, sin defectos, en el plazo requerido, respetando los costes presupuestados y con un claro enfoque en la eliminación o reducción de las pérdidas, es decir, las actividades que no generen beneficios. El “Last Planner System”, o “Sistema del Último Planificador”, es un sistema del “Lean Construction” que por su propia naturaleza protege a la planificación y, por ende, ayuda a maximizar el valor y minimizar las pérdidas, optimizando de manera sustancial los sistemas de seguridad y salud. El “Lean Construction” se inició como un concepto enfocado a la ejecución de las obras, posteriormente se aplicó la filosofía a todas las etapas del proyecto. Actualmente considera el desarrollo total de un proyecto, desde que nace la idea hasta la culminación de la obra y puesta en marcha, considerando el ciclo de vida completo del proyecto. Es una filosofía de gestión, metodologías de trabajo y una cultura empresarial orientada a la eficiencia de los procesos y flujos. La filosofía “Lean Construction” se está expandiendo en todo el mundo, además está creciendo en su alcance, influyendo en la gestión contractual de los proyectos. Su primera evolución consistió en la creación del sistema “Lean Project Delivery System”, que es el concepto global de desarrollo de proyectos. Posteriormente, se proponen el “Target Value Design”, que consiste en diseñar de forma colaborativa para alcanzar los costes y el valor requerido, y el “Integrated Project Delivery”, en relación con sistemas de contratos relacionales (colaborativos) integrados, distintos a los contratos convencionales. 3. Se verificó que no existe regulación específica del ¨Lean Construction” en otros países, en otras palabras, no existe el agente con el nombre específico de “Especialista en Lean Construction” o similar, en consecuencia, es un agente adicional en el proyecto de la edificación, cuyas funciones y cometidos se pueden solapar con los del “Project Manager”, “Construction Manager”, “Contract Manager”, “Safety Manager”, entre otros. Sin embargo, se comprobó la existencia de formatos privados de contratos colaborativos de Integrated Project Delivery, los cuales podrían ser tomados como unas primeras referencias para futuras regulaciones. 4. Se verificó que sí existe demanda del ¨Lean Construction” en el desarrollo del presente trabajo, aunque aún su uso es incipiente, cada día existe más interesados en el tema. 5. No existe regulación del ¨Lean Construction” en España. 6. Uno de los objetivos fundamentales de esta tesis es el de regular esta figura cuando actúe en un proyecto, definir y realizar una estructura de Agente de la Edificación, según la Ley de Ordenación de la Edificación (LOE), y de esta manera poder introducirla dentro de la Legislación Española, protegiéndola de eventuales responsabilidades civiles. En España existe jurisprudencia (sentencias de los tribunales de justicia españoles) con jurisdicción civil basada en la LOE para absolver o condenar a agentes de la edificación que son definidos en los tribunales como “gestores constructivos” o similares. Por este motivo, en un futuro los tribunales podrían dictaminar responsabilidades solidarias entre el especialista “Lean Construction” y otros agentes del proyecto, dependiendo de sus actuaciones, y según se implemente el “Lean Project Delivery System”, el “Target Value Design” y el “Integrated Project Delivery”. Por otro lado, es posible que el nivel de actuación del especialista “Lean Construcción” pueda abarcar la gestión del diseño, la gestión de la ejecución material (construcción), la gestión de contratos, o la gestión integral de todo el proyecto de edificación, esto último, en concordancia con la última Norma ISO 21500:2012 o UNE-ISO 21500:2013 Directrices para la dirección y gestión de proyectos. En consecuencia, se debería incorporar adecuadamente a uno o más agentes de la edificación en la LOE de acuerdo a sus funciones y responsabilidades según los niveles de actuación del “Especialista en Lean Construction”. Se propone la creación de los siguientes agentes: Gestor del Diseño, Gestor Constructivo y Gestor de Contratos, cuyas definiciones están desarrolladas en este trabajo. Estas figuras son definidas de manera general, puesto que cualquier “Project Manager” o “DIPE”, gestor BIM (Building Information Modeling), o similar, puede actuar como uno o varios de ellos. También se propone la creación del agente “Gestor de la Construcción sin Pérdidas”, como aquel agente que asume las actuaciones del “gestor de diseño”, “gestor constructivo” y “gestor de contratos” con un enfoque en los principios del Lean Production. 7. En la tesis se demuestra, por medio del uso de la ISO 21500, que ambos sistemas son complementarios, de manera que los proyectos pueden tener ambos enfoques y ser compatibilizados. Un proyecto que use el “Project & Construction Management” puede perfectamente apoyarse en las herramientas y técnicas del “Lean Construction” para asegurar la eliminación o reducción de las pérdidas, es decir, las actividades que no generen valor, diseñando el sistema de producción, el sistema de diseño o el sistema de contratos. 8. Se debería incorporar adecuadamente al agente de la edificación “Especialista en Lean Construction” o similar y al agente ¨Especialista en Project & Construction Management” o DIPE en la Ley de Ordenación de la Edificación (LOE) de acuerdo a sus funciones y responsabilidades, puesto que la jurisprudencia se ha basado para absolver o condenar en la referida Ley. Uno de los objetivos fundamentales de esta tesis es el de regular la figura del “Especialista en Lean Construction” cuando actúa simultáneamente con el DIPE, y realizar una estructura de Agente de la Edificación según la LOE, y de esta manera protegerlo de eventuales responsabilidades solidarias. Esta investigación comprueba que la propuesta de definición del agente de edificación DIPE, según la LOE, presentada en la tesis doctoral del Doctor Manuel Soler Severino es compatible con las nuevas definiciones propuestas. El agente DIPE puede asumir los roles de los diferentes gestores propuestos en esta tesis si es que se especializa en dichas materias, o, si lo estima pertinente, recomendar sus contrataciones. ABSTRACT This work is based on the Lean Construction philosophy; an analysis is made herein with regard to the situation of this philosophy in the building sector within the international and Spanish context, replying to the following questions: 1. How did the concept of Lean Construction emerge? 2. Which are the activities, functions and objectives of Lean Construction? 3. Are there regulations on Lean Construction in other countries? 4. Is there a demand for Lean Construction in Spain? 5. Are there regulations on Lean Construction in Spain? 6. How should regulations on Lean Construction be developed in Spain? 7. What is the relationship between Lean Construction and the Project & Construction Management? 8. How should regulations on Lean Construction be developed in Spain considering its relationship with the Project & Construction Management? We have answered these questions in detail here and the replies are summarized as follows: 1. The concept of Lean Construction emerged in august of 1992, when Finnish researcher Lauri Koskela published in Stanford University TECHNICAL REPORT N° 72 entitled “Application of the New Production Philosophy to Construction”. A year later, Professor Koskela invited a group of construction specialists to Finland to the first workshop conducted on this matter; thus, the International Group for Lean Construction (IGLC) was established, which has contributed to extending the philosophy to the United States, Europe, the Americas, Asia, Oceania, and Africa. Lean Construction is a system based on the Lean Production approach, which was developed in Japan by Toyota Motors in the 1950s. Thanks to this system, the Toyota plants were able to produce more units, with greater efficiency than the American industry, less resources, in less time, and with fewer manufacturing errors. 2. The Lean Construction system aims at maximizing the value of projects while reducing waste, producing an effective coordination among those involved; it manages projects as a production system, enhancing collaboration between the parties that participate in the projects while building their capacities, empowering them, and promoting a culture of change. Its purpose is to develop a construction process free of accidents, without damages to the equipment, facilities, environment and community, flawless, in accordance with contractual requirements, within the terms established, respecting budgeted costs, and with a clear approach to eliminating or reducing waste, that is, activities that do not generate benefits. The Last Planner System is a Lean Construction system, which by its own nature protects planning and, therefore, helps to maximize the value and minimize waste, optimizing substantially the safety and health systems. Lean Construction started as a concept focused on the execution of works, and subsequently the philosophy was applied to all the stages of the project. At present it considers the project’s total development, since the time ideas are born until the completion and start-up of the work, taking into account the entire life cycle of the project. It is a philosophy of management, work methodologies, and entrepreneurial culture aimed at the effectiveness of processes and flows. The Lean Construction philosophy is extending all over the world and its scope is becoming broader, having greater influence on the contractual management of projects. It evolved initially through the creation of the Lean Project Delivery System, a global project development concept. Later on, the Target Value Design was developed, based on collaborative design to achieve the costs and value required, as well as the Integrated Project Delivery, in connection with integrated relational (collaborative) contract systems, as opposed to conventional contracts. 3. It was verified that no specific regulations on Lean Construction exist in other countries, in other words, there are no agents with the specific name of “Lean Construction Specialist” or other similar names; therefore, it is an additional agent in building projects, which functions and objectives can overlap those of the Project Manager, Construction Manager, Contract Manager, or Safety Manager, among others. However, the existence of private collaborative contracts of Integrated Project Delivery was confirmed, which could be considered as first references for future regulations. 4. There is a demand for Lean Construction in the development of this work; even though it is still emerging, there is a growing interest in this topic. 5. There are no regulations on Lean Construction in Spain. 6. One of the main objectives of this thesis is to regulate this role when acting in a project, and to define and develop a Building Agent structure, according to the Building Standards Law (LOE by its acronym in Spanish), in order to be able to incorporate it into the Spanish law, protecting it from civil liabilities. In Spain there is jurisprudence in civil jurisdiction based on the LOE to acquit or convict building agents, which are defined in the courts as “construction managers” or similar. For this reason, courts could establish in the future joint and several liabilities between the Lean Construction Specialist and other agents of the project, depending on their actions and based on the implementation of the Lean Project Delivery System, the Target Value Design, and the Integrated Project Delivery. On the other hand, it is possible that the level of action of the Lean Construction Specialist may comprise design management, construction management and contract management, or the integral management of the entire building project in accordance with the last ISO 21500:2012 or UNE-ISO 21500:2013, guidelines for the management of projects. Accordingly, one or more building agents should be appropriately incorporated into the LOE according to their functions and responsibilities and based on the levels of action of the Lean Construction Specialist. The creation of the following agents is proposed: Design Manager, Construction Manager, and Contract Manager, which definitions are developed in this work. These agents are defined in general, since any Project Manager or DIPE, Building Information Modeling (BIM) Manager or similar, may act as one or as many of them. The creation of the Lean Construction Manager is also proposed, as the agent that takes on the role of the Design Manager, Construction Manager and Contract Manager with a focus on the Lean Production principles. 7. In the thesis it is demonstrated that through the implementation of the ISO 21500, both systems are supplementary, so projects may have both approaches and be compatible. A project that applies the Project & Construction Management may perfectly have the support of the tools, techniques and practices of Lean Construction to ensure the elimination or reduction of losses, that is, those activities that do not generate value, thus designing the production system, the design system, or the contract system. 8. The Lean Construction Specialist or similar and the Specialist in Project & Construction Management should be incorporated appropriately into the LOE according to their functions and responsibilities, since jurisprudence has been based on such Law to acquit or convict. One of the main objectives of this thesis is the regulate the role of the Lean Construction Specialist when acting simultaneously with the DIPE, and to develop a structure of the building agent, according to the LOE, and in this way protect such agent from joint and several liabilities. This research proves that the proposal to define the DIPE building agent, according to the LOE, and presented in the doctoral dissertation of Manuel Soler Severino, Ph.D. is compatible with the new definitions proposed. The DIPE agent may assume the roles of the different managers proposed in this thesis if he specializes in those topics or, if deemed pertinent, recommends that they be engaged.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Los procesos de diseño y construcción en Arquitectura han mostrado un desarrollo de optimización históricamente muy deficiente cuando se compara con las restantes actividades típicamente industriales. La aspiración constante a una industrialización efectiva, tanto en aras de alcanzar mayores cotas de calidad así como de ahorro de recursos, recibe hoy una oportunidad inmejorable desde el ámbito informático: el Building Information Modelling o BIM. Lo que en un inicio puede parecer meramente un determinado tipo de programa informático, en realidad supone un concepto de “proceso” que subvierte muchas rutinas hoy habituales en el desarrollo de proyectos y construcciones arquitectónicas. La inclusión y desarrollo de datos ligados al proyecto, desde su inicio hasta el fin de su ciclo de vida, conlleva la oportunidad de crear una realidad virtual dinámica y actualizable, que por añadidura posibilita su ensayo y optimización en todos sus aspectos: antes y durante su ejecución, así como vida útil. A ello se suma la oportunidad de transmitir eficientemente los datos completos de proyecto, sin apenas pérdidas o reelaboración, a la cadena de fabricación, lo que facilita el paso a una industrialización verdaderamente significativa en edificación. Ante una llamada mundial a la optimización de recursos y el interés indudable de aumentar beneficios económicos por medio de la reducción del factor de incertidumbre de los procesos, BIM supone un opción de mejora indudable, y así ha sido reconocido a través de la inminente implantación obligatoria por parte de los gobiernos (p. ej. Gran Bretaña en 2016 y España en 2018). La modificación de procesos y roles profesionales que conlleva la incorporación de BIM resulta muy significativa y marcará el ejercicio profesional de los futuros graduados en las disciplinas de Arquitectura, Ingeniería y Construcción (AEC por sus siglas en inglés). La universidad debe responder ágilmente a estas nuevas necesidades incorporando esta metodología en la enseñanza reglada y aportando una visión sinérgica que permita extraer los beneficios formativos subyacentes en el propio marco BIM. En este sentido BIM, al aglutinar el conjunto de datos sobre un único modelo virtual, ofrece un potencial singularmente interesante. La realidad tridimensional del modelo, desarrollada y actualizada continuamente, ofrece al estudiante una gestión radicalmente distinta de la representación gráfica, en la que las vistas parciales de secciones y plantas, tan complejas de asimilar en los inicios de la formación universitaria, resultan en una mera petición a posteriori, para ser extraída según necesidad del modelo virtual. El diseño se realiza siempre sobre el propio modelo único, independientemente de la vista de trabajo elegida en cada momento, permaneciendo los datos y sus relaciones constructivas siempre actualizados y plenamente coherentes. Esta descripción condensada de características de BIM preconfiguran gran parte de las beneficios formativos que ofrecen los procesos BIM, en especial, en referencia al desarrollo del diseño integrado y la gestión de la información (incluyendo TIC). Destacan a su vez las facilidades en comprensión visual de elementos arquitectónicos, sistemas técnicos, sus relaciones intrínsecas así como procesos constructivos. A ello se une el desarrollo experimental que la plataforma BIM ofrece a través de sus software colaborativos: la simulación del comportamiento estructural, energético, económico, entre otros muchos, del modelo virtual en base a los datos inherentes del proyecto. En la presente tesis se describe un estudio de conjunto para explicitar tanto las cualidades como posibles reservas en el uso de procesos BIM, en el marco de una disciplina concreta: la docencia de la Arquitectura. Para ello se ha realizado una revisión bibliográfica general sobre BIM y específica sobre docencia en Arquitectura, así como analizado las experiencias de distintos grupos de interés en el marco concreto de la enseñanza de la en Arquitectura en la Universidad Europea de Madrid. El análisis de beneficios o reservas respecto al uso de BIM se ha enfocado a través de la encuesta a estudiantes y la entrevista a profesionales AEC relacionados o no con BIM. Las conclusiones del estudio permiten sintetizar una implantación de metodología BIM que para mayor claridad y facilidad de comunicación y manejo, se ha volcado en un Marco de Implantación eminentemente gráfico. En él se orienta sobre las acciones docentes para el desarrollo de competencias concretas, valiéndose de la flexibilidad conceptual de los Planes de Estudio en el contexto del Espacio Europeo de Educación Superior (Declaración de Bolonia) para incorporar con naturalidad la nueva herramienta docente al servicio de los objetivos formativo legalmente establecidos. El enfoque global del Marco de Implementación propuesto facilita la planificación de acciones formativas con perspectiva de conjunto: combinar los formatos puntuales o vehiculares BIM, establecer sinergias transversales y armonizar recursos, de modo que la metodología pueda beneficiar tanto la asimilación de conocimientos y habilidades establecidas para el título, como el propio flujo de aprendizaje o learn flow BIM. Del mismo modo reserva, incluso visualmente, aquellas áreas de conocimiento en las que, al menos en la planificación actual, la inclusión de procesos BIM no se considera ventajosa respecto a otras metodologías, o incluso inadecuadas para los objetivos docentes establecidos. Y es esta última categorización la que caracteriza el conjunto de conclusiones de esta investigación, centrada en: 1. la incuestionable necesidad de formar en conceptos y procesos BIM desde etapas muy iniciales de la formación universitaria en Arquitectura, 2. los beneficios formativos adicionales que aporta BIM en el desarrollo de competencias muy diversas contempladas en el currículum académico y 3. la especificidad del rol profesional del arquitecto que exigirá una implantación cuidadosa y ponderada de BIM que respete las metodologías de desarrollo creativo tradicionalmente efectivas, y aporte valor en una reorientación simbiótica con el diseño paramétrico y fabricación digital que permita un diseño finalmente generativo. ABSTRACT The traditional architectural design and construction procedures have proven to be deficient where process optimization is concerned, particularly when compared to other common industrial activities. The ever‐growing strife to achieve effective industrialization, both in favor of reaching greater quality levels as well as sustainable management of resources, has a better chance today than ever through a mean out of the realm of information technology, the Building Information Modelling o BIM. What may initially seem to be merely another computer program, in reality turns out to be a “process” concept that subverts many of today’s routines in architectural design and construction. Including and working with project data from the very beginning to the end of its full life cycle allows for creating a dynamic and updatable virtual reality, enabling data testing and optimizing throughout: before and during execution, all the way to the end of its lifespan. In addition, there is an opportunity to transmit complete project data efficiently, with hardly any loss or redeveloping of the manufacture chain required, which facilitates attaining a truly significant industrialization within the construction industry. In the presence of a world‐wide call for optimizing resources, along with an undeniable interest in increasing economic benefits through reducing uncertainty factors in its processes, BIM undoubtedly offers a chance for improvement as acknowledged by its imminent and mandatory implementation on the part of governments (for example United Kingdom in 2016 and Spain in 2018). The changes involved in professional roles and procedures upon incorporating BIM are highly significant and will set the course for future graduates of Architecture, Engineering and Construction disciplines (AEC) within their professions. Higher Education must respond to such needs with swiftness by incorporating this methodology into their educational standards and providing a synergetic vision that focuses on the underlying educational benefits inherent in the BIM framework. In this respect, BIM, in gathering data set under one single virtual model, offers a uniquely interesting potential. The three‐dimensional reality of the model, under continuous development and updating, provides students with a radically different graphic environment, in which partial views of elevation, section or plan that tend characteristically to be difficult to assimilate at the beginning of their studies, become mere post hoc requests to be ordered when needed directly out the virtual model. The design is always carried out on the sole model itself, independently of the working view chosen at any particular moment, with all data and data relations within construction permanently updated and fully coherent. This condensed description of the features of BIM begin to shape an important part of the educational benefits posed by BIM processes, particularly in reference to integrated design development and information management (including ITC). At the same time, it highlights the ease with which visual understanding is achieved regarding architectural elements, technology systems, their intrinsic relationships, and construction processes. In addition to this, there is the experimental development the BIM platform grants through its collaborative software: simulation of structural, energetic, and economic behavior, among others, of the virtual model according to the data inherent to the project. This doctoral dissertation presents a broad study including a wide array of research methods and issues in order to specify both the virtues and possible reservations in the use of BIM processes within the framework of a specific discipline: teaching Architecture. To do so, a literature review on BIM has been carried out, specifically concerning teaching in the discipline of Architecture, as well as an analysis of the experience of different groups of interest delimited to Universidad Europea de Madrid. The analysis of the benefits and/or limitations of using BIM has been approached through student surveys and interviews with professionals from the AEC sector, associated or not, with BIM. Various diverse educational experiences are described and academic management for experimental implementation has been analyzed. The conclusions of this study offer a synthesis for a Framework of Implementation of BIM methodology, which in order to reach greater clarity, communication ease and user‐friendliness, have been posed in an eminently graphic manner. The proposed framework proffers guidance on teaching methods conducive to the development of specific skills, taking advantage of the conceptual flexibility of the European Higher Education Area guidelines based on competencies, which naturally facilitate for the incorporation of this new teaching tool to achieve the educational objectives established by law. The global approach of the Implementation Framework put forth in this study facilitates the planning of educational actions within a common perspective: combining exceptional or vehicular BIM formats, establishing cross‐disciplinary synergies, and sharing resources, so as to purport a methodology that contributes to the assimilation of knowledge and pre‐defined competencies within the degree program, and to the flow of learning itself. At the same time, it reserves, even visually, those areas of knowledge in which the use of BIM processes is not considered necessarily an advantage over other methodologies, or even inadequate for the learning outcomes established, at least where current planning is concerned. It is this last category which characterizes the research conclusions as a whole, centering on: 1. The unquestionable need for teaching BIM concepts and processes in Architecture very early on, in the initial stages of higher education; 2. The additional educational benefits that BIM offers in a varied array of competency development within the academic curriculum; and 3. The specific nature of the professional role of the Architect, which demands a careful and balanced implementation of BIM that respects the traditional teaching methodologies that have proven effective and creative, and adds value by a symbiotic reorientation merged with parametric design and digital manufacturing so to enable for a finally generative design.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Este proyecto trata el desarrollo de un weblog sobre tecnología e internet siguiendo la Metodología de December, abordando todas sus etapas e incorporando otros aspectos a la metodología que han enriquecido el proyecto hasta su resultado final. Se pretende realizar una aplicación web con la funcionalidad de un weblog centrándose tanto en la parte del usuario final como del administrador de la web. Que este weblog sirva para compartir conocimientos de forma dinámica actualizándose con frecuencia y para usuarios con inquietudes tecnologías y con mayor o menor nivel de conocimientos. Se pone especial interés en la usabilidad de la herramienta y es tenida en cuenta a lo largo de todo el ciclo de vida de la metodología. Como punto de partida para estructurar la aplicación se toma como metodología de desarrollo la metodología December enfocada al desarrollo web y como a partir de ella se da forma a lo que hoy es el proyecto completo. Se tienen en cuenta cada una de sus etapas en las cuales se va avanzando para ir completando cada pieza del desarrollo final. Se intenta también en esta memoria abordar datos más técnicos de la herramienta, desde la elección de los lenguajes utilizados hasta el diseño de la estructura de base de datos, los procesos que intervienen en la aplicación y las decisiones más subjetivas de diseño de la interface web. En todo momento se ha intentado estructurar la memoria de tal forma que resultará clara y concisa, fácil de leer. Plasmando en ella todo el proceso de realización del proyecto. ABSTRACT This project involves the development of a technology and internet weblog following the December’s Methodology, covering all stages and adding other aspects to this methodology that have enriched the project to its final result. I plan to develop a web application with the functionality of a weblog focusing on both, the end user and the webmaster. A weblog to share knowledge in a dynamic and updated way, for users concerned with technologies and different levels of expertise. Special emphasis has been made on the usability of the web tool, taking this aspect into account through the entire methodology’s life cycle. To begin the development, the application structure is based on December’s methodology focused on web development. The whole project is built from this methodology. All the stages have been taken into account to complete each part of the final development. This project deals with technical data of the web tool, from the choice of the programming languages used to the design of the database structure, the processes involved in the application and the subjective decisions of interface design. At all times I have tried to structure the report in a clear, concise and easy to read way, reflecting it in the whole process of the project.