3 resultados para 1988-1994
em Massachusetts Institute of Technology
Resumo:
The processes underlying the perceptual analysis of visual form are believed to have minimal interaction with those subserving the perception of visual motion (Livingstone and Hubel, 1987; Victor and Conte, 1990). Recent reports of functionally and anatomically segregated parallel streams in the primate visual cortex seem to support this hypothesis (Ungerlieder and Mishkin, 1982; VanEssen and Maunsell, 1983; Shipp and Zeki, 1985; Zeki and Shipp, 1988; De Yoe et al., 1994). Here we present perceptual evidence that is at odds with this view and instead suggests strong symmetric interactions between the form and motion processes. In one direction, we show that the introduction of specific static figural elements, say 'F', in a simple motion sequence biases an observer to perceive a particular motion field, say 'M'. In the reverse direction, the imposition of the same motion field 'M' on the original sequence leads the observer to perceive illusory static figural elements 'F'. A specific implication of these findings concerns the possible existence of (what we call) motion end-stopped units in the primate visual system. Such units might constitute part of a mechanism for signalling subjective occluding contours based on motion-field discontinuities.
Resumo:
The Lean Aircraft Initiative began in the summer of 1992 as a “quick look” into the feasibility of applying manufacturing principles that had been pioneered in the automobile industry, most notably the Toyota Production System, to the U.S. defense aircraft industry. Once it was established that “lean principles” (the term coined to describe the new paradigm in automobile manufacturing) were indeed applicable to aircraft manufacturing as well, the Initiative was broadened to include other segments of the defense aerospace industry. These consisted of electronics/avionics, engines, electro-mechanical systems, missiles, and space systems manufacturers. In early 1993, a formal framework was established in which 21 defense firms and the Air Force formed a consortium to support and participate in the Initiative at M.I.T.
Resumo:
The Manufacturing Systems team was one of the research teams within the Lean Aerospace Initiative (LAI) whose goal was to document, analyze and communicate the design attributes and relationships that lead to significant performance improvements in manufacturing systems in the defense aerospace industry. This report will provide an integrated record of this research using the Production Operations Transition to Lean Roadmap as its organizing framework.