2 resultados para integrity of management

em Massachusetts Institute of Technology


Relevância:

90.00% 90.00%

Publicador:

Resumo:

This volume of the final report documents the technical work performed from December 1998 through December 2002 under Cooperative Agreement F33615-97-2-5153 executed between the U.S. Air Force, Air Force Research Laboratory, Materials and Manufacturing Directorate, Manufacturing Technology Division (AFRL/MLM) and the McDonnell Douglas Corporation, a wholly-owned subsidiary of The Boeing Company. The work was accomplished by The Boeing Company, Phantom Works, Huntington Beach, St. Louis, and Seattle; Ford Motor Company; Integral Inc.; Sloan School of Management in the Massachusetts Institute of Technology; Pratt & Whitney; and Central State University in Xenia, Ohio and in association with Raytheon Corporation. The LeanTEC program manager for AFRL is John Crabill of AFRL / MLMP and The Boeing Company program manager is Ed Shroyer of Boeing Phantom Works in Huntington Beach, CA. Financial performance under this contract is documented in the Financial Volume of the final report.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Three terminal ‘dotted-I’ interconnect structures, with vias at both ends and an additional via in the middle, were tested under various test conditions. Mortalities (failures) were found in right segments with jL value as low as 1250 A/cm, and the mortality of a dotted-I segment is dependent on the direction and magnitude of the current in the adjacent segment. Some mortalities were also found in the right segments under a test condition where no failure was expected. Cu extrusion along the delaminated Cu/Si₃N₄ interface near the central via region was believed to cause the unexpected failures. From the time-to-failure (TTF), it is possible to quantify the Cu/Si₃N₄ interfacial strength and bonding energy. Hence, the demonstrated test methodology can be used to investigate the integrity of the Cu dual damascene processes. As conventionally determined critical jL values in two-terminal via-terminated lines cannot be directly applied to interconnects with branched segments, this also serves as a good methodology to identify the critical effective jL values for immortality.