2 resultados para Knights of Labor. District Assembly No. 30

em Massachusetts Institute of Technology


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis describes a mechanical assembly system called LAMA (Language for Automatic Mechanical Assembly). The goal of the work was to create a mechanical assembly system that transforms a high-level description of an automatic assembly operation into a program or execution by a computer controlled manipulator. This system allows the initial description of the assembly to be in terms of the desired effects on the parts being assembled. Languages such as WAVE [Bolles & Paul] and MINI [Silver] fail to meet this goal by requiring the assembly operation to be described in terms of manipulator motions. This research concentrates on the spatial complexity of mechanical assembly operations. The assembly problem is seen as the problem of achieving a certain set of geometrical constraints between basic objects while avoiding unwanted collisions. The thesis explores how these two facets, desired constraints and unwanted collisions, affect the primitive operations of the domain.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

We present an optimal methodology for synchronized scheduling of production assembly with air transportation to achieve accurate delivery with minimized cost in consumer electronics supply chain (CESC). This problem was motivated by a major PC manufacturer in consumer electronics industry, where it is required to schedule the delivery requirements to meet the customer needs in different parts of South East Asia. The overall problem is decomposed into two sub-problems which consist of an air transportation allocation problem and an assembly scheduling problem. The air transportation allocation problem is formulated as a Linear Programming Problem with earliness tardiness penalties for job orders. For the assembly scheduling problem, it is basically required to sequence the job orders on the assembly stations to minimize their waiting times before they are shipped by flights to their destinations. Hence the second sub-problem is modelled as a scheduling problem with earliness penalties. The earliness penalties are assumed to be independent of the job orders.