2 resultados para Cost-to-Serve
em Massachusetts Institute of Technology
Resumo:
This thesis details the development of a model of a seven degree of freedom manipulator for position control. Then, it goes on to discuss the design and construction of a the PHD, a robot built to serve two purposes: first, to perform research on joint torque control schemes, and second, to determine the important dynamic characteristics of the Harmonic Drive. The PHD, is a planar, three degree of freedom arm with torque sensors integral to each joint. Preliminary testing has shown that a simple linear spring model of the Harmonic Drive's flexibility is suitable in many situations.
Resumo:
This paper reports on results from five companies in the aerospace and automotive industries to show that over-commitment of technical professionals and under-representation of key skills on technology development and transition teams seriously impairs team performance. The research finds that 40 percent of the projects studied were inadequately staffed, resulting in weaker team communications and alignment. Most importantly, the weak staffing on these teams is found to be associated with a doubling of project failure rate to reach full production. Those weakly staffed teams that did successfully insert technology into production systems were also much more likely than other teams to have development delays and late engineering changes. The conclusion suggests that the expense of project failure, delay and late engineering changes in these companies must greatly out-weigh the savings gained from reduced staffing costs, and that this problem is likely going to be found in other technology-intensive firms intent on seeing project budgets as a cost to be minimized rather than an investment to be maximized.