14 resultados para post-project audit
em University of Michigan
Resumo:
National Highway Traffic Safety Administration, Office of Driver and Pedestrian Programs, Washington, D.C.
Resumo:
Issued in several sections called: Appendix A, ... annual financial report; Appendix D, Costs of recreation and fish and wildlife enhancement; Appendix E, Water operations in the Sacramento-San Joaquin Delta; and: Appendix F, San Joaquin Valley post-project economic impact.
Resumo:
National Highway Traffic Safety Commission, Washington, D.C.
Resumo:
National Highway Traffic Safety Administration, Office of Driver and Pedestrian Programs, Washington, D.C.
Resumo:
"U.S. Atomic Energy Commission Plowshare Program"--Cover.
Resumo:
"Issued: May 22, 1962"--Cover.
Resumo:
Caption title.
Resumo:
National Highway Traffic Safety Administration, Office of Alcohol Countermeasures, Washington, D.C.
Resumo:
National Highway Traffic Safety Administration, Washington, D.C.
Resumo:
National Highway Traffic Safety Administration, Washington, D.C.
Resumo:
Final report Project W-22-R, Job IV-A.
Resumo:
Basic materials were prepared by Walter E. Collins, D.V.M., project director, SUNY Agricultural and Technical College at Delhi, pursuant to a contract with the U. S. Office of Education.
Resumo:
On cover: Reviewed by George F. Barrett, attorney general.
Resumo:
"A product of the Critical Trends Assessment Program (CTAP) and the Ecosystems Program of the Illinois Dept. of Natural Resources (DNR)"--P. [2] of cover.