16 resultados para Public-private sector cooperation -- Case studies


Relevância:

100.00% 100.00%

Publicador:

Resumo:

OUTLINE: • Introduction • Experimental Setup • Experimental Procedure • Experimental Results - Surface Roughness - Residual Stresses - Friction - Wear - EDX • Conclusions

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Many countries around the world are implementing Public?Private?Partnership (PPP) contacts to manage road infrastructure. In some of these contracts the public sector introduces economic incentives to the private operator to foster the accomplishment of social goals. One of the incentives that have been introduced in some PPP contracts is related to safety in such a way that the better the safety outcome the greater will be the economic reward to the contractor. The aim of this paper is at identify whether the incentives to improve road safety in highway PPPs are ultimately effective in improving safety ratios. To this end Poisson and negative binomial regression models have been applied using information from highway sections in Spain. The findings indicate that even though road safety is highly influenced by variables that are not much controllable by the contractor such as the Average Annual Daily Traffic and the percentage of heavy vehicles, the implementation of safety incentives in PPPs has a positive influence in the reduction of fatalities, injuries and accidents.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This master thesis is intended to perform an exploratory approach for the potential to Public-Private Partnerships as a tool for advanced collaboration between businesses and the cooperation system in the specific context of humanitarian action. It intends to conduct a case study analysis of representative interactions between the public and private actors in the humanitarian aid, and in conjunction with a profound revision of the existing literature, creates a set of conclusions and recommendations that can serve as a prototype for possible inclusion guide the private sector in humanitarian action through new paradigms that go beyond the classical donor-recipient model.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Public Private Partnerships (PPPs) are mostly implemented to circumvent budgetary constraints, and to encourage efficiency and quality in the provision of public infrastructure in order to reach social welfare. One of the ways of reaching the latter objective is by the introduction of performance based standards tied to bonuses and penalties to reward or punish the performance of the contractor. This paper focuses on the implementation of safety based incentives in PPPs in such a way that the better the safety outcome the greater larger will be the economic reward to the contractor. The main aim of this paper is to identify whether the incentives to improve road safety in PPPs are ultimately effective in improving safety ratios in Spain. To that end, Poisson and negative binomial regression models have been applied using information of motorways of the Spanish network of 2006. The findings indicate that even though road safety is highly influenced by variables that are not much controllable by the contractor such as the Average Annual Daily Traffic and the percentage of heavy vehicles, the implementation of safety incentives in PPPs has a positive influence in the reduction of fatalities, injuries and accidents.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The current deficit situation of the Spanish airport system suggests the need to manage this in a more efficient and profitable way. One of the possible options is through private management and being able to do this through Public Private Partnerships (PPP). This study analyzes the situation of the sector and its economic importance and the different possibilities for introducing private management in a public company, specifying the situation in the case of airports, presenting the advantages and disadvantages of these possibilities, and aiming at results obtained in other places where it has been applied. It is proposed that the ideal model for the introduction of private management would be through PPP models tailored to each airport, but having common characteristics according to the group they belong to. Finally, we observe that not all airports are commercially attractive, so that the PPP concept does not apply to all of them. In some cases even the operability itself is not viable at all, and that should be considered separately in order to avoid creating a private monopoly while trying to enhance competition among them.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

El Transportation Research Board es un congreso de reconocido prestigio internacional en el ámbito de la investigación del transporte. Aunque las actas publicadas están en formato digital y sin ISSN ni ISBN, lo consideramos lo suficientemente importante como para que se considere en los indicadores. This paper focuses on the implementation of safety based incentives in Public Private Partnerships (PPPs). The aim of this paper is twofold. First, to evaluate whether PPPs lead to an improvement in road safety, when compared with other infrastructure management systems. Second, is to analyze whether the incentives to improve road safety in PPP contracts in Spain have been effective at improving safety performance. To this end, negative binomial regression models have been applied using information from the Spanish high-capacity network covering years 2007-2009. The results showed that even though road safety is highly influenced by variables that are not manageable by the private concessionaire such as the average annual daily traffic, the implementation of safety incentives in PPPs has a positive influence in the reduction of accidents.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Planning and Comunity Development: Case Studies, presents the findings of the inter-university Seminar held on 28?29 July 2011 and organized by researchers from the Technical University of Madrid and the University of California, Berkeley, who were fortunate to have the presence of the renowned Professor John Friedmann. Professors, researchers and PhD students from our research groups presented their works as scientific communications that were enriched by the debate among the different researches who attended the Seminar. All of them appear in the picture below in front of the gate of Haviland Hall at UC Berkeley. This book analyses the concept of planning and its evolution so far, leading to the conceptualization of governance as an expression of the planning practice. It also studies the role of social capital and cooperation as tools for the community development. The conceptual analysis is complemented by the development of six case studies that put forward experiences of planning and community development carried out in diverse social and cultural contexts of Latin-America, Europe and North America. This publication comes after more than 20 years of work of the researchers that met at the seminar. Through their work in managing development initiatives, they have learned lessons and have contribute to shape their own body of teaching that develops and analyses the role of planning in public domain to promote community development. This knowledge is synthesized in the model Planning as Working With People, that shows that development is not effective unless is promoted in continuous collaboration with all the actors involved in the process.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Increasing foreign private investment in developing countries explains why the Public-Private Investment (PPI) is becoming a key tool to reach the development goal. This article analyzes the relation between PPI in infrastructure and agricultural exports in developing countries. We use the panel data approach (52 countries and 17 years). Results show that PPI in infrastructure has a positive impact on agricultural exports of developing countries. The impact is greater in developing countries with higher income rates. This suggests that the lower income countries require the intervention of public sector without which private investment cannot help to economic development.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Based on the empirical evidence that the ratio of email messages in public mailing lists to versioning system commits has remained relatively constant along the history of the Apache Software Foundation (ASF), this paper has as goal to study what can be inferred from such a metric for projects of the ASF. We have found that the metric seems to be an intensive metric as it is independent of the size of the project, its activity, or the number of developers, and remains relatively independent of the technology or functional area of the project. Our analysis provides evidence that the metric is related to the technical effervescence and popularity of project, and as such can be a good candidate to measure its healthy evolution. Other, similar metrics -like the ratio of developer messages to commits and the ratio of issue tracker messages to commits- are studied for several projects as well, in order to see if they have similar characteristics.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Fashion is one of the most vibrant sectors in Europe and important contributors to the European Union (EU) economy. In particular, Small and Medium Enterprises (SMEs) play a major part in European fashion industry (EU 2012). Just like fashion, where people¿s style has inherently meant to be shared as it is foremost a representation of one¿s self-image, social media allow the reflection of ones' personality and emotions. Although fashion practitioners have embraced social media in their marketing activities, it is still relatively few known at an academic level about the specificities of fashion industry when approaching social media marketing (SMM) strategies. This study sets out to explore fashion companies' SMM strategy and its activities. From an exploratory approach, we present case studies of two Spanish SME fashion companies, anonymously named hereafter as Company A and Company B, to deepen our understanding on how fashion brands implement their SMM strategy. Company A offers high-end fashion products while Company B produces medium fashion products. We analyzed the case studies using qualitative (interviews to companies' executives) and a mix of qualitative and quantitative (content analysis of companies' social media platform) methods. Public posts data of both companies' Facebook brand pages were used to perform the content analysis. Our findings through case studies of the two companies reveal that branding-oriented strategic objectives are the main drivers of their SMM implementations. There are significant differences between both companies. The main strategic action employed by Company A is engaging customers to participate into brand's offline social gathering events by inviting them through social media platform, while Company B focuses its effort on posting product promotion related contents and engaging influencers such as fashion bloggers. Our results are expected to serve as a basis of further investigations on how SMM strategy and strategic actions implemented by fashion brands may influence marketing outcomes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The estimation of power losses due to wind turbine wakes is crucial to understanding overall wind farm economics. This is especially true for large offshore wind farms, as it represents the primary source of losses in available power, given the regular arrangement of rotors, their generally largerdiameter and the lower ambient turbulence level, all of which conspire to dramatically affect wake expansion and, consequently, the power deficit. Simulation of wake effects in offshore wind farms (in reasonable computational time) is currently feasible using CFD tools. An elliptic CFD model basedon the actuator disk method and various RANS turbulence closure schemes is tested and validated using power ratios extracted from Horns Rev and Nysted wind farms, collected as part of the EU-funded UPWIND project. The primary focus of the present work is on turbulence modeling, as turbulent mixing is the main mechanism for flow recovery inside wind farms. A higher-order approach, based on the anisotropic RSM model, is tested to better take into account the imbalance in the length scales inside and outside of the wake, not well reproduced by current two-equation closure schemes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Since the mid 80ies the Trans ‐European Transport Network (TEN‐T) policy has been setting the framework for the development of infrastructure for the smooth functioning of the internal market within the European Union (EU). Public Private Partnerships (PPPs) have always been regarded by the EU as a key instrument to promote the TEN‐T.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A participatory modelling process has been conducted in two areas of the Guadiana river (the upper and the middle sub-basins), in Spain, with the aim of providing support for decision making in the water management field. The area has a semi-arid climate where irrigated agriculture plays a key role in the economic development of the region and accounts for around 90% of water use. Following the guidelines of the European Water Framework Directive, we promote stakeholder involvement in water management with the aim to achieve an improved understanding of the water system and to encourage the exchange of knowledge and views between stakeholders in order to help building a shared vision of the system. At the same time, the resulting models, which integrate the different sectors and views, provide some insight of the impacts that different management options and possible future scenarios could have. The methodology is based on a Bayesian network combined with an economic model and, in the middle Guadiana sub-basin, with a crop model. The resulting integrated modelling framework is used to simulate possible water policy, market and climate scenarios to find out the impacts of those scenarios on farm income and on the environment. At the end of the modelling process, an evaluation questionnaire was filled by participants in both sub-basins. Results show that this type of processes are found very helpful by stakeholders to improve the system understanding, to understand each others views and to reduce conflict when it exists. In addition, they found the model an extremely useful tool to support management. The graphical interface, the quantitative output and the explicit representation of uncertainty helped stakeholders to better understand the implications of the scenario tested. Finally, the combination of different types of models was also found very useful, as it allowed exploring in detail specific aspects of the water management problems.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper describes a theoretical model based primarily on transaction costs, for comparing the various tendering mechanisms used for transportation Public-Private Partnership (PPP) projects. In particular, the model contrasts negotiated procedures with the open procedure, as defined by the current European Union legislation on public tendering. The model includes both ex ante transaction costs (borne during the tendering stage) and ex post transaction costs (such as enforcement costs, re-negotiation costs, and costs arising from litigation between partners), explaining the trade-off between them. Generally speaking, it is assumed that the open procedure implies lower transaction costs ex ante, while the negotiated procedure reduces the probability of the appearance of new contingencies not foreseen in the contract, hence diminishing the expected value of transaction costs ex post. Therefore, the balance between ex ante and ex post transaction costs is the main criterion for deciding whether the open or negotiated procedure would be optimal. Notwithstanding, empirical evidence currently exists only on ex ante transaction costs in transportation infrastructure projects. This evidence has shown a relevant difference between the two procedures as far as ex ante costs are concerned, favouring the open procedure. The model developed in this paper also demonstrates that a larger degree of complexity in a contract does not unequivocally favour the use of a negotiated procedure. Only in those cases dealing with very innovative projects, where important dimensions of the quality of the asset or service are not verifiable, may we observe an advantage in favour of the negotiated procedure. The bottom line is that we find it difficult to justify the employment of negotiated procedures in most transportation PPP contracts, especially in the field of roads. Nevertheless, the field remains open for future empirical work and research on the levels of transaction costs borne ex post in PPP contracts, as well as on the probabilities of such costs appearing under any of the procurement procedures.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In Navea, north of Spain, a medieval arch bridge shows a visible distortion (fig.1a). A stone falls down from the web of a gothic vault in a big parish church in Burgos (fig. 1b), and a voussoir falls down from the rib of another gothic vault in Oviedo (fig. 1c). An oval dome collapses in Zaragoza, though another four identical domes remain safe (fig. 1d). Sometimes the building has to support new, heavier loads. The ruin of the abandoned (since the 19th Century) monastery of Melón should be consolidated, some vaults are rebuilt and the visitors can walk over them. A Franciscan Convent is going to be turned into a Cultural Centre, the loads to be supported being multiplied by a factor of two. A little medieval bridge is asked to support the pass of heavy lorries. These are some of the cases I have studied in the last two decades, all of them referring to questions of structural safety. These are the kind of situations which often occurs in the field of Historic Structures. They require a study and an answer. This is no scholarly work (though in some cases new lines of future research will emerge). A judgement must be made by the expert and this judgement affects the safety and economy, in the last instance, of people. As there are rarely unique answers, the behaviour of the expert, then, can also be judged as "ethical", if he proposes an intervention that is necessary and adequate (or, recommends no intervention, judging the situation safe), or "non-ethical", if recommends an unnecessary or disproportionate intervention. In relation to the monument, also, the proposal can be judged ethically; any intervention damaging seriously the character of the monument may be labelled un-ethical.