3 resultados para technical engineering and consulting industry

em Massachusetts Institute of Technology


Relevância:

100.00% 100.00%

Publicador:

Resumo:

A revolution\0\0\0 in earthmoving, a $100 billion industry, can be achieved with three components: the GPS location system, sensors and computers in bulldozers, and SITE CONTROLLER, a central computer system that maintains design data and directs operations. The first two components are widely available; I built SITE CONTROLLER to complete the triangle and describe it here. SITE CONTROLLER assists civil engineers in the design, estimation, and construction of earthworks, including hazardous waste site remediation. The core of SITE CONTROLLER is a site modelling system that represents existing and prospective terrain shapes, roads, hydrology, etc. Around this core are analysis, simulation, and vehicle control tools. Integrating these modules into one program enables civil engineers and contractors to use a single interface and database throughout the life of a project.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This report is a formal documentation of the results of an assessment of the degree to which Lean Principles and Practices have been implemented in the US Aerospace and Defense Industry. An Industry Association team prepared it for the DCMA-DCAAIndustry Association “Crosstalk” Coalition in response to a “Crosstalk” meeting action request to the industry associations. The motivation of this request was provided by the many potential benefits to system product quality, affordability and industry responsiveness, which a high degree of industry Lean implementation can produce.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper reports on results from five companies in the aerospace and automotive industries to show that over-commitment of technical professionals and under-representation of key skills on technology development and transition teams seriously impairs team performance. The research finds that 40 percent of the projects studied were inadequately staffed, resulting in weaker team communications and alignment. Most importantly, the weak staffing on these teams is found to be associated with a doubling of project failure rate to reach full production. Those weakly staffed teams that did successfully insert technology into production systems were also much more likely than other teams to have development delays and late engineering changes. The conclusion suggests that the expense of project failure, delay and late engineering changes in these companies must greatly out-weigh the savings gained from reduced staffing costs, and that this problem is likely going to be found in other technology-intensive firms intent on seeing project budgets as a cost to be minimized rather than an investment to be maximized.