76 resultados para electronic appetite rating system

em University of Michigan


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Federal Highway Administration, Washington, D.C.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"This report is based largely on work done by Leslie Bol and Leon Hinz of the Illinois Natural History Survey, and Ann Marie Holtrop of the IDNR. Their work was funded by IDNR through the Illinois State Wildlife Grant Program (T-20-P-001)." -- acknowledgments.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Includes bibliographical references.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"This report is available in electronic format through the U.S. Office of Personnel Management's home page on the world wide web at http://www.opm.gov. It is also available through the U.S. Office of Personnel Management's electronic bulletin board system, OPM Mainstreet (202-606-4800)."--.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Indiana Department of Transportation, Indianapolis

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Federal Highway Administration, Washington, D.C.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

v.1 Summary -- v. 2. Frequency allocations and network designs -- v.3 Technology studies

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The Illinois Department of Transportation (IDOT), through the Office of Planning and Programming (OPP), conducts a Condition Rating Survey (CRS) to assess pavement condition on its approximate 16,000 mile state highway system. The CRS is an important tool to assist the Department with its pavement management activities. A CRS value indicates the current condition of a pavement. CRS is a factor in highway program development, provides an opportunity to review the highway network, provides overall condition of the state highway system, gives input into the legislative/budgeting process and allows calculation of pavement needs.