10 resultados para aerospace industries
em Massachusetts Institute of Technology
Resumo:
Creation of lifecycle value - a balance of performance with cost and other attributes - represents a challenge for the development of aerospace products in the twenty-first century. This paper examines the concept of lifecycle value that stems from existing approaches of value management and analysis, lifecycle costing, and systems engineering. To ascertain common characteristics of lifecycle value creation, case studies were done for four aircraft programs: F/A- 18E/F, JAS 39 Gripen, F-16C/D, and B-777. A lifecycle value creation framework is introduced, comprised of three phases: value identification, value proposition, value delivery. Based upon observed practices in the four case studies, six value creation attributes were identified. Capability maturity models for the six attributes and three value creation phases are presented. The resulting framework represents a starting point for programs seeking to create lifecycle value for aerospace products.
Resumo:
Manufacturing has evolved to become a critical element of the competitive skill set of defense aerospace firms. Given the changes in the acquisition environment and culture; traditional “thrown over the wall” means of developing and manufacturing products are insufficient. Also, manufacturing systems are complex systems that need to be carefully designed in a holistic manner and there are shortcomings with available tools and methods to assist in the design of these systems. This paper outlines the generation and validation of a framework to guide this manufacturing system design process.
Resumo:
The Massachusetts Institute of Technology (MIT) submits this proposal for the Enterprise Value Phase of the Lean Aerospace Initiative (LAI) in response to the October 9, 2002 Request for Proposal (RFP) F33615-02-2-5501 from the Air Force Research Laboratory (AFRL/MLKT), Wright-Patterson Air Force Base, Ohio. This proposal addresses the conduct of the LAI as set forth in the Enterprise Value Phase Concept of Operations (final draft dated 5 June 2002. The creation of this Enterprise Value Phase Concept of Operations (ConOps) was the result of extensive interaction among all stakeholders in the LAI consortium. The proposed products and research topics have been developed by the MIT LAI team based on this extended interaction with the Lean Aerospace Initiative consortium members during the concept of operations development. This proposal is in consonance with the Enterprise Value Phase vision, and mission as set forth in the concept of operations so as to meet stakeholder needs to achieve the goals and deliverables desired, prioritized to fit available funding.
Resumo:
This report is a formal documentation of the results of an assessment of the degree to which Lean Principles and Practices have been implemented in the US Aerospace and Defense Industry. An Industry Association team prepared it for the DCMA-DCAAIndustry Association “Crosstalk” Coalition in response to a “Crosstalk” meeting action request to the industry associations. The motivation of this request was provided by the many potential benefits to system product quality, affordability and industry responsiveness, which a high degree of industry Lean implementation can produce.
Resumo:
• Lean Aerospace Initiative origin and mission • Functional lean successes • Successes through interaction between functions • Success through enterprise integration and value creation • Total enterprise integration of all stakeholders • Enterprise transformation insights
Resumo:
In the 1980’s, many United States industrial organizations started developing new production processes to improve quality, reduce cost, and better respond to customer needs and the pressures of global competition. This new paradigm was coined Lean Production (or simply “Lean”) in the book The Machine That Changed The World published in 1990 by researchers from MIT’s International Motor Vehicle Program. In 1993, a consortium of US defense aerospace firms and the USAF Aeronautical Systems Center, together with the AFRL Materials and Manufacturing Directorate, started the Lean Aircraft Initiative (LAI) at MIT. With expansion in 1998 to include government space products, the program was renamed the Lean Aerospace Initiative. LAI’s vision is to “Significantly reduce the cost and cycle time for military aerospace products throughout the entire value chain while continuing to improve product performance.” By late 1998, 23 industry and 13 government organizations with paying memberships, along with MIT and the UAW were participating in the LAI.
Resumo:
Begin with a call to action. Present evidence on the dimensions of an employment crisis in the Aerospace Industry. Understand the links to issues of instability and lean. Focus dialogue on high leverage, mutual gains options for all stakeholders in the industry. Identify specific next steps. Under the auspices of LAI. In other forums as appropriate.
Resumo:
This paper reports on results from five companies in the aerospace and automotive industries to show that over-commitment of technical professionals and under-representation of key skills on technology development and transition teams seriously impairs team performance. The research finds that 40 percent of the projects studied were inadequately staffed, resulting in weaker team communications and alignment. Most importantly, the weak staffing on these teams is found to be associated with a doubling of project failure rate to reach full production. Those weakly staffed teams that did successfully insert technology into production systems were also much more likely than other teams to have development delays and late engineering changes. The conclusion suggests that the expense of project failure, delay and late engineering changes in these companies must greatly out-weigh the savings gained from reduced staffing costs, and that this problem is likely going to be found in other technology-intensive firms intent on seeing project budgets as a cost to be minimized rather than an investment to be maximized.
Resumo:
Manufacturing has evolved to become a critical element of the competitive skill set of defense aerospace firms. Given the changes in the acquisition environment and culture; traditional “thrown over the wall” means of developing and manufacturing products are insufficient. Also, manufacturing systems are complex systems that need to be carefully designed in a holistic manner and there are shortcomings with available tools and methods to assist in the design of these systems. This paper outlines the generation and validation of a framework to guide this manufacturing system design process.
Resumo:
Lean is common sense and good business sense. As organizations grow and become more successful, they begin to lose insight into the basic truths of what made them successful. Organizations have to deal with more and more issues that may not have anything to do with directly providing products or services to their customers. Lean is a holistic management approach that brings the focus of the organization back to providing value to the customer. In August 2002, Mrs. Darleen Druyun, the Principal Deputy to the Assistant Secretary of the Air Force for Acquisition and government co-chairperson of the Lean Aerospace Initiative (LAI), decided it was time for Air Force acquisitions to embrace the concepts of lean. At her request, the LAI Executive Board developed a concept and methodology to employ lean into the Air Force’s acquisition culture and processes. This was the birth of the “Lean Now” initiative. An enterprise-wide approach was used, involving Air Force System Program Offices (SPOs), aerospace industry, and several Department of Defense agencies. The aim of Lean Now was to focus on the process interfaces between these “enterprise” stakeholders to eliminate barriers that impede progress. Any best practices developed would be institutionalized throughout the Air Force and the Department of Defense (DoD). The industry members of LAI agreed to help accelerate the government-industry transformation by donating lean Subject Matter Experts (SMEs) to mentor, train, and facilitate the lean events of each enterprise. Currently, the industry SMEs and the Massachusetts Institute of Technology are working together to help the Air Force develop its own lean infrastructure of training courses and Air Force lean SMEs. The first Lean Now programs were the F/A-22, Global Hawk, and F-16. Each program focused on specific acquisition processes. The F/A-22 focused on the Test and Evaluation process; the Global Hawk focused on Evolutionary Acquisitions; and the F-16 focused on improving the Contract Closeout process. Through lean, each enterprise made many significant improvements. The F/A-22 was able to reduce its Operational Flight Plan (OFP) Preparation and Load process time of 2 to 3 months down to 7 hours. The Global Hawk developed a new production plan that increases the annual production of its Integrated Sensor Suite from 3 per year to 6 per year. The F-16 enterprise generated and is working 12 initiatives that could result in a contract closeout cycle time reduction of 3 to 7 years. Each enterprise continues to generate more lean initiatives that focus on other areas and processes within their respective enterprises.