18 resultados para Android,Multihoming,LISP,LISPmob,Performance,Test,Development,Analysis


Relevância:

50.00% 50.00%

Publicador:

Resumo:

This paper summarizes the research activities focused on the behaviour of concrete and concrete structures subjected to blast loading carried out by the Department of Materials Science of the Technical University of Madrid (PUM). These activities comprise the design and construction of a test bench that allows for testing up to four planar concrete specimens with one single explosion, the study of the performance of different protection concepts for concrete structures and, finally, the development of a numerical model for the simulation of concrete structural elements subjected to blast. Up to date 6 different types of concrete have been studied, from plain normal strength concrete, to high strength concrete, including also fibre reinforced concretes with different types of fibres. The numerical model is based on the Cohesive Crack Model approach, and has been developed for the LSDYNA finite element code through a user programmed subroutine. Despite its simplicity, the model is able to predict the failure patterns of the concrete slabs tested with a high level of accuracy

Relevância:

50.00% 50.00%

Publicador:

Resumo:

The Shopping centre is a long term investment in which Greenfield development decisions are often taken based on risks analysis regarding construction costs, location, competition, market and an expected DCF. Furthermore, integration between the building design, project planning, operational costs and investment analysis is not entirely considered by the investor at the decision making stage. The absence of such information tends to produce certain negative impacts on the future running costs and annual maintenance of the building, especially on energy demand and other occupancy expenses paid by the tenants to the landlord. From the investor´s point of view, this blind spot in strategy development will possibly decrease their profit margin as changes in the occupancy expenses[ ] have a direct outcome on the profit margin. In order to try to reduce some higher operating cost components such as energy use and other utility savings as well as their CO2 emissions, quite a few income properties worldwide have some type of environmental label such as BREEAM and LEED. The drawback identified in this labelling is that usually the investments required to get an ecolabel are high and the investor finds no direct evidence that it increases market value. However there is research on certified commercial properties (especially offices) that shows better performance in terms of occupancy rate and rental cost (Warren-Myers, 2012). Additionally, Sayce (2013) says that the certification only provides a quick reference point i.e. the lack of a certificate does not indicate that a building is not sustainable or efficient. Based on the issues described above, this research compares important components of the development stages such as investments costs, concept/ strategy development as well as the current investor income and property value. The subjects for this analysis are a shopping centre designed with passive cooling/bioclimatic strategies evaluated at the decision making stage, a certified regional shopping centre and a non-certified standard regional shopping centre. Moreover, the proposal intends to provide decision makers with some tools for linking green design features to the investment analysis in order to optimize the decision making process when looking into cost savings and design quality.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

Context. This thesis is framed in experimental software engineering. More concretely, it addresses the problems arisen when assessing process conformance in test-driven development experiments conducted by UPM's Experimental Software Engineering group. Process conformance was studied using the Eclipse's plug-in tool Besouro. It has been observed that Besouro does not work correctly in some circumstances. It creates doubts about the correction of the existing experimental data which render it useless. Aim. The main objective of this work is the identification and correction of Besouro's faults. A secondary goal is fixing the datasets already obtained in past experiments to the maximum possible extent. This way, existing experimental results could be used with confidence. Method. (1) Testing Besouro using different sequences of events (creation methods, assertions etc..) to identify the underlying faults. (2) Fix the code and (3) fix the datasets using code specially created for this purpose. Results. (1) We confirmed the existence of several fault in Besouro's code that affected to Test-First and Test-Last episode identification. These faults caused the incorrect identification of 20% of episodes. (2) We were able to fix Besouro's code. (3) The correction of existing datasets was possible, subjected to some restrictions (such us the impossibility of tracing code size increase to programming time. Conclusion. The results of past experiments dependent upon Besouro's data could no be trustable. We have the suspicion that more faults remain in Besouro's code, whose identification requires further analysis.